SDH Network
Installation & ManagementIn Metropolis
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
3/27
SDH Network installation & management
I. Presentation of the project
II. Project installation
III. Internship results
3
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
4/27
I. Presentation of the internship
1. The company
2. What is SDH ?
3. Presentation of the subject
4
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
5/27
1. The company
Trk Telekomunikasyon A..
Communication
Paul DOANY
Division in 1995
Capital: 2,06 milliard
5
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
6/27
1. The company
Istanbul
Map:
6
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
7/27
2. What is SDH ?
Synchronous Digital Hierarchy
Transport layer
Optic fiber
Signal from a point to another
Replace PDH
CCIT ITU-T recommendations G708... EXPLIQUER
7
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
8/27
2. What is SDH ?
Advantages:
High transmission rates
Reliability
Future-proof platform for new services Interconnection
Disadvantages:
Resistance
Big lost of data if there is a corruption
8
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
9/27
3. Presentation of the subject
SDH network management and installation
Assembly and configuration of a SDH ring
Find solution to the different breakdowns
Team work
9
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
10/27
SDH Network installation & management
I. Presentation of the project
II. Project installation
III. Internship results
10
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
11/27
II. Project installation
1. Assembly of the system
2. Configuration
3. Breakdowns
11
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
12/27
II. Project installation
1. CARTE POUR LES DIFFERENTECENTRALE
12
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
13/27
1. Assembly of the system13
ACIB
AD
EM
TAHTAKALE
AT
AK
Y
GAYRETTEPE
Ring with 4 central :
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
14/27
1. Assembly of the system14
Ring Structure :
E W E W E WW E
Fiber Optic
STM 16
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
15/27
1. Assembly of the system15
WEST
EAST
- 48 V
GAYRETTEPECENTRAL
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
16/27
2. Configuration
Management of SDH Network
Ericsson System Windows XP, 2000, 98
Element management
Network management
16
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
17/27
2. Configuration17
Open Global-UxWindows
Creation of abuild
No cardinserted
Card inserted
Introducing thecard
Card isintroduced
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
18/27
3. Breakdowns
Different type of breakdowns :
Fiber corruption
Slot Card
Switch card
Optic card
18
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
19/27
3. Breakdowns19
Central
Coverage :
GTBOFTAT
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
20/27
3. Breakdowns
Breakdowns on LINK 708, Slot 2-4 :
Corruption between Baakehir and Ataky Central
Breakdown nature : AIS
Use local terminal
Use measuring equipment Ant-5
Check of the signal between Basaksehir and Ataky
20
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
21/27
3. Breakdowns21
Local Terminal
Slot 2 Port 4
LoopbackWindows
Ant-5 connection
Ant-5configuration
Test is
OK
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
22/27
3. Breakdowns
Breakdowns Results on LINK 708 :
Loopback test
Measure with Ant-5
Ataky side is clear
Problem comes from Basaksehir
Cable problems at Basaksehir
22
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
23/27
SDH Network installation & management
I. Presentation of the project
II. Project installation
III. Internship results
23
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
24/27
III. Internship results
1.Company side
2. Personal assessment
24
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
25/27
1. Company side
Installation of a Ring between 4 central
STM-16 for a highest data traffic
Over Fiber optic
Remotely management
25
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
26/27
2. Personal assessment
Using of Global-UX software and Ant-5
Solution to the breakdowns
Team work
Professional experience
Work about VoIP at TSM Informatics
26
Uur UPINAR Istanbul - Turkey April July 2007
7/29/2019 Ugur Presentation
27/27
Conclusion
Assembly and management of SDH Network
90 days
Breakdown service
Enriching experiment
Preparation to the ISVD Licence
27