LOGISTICS AND INVENTORY CONTROL

PRESENTATIONON

A REAL COMPARISON OF LOGISTICS BETWEEN PAKISTAN RAILWAY AND TRUCKINIG INDUSTRY

(HEAVY VEHICLE INDUSTRY)

BY Waqqas Kayani

Jehanzeb Anees

Moazzam A.Vahidy

Page 2: Transport sector of pakistan

PAKISTAN INTRODUCTION• Population 170.0 million

• Population Growth Rate 1.999%

• GDP US$164.0 bn

• Contributors to GDP:

– Agriculture 21.0%– Manufacturing 22.0%– Services 57.0%

• Per Capita Income US$1,045

Page 4: Transport sector of pakistan

PAKISTAN RAILWAY AND ROADS LOGISTICS

• Pakistan's roads and highways are in dangerously poor condition. Minor maintenance is performed on existing roads as new construction continues.

• This ineffective planning and an erratic prioritization of resource usage and poor implementation of policies and regulations explain why Pakistan's inadequate road network doesn't serve its needs.

• Trade and commerce languish in the void of crucial road transport services. Moreover, serious and numerous fatal road accidents could be prevented with common sense, enforced regulations and practical traffic management systems.

• Second only to the armed forces, Pakistan Railway is the largest employer in Pakistan. The number of employees and their low skill levels drain any revenue earned.

• A single ministry, Ministry of Railways, manages this one sub sector of transportation. Yet, the viability of Pakistan Railways is in question. Flagrant sub-standard maintenance is performed. Modern and functional locomotives are in short supply. Unreliable and lacking passenger services receive resources on higher priority than possible revenue-producing cargo.

• Furthermore, inadequate investment levels deposited the fate of Pakistan Railways existence on the desk of the Privatization Commission.

Page 6: Transport sector of pakistan

ABOUT PAKISTAN RAILWAY

• Pakistan Railways is the state-owned railway company of Pakistan. It is a large organization under the administration of the Pakistani Government's Ministry of Railways.

• Pakistan Railways provides an important mode of transportation in the farthest corners of the country and brings them closer for business, sightseeing, pilgrimage and education and its headquarter in Lahore

• It has been a great integrating force and forms the life line of the country by catering to its needs for large scale movement of people and freight. The current chairman is Mr. Shakil Durrani.

Page 7: Transport sector of pakistan

HISTORY OF PAKISTAN RAILWAY

• The possibility of Karachi as a sea port was first noticed in the middle of 19th century. Sir Henry Edward Frere was appointed after its annexation to British India's Bombay Presidency in 1847 and sought permission from Lord Dalhousie to begin a survey for a sea port. He also initiated the survey for a railway line in 1858.

• It was proposed that a railway line from Karachi City to Kotri, steam navigation up the Indus and Chenab rivers up to Multan and from there another railway to Lahore and beyond be constructed.

• It was on 13 May 1861, that the first railway line was opened for public traffic between Karachi City and Kotri, a distance of 105 miles (169 km). The line between Karachi City and Kiamari was opened on 16 June 1889. During 1897 the line from Keamari to Kotri was doubled.

Page 8: Transport sector of pakistan

PAKISTAN RAILWAY ROLE

• Pakistan Railway forms the life line of the country by catering to its needs for large scale movement of freight as well as passenger traffic. It not only contributes to its economic growth but also promotes national integration.

• Pakistan Railway endeavors to run the trains strictly in accordance to time table and maintain high standard of punctuality.

• The progressive freight train sport organization operated by professional management and competent staff committed to provide reliable, competitive and economical service of recognized standards to its customers.

• It provides logistics services to its customers and having a country biggest cargo providing services to its customer.

• Pakistan Railway plays an important role in the development of economy and earning a huge revenue for country.

Page 9: Transport sector of pakistan

NETWORK OF RAILWAY BEFORE 1947

Page 10: Transport sector of pakistan

PAKISTAN RAILWAY

– Largely neglected since independence in 1947.

– Carry less than 9% of passenger and approximately 4% of freight.

– Total length of rail tracks in Pakistan are 8,162 KMS.

– Railways connect agricultural heartland to the port of Karachi.

– Sector, especially freight being opened by Government to private sector, however legal issues remain.

Page 11: Transport sector of pakistan
Page 12: Transport sector of pakistan

PAKISTAN RAILWAY MAJOR ROUTES FOR FREIGHT

Major Routes• Train platform at Rohri Junction• Train platform at Sahiwal Junction

The total length of railway tracks in Pakistan is 5,072 miles (8,163 km). The busiest routes include:

• Peshawar-Karachi Route • Peshawar-Quetta Route • Lahore-Sialkot Route • Lahore-Faisalabad Route • Faisalabad-Khanewal Route

Page 13: Transport sector of pakistan

FREIGHT TRAFFIC OF PAKISTAN RAILWAY

• The Freight Business Unit, with 12,000 personnel, operates over 200 freight stations on the railway network.

• The Unit serves two major ports of Karachi and Bin Qasim as well as all four provinces of the country and generates revenue from the movement of agricultural, industrial and imported products, Petroleum Oil & Lubricants (POL), wheat, coal, fertilizer, rock phosphate, cement, container traffic and sugar.

• About 39% of the revenue is generated from the transportation of POL products, 19% from imported wheat, fertilizer and rock phosphate. The remaining 42% is earned from domestic traffic.

Page 14: Transport sector of pakistan

FREIGHT TRAFFIC OF PAKISTAN RAILWAY

• The Freight Business Unit offers services to meet customer requirements and reduce

costs through efficiency, innovation and modernization.

• All possible efforts are made to increase revenues and pass on the benefits to customers. The Freight Business Unit is headed by an additional General Manager.

• The Freight Rates structure is based on market trends, particularly of road transport, which is the Railways' main competitor.

• The freight rates are no longer rigid but flexible, depending on the lead, peak-off peak season, and quantum offered.

Page 15: Transport sector of pakistan

CURRENT PROBLEMS IN PAKISTAN RAILWAY

• Pakistan railway still suffers from a mixture of gauges, 1,676 mm (5 ft 6 in) and 1,000 mm (3 ft 3⅜ in), but this is being gradually tackled by converting the narrow gauge lines to broad gauge, with little narrow gauge remaining.

Page 16: Transport sector of pakistan
Page 17: Transport sector of pakistan

PAKISTAN RAILWAY IS OPERATING ON THREE GUAGES

Page 18: Transport sector of pakistan
Page 19: Transport sector of pakistan

FUNCTIONS OF PAKISTAN RAILWAY

• All matters pertaining to Pakistan Railway.

• Movement and priority in respect of Defence traffic.

• Maintenance of Railway lines for strategic reasons.

• Negotiations with International Organizations and other Countries and implementation of agreements, with them.

• Coordination of Development Projects of Railways as a part of the National Development Programmed.

• Standardization and specifications of materials and stores.

• Overall efficiency and safety of Railways.

• Coordination of Rail movements into and from Ports

Page 20: Transport sector of pakistan

PAKISTAN RAILWAY NETWORK

Page 21: Transport sector of pakistan

PAKISTAN RAILWAY FREIGHT RATES DETAILS

Commodity: RICE

Unit: PER TONNE

Effect from date: 30/06/2009

Station From Station To Distance Rate

QUETTA VIA KOHI TAFTAN - 1635:00:00

LAHORE KOHI TAFTAN - 1610:00:00

LAHORE DRY PORT KOHI TAFTAN - 1610:00:00

MURIDKE KOHI TAFTAN - 750

KAMOKE KOHI TAFTAN - 2170:00:00

KARACHI BANDAR LAHORE - 890

GUJRAT KOHI TAFTAN - 1635:00:00

KBX WAZIR MANSION KOHI TAFTAN - 1925:00:00

Page 22: Transport sector of pakistan

PAKISTAN RAILWAY FREIGHT RATESPLANT & EQUIPMENT  UNIT 2006-2007 2007-2008

Route - Kilometers Kms 7,791 7,791

Track - Kilometers Kms 11,636 11,658

Locomotives No 544 555

Coaching Vehicles No 1,670 1,627

Other Coaching Vehicles No 246 241

Freight Wagons  No 19,638 18,638

Railway Stations No 589 559

OPERATIONS  UNIT 2006-2007 2007-2008

Passenger, Mixed & other Coaching Trains Run.  No 88,871 83,884

Train Kilometers, Passenger Mixed and other Coaching. Thousand 33,697 33,413

Coaching Vehicle-kilometers  Thousand 592,390 603,445

Freight Train Run No 16,728 18,181

Freight Train-Kilometers Thousand 7,132 7,338

Freight Wagon-Kilometers (Freight & Mixed Trains) Thousand 352,290 365,480

Other Coaching Freight Tonne-Kilometres. Thousand 562,705 550,205

Page 23: Transport sector of pakistan

Volume of Traffic  UNIT 2006-2007 2007-2008

Passengers Carried Thousand 83,899 79,984

Passengers Kilometers Thousand 26,446,362 24,730,726

Tonnes of  Freight Carried Thousand 6,420 7,234

Tonne - Kilometers  Thousand 5,453,969 6,187,299

Tonne - Kilometers Freight & Coaching Combined. Thousand 6,016,674 6,737,504

Freight Wagons Loaded No 320,335 363,564

 

FUEL CONSUMPTION  UNIT 2006-2007 2007-2008 

Furnace Oil Tonnes 1,499 1,473

H.S.D. Oil Tonnes 149,133 151,902 

Electric Energy KWH 10,942,567 5,810,094

Coal Tonnes 90.15 60

    

EMPLOYMENT & WAGES  UNIT 2006-2007 2007-2008

Persons Employed  No 86,564 86,669

Cost Of Employees Thousand 8,597,244 9,414,211

Pension Payment Thousand 4,067,468 4,364,471

 

FINANCIAL RESULTS  UNIT 2006-2007 2007-2008 

Gross Earnings Thousand 19,192,485 19,972,858

Total Ordinary Working Expenses Thousand 20,240,569 21,889,768

Operating Ratio Percent 105,46 109.59

Page 24: Transport sector of pakistan

PAKISTAN RAILWAY Comparative Statistics

2003 - 2004 Through 2007-2008 S.No Particulars 2003-2004

2004-2005

2005-2006

2006-2007

2007-2008

1

Capital-at-charge (at the end of the year in

Thousand) Rs. 22,538,64529,524,

219 35,082,670 38,783,272 43,419,142

2Stores Fund (Thousand) Rs. 6,124,496

6,228,889 8,647,914 9,883,807 11,851,117

3 Route-kilometers Rs. 7,791 7,791 7,791 7,791 7,791

4Track-kilometers including sidings Rs. 11,515 11,515 11,515 11,636 11,658

5Capital outlay (Per Route-kilometer) Rs. 3.277,967

3,789,528 4,502,975 4,977,958 5.572,987

6Gross Earnings

(Thousand) Rs. 14,634,57917,828,

650 18,182,079 19,192,485 19,972,858

7 Operating Expenses Rs. 13,354,34214,158,

740 17,693,619 20,240,569 21,889,768

8

Appropriation to Depreciation Reserve

Fund (Thousand) Rs. 216,519 248,060 373,630 542,518 484,123

9Net Earnings (Thousand) Rs. (-)2,438,445

(-)225,733

(-)3,854,022

(-)6,213,454

(-)7,500,521

10Interest Charges

(Thousand) Rs. 2,095,6812,145,9

92 3,726,626 3,363,889 3,795,061

11Gain (+) Loss (-)

(Thousand) Rs. (-)6,010,943(-)4,069

,993(-)11,642,7

91(-)15,277,6

68(-)16,854,7

89

12 Operating Ratio %  91.25 79.42 97.28 105,46 109.59

Page 25: Transport sector of pakistan

PAKISTAN RAILWAYComparative Statistics 2003 - 2004 Through 2007-2008 Contd..

Per Route-Kilometer Worked:-

13 Gross Earnings Rs. 1,878,395 2,288,3642,333,72

82,463,41

72,563,58

0

14Operating Expenses Rs. 1,714,072 1,872,288

2,271,033

2,597,942

2,809,622

15

Depreciation Reserve Fund

(D.R.F.) Rs. 27,790 31,839 47,956 69,633 62,138

16 Interest Rs. 268,897 275,445 278,324 431,766 487,108

17

Operating Expenses Plus

D.R.F. & Interest Rs. 2,010,851 2,124,5732,797,31

43,099,34

23,358,86

9

18 Gain (+) Loss (-) Rs. (-) 771,523 (-)522,396(-)1,494,3

89(-)1,960,

938(-)2,163,

366

19

Total train-kilometers excluding

Departmental (Thousand) Kms 38,718 37,760 38,064 40,829 40,829

20

Railcar and Trailer Coach kilometer

(Excluding Departmental (Thousand) Kms. Nil Nil Nil Nil Nil

Page 26: Transport sector of pakistan

PAKISTAN RAILWAYComparative Statistics 2003 - 2004 Through 2007-2008 Contd..

Per Train-Kilometers (including. 1/3 Car & Trailer Kms.

21 Gross Earning Rs. 377.9 472.1 477.6 470 487.9

22Operating

Expenses Rs. 344.9 374.9 464.8 495.7 534.7

23

Depreciation Reserve Fund

(D.R.F.) Rs. 5.5 6.5 9.8 13.2

11.8

24 Interest Rs. 54.1 56.8 97.8 82.3 92.7

25

Operating Expenses plus

D.R.F. & Interes Rs. 404.6 438.3 572.2 591.4 639.3

26 Gain (+) Loss (-) Rs. (-)155.2 (-)107.7 (-)305.8 (-)374.1 (-)411.7

27Passenger Carried

(Thousand)   75,700 781.79 81.428 83,899 79,984

28

Passenger-kilometres (Thousand)  

23,045,105

24,237,796

25,621,228

26,446,362

24,730,726

Page 27: Transport sector of pakistan

PAKISTAN RAILWAYComparative Statistics 2003 - 2004 Through 2007-2008 Contd..

Tonnes Carried

29(i) Public Goods (Excl. Live-

stock) (Thousand)   4.82 5.255 4,647 4,951 5,730

30(ii) Departmental

(Thousand)   1,320 1,155 1,380 1,469 1,504

31 (iii) Live-stock (Thousand)   1 -- -- -- --

32Total Goods (i+ii+iii)

(Thousand)   6,140 6,410 6,027 6,420 7,234

33Tonne-Kilometres

(Thousand)   4,796,269 5,013,540 4,970,8475,453,96

96,187,29

9

34

Average kilometers a Tonne of Goods was

Carried   781.2 782.1 824.7 849 855.3

35Coaching Earnings

(Thousand) Rs. 9,145,884 10,154,90111.269,05

611.674,5

1511,347,4

07

Page 28: Transport sector of pakistan

PAKISTAN RAILWAYComparative Statistics 2003 - 2004 Through 2007-2008

36Goods Earnings

(Thousand) Rs. 4,565,722 5,287,056 4,934,7395,115,3

316,120,1

76

37

Average rate charged per tonne per kilometer Paisa 0.9 1.05 0.94 0.9 1,.06

38

Miscellaneous Earnings

(Thousands) Rs. 922.972 2,385,510 1,978,0792,402,6

382,505,2

73

39

Earnings Under Suspense

(Thousand)   (-)685,546 (-)332,366 81,450(-)242,7

47 244,143

Page 29: Transport sector of pakistan

PAKISTAN RAILWAYComparative Statistics 2003 - 2004 Through 2007-2008

Rolling-Stock Owned on 30th June

40 Locomotives   592 557 544 544 555

41Coaching

Vehicles   1,865 1,818 1,904 1,916 1,868

42Brake·Vans

(goods)   328 328 373 411 421

43

Goods Wagons (in terms ef 4

wheelers)   25,324 25,249 24,644 23,593 23,289

44

Total Carrying Capacity of

Goods Wagons   487,822 488,500 546,564 606,119 598,303

45Persons Employed   90,891 86,807 86,096 86,564 86,669

Page 30: Transport sector of pakistan

PAKISTAN RAILWAY PRICING POLICY

• Pakistan Railways moves cargo on rails at a lesser cost in fuel spent in moving the same cargo by road.

• The organization by reason of this advantage is able to formulate its pricing policy to the maximum advantage allowable to the customer and the organization.

• The pricing policy of Railways is that all the

commodities be charged on differential basis according to the principle of  "What each type of traffic can bear" The rate structure of Pakistan Railways is designed to fix an upper limit while taking into account the basic cost incurred in transport value of commodity, its load ability, susceptible to damage and pilferage along with various other factors.

• Promotional reduced rates are quoted to provide incentive to move the commodities by Rail of Road. Seasonal reduced rates are quoted to attract the commodity.

Page 31: Transport sector of pakistan

PAKISTAN RAILWAY CARGO EXPRESS

• A Cargo Express Service introduced Since 1974 is now running daily for transportation of general cargo from Karachi City to Badami Bagh / Lahore and Vice Versa.

• This cargo express has been re-structured with High Capacity and High Speed Wagons along with terminal facilities to increase the present load of 1000 tones to 1600 tones A Similar Cargo Service has been initiated between Faisalabad   Multan and Karachi and vice versa.

• Presently, these services are being run five time a week.

• The containerization of cargo and the establishment of Dry Ports were the steps that further facilitated multimodal movement of goods

Page 32: Transport sector of pakistan
Page 33: Transport sector of pakistan

PAKISTAN RAILWAY MATERIAL HANDLING EQUIPMENTS

Page 34: Transport sector of pakistan

HEAVY VEHICLE INDUSTRY (FREIGHT CARGO)

OF

PAKISTAN

Page 35: Transport sector of pakistan

ROAD LOGISTICS SHARE IN PAKISTAN

• The road freight services are mostly (95%) in the private sector, though fragmented but very efficient.

• The public sponsored National Logistic Cell has a 5% market share, and enjoys a preferred status.

• Carry 91% of national passenger and 96% of freight.

• Total number of trucks registered in Pakistan are 210,027 (2008-2009).

Page 36: Transport sector of pakistan
Page 37: Transport sector of pakistan

TOTAL LENGTH OF NATIONAL HIGHWAY AND MOTORWAYS OF

PAKISTAN

• Pakistan National Highways is consist of 9,555 Km and in this Punjab secures the first position and second is Sind third is Baluchistan Fourth is Northern Areas and at last is Kashmir.

• Pakistan Motorway total length is 1930 Km and playing a vital role in the development of the country and in this Baluchistan is having 1030Km of road Motorway than comes Punjab.

Page 38: Transport sector of pakistan

(2003-2004).

Page 39: Transport sector of pakistan

Highways/ Motorways

Weigh Stations Installed Operational Planned/ In Progress

SSWIM HSWIM Static

M-1 - - - - 9

M-2 - 10 13 16 (7 HSWIM are being used

with static)

-

M-3 3 - - 9 0

M-9 - - 1 1 1

N-5 10 - 2 12 -

N-25 - - 2 2 -

N-40 - - 2 2 -

N-55 1 - - 1 5

N-65 - - 2 2 -

N-70 - - 2 0 1

SSWIM ---- Slow Speed Weigh In Motion

HSWIM ---- High Speed Weigh In Motion

WEIGH STATIONS IN PAKISTAN

Page 40: Transport sector of pakistan

Weigh station

Page 41: Transport sector of pakistan
Page 42: Transport sector of pakistan
Page 43: Transport sector of pakistan
Page 44: Transport sector of pakistan

Unfortunately In Pakistan Axle Loads are uncontrollable resulting in Damaging the Roads

Page 45: Transport sector of pakistan
Page 46: Transport sector of pakistan

OVERLOADING CAUSE ACCIDENT

Page 47: Transport sector of pakistan

COMPARISON DISTRIBUTION OF ACCIDENTS IN PAKISTAN AND EUROPE DUE TO POOR ROADS

AND OVER AXLE LOADS

Page 48: Transport sector of pakistan
Page 49: Transport sector of pakistan
Page 50: Transport sector of pakistan
Page 51: Transport sector of pakistan

Composition of Trucks by Axle Configuration ( 1995 Data)

No Two Axle Three Axle

Three Axle Trailer

Four Axle Five & Six Axle Total

Numbers

53864 16805 944 5076 1503 78192

% age 70 21.5 1.2 6.5 1.92 100

Page 52: Transport sector of pakistan

Composition of Trucks by Axle Configuration In Pakistan (1995)

Page 53: Transport sector of pakistan

Composition of Trucks by Axle Configuration Description

• The study revealed that there is a trend in the commercial market to use multi axle trucks instead of 2-axle. In 1982, share of 2-axle was 96.5% that reduced to 69% in 1995, whereas share of multi axle trucks increased from 4% in 1982 to 31% in 1995.

• Premature pavements failure of the National Highways and its rehabilitation and maintenance is the result of over loading. Axle load study NTRC conducted in 1995 indicates that 88% of trucks are loaded above the designed limits of 8.2 tons and 43% above the axle load limits of 12 tons.

Page 54: Transport sector of pakistan

• The prime reasons for the overloading as indicated in the study are the dominant presence of 2-axle trucks i.e. 69% in the overall truck fleet presently plying on our National Highways. Various studies nave indicated that 2 axle trucks cause most of the damage to pavement structure because of load distribution Mainly on rear axle.

• Technically speaking damage of road by standard axle (8.2 tons) is one and any increase in load on an axle increase by a power of 4.5 Tons.

• In addition to higher loading and to offset its effect tyres are over inflated far in excess of their normal pressure capacity. Studies revealed that almost 100% of the tiers are inflated in excess and are mostly as high as 160 psi against permissible design limits of 100 psi.

Composition of Trucks by Axle Configuration Description Contd..

Page 55: Transport sector of pakistan

COMMERICAL TRUCKS IN PAKISTAN FOR CARGO TRANSPORTATION

• In Pakistan presently there are around 210,027 (2008 – 2009) registered commercial trucks (3% of total vehicles) plying on our roads.

• Since there is no adequate truck manufacturing industry in Pakistan, types and makes of these trucks varies.

• Bodies are mostly manufactured in Pakistan by local Industry not following proper dimensions.

• Bed Ford (53%), Hino (23%), Nissan (16%), Isuzu (5%), other (3%) are common types of trucks.

Page 56: Transport sector of pakistan
Page 57: Transport sector of pakistan
Page 58: Transport sector of pakistan
Page 59: Transport sector of pakistan
Page 60: Transport sector of pakistan
Page 61: Transport sector of pakistan

INTRODUCTION

OF

NATIONAL LOGISTICS CELL

Page 62: Transport sector of pakistan

ABOUT NATIONAL LOGISTICS CELL• NLC is a multifaceted organization where

diversification guides growth. With business interests, both domestic and international, NLC’s development strategies exploit the strength of the core business while evolving challenging activities.

• Through infrastructure development, provision of freight services, management of border terminals and strategic inland dry ports, manufacturing and engineering excellence, enhancing energy resources; we endeavor growth towards a self reliant Pakistan.

• This established reputation of the Cell has resulted in the assignation of mega engineering and construction ventures in Qatar, Afghanistan and other countries of the Middle-East. This has resulted planned expansion of its operations to Central Asian Republics, Turkey and Iran.

Page 63: Transport sector of pakistan

NATIONAL LOGISTICS CELL HISTORY

• National Logistics Cell (NLC) was raised on 6th August 1978 to reduce the congestion at Karachi Port, which had resulted in a waiting time of 50 days for the ships and was costing the Government $12.5 Million per annum in demurrage.

• In the process NLC introduced in the country the concept of containerization and became the largest multi-modal freight handler in the region.

• NLC also serves as the Crisis Management Arm of the Government to handle and diffuse logistics emergencies. In recognition of its services, NLC has been awarded Gold Mercury Award by the Government of Pakistan.

Page 64: Transport sector of pakistan

E NATIONAL LOGISTICS CELL

• Under the eNLC Program, the National Logistics Cell plans to create a fully networked, IT-enabled environment which will streamline business processes and will eliminate operational redundancies.

• Additionally, it will provide ‘real-time’ accurate data for managing all our administrative and business functions. Using the latest web based technologies, NLC envisions itself transforming into a ‘One Stop Shop’ for clients’ multimodal freight requirements.

• Clients will be able to make bookings on the Internet and view the progress of their goods from pickup point to final destination. In an environment where the customer continues to have increasing options, NLC plans to offer quality services that no one else can provide.

Page 65: Transport sector of pakistan

E NLC ERP SYSTEM

Page 66: Transport sector of pakistan

NLC LOGISTICS FLEET• NLC is a financially independent,

multidimensional organization that employees more than 7000 personal, equipped with more than 1500 state of the art trucks. NLC today is on its way to become a modern, flexible and sophisticated logistics service provider in Asia.

• NLC has imported EURO 3 Mercedeze Benz prime movers which are the first of their kind in Pakistan, meeting all the international regulation of fitness, to be able to go in any country in the world.

• In the transportation and allied sector, NLC makes use of the most modern tracking developed indigenously by NLC and is adapting to fully automated concept of fleet management for its 1500 strong fleet of modern trucks.

Page 67: Transport sector of pakistan

NLC LOGISTICS FLEET CONTD..

• NLC embraces the emerging technologies developed both in Pakistan and abroad .

• Sadly, none of the Pakistan tucks at present come up to these standards. It also holds credit for the new car carrier which has the capacity of transporting 10 cars.

• These cars carriers are now being fabricated in NLC workshops in Karachi.

Page 68: Transport sector of pakistan
Page 69: Transport sector of pakistan

NLC DRY PORTS FOR LOGISTICS

• NLC is spearheading the drive to establish Dry Ports in Pakistan.

• It exclusively operates the Karachi and Hyderabad Dry Ports.

• In addition, NLC has established modern Container Freight Stations at Lahore and Amangarh (Nowshera).

• It has additional detachments at Sialkot, Multan, Faisalabad, Rawalpindi and Peshawar to meet the requirements of the business community.

Page 70: Transport sector of pakistan

NLC DRY PORTS FOR LOGISTICS Contd..

• NLC also handles international freight transiting Pakistani ports and offers warehousing facilities to United Nations World Food Program, UNHCR, UNICEF and other donor agencies.

• NLC is also employed by the government to monitor and arranges logistics for government and private sectors.

Page 71: Transport sector of pakistan

NLC WAREHOUSING FACILITY• Warehousing

• NLC owns both covered and open warehouses throughout the country.

• It offers covered accommodation of over 50,000 sq m and open warehousing facility of 0.5 million sq m for containerized cargo at Quetta and Amangarh (Nowshera).

• NLC is now launching a program of building additional ware housing capacity in the Rice Belt in Pakistan, especially in Gujranwala, Mured-ke and Shahdara.

 

Page 72: Transport sector of pakistan

NLC CUSTOM CLEARANCE AND HANDLING FACILITY

• In order to provide one window operation to its customers, NLC is Providing efficient custom clearance and handling services as per International Standards, with the assistance of Central Board of Revenue.

• This enables NLC to efficiently handle export cargo.

Page 73: Transport sector of pakistan

NLC STATE OF THE ART SCANNERS

• NLC is installing container scanners all across the country on behalf of Central Board of Revenue (CBR).

  • In the first phase 6 scanners are being installed.

Subsequently the Scanners at Lahore, Sialkot and Faisalabad will also be installed.

• This will facilitate the customers to conduct their business free of encumbrances of the post 9/11 security paradigm. These scanners are already functional at Port Qasim, Karachi and Lahore.

Page 74: Transport sector of pakistan
Page 75: Transport sector of pakistan

NLC BORDER TERMINALS• Modern Border Terminals

• The government has decided to establish four modern border terminals on routes entering Pakistan. In order to promote trade through land routes, the border terminals will be fully automated with in-house scanners and online data management.

• NLC has been tasked to build these state of the art Border terminals at Wagah, Torkham/Jamrod, Chaman and Taftan. NLC has therefore acquired land in these locations to develop these terminals and provide ware housing and display centres.

• Thus, the Pakistani exporters will be able to display their goods closer to the zero point and will be able to strike deals with importers on the spot.

• The establishment of such terminals would also meet one of the major requirements of trade facilitation in the region and promote land route trade among the countries of the region.

Page 76: Transport sector of pakistan
Page 77: Transport sector of pakistan

NLC TRANSPORTATION

OPERATIONS

Page 78: Transport sector of pakistan

DRY CARGO OPERATIONS

• Dry Cargo Operations

NLC specializes in transportation of containerized cargo and has the ability to deliver it cis or trans-frontier. It also handles commodities such as fertilizers, wheat, rice, cotton and sugar from ports and production sites to consumption centers all over Pakistan.

Page 79: Transport sector of pakistan

NLC LIQUID CARGO OPERATIONS

• NLC is a major oil carrier for OGDC, BP and MOL. It lifts over 50% of the nation's crude oil production from the far flung oil fields where the private bowzers dare not venture. The crude oil is transported by NLC from oil fields to refineries at Karachi and Rawalpindi. NLC employs special carriers to transport liquid chemicals and other products.

Page 80: Transport sector of pakistan

NLC CAR FLEET MONITROING SYSTEM

• NLC is Pakistan's only road transportation organization to install fully computerized vehicle's monitoring system. The system facilitates in the identification of the location of cargo being transported, and in forecasting its arrival at destination.  The system is being extended to enable customers to trace their cargo when transported by NLC.

Page 81: Transport sector of pakistan

NLC IN WATER LOGISTICS SERVICES

• Water Services

Provision of pure water in Karachi is one of the major problems of the metropolitan city. NLC has dedicated its bowzers for delivering pure water in Karachi and supplies over 3 million liters of water on a daily basis.

Page 82: Transport sector of pakistan

NLC DRIVING SCHOOL

• National Logistics Cell (NLC) Driving School Dina was established at 25 acres of land, equipped with modern training facilities in 2003 on GT Road at Dina near Jhelum. The school has the unique distinction of being the only and pioneer institute of its kind in Pakistan, solely dedicated to impart professional training to the driving segment of NLC in particular and the public Sector in general.

• Dynamic programme encompassing state of the art equipment, modern driving track, driving simulators, dedicated and professional instructional staff and congenial atmosphere are the hallmarks of the school. The school has a twenty seater Driving Simulator of Japanese origin

• The school is committed to develop its students into proficient drivers and responsible citizens with a passion to contribute towards the objective of safe driving and tolerance on the roads. So far this school has trained 983 NLC heavy vehicle drivers.

Page 83: Transport sector of pakistan
Page 84: Transport sector of pakistan
Page 85: Transport sector of pakistan

NLC TRANSPORT SHARE

Page 86: Transport sector of pakistan

NLC MATERIAL HANDLING EQUIPMENTS

Page 87: Transport sector of pakistan

INTRODUCTION

OF

CHOUDHARY CARGO

Page 88: Transport sector of pakistan

ABOUT CHAUDHARY CARGO• Chaudhary cargo is a local transport

goods company.

• There office is located in Mari Pur Bus Ada near Hawks bay.

• The company is about more than 10 years old.

• They give transport facility to their clients and having a 2 , 3 and 4 axle trucks and there quantity is around 8.

• They deal in all types of goods and cargo transfer facility.

Page 89: Transport sector of pakistan

CHAUDHARY CARGO LOGISTICS SERVICES

• Chaudhary cargo has a wide range of transport network all over the Pakistan.

• The major cities includes in their transport are Lahore, Faisalabad, Pindi, Quetta and Peshawar.

• There Trucks reach upcountry with cargo in 3 to 5 days or sometimes 7 days depending on cargo size and weight.

Page 90: Transport sector of pakistan

CHAUDHARY CARGO MATERIAL HANDLING EQUIPMENTS

• Chaudhary Cargo does not have a material handling equipments.

• The labour is arranged by them for their clients to lift off the cargo or goods and light and medium weight freights are handle by hands.

• Heavy Duty Fork Lifters and Mobile Cranes are available on hourly charges but it does not belongs to the company.

• Sometimes company bring their own labours.

• Oil and Diesels are provided by the PSO , CALTEX TOTAL and SHELL on credit to them.

Page 91: Transport sector of pakistan

CHAUDHARY CARGO MATERIAL HANDLING EQUIPMENTS

Page 92: Transport sector of pakistan
Page 93: Transport sector of pakistan
Page 94: Transport sector of pakistan

PERSONAL VISIT PHOTOS

OF

PAKISTAN RAILWAY

NLC AND CHOUDARY CARGO

Page 95: Transport sector of pakistan

AFTER AN EXTENSIVE RESEARCH WE ARE ABLE TO

COMPARE

PAKISTAN RAILWAY , NLC AND CHAUDARY CARGO

Page 96: Transport sector of pakistan

COMPARISON BETWEEN PAKISTAN RAILWAY ,

NLC AND CHOUDARY CARGO

• Pakistan Railway plays an important role in the transportation of goods from one city to another.

• Pakistan railway is cheaper then NLC and Choudary Cargo.

• Insurance facility is available in Pakistan railway as they have two options Owner Risk and Railway Management risk such as if customer uses its own labour and if any theft occurs than railway is not responsible and if customer sends goods through Railway Management service they appoint their person who takes care of goods and charges from customer. for eg if 50 packets of cement have to be sent to Faisalabad and their weight is around 3 tons and distance is around 700 km they will charge at the rate of 125.3 per ton .

• In Pakistan railway rates are totally depend on weight , distance or Km or mileage and it also depend on the railway stations.

Page 97: Transport sector of pakistan

COMPARISON BETWEEN PAKISTAN RAILWAY , NLC AND CHOUDARY CARGO CONTD..

• Pakistan Railway charges Rs.5 for per kg to keep goods in their godown after the arrival of goods after 24 hrs.

• Pakistan Railway gives free godown to their customer for 24 hrs after that they start to charge. (See Above)

• Maximum ZBFC AND ZBKC takes 60 tons of goods, 40 tons and minimum 20 tons of goods. ZBFC and ZBKC are cargo train carriers they have been imported from china and are also known as China Rack and their capacity is more then Pakistan railway has. ZBFC cargo carrier is closed from all sides and all goods , parcel and cargo send through them. And ZBKC is a opened cargo train carrier in this car , trucks and heavy machineries are send.

Page 98: Transport sector of pakistan

COMPARISON BETWEEN PAKISTAN RAILWAY , NLC AND CHOUDARY CARGO CONTD..

• But Pakistan railway takes the longest time to shift goods from one city to another at least 4 to 5 days and the risk is high as compared to road transport.

• In Pakistan railway if excel load exceeds then the goods are not taken by the railway master.

• In Pakistan railway Rates are fixed by the government and they are cheaper then road transportation.

• Pakistan railway provides goods services to each part of the country.

• In Pakistan railway they have no advance equipment all labour are using and they use local trawls.

• If NLC does not ship the goods within the time then they have to give 3000 rupees to their customer as a penalty on per ton.

Page 99: Transport sector of pakistan

National Trade Corridor

Page 100: Transport sector of pakistan

COMPARISON BETWEEN PAKISTAN RAILWAY , NLC AND CHOUDARY CARGO

• Every day Pakistan Railway sent the goods at 4.00 pm after the complete collection of good.

• According to the sources Pakistan railways have around more cargo carriers then others in Pakistan i.e. Road transport.

• Pakistan railway takes all products of government, private and semi government.

• Railway is cheaper then road transport but they are not speedy.

• Packing facility in Pakistan railway is partially given though most of the customers do by them self.

• No automatic tracking system only builty system is available.

• The routes charges are fixed by the government.

Page 101: Transport sector of pakistan

COMPARISON BETWEEN PAKISTAN RAILWAY , NLC AND CHOUDARY CARGO

• Handling of goods (Loading and unloading) Pakistan railway has given the contractor to local company and the agreement is of 0ne year.

• Due to its cheaper rate Pakistan railway has destroyed the work of local truck industry.

• Pakistan railway has no proper warehousing facility to its customers.

• Now days all heavy weight cargo are taken by the Pakistan railway.

• Pakistan railway has their own weighing machines.

• Pakistan railway has their own policy and can be seen in the picture.

• Routes are selected by the railway management.

• Diesel rates are fixed by the government and they are cheaper then another road transport companies.

Page 102: Transport sector of pakistan

COMPARISON BETWEEN PAKISTAN RAILWAY , NLC AND CHOUDARY CARGO

• NLC is a multifaceted organization where diversification guides growth. With business interests, both domestic and international, NLC's development strategies exploit the strength of the core businesses while evolving challenging activities.

• Through infrastructure development, provision of freight services, management of border terminals and strategic inland dry ports, manufacturing and engineering excellence, enhancing energy resources; we Endeavour growth towards a self reliant Pakistan.

• NLC provides online cargo tracking facilitates to its customers and Pakistan railway has no such computerized system as well as chodary cargo also.

• NLC provides cargo inspection machines.

• NLC only provides vessels to its customers and no such packing facilities are provide to their customers.

Page 103: Transport sector of pakistan

COMPARISON BETWEEN PAKISTAN RAILWAY , NLC AND CHOUDARY CARGO

• Containers are also not providing by NLC customer have to arrange by its self.

• NLC provides warehousing facility to its customer for container and they charge around Rs.40000 to 5000 rupees per day depending on cargo weight.

• They have around 1500 trucks.

• NLC take 2 to 4 days to reach its destination.

• Insurance facility is provided by the NLC to its customer.

• Builty system is not available in NLC.

• NLC have 40 feets (25 tons) , 45 feet ( 35tons) MB VEHICLES ( Mercedeze Benz Vehicle ) and GC VEHICLES (Grey Carrier vehicle) and they are all Volvo made vehicles.

Page 104: Transport sector of pakistan

Relative Operating Characteristics Surveyed after Great Research

Operating

Characteristics Rail NLC Chaudary

Speed 4 2 3

Availability 2 1 3

Dependability 3 1 4

Capability 2 1 3

Frequency 4 2 5

1=best, 5=worst

Page 105: Transport sector of pakistan

COMPARISON BETWEEN PAKISTAN RAILWAY , NLC AND CHOUDARY CARGO CONTD..

• They have both types of vehicles Containerized and flat truck vehicles.

• Rates are not fixed they are changed daily on the basis of market need and oil prices.

• NLC have their own fueling system the diesels are given to their vehicle from their own petrol pump and they charge diesel rates according to the distance and cargo weight (Rates not disclosed by them).

• NLC have a edge from their competitors they have modern handling equipment that can carry up to 60 tons of containers.

• If the container was not taken by the NLC on time then customer can fined them on daily basis i.e. Rs.3000 per kg.

• Route Racke done by NLC which means to select the shortest routes and it all done by the Lt. Colonel and liuetent after every 5 to 8 years.

Page 106: Transport sector of pakistan

COMPARISON BETWEEN PAKISTAN RAILWAY , NLC AND CHOUDARY CARGO

• NLC only takes the containers of government and semi government and some private companies such as Pakistan Ordinance factory , radio broad casting , Pakistan Army etc.

• Packing of goods done by the customers.

• NLC only arrange container Vehicles and ordinary vehicle.

• NLC as compared to Chowdary Cargo is more superior as well as from Pakistan railway but they are reliable ,to the time but little costly approximately they charge Rs.60,000 to 80,000 for 40 feet containers but rates are depend on the route distance.

Page 107: Transport sector of pakistan
Page 108: Transport sector of pakistan
Page 109: Transport sector of pakistan

COMPARISON TABLE AT A GALANCE

OF

PAKISTAN RAILWAY

NLC AND CHOUDARY CARGO

Page 110: Transport sector of pakistan

Pakistan Railway NLC Choudary Cargo

1.Pakistan Railway is cheaper.

2. No speclized Handling equipments.

3. No proper Warehousing.

4. Charge 250 to 500 rupees for godwon for 24 hrs.

5. Takes 5 to 6 days to reach its destination.

6. Builty System no computerized tracking.

7.No computerized System such as ERP.

1.NLC is expensive then Pakistan Railway.

2. They have speclized equipments.

3.Proper warehouse container facility.

4.They charge 5000 to 7000 rupees for 12 hrs.

5.They take 3 to 4 days.

6.Computerized tracking system.

7.ERP SYSTEM is available in NLC.

1.Chaudary cargo is also expensive.

2.They don’t have specialized equipments.

3.Proper warehouse facility but not comparative with NLC.

4.They sometime don’t charge for there cargo.

5.They take 4 to 7 days for up country.

6. They have a builty system.

7.No computerized system all hand work.

Page 111: Transport sector of pakistan

Pakistan Railway NLC Choudary Cargo

8. Pakistan Railway can carry up to 60 Tons of Cargo.

9. They don’t have specialized staff.

10. Facing problems in term of different gauges.

11. Rates Charges are fixed by the government a edge for Pakistan Railway.

12. Fuel is given by the government on discount but not disclosed by the officer.

8. NLC is capable of carrying 45 tons.

9. They have speclized staff and all are train.

10. Facing problems because of road conditions.

11. Rates are change on daily basis.

12. They their own PSO petrol pump from where all trucks fill diesel and the fuel is given on discount.

8. Chaudary cargo can carry up to 20 to 40 tons of cargo.

9. They also don’t have specialized staff all local labour on rent.

10. Proper warehouse facility but not comparative with NLC.

11. Rates are not fixed they charge on the weight of the cargo and company appearance.

12. . PSO , Caltex , Total and shell gives diesel on contract basis to them.

Page 112: Transport sector of pakistan
Page 113: Transport sector of pakistan

ADVANTAGES OF NLC OVER CHAUDHARY CARGO

Page 114: Transport sector of pakistan

RECOMMENDATIONS– Pakistan Railway should improve the line gauges to promote the

cargo transport from one city to another as well their warehousing facility.

– Pakistan Railway should have a latest handling materials.

– NLC should try to adopt more modern technology such as GPS so that drivers can avoid from traffic jam and reach its destinations.

– NLC must develop more logistics techniques.

– Chaudhary Cargo have to develop its fleet in proper manner.

– They should develop a driving school facility for the drivers.

Page 115: Transport sector of pakistan

CONCLUSION

• Logistics plays an important role in the development of the country. Pakistan can earn a heavy revenue from transport of cargo from one city to another.

• Pakistan Railway, NLC and Chaudhary Cargo is playing its role to promote the logistics but there is more to do in order to give Pakistan a name in the world just like Japan.

• Pakistan Government have to develop a robust policy in logistics and they have to open a training institute and should implement the Axle Load Policy in all trucks so that the roads will not be damaged results in delay transportation of Freights and accidents.

Page 116: Transport sector of pakistan

MANY THANKS TO THOSE WHO HELP US TO SHARE THE INFORMATION

• Pakistan Railway – Parcel Office (Karachi). Mr.Fiaz.

• Mr. Muhammad Aslam – Pakistan Railway (Commercial Superintendent (Parcel).

• Brigadier Fahim – NLC Freight Cargo DG.

• Mr. Qasim Bin Imad – NLC (Manager Marketing).

• Mr.Saud Khalid Chaudhry &

• Mr.Hamood Khalid Choudhry.

• National Highway Authority.