32
TUBO TRADING AND CONTRACTING | COMPANY PROFILE 1

TUBO TRADING AND CONTRACTING | COMPANY PROFILE · TUBO Trading & Contracting is proud to have been a part of the following projects. Client Main Contractor Job Description Contract

  • Upload
    others

  • View
    19

  • Download
    0

Embed Size (px)

Citation preview

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 1

1

INFINITE SOLUTIONS...

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 1

2

TUBO Trading & Contracting is a contracting company

specialized in Horizontal Directional Drilling (HDD)

field. Our team is experienced and capable of dealing

with any type of ground strata and site conditions.

Since its inception, TUBO is starting its HDD contracting works with a

firm background, reliable contractor mentality and on time completion

of its projects.

TUBO is growing in parallel with the market growth specially in the Infrastructure business.TUBO has expanded its range of services to include infrastructure works as a secondary corebusiness and become a specialized Enabling works and Earthworks Contractor in addition to itsHDD Specialty.

TUBO’s current services include, but not limited to, HDD contracting

works, welding of HDPE pipes, management and any other HDD related works.

CORE VALUESSafety FirstWe ensure a safe, healthy work environment and a ‘zero injury’ culture.

Trust and CandourWe conduct ourselves professionally, with candour, respect and integrity.

Passion for ExcellencePace-setting and innovative. Always striving to find a better way. Doing

it right the first time - every time.

A People Focused, Learning CultureDeveloping the best leaders and realizing the full potential of our

people. Learning is core - we never stop trying to improve.

Results OrientedWe have a ‘do whatever it takes’ attitude. Empowered and

entrepreneurial operations within a common framework of values,

strategies and key processes.

COMPANY BRIEF

TUBO TRADING AND CONTRACTING | COMPANY PROFILE

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 3

Name

Address

Office Location

Telephone

Fax

Commercial R.N

Email

Tubo Trading & Contracting W.L.L.

P.O. Box 24355, Doha, Qatar

Ibn Seena Street, Al Muntazah Offices

Building No. 26, 4th Floor, Office No. 403

+974 4411 2536

+974 4463 1861

69573

[email protected]

VISIONWe are a committed to becoming

the contractor of choice, pursuing

excellence through dedication,

experience and disciplined

employees with an ongoing

passion to deliver quality, timely

and profitable projects.

TUBO TRADING AND CONTRACTING | COMPANY PROFILE1 TUBO TRADING AND CONTRACTING | COMPANY PROFILE4

MISSIONTubo’s mission is “to excel in the delivery of HDD services

through quality workmanship and design that exceeds

client requirements, delivering projects on time and

within budget by a team sharing the same vision.”

By adhering to this mission, Tubo has been noted

for its achievements in HDD works earning

recognition and accolades.

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 15

GENERAL MANAGER

ADMINISTRATION DEPARTMENT

ADMIN & HR MANAGER

PROCUREMENT DEPARTMENT

EXTERNAL FINANCIAL AUDITOR

PROCUREMENT MANAGER

PROCUREMENT TEAM

ACCOUNTS DEPARTMENT

ACCOUNTANT

OPERATIONS DEPARTMENT

PROJECT ENGINEERS

PROJECT TEAMS

SENIOR SALES ENGINEER

GENERAL MANAGER

GENERAL MANAGER

PROCUREMENT DEPARTMENTACCOUNTS DEPARTMENT OPERATIONS DEPARTMENTADMINISTRATION DEPARTMENT

CORPORATE STRUCTURE

CLIENTSApproved by:

TUBO TRADING AND CONTRACTING | COMPANY PROFILE6

7

PROJECTSTUBO Trading & Contracting is proud to have been a

part of the following projects.

Client Main Contractor

Job DescriptionContract Agreed Quantity

Project Start DateFinish Date

ASHGHAL Consolidated Contractors Group S.A.L. (O shore CCC) / Teyseer Contracting company JVWelding and Installation of HDPE pipes using HDD method9,570 m January 17, 2018On Call

AL BUSTAN NORTH STREET – P007 C7 P2

Client Main Contractor

Job Description

Contract Agreed QuantityProject Start Date

Finish Date

KAHRAMAALarsen & Toubro LimitedContracting company JVExcavation and Disposal of Excavated Materials for the following Substations:• Mashaf Substation• Wukair Substation• Al Saad Substation• Rawadat Al Egdim Substation.• Al Faroosh Substation• KTS (Khalifa Town South Substations)

40,991 m3June 3, 2018.On going

Project: Qatar Power Transmission System Expansion Phase -13 Substations

8 TUBO TRADING AND CONTRACTING | COMPANY PROFILE

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

ASHGHALLarson & Turbo LimitedInstallation of HDPE Pipes using HDD method1,500 mApril 17, 2017July 15, 2017

AL WAKRA BYPASS ROAD (P015)

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

ASHGHAL QDVC Bin Omran JVWelding and Installation of di erent sizes of HDPE pipes (up to 700mm dia.) using HDD method3,100 mMarch 23, 2017Ongoing

NOH2 - NEW ORBITAL HIGHWAY & TRUCK ROUTE, CONTRACT: C2 SALWA ROAD TO NORTH RELIEF ROAD (P023)

Client Main Contractor

Job DescriptionContract Agreed Quantity

Project Start DateFinish Date

ASHGHALConsolidated Contractors Group S.A.L. (O shore CCC) / Teyseer Contracting company JVWelding and Installation of HDPE pipes using HDD method500 mJanuary 25, 2018Postponed

ROAD & INFRASTRUCTURE (PH2, PKG7) - IP 12/13 C071 - BANI HAJER

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 9

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

ASHGHAL Consolidated Contractors Group S.A.L. (Offshore CCC) / Teyseer Contracting company JV.Supporting the existing high Voltage 400 KVA cable by installing Steel I Beams under the cable to form a supporting slab to carry the cables and allow the Contractor to excavate and construct traffic tunnel underneath it without route changing192 mSeptember 1, 2015October 27, 2015

DUKHAN HIGHWAY PROJECT

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

ASHGHAL China Harbour Engineering Company Ltd.Supply, Drilling, Reaming and Installation of HDPE pipes underneath Live Oil and Gas Pipe Lines.1,000 mJune 26, 2016May 27, 2017

CONSTRUCTION OF EAST CORRIDOR P011(Package 2)

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

Qatar PetroleumGulfar Al Misnad Engineering and Contracting CompanyInstallation of Steel Oil Pipes using HDD method120 mMay 3, 2016May 5, 2016

7744 - FLOWLINE - DUKHAN

TUBO TRADING AND CONTRACTING | COMPANY PROFILE10

Client Main Contractor

Job Description

Contract Agreed QuantityProject Start Date

Finish Date

ASHGHAL Consolidated Contractors Group S.A.L. (O shore CCC) / Teyseer Contracting company JV.Welding and Installation of HDPE pipes from KAHRAMAA approved supplier using HDD method (200 Lm shots)2,000 mJanuary 30, 2016August 22, 2016

DUKHAN HIGHWAY PROJECT

Client Main Contractor

Job Description

Contract Agreed QuantityProject Start Date

Finish Date

Qatar RailQDVC-GS E & C – ADE JV

Supply, Welding and Installation of HDPE pipes using HDD method

250 mJuly 7, 2018.On Going

Red Line South Underground

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

KAHRAMAA Qatar Arab Contractors Company (QAC)Supply, Welding and Installation of HDPE pipes from KAHRAMAA approved supplier using HDD method1,700 mMay 1, 2015August 15, 2015

EXTENSION OF DISTRIBUTION NETWORK AT DOHA AND VICINITY - Phase 5 (Package A)

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 11

Client

Main Contractor

Job DescriptioN

Contract Agreed Quantity

Project Start Date

Finish Date

Ministry of Interior Al Baud Technology Co.Supply, Welding and Installation of HDPE pipes using HDD method1,813 mSeptember 25, 2016Ongoing

AL SHERYAN-2

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

Qatar Petroleum FAL Telecommunication Supply, Welding and Installation of HDPE pipes using HDD method130 mJuly 2, 2016July 8, 2016

ROAD CROSSINGS AT QP DUKHAN FIELDS

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

Lusail Real Estate Development Company Al Jaber EngineeringInstallation of HDPE pipes under sea water beds to connect Al Qetaifan Islands to the Gas Supply Network using HDD Method (400 Lm shots at -13 m Depth)1,900 mNovember 21, 2015January 31, 2016

CONSTRUCTION OF CP08-A-03 ENABLING WORKS - QETAIFAN ISLANDS

TUBO TRADING AND CONTRACTING | COMPANY PROFILE12

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

KAHRAMAA Al-Ajjaj Limited Company (AALCO)Welding and Installation of HDPE pipes using HDD method2,000 mJuly 11, 2015November 25, 2015

GTC-554/2013 CALL OF CONTRACT FOR 11KV REINSTATEMENT WORK FOR KAHRAMAA

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

KAHRAMAA Al-Ajjaj Limited Company (AALCO)Welding and Installation of HDPE pipes using HDD method500 mAugust 16, 2015September 2, 2015

GTC-586/2013 CALL OF CONTRACT FOR ELECTRICITY DISTRIBUTION NETWORK FOR KAHRAMAA

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

Qatar Rail Red Line South JV.Pedestrian subway Pipe Roofing to support the above existing roads400 mFebruary 27, 2016March 5, 2016

RED LINE SOUTH METRO

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

KAHRAMAA Q TEC’ EngineeringSupply, Welding and Installation of HDPE pipes from KAHRAMAA approved supplier using HDD method2,000 mJuly 19, 2015July 26, 2015

GTC-593/2013 CALL OF CONTRACT FOR 11KV REINSTATEMENT WORK FOR KAHRAMAA

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 13

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

KAHRAMAA Al-Ajjaj Limited Company (AALCO)Welding and Installation of HDPE pipes using HDD method500 mMay 15, 2016June 22, 2016

GTC-666/14 CALL OF CONTRACT FOR ELECTRICITY DISTRIBUTION NETWORK (SCHEME) FOR KAHRAMAA

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

KAHRAMAA Al-Ajjaj Limited Company (AALCO)Supply, Welding and Installation of HDPE pipes using HDD method150 mDecember 21, 2016December 29, 2016

GTC-566/2013 & GTC-628/2014

TUBO TRADING AND CONTRACTING | COMPANY PROFILE14

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

ASHGHALLANE-SOLID-TADMUR JV Supply, Welding and Installation of HDPE pipes using HDD method400 mNovember 27, 2016December 20, 2016

ROAD & INFRASTRUCTURE WAKRA WEST MMUP (PH2, PKG14)

Safety is a moral

obligation. Our

goal is zero harm.

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

KAHRAMAA Al-Ajjaj Limited Company (AALCO)Supply, Welding and Installation of HDPE pipes using HDD method544 mJanuary 3, 2017August 20, 2018

GTC-707/14 CALL OF CONTRACT FOR ELECTRICITY DISTRIBUTION NETWORK FOR KAHRAMAA

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 15

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

Qatar Petroleum Al Mohanna Trading & Contracting. Supply, Welding and Installation of HDPE pipes using HDD method57 mAugust 17, 2016August 20, 2016

MAINTENANCE WORKS FOR QP

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

Al Khalij CementSpacemaker (A Subsidiary of Gulf Contracting Co.)Supply, Welding and Installation of HDPE pipes using HDD method80 mJuly 4, 2016July 20, 2016

AL KHALIJ CEMENT, EXTERNAL WORKS

TUBO TRADING AND CONTRACTING | COMPANY PROFILE16

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

Qatar Chlorine

Power Links Qatar

Supply, Welding and Installation of HDPE pipes using HDD method

400 m

June 10, 2016

July 5, 2016

QATAR CHLORINE SUBSTATION

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

KAHRAMAA

Al Bawakir Unicon

Supply, Welding and Installation of HDPE pipes using HDD method

300 m

July 3, 2016

July 29, 2016

GTC-614-2013

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 17

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

Supreme Committee

Al Bawakir Unicon

Supply, Welding and Installation of HDPE pipes using HDD method

100 m

September 26, 2016

October 2, 2016

WAKRA STADIUM (ENABLING WORKS)

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

Qatar Petroleum

PROTEC Technical Services

Supply, Welding and Installation of HDPE pipes using HDD method

1,500 m

May 10, 2016

Ongoing

2500M3/DAY SEA WATER DESALINATION PLANT

Tubo has a diverse range of

capabilities and expertise to

undertake all types of complex,

fast-track and specialized

works for HDD projects.

TUBO TRADING AND CONTRACTING | COMPANY PROFILE18

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

ASHGHAL TEKFEN Construction

Welding and Installation of HDPE pipes using HDD method

300 m

January 20, 2016

March 5, 2016

NORTH ROAD CORRIDOR

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

Qatar Petroleum / KAHRAMAA

Gulfar Al Misnad Engineering and Contracting Company

Supply, Welding and Installation of HDPE pipes using HDD method

180 m

May 4, 2016

May 5, 2016

8857-KAHARAMAA

Client

Main Contractor

Job Description

Contract Agreed Quantity

Project Start Date

Finish Date

Qatar Petroleum

Gulfar Al Misnad Engineering and Contracting Company

Supply, Welding and Installation of HDPE pipes using HDD method

210 m

February 1, 2016

February 6, 2016

8-859-00-QNC-CO

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 19

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

KAHRAMAAMirrikh Contracting Company Welding and Installation of HDPE pipes using HDD method1,500 mSeptember 7, 2015April 6, 2016

GTC-619/2013 & GTC620/2013 CALL OF CONTRACT FOR KAHRAMAA

Client Main ContractorJob Description

Contract Agreed QuantityProject Start Date

Finish Date

KAHRAMAAETA Star International Welding and Installation of HDPE pipes using HDD method300 mJanuary 16, 2017August 5, 2017

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE -11

20

PMV FLEET LIST

DESCRIPTION

Vermeer D100x120 DR

Vermeer D36 x 50 DR

Hurner Schweisstechnik,

weld control 250

Hurner Schweisstechnik,

weld control 630

Hurner Schweisstechnik,

weld control 850

EW205D Volvo Wheeled

Excavator

Mitsubishi Canter Self loading

Truck

Mitsubishi Canter

Toyota Hiace Bus

Mitsubishi Pickups

Ford F150 Double cabin Truck

MODEL YEAR

2015

2015

2015

2016

2016

2012

2015

2016

2015

2015

2013

CAPACITY

Up to 40” Dia and 700 m length

Up to 28” Dia and 300 m length

Up to 250 mm Dia

Up to 630 mm Dia

Up to 800 mm Dia

20 Ton

10 Ton

6 Ton, 3 seater

4 Ton, 6 stearer

15 seater

5 seater

5 seater

QTY

1

3

1

1

1

2

EW205D Volvo Wheeled

Excavator201220 Ton 2

2

1

2

3

1

TUBO TRADING AND CONTRACTING | COMPANY PROFILE

Scania Self Loading Truck 2009 1

Mercedes -Benz Trailer Head 2000Trailer Tanker, Trailer LowbedTrailer Auto Dumper, Lowbed

1

TUBO TRADING AND CONTRACTING | COMPANY PROFILETUBO TRADING AND CONTRACTING | COMPANY PROFILE

As a trusted industry

leader, Tubo has built

enduring relationships

with consultants, clients

and market leaders in Qatar.

21

TUBO TRADING AND CONTRACTING | COMPANY PROFILE22

ApprovalQ a t a r R a i l

k a h r a m a a

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 23

Approval

TUBO TRADING AND CONTRACTING | COMPANY PROFILE24

ApprovalA s h g h a l

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 25

Our SisterCompanies

SAFETY

TUBO TRADING AND CONTRACTING | COMPANY PROFILE26

Safety is our number one core value. We are

uncompromising in our commitment to the health

and safety of our employees, subcontractors,

customers, and community. We will continually

improve our processes, demonstrate leadership, and

promote comprehensive safety.

We will require individual accountability, expect all employees to

adhere to our safety standards, and actively participate in and support

the advancement of our health and safety practices. Safety is the

responsibility of all employees, including both top management and

the individual craft worker. Everyone is responsible for achieving zero

accidents resulting in a SAFE day, a SAFE tomorrow, a SAFE year, and

a SAFE career.

TUBO is committed to be the safest, most stable, and most rewarding

place to work for the benefit of all of our employees, our customers,

and the communities in which we live and work. Together, we will

THINK, COMMUNICATE, and WORK SAFELY, every minute, every hour,

and every day.

Tubo has a prominent QHSE awareness and adherences. Tubo has its

pride with its proven accident-less track record throughout the projects

worked in.

TUBO TRADING AND CONTRACTING | COMPANY PROFILE

We ensure a safe, healthy

work environment and

a ‘zero injury’ culture.

27

22 TUBO TRADING AND CONTRACTING | COMPANY PROFILE

TUBO TRADING AND CONTRACTING | COMPANY PROFILE 1

THANK YOU

Name

Address

Office Location

Telephone

Fax

Email

Tubo Trading & Contracting W.L.L.

P.O. Box 24355, Doha, Qatar

Ibn Seena Street, Al Muntazah Offices

Building No. 26, 4th Floor, Office No. 403

+974 4411 2536

+974 4463 1861

[email protected]

Name

Address

Office Location

Telephone

Fax

Email

Tubo Trading & Contracting W.L.L.

P.O. Box 24355, Doha, Qatar

Ibn Seena Street, Al Muntazah Offices

Building No. 26, 4th Floor, Office No. 403

+974 4411 2536

+974 4463 1861

[email protected]