TTT Working Group Putney Embankment Foreshore & Barn Elms Thursday 24 th November 2016

TTT Working Group Putney Embankment Foreshore & Barn … · 2 The Putney Embankment Foreshore site is on the southern bank of the River Thames. There are two sites: a main construction

Embed Size (px)

Citation preview

TTT Working Group

Putney Embankment Foreshore & Barn Elms

Thursday 24th November 2016

2

The Putney Embankment Foreshore site is on the southern bank of the River Thames. There are two sites: a main construction site and an area to build a temporary slipway to maintain public access to the River Thames.This site will be used to intercept the Putney Bridge combined sewer overflow.

Putney Embankment Foreshore

Overview

Upcoming Works – Update until March 2017

Works present to Christmas 2016• Installation of site hoardings and pedestrian diversion • Placement of floating barriers on the river to secure the works area • Temporary re-routing of pedestrian walkways on the embankment• Piling at the base of the river wall on the foreshore

Note: Putney slip / Putney Hard will be open over the weekend of 26 and 27 November to allow access for Vesta Scullers' Head of the River Race.

Works from January 2017 until March 2017• Installation of the temporary slipway on the foreshore• Associated tie in works to highway and pedestrian areas• Demobilisation of the site before the Oxford v Cambridge Boat race

4

Site setup plan

5

Site river boundaries and barriers

6

Piling works – December 2016

7

Construction of the slipway January 2017 – March 2017

8

Completion of the Slipway – End of March 2017

AIR QUALITY AND NOISE MONITORS

Noise Monitor Locations

AIR QUALITY AND NOISE MONITORS

Air Quality Monitor Locations

Putney Embankment Foreshore

Questions

12

Barn Elms

13

Barn Elms

Overview

CSO Drop Shaft

Connection Tunnel to Main Tunnel

Connection Culvert

Valve Chamber

Outfall Chamber

Air Treatment Chamber

Interception Chamber

Existing West Putney Storm Relief Sewer

Integrated Electrical and Control Kiosk and Ventilation Column

Upcoming Works – November/December 2016

• Ground Investigation• Visual survey within the buildings of the Sports Centre on 28, 29 and 30

November

Area of Ground to be Investigated

Barn Elms Sports Centre

16

Barn ElmsTimeline of Work

Questions

18

Hoarding Artwork

Possibilities and Opportunities for Community

Engagement

ProposalCommissioned Design, Design development

Installation & Maintenance

CLWGStakeholders

PAS Vision & HIS where

appropriate

LA Sign Off / Planning

Tideway Specialists &Design Team

Contractor

Maintenance

Workshops / schools,

community where applicable

Recording & evaluation

March / April / MayJanuary open call February

Brief

Artist Selection Panel

CLWG / LA / local arts org

representatives

Tideway sign off

Curators: open call or longlist & shortlist

artists with stakeholders

Launch event / schools,

communityCLWG

December June

20

Who wants to engage in the artwork?

21

What focus do you want for the artwork?

22

Community Engagement

Wandsworth Christmas Fair & Tideway Carol Service

Wandsworth Christmas Fair

• BMB sponsoring the Christmas Tree• Tideway BMB have stall providing

information on scheme• Friday 2nd December 12noon-8pm

Tideway Carol service

• Held at St Mary’s Church, Putney• Wednesday 14th December 6pm

Helpdesk