13
7/28/2019 Training Day 2 http://slidepdf.com/reader/full/training-day-2 1/13 Telkomsel IN Daily Report(template) 内部公开 Issue Date leader No. 1.1 1.2 2.1 2.2 TELKOM IMS Training Report training material 2nd day 1. Continue SIP Protocol 2. OSTA2.0 Hardware System 3. CGP Introduction 4. CGP General Operation and Maintenance 18 October 2011 1 - Hari Lo - Zukhri supriyono - Zulaikah - Rendy - Wilvan Report Date CN Team PT.Telekomunikasi Indonesia Tbk Operatort Name: Subject description material Header Fields 1.Via 2.Supported 3.Content Length/Content Type 4.Expires 5. Max Forwards and User Agent 6. Extension Header 1. OSTA Platform 2. Rack 3. Hardware Components 4. Full Rack Configuration (Integrated Rack, Service Rack, Network Rack) 5. T8280 Sub Rack 6. Master Rack Monitoring Unit Bord Introduction 1.Overview of OSTA board 2.Equipment Management Subsystem 3.Switching Subsystem 4. Processor Subsystem 5. Electromechanical Subsystem SIP Application in IMS 1.Main Procedure in IMS Application (session setup,media negotiotian) 2.Route in IMS Signaling Flow OSTA Indtroduction 4/13/2013 华为机密,未经许可不得扩散 第1页,共13页

Training Day 2

Embed Size (px)

Citation preview

Page 1: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 1/13

Telkomsel IN Daily Report(template) 内部公开

Issue Date

leader 

No.

1.1

1.2

2.1

2.2

TELKOM IMS Training Report

training material

2nd day

1. Continue SIP Protocol

2. OSTA2.0 Hardware System

3. CGP Introduction

4. CGP General Operation and Maintenance

18 October 2011 1

- Hari Lo

- Zukhri supriyono

- Zulaikah

- Rendy

- Wilvan

Report Date

CN Team

PT.Telekomunikasi Indonesia TbkOperatort Name:

Subject

descriptionmaterial

Header Fields

1.Via

2.Supported

3.Content Length/Content Type

4.Expires

5. Max Forwards and User Agent

6. Extension Header

1. OSTA Platform

2. Rack

3. Hardware Components

4. Full Rack Configuration (Integrated Rack, Service

Rack, Network Rack)

5. T8280 Sub Rack

6. Master Rack Monitoring Unit

Bord Introduction

1.Overview of OSTA board

2.Equipment Management Subsystem

3.Switching Subsystem

4. Processor Subsystem

5. Electromechanical Subsystem

SIP Application in IMS

1.Main Procedure in IMS Application (session

setup,media negotiotian)

2.Route in IMS Signaling Flow

OSTA Indtroduction

4/13/2013 华为机密,未经许可不得扩散 第1页,共13页

Page 2: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 2/13

Telkomsel IN Daily Report(template) 内部公开

2.3

2.4

2.5

3.1

3.2

3.3

3.4

4.1

4.2

4.3 KVM over IP1. Login KVM over IP

2. Login to the Board

OSTA Hardware O&M

1. Power System Checking

2. Fan Box Checking

3. Board Checking

4. Port Checking

System Architecture

1. CGP Software

2. CGP Software Architecture

3. Operation and Management Nes

iLMT introduction

Alarm Flow

1. Main Panel

2. Device Panel

3. Batch Command Operation

4. Batch Command Setting

5. Batch Command Execute

6. Export ME Configuration File

7. List Event Log File

8. List Alarm Log File

Interfaces

.

2. Northbound Interface

3. Function of the Northbound Interface

Function and Features

1. CGP Function ( Manageing of Configuration,

Performance, security, Log, signaling, and Fault)

2. MML Command Saving

3. FTTPS Function

1. Hardware Alarm Classification

2. Board Alarm Report Path

3. Disk Array Alarm Report Path

4. Software Alarm Classification

5. Software Alarm report Path

Product Positioning

1.Location of the CGP

2.Logging in to The CGP3.Navigation Tree

4.CGP Client Interface

5.CGP Processes

Software Architecture1.Operating System

2. Carrier Grade Platform (CGP)

Signaling Cable

1. System Connection

2. OMU Back Slot Bord Connection

3. Cascading Mode

4. Broadband Signaling Processing Board

5. PDB Monitor Serial Cable Connection

6. Connections Between iCG981/MediaX3600 andS2600F disk Array

7. Connection Between HSS and S2600F Disk Array

4/13/2013 华为机密,未经许可不得扩散 第2页,共13页

Page 3: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 3/13

Telkomsel IN Daily Report(template) 内部公开

4.4 Serial Over IP 1. Serial over IP Operation

4/13/2013 华为机密,未经许可不得扩散 第3页,共13页

Page 4: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 4/13

Telkomsel IN Daily Report(template) 内部公开

9.00-10.30

8 October 2011

kongzhigang

time

4/13/2013 华为机密,未经许可不得扩散 第4页,共13页

Page 5: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 5/13

Telkomsel IN Daily Report(template) 内部公开

10.30-14.30

14.30-17.00

17.00-18.00

4/13/2013 华为机密,未经许可不得扩散 第5页,共13页

Page 6: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 6/13

Telkomsel IN Daily Report(template) 内部公开

4/13/2013 华为机密,未经许可不得扩散 第6页,共13页

Page 7: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 7/13

CO site nameSite

type(indoor/outdoor) Actual CO Date

CO

Status(finish/pending)

RL_TJR_kimstar outdoor 1-Aug-11 finish

Tnajung Batu 1 indoor  

Tanjung Batu 2 indoor  

RW_SPL otdoor 11-12 aug 2011 finish

RBE_sentrum outdoor 22-08-2011 finish

MRT_TJM--

>172.29.47.29outdoor 23-08-2011 finish

MRA_PUBA outdoor 24-08-2011 finsh

JTN Tahap 5 VIP

subscriber indoor 22-08-2011 finish

11-Aug-11 finish

MIGRATION C5

Page 8: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 8/13

46

45

44

43 0 1 2 3 4 5 6 7 8 9 10 11 12 13

42

41

40

39

38

37

36

35

3433

32

31

30

29 1U

28 1U

27 1U

26 1U

25 1U

24 1U

23 0 1 2 3 4 5 6 7 8 9 10 11 12 13

22

21

20

19

18

17

16

1514

13

12

11

10

9 FAN1

    U    P    B    A    5    /    G    B    U    0    1

    U    P    B    A    1    /    O    M    U

    S    W    U    A    1

    S    W    U    A    1

    U    P    B    A    5    /    G    B    U    0    1

    U    P    B    A    5    /    G    B    U    0    1

    U    P    B    A    5    /    G    B    U    0    1

    U    P    B    A    0    /    G    C    U    1    0

    0

    U    P    B    A    0    /    G    C    U    1    0

    0

    U    P    B    A    0    /    G    C    U    1    0

    0

    U    P    B    A    0    /    G    C    U    1    0

    0

    U    P    B    A    1    /    O    M    U

    S    W    I    A    1

    S    W    I    A    1

    U    S    I    A    1

    U    S    I    A    1

    U    S    I    A    1

    U    S    I    A    1

Basic

Subrack (0)14U

    U    S    I    A    1

    U    S    I    A    1

    U    S    I    A    7

    U    S    I    A    7

Cabling Trough

LAN Switch (LSW00)

Cabling Trough

Dummy Panel

LAN Switch (LSW01)

Extended

Subrack (1)14U

3U Power Distribution Box

Page 9: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 9/13

8

7

6

5

4

3

2

1

 Air intake vent

SMM1 SMM29U

FAN2

Page 10: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 10/13

for XPTU to Lig OAM

0 1 2 3 4 5 6

Expansi on 15 august

From 2nd BOQ expansion

    F   r   o   n    t

    U    P    B    A    0    /    G    C    U    1    0

    0

    U    P    B    A    0    /    G    C    U    1    0

    0

    U    P    B    A    0    /    G    C    U    1    0

    0

    U    P    B    A    0    /    G    C    U    1    0

    0

    U    P    B    A    1    /    O    M    U

    U    P    B    A    1    /    O    M    U

    S    W    U    A    1

    U    S    I    A    7

    U    S    I    A    7

    S    W    I    A    1

    B   a   c    k

    U    S    I    A    1

    U    S    I    A    1

    F   r   o   n    t

ignaling to LS/route

    B   a   c    k

    U    S    I    A    1

    U    S    I    A    1

    U    S    I    A    7

    U    S    I    A    7

Page 11: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 11/13

.

   s    l   a   v   e

   m   a   s    t   e   r

   s    l   a   v   e

   m   a   s    t   e   r

   s    l   a   v   e

   m   a   s    t   e   r

   m   a   s    t   e   r

Page 12: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 12/13

to LS/router 

Billing center 

7 8 9 10 11 12 13

    U    P    B    A    5    /    G    B    U    0    1

    U    P    B    A    5    /    G    B    U    0    1

    U    P    B    A    5    /    G    B    U    0    1

    U    P    B    A    5    /    G    B    U    0    1

    S    W    U    A    1

    U    S    I    A    1

    U    S    I    A    1

    U    S    I    A    1

    S    W    I    A    1

    U    S    I    A    1

    U    S    I    A    1

    U    S    I    A    1

Page 13: Training Day 2

7/28/2019 Training Day 2

http://slidepdf.com/reader/full/training-day-2 13/13

   m   a   s    t   e   r

   s    l   a   v   e

   s    l   a   v   e

   m   a   s    t   e   r

   s    l   a   v   e