ate on AIDA2020 cie’s slides for the general AIDA2 meeting 17 February 2014, / indico.cern.ch/event/289451/contribution/2/material/slides/1.pdf Konrad Elsener at the CLICdp IB meeting, 12 June 2014 1 1.Present list of workpackages 2.Generalities and rules/guidelines given by the EU or by the co-ordination team 3. CLICdp groups/teams in AIDA2020 4. Next Steps

U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

  • Upload
    dorie

  • View
    42

  • Download
    0

Embed Size (px)

DESCRIPTION

U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014, http:// indico.cern.ch/event/289451/contribution/2/material/slides/1.pdf. Present list of workpackages Generalities and rules/guidelines given by the EU or by the co-ordination team - PowerPoint PPT Presentation

Citation preview

Page 1: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

1

Update on AIDA2020NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,http://indico.cern.ch/event/289451/contribution/2/material/slides/1.pdf

Konrad Elsener at the CLICdp IB meeting, 12 June 2014

1. Present list of workpackages

2. Generalities and rules/guidelines given by the EU or by the co-ordination team

3. CLICdp groups/teams in AIDA2020

4. Next Steps

Page 2: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

2

1. Present list of workpackages

Page 3: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

3

AIDA2020 Work Package title (some are not finalized)

WP1 Management WP2_NA Advanced Software WP3_NA Micro-Electronics+interconnectionWP4_NA Industry / Innovation WP5_NA Advanced Hybrid Pixel DetectorsWP6_NA High-voltage CMOS sensors (HV-CMOS)WP7_NA Common data acquisition system for combined detector beam testsWP8_TA DESY and CERN testbeamsWP9_TA Irradiation TAWP10_TA Detector testing by …WP11_NA Cryogenic liquid detectorsWP12_NA Frontier Gas DetectorsWP13_JRA Test infrastructure for micro-channel cooling, mechanical support structures and air coolingWP14_JRA Calorimetry WP15_JRA Testbeam and Irradiation Infrastructure Upgrades

Page 4: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

4

2. Generalities and rules/guidelines given by the EU

or by the co-ordination team

Page 5: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

5

AIDA2020 - total request to EU: 10 M€

aim: to have max. 30 institutes as beneficiaries (presently >45, even with INFN, CNRS already grouped)

min. EU funding per institute (project overall): 40 k€(note: this implies 60 k€ matching funds from institute;detail on matching funds depend on the way overhead from EU is treated in inst.)

Page 6: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

6

try to avoid “official sub-contracting” from some instituteto another institute inside the proposal, admin. overhead-> encourage informal solution with “associate partners” as currently in AIDA (such partners can be mentioned as “collaborating institutes” in Annex 1)

in case of such arrangements (helping to reach the goal of no more than 30 institutes!) the rules for matching funds will be relaxed(e.g. EU 40%-60% rule could become EU 60%-40%)

Page 7: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

7

3. CLICdp groups/teams in AIDA2020

Page 8: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

8

DRAFT – still evolving

Advanced Software Cambridge 173 k€ / CERN-LCD 100 k€ (?)

Microelectronics AGH-UST 70 k€

Advanced Hybrid Pixel Liverpool 72 k€ / CERN-LCD 100 k€

HV-CMOS CERN-LCD 0 k€

Calorimetry FCAL TelAviv/IFJ-PAN 50 k€ / AGH-UST 50 k€ /CERN-LCD 0 k€

AHCAL MPP-MPG 33 k€ / Bergen 40 k€

N.B.DESY and CERN testbeams transnational access (open to all)

Page 9: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

9

CLICdp partners with purely LHC- and/or ILC-based participation in AIDA2020

Bristol

Glasgow

Minsk

Oxford

Prague

(?) Spanish LC consortium (?) (in AIDA2020: CSIC, IFAE, CIEMAT, Zaragoza)

DRAFT – still evolving

Page 10: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

10

4. Next Steps

Page 11: U pdate on AIDA2020 NB. Lucie’s slides for the general AIDA2 meeting 17 February 2014,

11

(meet CERN DG on Friday, 13 June)

• Finalize workpackages, leading institutes etc.(description, tables etc.)

• Finalize nomination of WP leaders (max. 2 per WP)

• Write proposal

• Submission early September 2014

• Hope for the best !