Trends in North American UVM
Trends in North American Utility Vegetation Management (UVM)
William Porter Principal Author of
CN Utility Consulting Utility Vegetation
Management Benchmark & Industry Intelligence (2010)
Trends in North American UVMOverview
Some Metrics We Are Covering Today:
I. Snapshot of North American UtilitiesII. UVM Program DriversIII. Cycles and Scheduling MethodologyIV. Clearance RequirementsV. UVM MethodsVI. ProductionVII. Customer IssuesVIII. ReliabilityIX. RegulationsX. Conclusion
Introduction
I. Basic Trend In North American UVM: Right Tree-Right Place
II. CNUC Objective: Discover Industry Best Management Practices(BMPs)
Introduction
Introduction
SNAPSHOT OF NORTH AMERICAN UTILITIESCompany Type
SNAPSHOT OF NORTH AMERICAN UTILITIESUtility Type
SNAPSHOT OF NORTH AMERICAN UTILITIESService Territory
SNAPSHOT OF NORTH AMERICAN UTILITIESService Territory Description – Customer Density
SNAPSHOT OF NORTH AMERICAN UTILITIES Overhead System Circuit Kilometres
SNAPSHOT OF NORTH AMERICAN UTILITIES Overhead System Span Kilometres
SNAPSHOT OF NORTH AMERICAN UTILITIES Tree Population
SNAPSHOT OF NORTH AMERICAN UTILITIES Tree Population
UVM PROGRAM DRIVERS
The Most Important Program Driver Is at the Top of the Graph
CYCLES AND SCHEDULING METHODOLOGYCycle Definitions
CYCLES AND SCHEDULING METHODOLOGYCycle Lengths
CYCLES AND SCHEDULING METHODOLOGYCycle Scheduling Methodology
CLEARANCE REQUIREMENTSCalifornia’s Clearance Requirements
GO 95 Rule 35: California has the most comprehensive UVM regulation in North America
Comments made by utilities with requirements:
• This enhances cycle times.• They are our major negotiating tool for obtaining what is proper clearance.• Clearance requirements set clear expectations and assist with funding requests.
CLEARANCE REQUIREMENTSMandatory Clearance Requirements
Opinions are Changing
CLEARANCE REQUIREMENTSDo They Work?
Companies Were Asked, “ Could You Achieve 100% Compliance with a Mandatory Clearance Requirement?”
UVM METHODSCrew Type
UVM METHODSHerbicide Usage
UVM METHODSSpecial Programs Included in Routine Maintenance
PRODUCTIONCost per System Span Kilometre
PRODUCTIONRelative Efficiency
CUSTOMER ISSUESUVM Inquiries per Year
CUSTOMER ISSUESUVM Complaints per Year
CUSTOMER ISSUESPerceived Customer Disconnect
Commentary by Utilities:
• Customer equates aesthetics with proper tree pruning, not aware of utility best management practices for line clearance.
• Although it is getting better, customer expectations are often not in sync with safety and reliability requirements.
CUSTOMER ISSUESUVM Problem Solving That Requires the Most Time
Ranked the Fifth Activity Out of 40 That Requires the Most Problem SolvingCustomer Relations Ranks Tenth
RELIABILITYCauses for Outages
RELIABILITYUS Reliability Metrics
SAIDI =
SAIFI =
CAIDI =
RELIABILITYFrequency of Outages Caused by Trees
LAWS AND REGULATIONSFAC-0003-1
LAWS AND REGULATIONSIncrease in Activities Due to Federal Regulations
CONCLUSIONMeasuring Progress
• This Graph Only Includes Companies with an Established Hazard Tree Removal Program
• Relatively High Correlation of -0.76 Which Means: The More Trees Removed, The Better The Reliability (In other words: SAIFI is Reduced)
CONCLUSION BMPs and Regulations for Right Tree in The Right Place
1. Clear Concept of Cycle Based Scheduling or a Replacement for Cycle Scheduling.
2. Cost Effective and Standardized Method of Tree Inventory/ Work Load Assessment.
3. Capture and Disseminate Research and Development Results.
4. Address the Customer Complaints Proactively, Recognizing the Political Force of an Insignificant Number of Complaints.
5. Keep Open and Debate the Concept of Mandatory Clearance Distances.