Transmission reliability metrics are more complex due to many factors

Factors

Response

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

Grid configuration, flows, and robust structural design sets transmission apart

Distribution

Radial Flow

Transmission

Bi-Directional Flow

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

Multiple functions of transmission vs. Load Serving distribution function

GenerationInterconnectionLoad

CircuitSwitchingSubstationCritical Path

Distribution Transmission

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

Transmission is subject to significant market interaction

Factors

Interactions

Response

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

The transmission industry is undergoing significant change

Factors

Response(Metric)

New

New

Modified

Modified

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

The physical attributes of the transmission grid are changing

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

The ownership and organization of utilities in the industry is changing

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

How we envision transmission grid use and its functionality is changing

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

Transmission reliability performance metrics development takes time

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

History 101: Two blackouts prior to the formation of NERC

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

2003 Blackout initiates change. FERC gains authority of grid reliability 2006

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

NERC RMWG working group formed in May 2009

1965 1977 2003 2009

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

Complexity & Change with Time Ticking

ComplexityChange Clock

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved

Blue Arc Energy Solutions , Inc.your advantage in performance intelligence

© 2009 Blue Arc Energy Solutions, Inc.All Rights Reserved