18
1 TxDOT’s Role in Flood Management Jack Kayser, P.E., Ph.D., CFM TxDOT – Austin District – Hydraulics Team Flash Flood Awareness Meeting October 8, 2010 Texas Department of Transportation

TxDOT’s Role in Flood Management

Embed Size (px)

DESCRIPTION

TxDOT’s Role in Flood Management. Jack Kayser, P.E., Ph.D., CFM TxDOT – Austin District – Hydraulics Team Flash Flood Awareness Meeting October 8, 2010. Texas Department of Transportation. Outline of Presentation. TxDOT’s Organizational Structure Jurisdiction and Responsibilities - PowerPoint PPT Presentation

Citation preview

Page 1: TxDOT’s Role in Flood Management

1

TxDOT’s Role in Flood Management

Jack Kayser, P.E., Ph.D., CFMTxDOT – Austin District – Hydraulics Team

Flash Flood Awareness Meeting

October 8, 2010

Texas Department of Transportation

Page 2: TxDOT’s Role in Flood Management

2

Outline of Presentation

- TxDOT’s Organizational Structure

- Jurisdiction and Responsibilities

- Emergency Flood Response Procedures

- Contributions to Floodplain Management

- Process of Hydrology and Hydraulic Design

- Example of Cross Drainage Culvert Design

- Summary and Conclusions

- References

Texas Department of Transportation

Page 3: TxDOT’s Role in Flood Management

3

TxDOT’s Organizational Structure

Texas Department of Transportation

As of August 2009 there are 13,015 TxDOT employees, 11.7% of which are P.E.s or E.I.T.s [1].

Page 4: TxDOT’s Role in Flood Management

4

Jurisdiction and Responsibilities

Texas Department of Transportation

For Travis and Williamson Counties there are 1,170 On-System miles and 7,205 Stratmap miles,statewide there are 80,067 On-System miles and 306,403 Stratmap miles (centerline miles) [2].

Page 5: TxDOT’s Role in Flood Management

5Texas Department of Transportation

Jurisdiction and Responsibilities

On-System:- Plan, Design, Build, Operate, and Maintain- Emergency Response

per internal and external request

Off-System: - Inspect All Public Bridges and Bridge Class Culverts- Oversight of Federal Transportation Funds- Emergency Response

per Governor’s Office of Emergency Management

Page 6: TxDOT’s Role in Flood Management

6

Emergency Flood Response Procedures [3]

Maintenance personnel are encouraged to use their own judgment, eliminating chain of command delays. Such personnel often personally know local DPS, Fire and EMS personnel. 73% of TxDOT staff are over 40 years of age and 53% have 11 or more years with the agency [4].

Texas Department of Transportation

Page 7: TxDOT’s Role in Flood Management

7

Highway Condition Reporting System

Texas Department of Transportation

Page 8: TxDOT’s Role in Flood Management

8

Contributions to Floodplain Management

Texas Department of Transportation

Sponsored USGS anduniversity hydrology andhydraulic research andpublications, used inengineering practice.

Standard hydraulic structuredesigns and specifications,used throughout the industry.

Hosting and supporting theTFMA – NFIP training program from 2004 to 2008.

Page 9: TxDOT’s Role in Flood Management

9

Process of Hydrology and Hydraulic Design [5]

Texas Department of Transportation

Page 10: TxDOT’s Role in Flood Management

10

Example of Cross Drainage Culvert Design

Texas Department of Transportation

Page 11: TxDOT’s Role in Flood Management

11Texas Department of Transportation

Where is Structure - What is Scope of Work

Page 12: TxDOT’s Role in Flood Management

12Texas Department of Transportation

Delineation of Watershed

Page 13: TxDOT’s Role in Flood Management

13Texas Department of Transportation

Delineation of Channel

Page 14: TxDOT’s Role in Flood Management

14

Revision of Conveyance Due to Ditch Carryover

Texas Department of Transportation

Existing FM487 Sta 313+00

675

680

685

690

695

700

30750 31250 31750 32250 32750 33250 33750

Station

Ele

vati

on

North Ditch Profile

Road Profile

South Ditch Profile

Page 15: TxDOT’s Role in Flood Management

15

Hydraulic Analysis of Culvert and Ditch

Texas Department of Transportation

Page 16: TxDOT’s Role in Flood Management

16

Summary and Conclusion

Texas Department of Transportation

- Two central aspects of dealing with floods:

a. Responding

b. Mitigation- Nature of TxDOT’s response depends on the

situation:

a. On-System versus Off-System

b. How the request reaches Maintenance

c. Decisions Made On-Site- Mitigation is made up of two parts:

a. Identifying the Risks

b. Avoiding Adverse Impacts

Page 17: TxDOT’s Role in Flood Management

17Texas Department of Transportation

References

1. Highway Engineer Staffing Analysis, Texas Comptroller of Public Accounts, January 2010, page 7.

2. Annual Report – Highway Status Open to Traffic Only, Texas Department of Transportation, Transportation Planning and Programming Division, August 17, 2009.

3. Information Sharing Plan – Austin District, June 8, 2010

4. Survey of Organizational Excellence Data Report, Texas Department of Transportation, 2008, pages 2 and 3.

5. Hydraulic Design Manual, Texas Department of Transportation, March 2009.

Page 18: TxDOT’s Role in Flood Management

18

Questions?

Texas Department of Transportation