GRAYS HARBOR
TRANSPORTATION AUTHORITY
TRANSIT DEVELOPMENT PLAN
August 2019
GRAYS HARBOR TRANSPORTATION AUTHORITY
705 30th Street
Hoquiam, Washington 98550
Contact: Ken Mehin, General Manager
(360) 532-2770 or 1-800-562-9730
Grays Harbor Transit Authority complies with all federal requirements under Title VI, which
prohibits discrimination on the basis of race, color or national origin.
Special acknowledgement is due to Ken Mehin, General Manager (GHTA), Jean Braaten, Accounting Manager (GHTA), and
Martin Best, Administrative Services Manager (GHTA) for contributions to this document.
Grays Harbor Transit Authority
GRAYS HARBOR TRANSPORTATION AUTHORITY
TRANSIT DEVELOPMENT PLAN
Table of Contents
Section Page
I Organization ......................................................................................... 2
II Physical Plant ....................................................................................... 3
III Service Characteristics ......................................................................... 3
IV Service Connections............................................................................. 4
V Activities in 2018 ................................................................................. 5
VI Service Objectives ............................................................................... 6
VII Public Hearing………………………………………………………...9
VIII Proposed Changes 2019 - 2024............................................................ 9
IX Capital Improvement Program 2019 - 2024 ........................................ 10
X Operating Revenues and Expenditures 2018 - 2024 ............................ 11
XI Operating Data, 2018 - 2024 ................................................................ 18
APPENDIX
Public Transportation Management System
Table 1 – Owned Rolling Stock Inventory ....................................................2
Table 2 – Owned Equipment Inventory .........................................................6
Table 3 – Owned Facilities Inventory ............................................................7
- 1 -
- 2 -
SECTION I
ORGANIZATION
The Grays Harbor Transportation Authority is a County Transportation Authority (CTA), authorized under
Chapter 36.57 RCW located in the southwestern portion of Washington State. The Grays Harbor
Transportation Authority began providing transportation services in June of 1975. Our system map shown on
the prior page indicates the extent of our service area. The three Grays Harbor County Commissioners and the
Mayors of Aberdeen, Hoquiam and Cosmopolis comprise the current Board of Directors. The position held by
the Mayor of Cosmopolis alternates with the Mayors from McCleary, Elma, Montesano, Oakville, Ocean
Shores, or Westport. The Board of Directors holds public meetings monthly at the Grays Harbor Transportation
Authority's Administrative Offices in Hoquiam.
Below is the table of organization for the Grays Harbor Transportation Authority:
As of December 31, 2018, the Grays Harbor Transportation Authority employed:
63 full time equivalents in the Operations Division
15 full time equivalents in the Maintenance Division
2 full time 2 part-time equivalents in the Customer Service Division
6 full time equivalents in the Administration Division
- 3 -
SECTION II
PHYSICAL PLANT
The administrative offices of the Grays Harbor Transportation Authority are located at 705 30th Street in
Hoquiam. The offices are housed in the maintenance and operation facility located on approximately 2½ acres
in the industrial area of Hoquiam. The Authority operates and maintains six major transfer facilities in
Aberdeen, Hoquiam, McCleary, Montesano, Ocean Shores and Elma. A park and ride lot is located in the
Westport vicinity.
SECTION III
SERVICE CHARACTERISTICS
Fixed Route Service Operation
Services are available countywide. Intercounty service is provided to Olympia and Centralia. The Authority
operates ten fixed routes Monday through Friday as well as eight fixed routes on Saturday and Sunday. No
service on six National Holidays.
Hours of operation are 4:45a.m. - 10:15p.m. Monday through Friday; 7:10am to 9:00pm on Saturdays and
Sundays. Aberdeen/Hoquiam routes operate on average 30-minute headway five days a week. Outlying routes
to west county (North Beach area) operate on a 2 hour to 3-hour headway weekdays. Service to east county
(Montesano, Elma) operates on a 2-hour headway weekdays. North County (Quinault) service is five times
daily, and south county (Westport/Grayland) service is eight times daily on weekdays.
Services for Persons with Disabilities Operation
“Specialized Van Service” provides door-to-door service for people with qualified ADA disabilities, which
prevents them from using regular bus services. Specialized Van Service hours of operation reflect all Fixed
Route service. Specialized Van Service is available in any area up to ¾ mile of the regular fixed route service
and up to 3 miles in Aberdeen, Hoquiam, and Cosmopolis. No service on the six national holidays.
Fares and Passes
The basic fare is $1.00 per boarding within the county. $3.00 is the fare for a trip to Olympia except from
McCleary, which is $2.00. Children 5 and under ride free. Existing fares have been in place since September 2,
2013 when fares increased from $.50 to $1.00.
Basic Monthly Passes
General Monthly Zone 1 $28.00
Student/Senior/Disabled/ Zone 1 $20.00
Premium General (Zone 1&2) $63.00
Premium Discount (Zone 1&2) $36.00
Token Transit Pass (Zone 2) $45.00
Tickets
Strips of Ten (.50 per Ticket) $5.00
Strips of Ten ($1.00 per ticket) $10.00
- 4 -
Vanpool Services Operation
By the end of 2018, there were 12 Grays Harbor Transit commuter vanpools in operation throughout Grays
Harbor and into the City of Olympia.
Grays Harbor Transit staff markets the vanpool program to employers and individuals, facilitates group
formation and provides defensive driver training. Vanpool groups lease the vehicles on a monthly mileage
basis, and operate independently.
Fares: Recovered: 85% of the operating costs.
Total Boarding’s: 76,420; decrease of .27 % from 2017.
Agency Performance
Grays Harbor Transit actively pursues efforts to improve the internal operations of the agency through
improved communications, increased employee involvement and better understanding of the needs and desires
of customers and employees. These efforts are aimed at making Grays Harbor Transit a valued employer and
enabling employees to effectively serve their customers. Grays Harbor Transit reviews financial and ridership
performance on a monthly basis and provides updates to the Transit Board each month.
The Public Transportation Facilities and Equipment Management System (PTMS) is a tool for monitoring the
condition of the capital assets of the public transportation service providers within Washington State. From this
monitoring GHTA will implement the development of strategies and projects that provide for optimizing the
use of those assets. The PTMS, which initially was a requirement of the Intermodal Surface Transportation
Efficiency Act (ISTEA), is also a key element of the Public Transportation and Intercity Rail Passenger Plan for
Washington State.
The Washington State Department of Transportation requires that rolling stock, facilities (replacement value of
$25,000+), and equipment (replacement value of $100,000+ not permanently mounted) be monitored by the
PTMS. The rolling stock and facilities inventory for Grays Harbor Transportation Authority is shown in Tables
1 and 2 in the appendices. GHTA has no equipment that qualified for inclusion in the equipment inventory.
SECTION IV
SERVICE CONNECTIONS
Because of its unique position on the map, Grays Harbor Transportation Authority provides connections to
several other Western Washington systems. A connection to Pacific Transit is made in Aberdeen by Pacific
Transit through Grays Harbor Transit. The Jefferson Transit connection is made at Amanda Park, and
connections with Intercity Transit, Pierce Transit, Mason Transit, and Greyhound are made in downtown
Olympia. GHTA also provides connections to Twin Transit and Amtrak in Centralia.
The Authority believes in the education of our youth and provides services every half hour to Grays Harbor
College.
- 5 -
SECTION V
ACTIVITIES
Vanpool Program:
Effective January 1, 2018 GHTA increased rates to cover the additional cost to provide the service and to stay
competitive to neighboring transit agencies vanpool programs.
Transit Service:
In October of 2018 GHTA submitted operating grant applications through the Consolidated Grant Program with
Washington State Department of Transportation for the 2019-2021 Biennium. Grants submitted will help
sustain fixed route and demand response service in Grays Harbor County. Initial Grant awards for the 2017-
2019 biennium are $930,782 for capital projects (two new replacement 40-foot coaches) and $3,140,436 for
operational expenses.
GHTA received a Surface Transportation Program (STP) grant in the amount of $85,000 for a commuter study
to examine the feasibility and operability of an express bus to Olympia for commuters. This service will require
the addition of easy access Park and Rides along Highway 12 and cut at least 25 minutes off the Olympia trip.
Ferry Service Project:
GHTA in cooperation with the Cities of Ocean Shores and Westport are planning to do a feasibility study to
bring back the passenger ferry service between Ocean Shores and Westport. This project may require some
startup funds for incidental expenses which will be shared by the three entities.
GHTA will be asking its Board of Directors to approve a certain amount of funds to be allocated to the study
project. Should the Transit Board approve the level of these funds, they will remain in GHT’s accounts until
such time when it is used to pay for some preapproved services by the Transit Board.
Equipment:
Through a capital grant GHTA received six (6) replacement 35’ Gillig coaches in January 2019.
Through a capital grant, GHTA received ten (10) replacement cutaways in June of 2019.
Through a capital grant, GHTA received four (4) replacement 15 passenger vanpool vans in May of 2019.
Facilities:
In the spring of 2018 GHTA moved forward with a complete renovation of the maintenance bus shed.
GHTA continues to conduct preventative maintenance on all of its facilities. However, our main Administration
building, and bus garage are over 40 years old. As part of our Capital Facilities Planning process, GHTA is
looking at immediate and long-term needs for both administrative space as well as potential satellite facilities.
GHTA will continue to apply for grants to keep our facility in a state of good repair.
- 6 -
SECTION VI
SERVICE OBJECTIVES
Specific service objectives have been identified through the development of the Washington Transportation
Plan (WTP). The Washington State Department of Transportation is responsible for development of the WTP.
Under the policy set forth therein, the following service objectives have been met and/or are anticipated to be
achieved:
GOAL #1 – Preservation
• Emphasize infrastructure preservation and maintenance as the priority in funding transportation
programs.
Preserve service with operating grants and continued county-wide connections.
GHTA continues using the fully automated Paratransit scheduling system. This system provides for
efficient use of paratransit services and enhances the technical support of the entire system.
GHTA continues to use the fixed route scheduling software to streamline the process and optimize the
scheduled trips.
GHTA added six new regular size coaches to its fleet in January of 2019, and ten replacement cutaways
in June of 2019.
GHTA has enhanced and mirrored its Saturday and Sunday services.
• Use lowest life-cycle cost methodology to determine the appropriate schedule for upkeep.
GHTA is effective in utilizing spare parts from unusable rolling stock. Regular maintenance is
performed on all rolling stock, structural facilities and shelters.
GHTA has adopted an asset management plan, which contains our detailed maintenance plan using
lowest life cycle cost methodologies.
GHTA has been awarded a grant by WSDOT for fixed route replacement coaches. GHTA’s grant is for
two (2) units in the 2019-2021 Biennium.
GOAL #2 – Safety
• Emphasize traveler safety and security as a primary consideration in the planning, designing,
constructing, maintaining and operating of all transportation systems.
All new facilities are developed with passenger safety at the forefront. Any new stations will provide an
ADA accessible and safe environment for passengers.
With the addition of our new “Passive Restraint”, customers using wheelchairs will just roll in, facing
the back of the bus, and set their brakes – no buckles or straps needed. A padded backstop will keep
- 7 -
wheelchairs from moving if the bus brakes suddenly, and a handy pole will prevent lateral movement
during sharp turns – and also provide a convenient stop-request button.
GHTA continually monitors all services on a daily and regular basis. Safety is the system’s #1 priority
and regular and on-going training of Operations and Maintenance staff, as well as other agency support
staff remains a vital component of the organization.
GHTA Aberdeen Station features a 29-camera security system to improve safety and security and a
four-camera system has been installed at the Hoquiam Station. Additionally, a 13-camera system with
secured access is being developed for the main administrative/maintenance facility. In addition to the
site cameras, all of the cutaway and fixed route coaches are equipped with an interior and exterior multi-
camera system.
GHTA will continue to develop programs for agency staff. In-house safety programs and committees
meet on a regular basis to review existing conditions with an eye toward making improvements.
GOAL #3 – Economic Vitality
• Support those aspects of the transportation system that enhance tourism.
A brochure identifying major recreation sites in the County and the GHTA route(s) which best serves
those sites is available. A committee of GHTA employees developed a set of schedules to put in book
form. This “Bus Book” provides information in both Spanish and English about GHTA’s system and
services. Bus Books are updated three times per year and mirror information on the website. The “Bus
Book” is available at our main office, Aberdeen and Hoquiam Transit Centers, all buses and at locations
throughout the county, including grocery stores, libraries and visitor centers.
• Grays Harbor Transit is a partner with Timberland Library and have agreed to sell bus passes at all eight
Timberland Libraries in Grays Harbor County. This is a mutual benefit to GHTA and Timberland.
GHTA transports people to the library to buy passes and then they can access all the other services
Timberland Library provides. GHTA passes can also be purchased at the Intercity Transit Center.
GOAL #4 – Mobility
• Provide mobility for people with special needs.
GHTA continues to coordinate services with persons of special needs through the provision of dial-a-
ride services, incorporating all area medical services, senior centers and care providers.
GHTA continues to solicit comments from the disabled population for service improvement.
Comment/Complaint cards are available on all GHTA busses and vans as well as the transit centers. In
addition to the comment cards, citizens can contact GHTA by phone, TTY, or email,
- 8 -
Provide convenient connections to ensure seamless travel for the customer.
GHTA provides connections to other systems including: Pacific Transit, Intercity Transit, Jefferson
Transit, Mason Transit, Twin Transit AmTrak and Greyhound.
• Internet Service
The Grays Harbor Transit website provides route and scheduling information via the internet as well as
other information relevant to the transit system.
• Transfers
GHTA began offering free second rides within 4 hours of the first one on all local routes on its fixed
routes in June of 2016. This option is meant to lower the riders’ travel cost and improve GHTA’s
ridership level.
• Global Positioning System (GPS)
GHTA implemented GPS functionality to all its Main Line and SVS coaches in 2017, for added comfort
and security to its patrons. This feature allows riders to monitor their bus location without having to
contact the dispatch office. Upgrades are also being implemented to show alerts that may affect a
particular bus route.
• Operate transportation systems to work reliably and responsibly for the customer.
Primary services/routes were maintained with on-time scheduling being a cornerstone of GHTA.
• Grays Harbor Transit sells passes and tickets on smart devices by using the Token Transit software. This
option is the most convenient way of purchasing GHTA fares.
GOAL #5 – Environment
GHTA continues to meet all onsite water quality standards, and recycles antifreeze, engine oil, office paper,
cardboard material and computer components.
GHTA recently acquired clean burning waste oil heaters for the maintenance areas to utilize the waste oil from
the buses. In addition to saving on utility expenses, there will be additional savings on the cost of waste oil
disposal and reducing our carbon footprint.
GHTA has changed all its workspace and yard lights to LED. This move is in line with GHTA’s promise to be a
good environmental and financial steward of the area it serves.
GOAL #6 – Stewardship
GHTA continues to monitor its fixed and demand response service for effectiveness and solicits comments from
the general public for suggestions to improve service.
GHTA staff is diligent when obtaining goods and services to ensure GHTA receives top quality goods for the
lowest possible cost.
- 9 -
SECTION VII
PUBLIC HEARING
A public hearing on the Transit Development Plan was held at the Grays Harbor Transportation Authority
offices on August 13, 2019. The hearing notice was published in a local newspaper prior to the hearing.
Vickie Raines, chairman of the Grays Harbor Transportation Authority Board, called the public hearing portion
of the meeting to order at 4:00 pm. The TDP was approved at 5:25 pm. No comments and recommendations
were received.
SECTION VIII
PROPOSED CHANGES, 2019-2024
PRESERVATION IMPROVEMENT
2019 Services: No Change Mirror and expand Sat & Sun service
Facilities: Maintain/replace shelters TV Monitors for Aberdeen and Hoquiam Stations, Camera’s for the
HTC
Equipment: Replace 10 Mini Buses/6 Coaches
& 4 Vanpool Vans Admin II Demolition
2020 Services: No Change Improve weekday, Saturday and Sunday Service and Increase Dial a
Ride in outline area.
Facilities: Maintain/replace shelters, fuel
pump and island / Yard paving
Island Canopy
Yard Paving
Equipment: Replace 2 coaches, 2 mini busses,
5 Vanpool vans Implement security features at the main office
2021 Services: No Change
Facilities: Maintain/replace shelters Construct additional shelters, Hwy 12 & 8 Park and Ride lots
development
Equipment: Replace 2 coaches, 1 mini bus 3 Over the Road busses for Express Service to Olympia
2022 Services: No Change Olympia express service
Facilities: Maintain/replace shelters Main Facility Admin Building / Camera system at all transit stations
Equipment: Replace 6 coaches, 4 mini busses, Barcode all stops
2023 Services: No Change Implement Hoquiam Shuttle Service
Facilities: Maintain/replace shelters Aberdeen Transit Center upgrade and expansion
Equipment: Replace 4 Coaches & 2 mini busses 1 mini bus
2024 Services: No Change No Change
Facilities: Maintain/replace shelters No Change
Equipment: Replace 4 coaches /2 Mini busses /
2 Vanpool vans 2 Coaches for Express Service
- 10 -
SECTION IX
CAPITAL IMPROVEMENT PROGRAM, 2019-2024
The costs identified below are uninflated cost estimates associated with the proposed changes identified in
Section VIII. All figures are in thousands of dollars.
Preservation CIP 2019-2024
PRESERVATION 2019 2020 2021 2022 2023 2024
Maintenance Equipment $0 $20 $50 $50 $50 $50
Dial A Ride Vehicles $1,000 $0 $100 $400 $200 $200
Transit Center $230 $50 $20 $20 $75 $75
Transit Shelters $0 $25 $25 $25 $25 $25
Transit Coaches $2,640 $1,000 $1,000 $3,000 $2,000 $2,000
Vanpool Vans $163 $0 $0 $0 $0 $0
Facility & Grounds $1,272 $100 $25 $25 $25 $25
Totals $5,305 $1,195 $1,220 $3,520 $2,375 $2,375
IMPROVEMENT 2019 2020 2021 2022 2023 2024
Maintenance Equipment $0 $0 $25 $30 $50 $50
Dial A Ride Vehicles $0 $0 $10 $0 $100 $20
Transit Center $65 $0 $50 $50 $2,000 $40
Transit Shelters $0 $20 $2,000 $20 $20 $20
Transit Coaches $0 $0 $0 $0 $0 $1,000
Vanpool Vans $0 $0 $1,000 $70 $0 $0
Facility & Grounds $316 $800 $150 $5,000 $50 $50
Totals $381 $820 $3,235 $5,170 $2,220 $1,180
COMBINED 2019 2020 2021 2022 2023 2024
Maintenance Equipment $0 $20 $75 $80 $100 $100
Dial A Ride Vehicles $1,000 $0 $110 $400 $300 $220
Transit Center $295 $50 $70 $70 $2,075 $115
Transit Shelters $0 $45 $2,025 $45 $45 $45
Transit Coaches $2,640 $3,000
$1,000 $3,000 $2,000 $3,000
Vanpool Vans $163 $0
$0 $70 $0 $0
Facility & Grounds $1,588 $900
$175 $5025 $75 $75
Totals $5,686 $2,015 $4,455 $8,690 $4,595 $3,555
- 11 -
SECTION X
Operating Revenues and Expenditures, 2019-2024 (Amounts in Thousands after 2018)
General Working Capital Self Debt
Fund Capital Fund Ins. Service
Beginning Balance $1,346,765 $5,300,000 $1,040,000 $166,343 $7,853,108
Advertising $4,410 $4,410
Sales Tax $8,173,420 $8,173,420
Farebox $470,484 $470,484
Vanpool $99,061 $99,061
Sales Tax Equalization $825,666 $825,666
State Operating $370,707 $370,707
Federal Operating Grants $488,661 $488,661
Other $175,320 $175,320
Contribution to Accounts ($600,000) 600,000 $0
Total Available $11,354,494 $5,900,000 $1,040,000 $166,343 $0 $18,460,837
Vanpool P & M $118,210 $118,210
Vanpool Sys Exp. $0
Fixed Route P & M $6,379,401 $6,379,401
Fixed Route Sys Expand $0
Demand Response P & M $2,480,878 $2,480,878
Demand Resp. Sys Exp. $0
Ambulance $183,099 $183,099
Annual Depreciation $639,623 $639,623
Contribution to Accounts $0
Total Expenses $9,801,211 $0 $0 $0 $0 $9,801,211
Add Back Depreciation $639,623 $639,623
Net Cash Available $2,192,906 $5,900,000 $1,040,000 $166,343 $0 $9,299,249
Reg. Mobility $0
State Vanpool $0
State Sec 5309 $0
Fed. Sec 5311 0 $0
Total Capital Revenue $0 $0 $0 $0 $0 $0
System P & M 430,448 $430,448
System Expansion $0
Total Capital Expense $430,448 $0 $0 $0 $0 $430,448
Ending Cash Bal. 12/31 $1,762,458 $5,900,000 $1,040,000 $166,343 $0 $8,868,801
2018
CAPITAL REVENUE
EXPENDITURES
Total
OPERATING EXPENSE
- 12 -
SECTION X
Operating Revenues and Expenditures, 2018-2024 (Amounts in Thousands after 2018)
Update
General Working Capital Self Debt
Fund Capital Fund Ins. Service
Beginning Balance $1,762 $5,900 $1,040 $166 $0 $8,868
Advertising $5 $5
Sales Tax $8,220 $8,220
Farebox $475 $475
Vanpool $110 $110
Sales Tax Equalization $390 $390
State Operating $396 $396
Federal Operating Grants $534 $534
Other $203 $203
Contribution to Accounts 4,098 (4,098) $0
Total Available $16,193 $1,802 $1,040 $166 $0 $19,201
Vanpool P & M $187 $187
Vanpool Sys Exp. $0
Fixed Route P & M $8,147 $8,147
Fixed Route Sys Expand $0
Demand Response P & M $3,168 $3,168
Demand Resp. Sys Exp. $0
Ambulance $200 $200
Annual Depreciation $729 $729
Contribution to Accounts $0
Total Expenses $12,431 $0 $0 $0 $0 $12,431
Add Back Depreciation $729 $729
Net Cash Available $4,491 $1,802 $1,040 $166 $0 $7,499
State Equalization $800 $800
State Vanpool $96
Fed. Sec 5339 $2,085 $2,085
Fed. 5311 $0
Total Capital Revenue $2,981 $0 $0 $0 $0 $2,885
System P & M 5,305 $5,305
System Expansion 381 $381
Total Capital Expense $5,686 $0 $0 $0 $0 $5,686
Ending Cash Bal. 12/31 $1,786 $1,802 $1,040 $166 $0 $4,698
2019
CAPITAL REVENUE
EXPENDITURES
Total
REVENUE
OPERATING EXPENSE
- 13 -
SECTION X
Operating Revenues and Expenditures, 2018-2024 (Amounts in Thousands after 2018)
Update
General Working Capital Self Debt
Fund Capital Fund Ins. Service
Beginning Balance $1,786 $1,802 $1,040 $166 $4,794
Advertising $5 $5
Sales Tax $8,750 $8,750
Farebox $481 $481
Vanpool $115 $115
Sales Tax Equalization $600 $600
State Operating $300 $300
Federal Operating Grants $750 $750
Other $77 $77
Contribution to Accounts $500 ($500) $0
Total Available $13,364 $1,302 $1,040 $166 $0 $15,872
Vanpool P & M $185 $185
Vanpool Sys Exp. $0
Fixed Route P & M $8,310 $8,310
Fixed Route Sys Expand $0
Demand Response P & M $3,231 $3,231
Demand Resp. Sys Exp. $0
Ambulance $200 $200
Annual Depreciation $830 $830
Contribution to Accounts $0
Total Expenses $12,756 $0 $0 $0 $0 $12,756
Add Back Depreciation $830 $830
Net Cash Available $1,438 $1,302 $1,040 $166 $0 $3,946
Reg. Mobility $0
State Vanpool $0
Fed. Sec 5339 Grant/buses $930 $930
Fed. Sec 5311 Grant $0
Total Capital Revenue $930 $0 $0 $0 $0 $930
System P & M 1,195 $1,195
System Expansion 820 $820
Total Capital Expense $2,015 $0 $0 $0 $0 $2,015
Ending Cash Bal. 12/31 $353 $1,302 $1,040 $166 $0 $2,861
2020
CAPITAL REVENUE
EXPENDITURES
Total
REVENUE
OPERATING EXPENSE
- 14 -
SECTION X
Operating Revenues and Expenditures, 2018-2024 (Amounts in Thousands after 2018)
Update
General Working Capital Self Debt
Fund Capital Fund Ins. Service
Beginning Balance $353 $1,302 $1,040 $166 $2,861
Advertising $5 $5
Sales Tax $9,100 $9,100
Farebox $490 $490
Vanpool $115 $115
Sales Tax Equalization $600 $600
State Operating $300 $300
Federal Operating Grants $750 $750
Other $77 $77
Contribution to Accounts $2,342 ($1,302) ($1,040) $0
Total Available $14,132 $0 $0 $166 $0 $14,298
Vanpool P & M $185 $185
Vanpool Sys Exp. $0 $0
Fixed Route P & M $8,475 $8,475
Fixed Route Sys Expand $0
Demand Response P & M $3,296 $3,296
Demand Resp. Sys Exp. $0
Ambulance $200 $200
Annual Depreciation $860 $860
Contribution to Accounts $0 $0
Total Expenses $13,016 $0 $0 $0 $0 $13,016
Add Back Depreciation $860 $860
Net Cash Available $1,976 $0 $0 $166 $0 $2,142
Reg. Mobility $0
State Vanpool
Fed. Sec 5309 Grant/buses $0
Fed. Sec 5311 Grant $0
Total Capital Revenue $0 $0 $0 $0 $0 $0
System P & M 1,220 $1,220
System Expansion 3,235 $3,235
Total Capital Expense $4,455 $0 $0 $0 $0 $4,455
Ending Cash Bal. 12/31 ($2,479) $0 $0 $166 $0 ($2,313)
2021
CAPITAL REVENUE
EXPENDITURES
Total
REVENUE
OPERATING EXPENSE
• Deficit is due to grants that are required for future operating and capital needs.
- 15 -
SECTION X
Operating Revenues and Expenditures, 2018-2024 (Amounts in Thousands after 2018)
Update
General Working Capital Self Debt
Fund Capital Fund Ins. Service
Beginning Balance ($2,479) $0 $0 $166 $0 ($2,313)
Advertising $5 $5
Sales Tax $9,464 $9,464
Farebox $500 $500
Vanpool $115 $115
Sales Tax Equalization $600 $600
State Operating $362 $362
Federal Operating Grants $750 $750
Other $77 $77
Contribution to Accounts $0
Total Available $9,394 $0 $0 $166 $0 $9,560
Vanpool P & M $185 $185
Vanpool Sys Exp. $0 $0
Fixed Route P & M $8,645 $8,645
Fixed Route Sys Expand $500 $500
Demand Response P & M $3,361 $3,361
Demand Resp. Sys Exp. $0 $0
Ambulance $200 $200
Annual Depreciation $860 $860
Contribution to Accounts $0 $0
Total Expenses $13,751 $0 $0 $0 $0 $13,751
Add Back Depreciation $860 $860
Net Cash Available ($3,497) $0 $0 $166 $0 ($3,331)
Reg Mobility $0
State Vanpool
Fed. Sec 5309 Grant/buses $0
Fed. Sec 5311 Grant $0 $0
Total Capital Revenue $0 $0 $0 $0 $0 $0
System P & M $3,520 $3,520
System Expansion $5,170 $5,170
Total Capital Expense $8,690 $0 $0 $0 $0 $8,690
Ending Cash Bal. 12/31 ($12,187) $0 $0 $166 $0 ($12,021)
2022
CAPITAL REVENUE
EXPENDITURES
Total
REVENUE
OPERATING EXPENSE
• Deficit is due to grants that are required for future operating and capital needs.
- 16 -
SECTION X
Operating Revenues and Expenditures, 2018-2024 (Amounts in Thousands after 2018)
General Working Capital Self Debt
Fund Capital Fund Ins. Service
Beginning Balance ($12,187) $0 $0 $166 $0 ($12,021)
Advertising $35 $35
Sales Tax $9,842 $9,842
Farebox $510 $510
Vanpool $115 $115
Sales Tax Equalization $600 $600
State Operating Special Needs $362 $362
Federal Operating Grants $750 $750
Other $77 $77
Contribution to Accounts $0
Total Available $104 $0 $0 $166 $0 $270
Vanpool P & M $185 $185
Vanpool Sys Exp. $0
Fixed Route P & M $8,817 $8,817
Fixed Route Sys Expand 505 $505
Demand Response P & M $3,429 $3,429
Demand Resp. Sys Exp. $0
Ambulance $200 $200
Annual Depreciation $860 $860
Contribution to Accounts $0
Total Expenses $13,996 $0 $0 $0 $0 $13,996
Add Back Depreciation $860 $860
Net Cash Available ($13,032) $0 $0 $166 $0 ($12,866)
Reg. Mobility $0
State Vanpool
Fed. Sec 5309 Grant/buses $0
Fed. Sec 5311 Grant $0
Total Capital Revenue $0 $0 $0 $0 $0 $0
System P & M 2,375 $2,375
System Expansion $2,220 $2,220
Total Capital Expense $4,595 $0 $0 $0 $0 $4,595
Ending Cash Bal. 12/31 ($17,627) $0 $0 $166 $0 ($17,461)
2023
CAPITAL REVENUE
EXPENDITURES
Total
REVENUE
OPERATING EXPENSE
Deficit is due to grants that are required for future operating and capital needs.
- 17 -
SECTION X
Operating Revenues and Expenditures, 2018-2024 (Amounts in Thousands after 2018)
General Working Capital Self Debt
Fund Capital Fund Ins. Service
Beginning Balance ($17,627) $0 $0 $166 $0 ($17,461)
Advertising $5 $5
Sales Tax $10,235 $10,235
Farebox $520 $520
Vanpool $115 $115
Sales Tax Equalization $600 $600
State Operating Special Needs $362 $362
Federal Operating Grants $750 $750
Other $77 $77
Contribution to Accounts $0
Total Available ($4,963) $0 $0 $166 $0 ($4,797)
Vanpool P & M $185 $185
Vanpool Sys Exp. $0
Fixed Route P & M $8,993 $8,993
Fixed Route Sys Expand 510 $510
Demand Response P & M $3,497 $3,497
Demand Resp. Sys Exp. $0
Ambulance $200 $200
Annual Depreciation $860 $860
Contribution to Accounts $0
Total Expenses $14,245 $0 $0 $0 $0 $14,245
Add Back Depreciation $860 $860
Net Cash Available ($18,348) $0 $0 $166 $0 ($18,182)
Reg. Mobility $0
State Vanpool
Fed. Sec 5309 Grant/buses $0
Fed. Sec 5311 Grant $0
Total Capital Revenue $0 $0 $0 $0 $0 $0
System P & M 2,375 $2,375
System Expansion $1,180 $1,180
Total Capital Expense $3,555 $0 $0 $0 $0 $3,555
Ending Cash Bal. 12/31 ($21,903) $0 $0 $166 $0 ($21,737)
EXPENDITURES
2024
Total
REVENUE
OPERATING EXPENSE
CAPITAL REVENUE
Deficit is due to grants that are required for future operating and capital needs.
- 18 -
SECTION XI
OPERATING DATA, 2018-2024 (Amounts in Thousands after 2018)
FIXED ROUTES Actual Estimates appear in thousands
2018 2019 2020 2021 2022 2023 2024
Veh. Hours 41,505 45 50 55 60 65 70
Veh. Revenue Hours 40,010 40 45 50 55 60 65
Veh. Miles 1,089,537 1,200 1,200 1,200 1,200 1,200 1,200
Veh. Revenue Miles 1,057,663 1,200 1,200 1,200 1,200 1,200 1,200
Passenger Trips 732,681 800 800 800 800 800 800
DIAL-A-RIDE Actual Estimates appear in thousands
2018 2019 2020 2021 2022 2023 2024
Veh. Hours 26,810 30 30 30 30 30 30
Veh. Revenue Hours 26,810 30 30 30 30 30 30
Veh. Miles 349,795 400 400 400 400 400 400
Veh. Revenue Miles 349,795 400 400 400 400 400 400
Passenger Trips 66,076 70 70 70 70 70 70
VANPOOLS Actual Estimates appear in thousands
2018 2019 2020 2021 2022 2023 2024
Veh. Revenue Hours 10,829 13 13 13 13 13 13
Veh. Revenue Miles 339,065 300 300 300 400 400 400
Passenger Trips 104,120 95 95 95 100 100 100
FATALITIES, REPORTABLE INJURIES, COLLISIONS, and FUEL CONSUMPTION BY
SERVICE TYPE: 2018
SERVICE TYPE Fatalities
Reportable
Injuries Collisions
Gas. Fuel
Consumed
(gallon)
Fixed Routes 0 0 0 182,357
Dial-a-Ride 0 0 0
30,255 (gas)
16,825 (diesel)
Vanpools 0 0 0 15,906
APPENDIX
Public Transportation Management System
Appendix Page - 2
TABLE 1
PUBLIC TRANSPORTATION MANAGEMENT SYSTEM
Owned Rolling Stock
Public Transportation Management System I hereby certify that all information reported in the inventories reflects true, accurate and complete information for the agency/organization listed and that project equipment purchased through a state or federal grant agreement is still being used in accordance with the terms and conditions of the grant agreement. Owned Rolling Stock Inventory & Verification of Continued Use
Agency/Organization: Grays Harbor Transportation Authority Ken Mehin, General Manager
July 23, 2019
Reporting Year: 2019 Signature and Title
Date
No. Year Make/Model Vehicle Code
Vehicle Identification Number (VIN)
Agency Vehicle Number
Actual Life Odometer
Meets Financi
al Needs of SGR
Y/N
Is the Vehicl
e Safe? Y/N
Agency's ULB (Year)
Agency's ULB
(Miles)
Main-tenance Current
Y/N
Performs its
Designed
Function Y/N
Replace-ment
Cost $
ADA Acce
ss Y/N
Seating
Capacity
Fuel Type
WSDOT Title Y/N
1 2008 Ford-El Dorado-Van 11 1FD4E45S28DB59462 256 295,993 Yes Yes 10 250,000 Yes Yes $ 85,000 Yes 16+5 G NO
2 2012 Ford-El Dorado-Van 11 1FDFE4FSXCDA95946 257 161,671 Yes Yes 10 250,000 Yes Yes $ 85,000 Yes 16+5 G NO
3 2012 Ford-El Dorado-Van 11 1FDFE4FS1CDA95947 258 177,364 Yes Yes 10 250,000 Yes Yes $ 85,000 Yes 16+5 G NO
4 2012 Ford-El Dorado-Van 11 1FDFE4FS8CDB04742 259 204,634 Yes Yes 10 250,000 Yes Yes $ 85,000 Yes 16+5 G NO
5 2012 Ford-El Dorado-Van 11 1FDFE4FS3CDA95948 260 193,033 Yes Yes 10 250,000 Yes Yes $ 85,000 Yes 16+5 G NO
6 2014 Ford-El Dorado-Van 11 1FDFE4FS5EDB10145 261 136,193 Yes Yes 10 250,000 Yes Yes $ 85,000 Yes 16+5 G YES
7 2014 Ford-El Dorado-Van 11 1FDFE4FS7EDB10146 262 145,676 Yes Yes 10 250,000 Yes Yes $ 85,000 Yes 16+5 G YES
8 2017 Ford-El Dorado-Van 11 1FDFE4FS1HDC51640 263 71,644 Yes Yes 10 250,000 Yes Yes $ 85,000 Yes 14+5 G YES
9 2019 Ford Mini Bus 11 1FDFE4S1KDC37406 264 3,762 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
10 2019 Ford Mini Bus 11 1FDFE4S1KDC37407 265 3,604 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
11 2019 Ford Mini Bus 11 1FDFE4S1KDC37408 266 3,399 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
12 2019 Ford Mini Bus 11 1FDFE4S1KDC37409 267 3,518 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
13 2019 Ford Mini Bus 11 1FDFE4S1KDC37410 268 2,872 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
14 2019 Ford Mini Bus 11 1FDFE4S1KDC37411 269 2,153 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
15 2019 Ford Mini Bus 11 1FDFE4S1KDC37412 270 2,795 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
16 2019 Ford Mini Bus 11 1FDFE4S1KDC37413 271 1,930 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
17 2019 Ford Mini Bus 11 1FDFE4S1KDC37414 272 1,854 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
18 2019 Ford Mini Bus 11 1FDFE4S1KDC37415 273 1,864 Yes Yes 10 250,000 Yes Yes $ 98,229 Yes 14+5 G YES
Appendix Page - 3
19 2006 Ford Econovan 13 1FBSS31L06DB41816 506 176,771 Yes Yes 10 200,000 Yes Yes $ 30,000 No 15 G NO
20 2006 Ford Econovan 13 1FBSS31L26DB41820 510 180,015 Yes Yes 10 200,000 Yes Yes $ 30,000 No 15 G NO
21 2008 Ford Econovan 13 1FBNE31L88DB31946 511 147,743 Yes Yes 10 200,000 Yes Yes $ 30,000 No 12 G NO
22 2008 Ford Econovan 13 1FBNE31LX8DB31947 512 156,201 Yes Yes 10 200,000 Yes Yes $ 30,000 No 12 G NO
23 2008 Ford Econovan 13 1FBNE31L18DB31948 513 142,704 Yes Yes 10 200,000 Yes Yes $ 30,000 No 12 G NO
24 2009 Ford Econovan 13 1FBNE31L49DA02930 517 127,403 Yes Yes 10 200,000 Yes Yes $ 30,000 No 12 G NO
25 2009 Chevy Express 13 1GNGG25K091155114 519 126,203 Yes Yes 10 200,000 Yes Yes $ 26,000 No 8 G NO
26 2009 Chevy Express 13 1GNGG25K491156816 520 133,895 Yes Yes 10 200,000 Yes Yes $ 26,000 No 12 G NO
27 2010 Chevy Express 13 1GA2GYDG8A1154163 521 160,590 Yes Yes 10 200,000 Yes Yes $ 29,000 No 12 G NO
28 2010 Chevy Express 13 1GA2GYDG0A1154660 522 145,750 Yes Yes 10 200,000 Yes Yes $ 29,000 No 12 G NO
29 2010 Dodge Caravan 13 2D4RN4DE2AR343330 524 63,328 Yes Yes 10 200,000 Yes Yes $ 26,000 No 7 G NO
30 2011 Ford Convan 13 1FBSS3BL0BDA78726 526 141,390 Yes Yes 10 200,000 Yes Yes $ 30,000 No 15 G NO
31 2011 Ford Convan 13 1FBSS3BL2BDA78727 527 132,869 Yes Yes 10 200,000 Yes Yes $ 30,000 No 15 G NO
32 2011 Ford Convan 13 1FBSS3BL4BDA78728 528 156,660 Yes Yes 10 200,000 Yes Yes $ 30,000 No 15 G NO
33 2011 Dodge Caravan 13 2D4RN4DG2BR707985 529 84,116 Yes Yes 10 200,000 Yes Yes $ 30,000 No 7 G NO
34 2011 Dodge Caravan 13 2D4RN4DG4BR707959 531 101,996 Yes Yes 10 200,000 Yes Yes $ 28,000 No 7 G NO
35 2013 Dodge Caravan 13 2C4RDGBG7DR692379 532 69,250 Yes Yes 10 200,000 Yes Yes $ 28,000 No 7 G NO
36 2013 Dodge Caravan 13 2C4RDGBG5DR692380 533 62,500 Yes Yes 10 200,000 Yes Yes $ 28,000 No 7 G NO
37 2013 Dodge Caravan 13 2C4RDGBG7DR692381 534 89,808 Yes Yes 10 200,000 Yes Yes $ 28,000 No 7 G NO
38 2013 Chevy Express 13 IGAZG1FG5D1154130 535 138,897 Yes Yes 10 200,000 Yes Yes $ 30,000 No 15 G NO
39 2019 Ford Transit 13 1FBAX2CG7KKA41404 539 4,221 NO NO 10 200,000 NO NO $ 38,162 No 15 G NO
40 2019 Ford Transit 13 1FBAX2CG0KKA41406 540 2,091 Yes Yes 10 200,000 Yes Yes $ 38,162 No 15 G YES
41 2019 Ford Transit 13 1FBAX2CG9KKA41405 541 1,256 Yes Yes 10 200,000 Yes Yes $ 38,162 No 15 G YES
42 2019 Ford Transit 13 1FBAX2CG2KKA41407 542 2,984 Yes Yes 10 200,000 Yes Yes $ 38,162 No 15 G YES
43 2016 Gillig Low Floor 2 15GGB2710G1185621 801 171,306 Yes Yes 16 750,000 Yes Yes $550,000 Yes 29+2 D YES
44 2019 Gillig Bus 35' 2 15GGB2711K3193188 802 17,639 Yes Yes 16 750,000 Yes Yes $505,000 Yes 29+2 D YES
45 2019 Gillig Bus 35' 2 15GGB2713K3193189 803 16,764 Yes Yes 16 750,000 Yes Yes $505,000 Yes 29+2 D YES
46 2019 Gillig Bus 35' 2 15GGB271XK3193190 804 17,828 Yes Yes 16 750,000 Yes Yes $505,000 Yes 29+2 D YES
47 2019 Gillig Bus 35' 2 15GGB2711K3193191 805 13,648 Yes Yes 16 750,000 Yes Yes $505,000 Yes 29+2 D YES
48 2019 Gillig Bus 35' 2 15GGB2713K3193192 806 17,152 Yes Yes 16 750,000 Yes Yes $505,000 Yes 29+2 D YES
Appendix Page - 4
49 2019 Gillig Bus 35' 2 15GGB2715K3193193 807 17,934 Yes Yes 16 750,000 Yes Yes $505,000 Yes 29+2 D YES
50 2002 Gillig Low Floor 2 15GCB181821072527 863 774,042 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D NO
51 2002 Gillig Low Floor 2 15GGB191X21072528 864 820,584 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D NO
52 2002 Gillig Low Floor 2 15GCB181121072529 865 988,964 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D NO
53 2002 Gillig Low Floor 2 15GGB181821072530 866 859,361 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D NO
54 2002 Gillig Low Floor 2 15GGB181231072277 867 819,285 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D NO
55 2006 Gillig Low Floor 2 15GGB291761077430 872 564,730 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D NO
56 2006 Gillig Low Floor 2 15GGB291961077431 873 332,131 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D NO
57 2006 Gillig Low Floor 2 15GGB291061077432 874 528,215 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D NO
58 2012 Gillig Low Floor 2 15GGB2719C1176328 875 364,479 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D YES
59 2012 Gillig Low Floor 2 15GGB2710C1176329 876 344,056 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D YES
60 2012 Gillig Low Floor 2 15GGB2715C1181557 877 315,655 Yes Yes 16 750,000 Yes Yes $550,000 Yes 32+2 D YES
61 1998 Gillig Low Floor 1 15GGD1812W1070181 902 852,475 Yes Yes 16 750,000 Yes Yes $550,000 Yes 38+2 D NO
62 1998 Gillig Low Floor 1 15GGD1813W1070173 904 989,187 Yes Yes 16 750,000 Yes Yes $550,000 Yes 38+2 D NO
63 1998 Gillig Low Floor 1 15GGD1815W1070174 905 890,393 Yes Yes 16 750,000 Yes Yes $550,000 Yes 38+2 D NO
64 1998 Gillig Low Floor 1 15GGD1810W1070180 909 952,168 Yes Yes 16 750,000 Yes Yes $550,000 Yes 38+2 D NO
65 2016 Gillig Low Floor 1 15GGD271XG1185662 912 182,022 Yes Yes 16 750,000 Yes Yes $550,000 Yes 35+2 D YES
66 2016 Gillig Low Floor 1 15GGD2711G1185623 913 181,175 Yes Yes 16 750,000 Yes Yes $550,000 Yes 35+2 D YES
67 2016 Gillig Low Floor 1 15GGD2713G1185624 914 164,295 Yes Yes 16 750,000 Yes Yes $550,000 Yes 35+2 D YES
68 2003 New Flyer Low Floor 1 5FYD2LV053U025639 968 788,534 Yes Yes 16 750,000 Yes Yes $550,000 Yes 35+2 D YES
69 2003 New Flyer Low Floor 1 5FYD2LV013U025640 969 801,175 Yes Yes 16 750,000 Yes Yes $550,000 Yes 35+2 D YES
70 2003 New Flyer Low Floor 1 5FYD2LV033U025641 970 779,408 Yes Yes 16 750,000 Yes Yes $550,000 Yes 35+2 D YES
71 2003 New Flyer Low Floor 1 5FYD2LV053U025642 971 669,755 Yes Yes 16 750,000 Yes Yes $550,000 Yes 35+2 D YES
Appendix Page - 5
Rolling Stock Useful Life Benchmarks
d
Appendix Page - 6
TABLE 2
PUBLIC TRANSPORTATION MANAGEMENT SYSTEM
Owned Equipment Inventory
Agency/Organization: Grays Harbor Transportation Authority
Date: 724/2019
Equipment Code and Description Condition (points)
Age (years)
Remaining Useful Life
(years)
Replacement Cost ($)
Comments (If more than two lines, please attach a
separate comment page)
1. 16-Bus Washer 100 10 15 $200,000.00 Replaced wash system in existing building.
2.
3.
Appendix Page - 7
TABLE 3
PUBLIC TRANSPORTATION MANAGEMENT SYSTEM
Owned Facilities Inventory
Agency/Organization: Grays Harbor Transportation Authority
Date: 7/23/2019
Facility
Code Facility Name Condition
(points) Age
(years)
Remaining Useful Life
(years) Replacement
Cost ($)
Comments (If more than two lines, please
attach a separate comment page)
1. 10&11 Administration & Maintenance Bldg. 50 38 2 $5,500,000 10,260 sq. ft.
2. 6 Aberdeen Station 70 28 19 $2,090,000 office, public/private restrooms,
covered benches
4. 6 Hoquiam Station 70 27 18 $550,000 office, public/private restrooms,
covered benches
5. 6 Montesano Station 70 23 19 $330,000 covered benches
6. 9 Westport Park & Ride Lot 80 24 16 $165,000 25 spaces, covered shelter
7. 6 Elma Station 80 15 26 $165,000 20 space park & ride, covered
benches
8. 6 Ocean Shores Station 50 14 26 $330,000 covered benches