Uninterruptible Power Supply RFQ WebinarMarch 9, 2020
Serving:Monterey County • San Benito County • Santa Cruz CountyCity of San Louis Obispo • City of Morro Bay
Presentation Summary
1. Who We Are
2. Program Goals
3. Finance
4. Critical Facilities
5. Customer Application Process
6. Vendor Process
7. Vendor Selection
8. Project Process Flow
9. RFQ Schedule
Download UPS Program supporting documents:https://www.mbcommunitypower.org/current_requests_for/ups-rfq/
WHO WE ARE
UPS Fund Program Goals
• Enhance regional community resiliency during prolonged power outages, such as Public Safety Power Shutoff (PSPS) events
• Accelerate adoption of reliable back-up power generation throughout the MBCP service area
• Support MBCP public and private sector customers with attractive funding arrangements for “critical load” back-up power supply for critical facilities
Download UPS Program supporting documents:https://www.mbcommunitypower.org/current_requests_for/ups-rfq/
Public Sector Finance
1. MBCP will finance $20 million in public sector projects
2. Cost recovery required within a ~10-year timeframe
3. No minimum nor maximum project size
4. Project finance, ownership, and asset
management determined on a case-by-case basis –
vendor to propose structure
Download UPS Program supporting documents:https://www.mbcommunitypower.org/current_requests_for/ups-rfq/
• Fire and Police Stations• Emergency response providers• Emergency operations centers• Public medical facilities (hospitals, skilled nursing facilities, etc.)• Water, wastewater, or flood control facilities• Jails and prisons• Locations designated by the IOUs to help during PSPS events• Cooling centers designated by state or local governments• Homeless shelters supported by federal, state, or local
governments• Schools• Libraries• Other
6
Eligible Public Sector Critical Facilities
Download UPS Program supporting documents:https://www.mbcommunitypower.org/current_requests_for/ups-rfq/
1. MBCP receives application
2. MBCP reviews project eligibility and feasibility
3. Third Party Credit Review a) Credit Review Summaryb) Borrower Financial Position Summary
4. MBCP to approve/deny the application
Customer Application Process
Vendor Process
Executive Summary
1. Submit Response to RFQ following RFQ Vendor Response Guide
2. If selected, vendor signs Base Agreement to enter pre-qualified vendor "pool"
3. Selected Program Participants (Customer) and MBCP release UPS Project RFP including Customer Project Specification Form
4. Vendor prepares proposal following Vendor Scope of Work Guide including Pro Forma
5. Vendor creates Energy Resiliency Contract with MBCP and Customer
6. Vendor completes project, commissioning, M&V, etc
1. Program Marketing and Promotion = 5 points
2. Overview of Approach to Energy Resiliency Contracting = 15 points
3. Project History = 20 points
4. Qualifications = 15 points
5. Financial Soundness and Stability = 20 points
6. Personnel and Staffing = 10 points
7. Best Value = 15 points
Pre-Qualified Vendor Selection Process
Download UPS Program supporting documents:https://www.mbcommunitypower.org/current_requests_for/ups-rfq/
10
Se
lect
ed
Ven
do
r
Public Sector Process Flow – Vendor and Project Selection Assistance
Cust
om
er
MBC
PM
BC
P Q
ualifi
ed
Ven
do
r P
oo
lLeg
end
Start: MBCP Receives
Application without pre-
selected vendor or project
design
Application reviewed for
completeness, deemed complete
[3 days]
Initial Technical Feasibility Review and Credit Check
Project is deemed feasible
[10 days]
Process StepStudy or
Evaluation
Conference call to kickoff process,
review application, develop
performance specification form
Engages governing body for approvals,
as needed
Team Executes
Contract/s
Project permitting,
construction, interconnection
MBCP tracks project
performance
Milestone
Reviews Proposals, meets with vendors, agrees on vendor
and project selection
Vendors perform preproposal inspections
Vendors generate fully vetted
project proposal including
finance/pro-forma [15 Days]
Prepares Contract
MBCP pre-construction site visit and
documnetation
Process for Pre-Qualified Vendors
RFQ Schedule
Download UPS Program supporting documents at https://www.mbcommunitypower.org/current_requests_for/ups-rfq/
TASK DATE/TIME
1. RFQ Issued 02/28/2020
2. Pre-Proposal Conference 03/09/2020
3. Written inquiries 3/11/2020
4. Responses to Inquiries 03/13/2020
5. Proposal Submission 03/19/2020
6. MBCP Review Period 03/19/2020 - 03/23/2020
7. Interviews and Contract Negotiation 03/24/2020 – 03/27/2020
8. Notice of Intent to Award 03/30/2020
9. Agreement or Contract with Pre-Qualified ESCOs 03/31/2020
Questions?
Download all supporting documents at https://www.mbcommunitypower.org/current_requests_for/ups-rfq/
Please submit any additional questions to [email protected]