Upload
signe-harding
View
25
Download
0
Embed Size (px)
DESCRIPTION
TS-CSE. TCR and CCC. Outline TCR and TS-CSE-CO mandate Applications Console layout Hardware and Operating System Strategy Conclusion. TCR and TS-CSE-CO mandate. TCR The TCR monitors and operates 24 hours a day, 365 days a year the entire technical infrastructure of CERN comprising : - PowerPoint PPT Presentation
Citation preview
13th May 2004 Uwe Epting - TS/CSE-CO 1
TS-CSE
Outline
– TCR and TS-CSE-CO mandate– Applications– Console layout– Hardware and Operating System– Strategy– Conclusion
TCR and CCC
13th May 2004 Uwe Epting - TS/CSE-CO 2
TCR and TS-CSE-CO mandate
• TCR– The TCR monitors and operates 24 hours a day, 365
days a year the entire technical infrastructure of CERN comprising :
• the electrical distribution network and energy consumption management
• heating, cooling, ventilation and air conditioning equipment
• safety installations, high vacuum and cryogenic systems • any other infrastructure equipment
• TS-CSE-CO– The TS-CSE-COntrol systems section is responsible for
the development and maintenance of the control systems and the computing environment for the Technical Control Room (TCR) …
13th May 2004 Uwe Epting - TS/CSE-CO 3
TCR Applications
Yacoma
Hummingbird Exceed 8.0 (IT)Internet browser: IE 6 (IT standard)CERN phone book (IT)Windows Netmeeting (remote maintenance)PuTTY + VNCWizcon and Wizweb (TS/CV applications)MP5 (maintenance DB - DataStream)PVSS (for GTPM and Vacuum)Spectrum (JRE 1.4.2)JavaGUILSGeoconcept 5.0 (SIG cartography)Aesys (for CERN entry panels)LabView (for SPS ventilation)
CAS / LASERUMMI / Jviews (for TIM)
W2K Linux IT AB TS Application
18/5 9/6 9 4 6 Total
Pcvue (CSAM and Access Control)
Ext.
6
Windows only Windows or Linux Linux possible Service and Maintenance
Outlook XP (for TCR and personal e-mail)
13th May 2004 Uwe Epting - TS/CSE-CO 4
TCR Layout (today)
TCR Operational Consoles Oper. pc TCR pc (admin.)
Oper. pc CSAM Consoles
13th May 2004 Uwe Epting - TS/CSE-CO 5
TCR Hardware and OS (today)
• Hardware – 7 PC running Windows (PIV-2,8GHz)
» 3 pc with 1 screen» 3 pc with 2 shared screens» 1 pc with 3 shared screens
– 1 Unix Console– Connected to the Technical Network (172.18) and surveilled
by Spectrum– 13 CRT 21” screens, 2 19” LCD screens (CSAM), 2 CRT 19”
for operator personal use– 9 wired keyboard and mice, 1 wireless keyboard and mouse
• Constraints– 1 PC = 1 CAS application– PVSS zooming and overview capability– Number of keyboards and mice– 2 layers desk, not very ergonomic
• Administration– Windows updates– Windows GPO applied on operational consoles– 1 operational account: tcroper– Applications startup only allowed from Yacoma
13th May 2004 Uwe Epting - TS/CSE-CO 6
Current Strategy
• Integration of industrial systems– Equipment groups provide TCR views based on their
tools– Development in equipment groups when possible– Additional TIM views where necessary– Use of common HCI conventions
• Operation and Maintenance– Use of standard components (PCs)– Use of IT support when possible– Experience with Windows consoles:
• Easy administration (1.5 persons on part time)• No downtime since two years• Cheap maintenance
13th May 2004 Uwe Epting - TS/CSE-CO 7
Conclusion
• Choice of Windows as operating system was taken based on PCR choice some years ago
• Strategy for integration of LHC infrastructure monitoring is based on Windows and available standard industrial components and contracts with industry
• TCR system requirements do not change for CCC
• Maintenance and repair quite easy
• No manpower, no budget and no time planned for changes
• Feasability for migration to LINUX not yet studied
13th May 2004 Uwe Epting - TS/CSE-CO 8
Questions
?