20
1 USSC 851775 rev 0 Model: 1602R Wood or Coal Gravity Style (Up-Flow) Supplemental Furnace C S S U C O M P A N Y U N I T E D S T A T E S S T O V E United States Stove Company Ŗ +PFWUVTKCN 2CTM 4QCF 21 $QZ Ŗ 5QWVJ 2KVVUDWTI 60 Ŗ YYYWUUVQXGEQO SAFETY NOTICE: +H VJKU HWTPCEG KU PQV RTQRGTN[ KPUVCNNGF C JQWUG ſTG OC[ TGUWNV (QT [QWT UCHGV[ HQNNQY VJGUG KPUVCNNCVKQP KPUVTWEVKQPU %QPVCEV NQECN DWKNFKPI QT ſTG QHſEKCNU CDQWV TGUVTKEVKQPU CPF KPUVCNNCVKQP TGSWKTGOGPVU KP [QWT CTGC 6JKU HWTPCEG OWUV DG KPUVCNNGF D[ C SWCNKſGF VGEJPKEKCP -GGR VJGUG KPUVTWEVKQPU HQT HWVWTG TGHGTGPEG Installation/Operator’s Manual 5CHGV[ 6GUVGF VQ 7.

U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

1USSC 851775 rev 0

Model: 1602RWood or Coal Gravity Style (Up-Flow) Supplemental Furnace

CSSUCOMPANY

UNITED STATES STOVE

United States Stove Company

SAFETY NOTICE:

Installation/Operator’s Manual

Page 2: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

USSC

INTRODUCTION

-

--

IMPORTANT

must beIn-

stallation Examples NEVER to be

NEVER INSTALL

-

DISCLAIMER NOTICE

Warning:-

LOCATING YOUR FURNACE

CLEARANCES

REDUCED CLEARANCES-

-

-

-

-

PROTECTIVE COVERING AND ALL SUPPORTS MUST

BE NON-COMBUSTIBLECONSTRUCTING

NON-COMBUSTIBLE WALLS

2” FROM FLOOR

2” FROM CEILING

1” AIR SPACE

-

22”

12”

20”15”

COMBUSTIBLE WALL

CO

MBU

STIB

LE W

ALL

FLUE

(TOP VIEW)

MINIMUM CLEARANCES TO A COMBUSTIBLE

WALL

CAUTION:DO NOT store

combustible orflammable materials or

liquids near thefurnace.

Page 3: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

USSC

CHIMNEY REQUIREMENTS

-

-

-

CREOSOTE - FORMATION AND NEED FOR REMOVAL

-

-

SMOKE PIPE INSTALLATION-

TYPE OF FLUE REQUIREDCONNECTION CLEARANCE

-

Page 4: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

4 USSC

DAMPERS ON STOVE PIPES

HEATED AIR DISCHARGE

CONNECTING HOT AIR DUCTTO FURNACE

-

ONLY -

INSTALLATION EXAMPLES

INSTALLATION #1-

IMPORTANT INFORMATION FOR ALL CONNECTOR PIPES

-

-

-

-

-

to prevent premature

Page 5: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

5USSC

INSTALLATION #3INSTALLATION #2

THE PLENUM OPENINGS DIFFERBETWEEN THE 1602 AND 1802

MODEL 1602 - 13” x 18” RectangularMODEL 1802 - 18” x 18” Rectangular

RETURN AIR IS VERY IMPORTANTMUST BE incor-

-

-

-

COMBUSTION AIR

--

NEGATIVE PRESSURE IN

BASEMENT

PLENUM OPENING

Page 6: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

USSC

FURNACE ASSEMBLY INSTRUCTIONS

-

DOOR HANDLES

-

ASH DOOR SPIN DRAFT

-

FUEL & ASH DOOR LATCH

-

-

SHAKER GRATE HANDLE

BRACKET

SMOKE CURTAIN

FRONT

SMOKE CURTAIN

SMOKE CURTAINCLIP

NUT

BOLT

1/4-20 NUTSMOKE CURTAIN CLIP

1/4-20 x 1-1/4CARRIAGE BOLT

SMOKE CURTAIN

-

-

Page 7: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

7USSC

SPRING HANDLES

DISTRIBUTION BLOWER & ACC.

(1) Fan Center Control

-

-

-

-

All electrical connections should be done by a

WIRING DIAGRAM

Page 8: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

8 USSC

FIREBOX BRICK REPLACEMENT-

For model 1602side

FORCED DRAFT BLOWER - 69189-

-

FIREBRICK AND BAFFLE REPLACEMENT

BAFFLE/BRICK REPLACEMENT

For model 1602

Page 9: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

USSC

-

-

GENERAL FURNACE OPERATION

TESTING AND OPERATING PROCEDURES

TESTING

STARTING A WOOD FIREUsing Forced Air Draft

STARTING A COAL FIREIf you burn coal, a forced air draft is required

CAUTION: Ashes should be placed in a metal container with a ti ht ttin lid he closed container o ashes should be placed on a non combustible oor or on the round well awa rom all combustible materials pendin nal disposal the ashes are disposed o b burial in soil or otherwise

locally dispersed, they should be retained in the closed container until all coals ha e thorou hly cooled

CAUTION: e er use asoline, asoline type lantern uel, erosene, charcoal li hter uid, or similar li uids to start or reshen up a re in the urnace eep all such li uids well

away rom the urnace while it is in use

CAUTION: o pre ent ame and smo e spilla e, the slide ba e must be pulled out and the uel door must be crac ed or ten seconds be ore bein ully opened

o not o er re your urnace A ter you ha e become amiliar with its operatin , you should now how much

wood to use

CAUTION: o a oid e cessi e temperatures, do not operate with uel door or ash pan open

Page 10: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

10 USSC

REMOVE ASHES FREQUENTLY!

-

-

NEVER

-

NEVER BURN

OPERATING NOTES

THIS IS A WOOD AND COAL BURN-ING FURNACE AND SHOULD NOT BE ALTERED IN ANY WAY! DOING SO

WILL VOID YOUR WARRANTY!

so t coalCoal hard coal NEVER USE

Page 11: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

11USSC

TROUBLE SHOOTING AND PROBLEM SOLVING

mo e pu s rom urnace

Solution:

-

-

nade uate heat bein deli ered to your home

Solution:

cess smo e or ames comin out door when re uelin

Solution:

-

Distribution blower vibrating

Solution:

Distribution blower continues to run or will not run

Solution:

Dra t blower continues to run or will not run

Solution:

dor rom rst re

Solution:

cessive reosote

Solution:

the re goes out or does not hold over night

Solution:

Page 12: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

USSC

PARTS DIAGRAM

11

12

13

161517

14

710

5

2 3

6

32 31

4

321

37

38

924

262527

1716

3 1918

20

28 29 30

36 21

2234

34

35

23

33

Page 13: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

USSC

38

39

41

40

44

43

47

4548

49

42

46

50

PARTS DIAGRAM AND LIST

IMPORTANT NOTE:

Qty

1 1

4

4 1

5 1

1

7 1

4

8 1

1

10 1

11

1

5

14 1

15 1

17

18 1

1

1

Flue Collar 1

1

1

1

41

1

1

1

1

Front Filler 1

1

Qty

40 8

41 8

80145 1

44 1

45 1

1

47 1

48 1

Fan Center Control 1

50 1

Page 14: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

14 USSC

PARTS DIAGRAMS AND LISTS - 69189

1

4 3 52

Qty

1 1

1

4

5

UFB908 COLD AIR RETURN / FILTER BOX - OPTIONAL KIT

-

-

Page 15: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

15USSC

DOMESTIC HOT WATER COIL KIT - OPTIONAL

DOMESTIC HOT WATER COIL

REAR WALL OF FIREBOX

TURN INSIDE NUTS UP TO END OF THREADS

1. NUT2. WASHER3. GASKET

2

3

45

6

ACCESS PANEL

1

-

he installation is now ready to be plumbed to your e ist-ing hot water system hoose one o the three methods described in the ot ater oil instructions

ave a uali ed plumber connect your domestic hot water pipe to the coil with the appropriate ttings

DR6 - 6” DRAFT REGULATOR KIT - OPTIONAL KIT--

Page 16: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

USSC

BULLETIN RC454A GUIDE TO BURNING COAL IN YOUR FURNACE

-

-

-

SIZE OF COAL:-

-

-

STOVE OPERATION:

-

-

CAUTION:

BURNING BITUMINOUS:

-

WELL ESTABLISHED

-

-

-

-

-

MAINTENANCE

ANTHRACITE:

Page 17: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

17USSC

-

-

-

-

BULLETIN RC454A GUIDE TO BURNING COAL IN YOUR FURNACE

BANKING THE FIRE:

-

DO NOT POKE OR SHAKE THE FIRE AT THIS TIME!

DO NOT -

NEVER -

NEVER

Page 18: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

18 USSC

NOTES

Page 19: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

USSC

NOTES

Page 20: U N USSC E COM P A N Y Installation/Operator’s Manual · ctg iqqf jgcv eqpfwevqtu uq vjg[ yknn dg cnoquv cu jqv qp vjgkt dcem ukfg cu vjg[ ctg qp vjg gzrqugf ukfg 6jgtg-hqtg vjg

USSC

HOW TO ORDER REPAIR PARTS

-

United States Stove Company