T T raffic raffic I I ncident ncident M M anagement anagement Program Program AASHTO SSOM AASHTO SSOM Meeting Meeting April 9, 2013

Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

Embed Size (px)

Citation preview

Page 1: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

TTraffic raffic IIncident ncident

MManagement Program anagement Program AASHTO SSOM AASHTO SSOM Meeting Meeting April 9, 2013

Page 2: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

Strategic Plan FY 2013-2017Strategic Plan FY 2013-2017FHWA Vision for TIM ResultsFHWA Vision for TIM Results

By 2017, FHWA Efforts Will Ensure:By 2017, FHWA Efforts Will Ensure:

Safe, Quick Clearance Laws—especially Move It—& the NUG adopted by all States

Performance Measures Collected in the Top Metro Areas Around the Country & Demonstrate TIM Improvements

TIM SHRP2 Responder Course, TIM Mid-Level Manager Workshop, TIM Decision Maker Courses & Other Topical Courses Used to Train Millions

Local-level Program Improvements that Will Benefit Region/State via Multiplier Effect

Page 3: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

Establishing the FoundationTI&EM Roadmap with 4 National Pillars

◦ National Leadership and Legislation◦ Institutional Development and Sustainability◦ Professional Capacity Building◦ Public Awareness and Education

2012 Senior Executive Transportation & Public Safety Summit

◦ Senior Executive Buy-In/Validation◦ Develop National Action Items

Advance Senior Executive Advance Senior Executive ParticipationParticipation

•Develop Executive Leadership Group (ELG)•Establish National Score Card

TIM Decision Maker TIM Decision Maker MeetingsMeetings

•Discuss & Promote TIM among Local/Regional Community Leadership

• Law Enforcement, Fire, & Transportation, Elected Officials

National Leadership Structure: National Leadership Structure: A cultural shiftA cultural shift

Page 4: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

Top Strategies to Progress TIM NationallyDeveloping a Presidential Directive Advancing TIM; Led by Public Safety CommunityAdvancing TIM Performance Measurements, Including a Change in Terminology from Secondary Crash to Event-Induced CrashExploring Grant Programs & Other Incentives to Adopt TIM Programs & StrategiesReaching Out to Public Safety Elements Using Regional Meetings, e.g., FHWA Support of IACP/S&P Regional MeetingsPromoting the Design & Development of Single & Multi-Disciplinary Regional Training Centers” dedicated to TIM

For Example, Tennessee Highway Patrol & TN DOT will build 800’ Freeway on Academy Grounds to Support TIM Training

Engaging Other Fed Departments & Agencies that Lead Public Safety Disciplines: DHS-Fire; DOJ-Law Enforcement; HHS-EMS, etc.

National Leadership Structure: National Leadership Structure: Game Changing StrategiesGame Changing Strategies

Page 5: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

Performance ManagementPerformance ManagementIACP State & Provincial Programs Committee/TIM SubcommitteeIACP State & Provincial Programs Committee/TIM Subcommittee

Develop & Deploy TIM Performance Pilot to Build Business Case Develop & Deploy TIM Performance Pilot to Build Business Case for TIM PMs Nationallyfor TIM PMs Nationally

Page 6: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

Expansion and improvement of SSP B/C tool- Overall TIM program effectiveness- Other TIM strategies- Improved sec. crash

estimation methodology- Additional lane blockage

analysis- Interface and defaults- Validation

4 Workshops

Institutional Development & Institutional Development & SustainabilitySustainability

TIM Benefit/Cost ToolTIM Benefit/Cost Tool

Page 7: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

Messages from Poster & PostcardsMessages from Poster & Postcards

Outreach Tools Outreach Tools http://ops.fhwa.dot.gov/eto_tim_pse/timtoolbox/index.htm•FHWA Memo to Community Partners•Talking Points Framework•Sample Press Release•Master PowerPoint Presentation•Brochure•2-Sided Postcard

Outreach ToolsOutreach Tools•Poster•Sample Driver Ed Curriculum Insert•PSA Videos –“Move Over” & “Move It” (coming soon)

Public Awareness & Education:Public Awareness & Education: Public Outreach ToolkitPublic Outreach Toolkit

Page 8: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

National Traffic Incident National Traffic Incident ManagementManagement

Responder Training Responder Training

8

Paul
Page 9: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

FHWA leadership to Foster Transportation & Public Safety Executive-Level Engagement in Support of

L12 National Deployment

TIM Responder Training Implementation Plans in Place

& Executed in Every State Plus DC & PR At least one TtT session in every State plus DC &

PR focused on large metro areas: Total at least 75

sessions

Train 2,500+ instructors (State/local) to deliver

classroom training Train over 50,000 in classroom training

Professional Capacity BuildingProfessional Capacity BuildingNational TIM Train-the-Trainer ProgramNational TIM Train-the-Trainer Program

Implementation Goals by Dec Implementation Goals by Dec 20142014

Page 10: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

International Association of Chiefs of Police International Association of Fire Chiefs American Association of State Highway

and Transportation Officials (AASHTO) National Volunteer Fire Council National Police Academy Directors Assoc.

10

High-Level SupportHigh-Level Support

Professional Capacity BuildingProfessional Capacity BuildingNational TIM Train-the-Trainer ProgramNational TIM Train-the-Trainer Program

Page 11: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

Train-the-Trainers Conducted or Train-the-Trainers Conducted or Scheduled Scheduled

TRB/SHRP 2 Program TtT Pilots Completed◦ Nashville, Richmond, Helena, Ft. Lauderdale

FHWA TtT’s Completed ◦ Phoenix, Columbus, Oklahoma City, Tulsa, Wisconsin, Akron/Cleveland,

Denver, St. Louis, Concord (NH), Tampa, Orlando, Cincinnati, Kansas City, Toledo, West Virginia, Atlanta, Kentucky

FHWA TtT’s Scheduled ◦ Boston (MA), Providence (RI) & Chicago (IL)

R E S U L T S R E S U L T S

Trainers Trained (as of 4/1/13) 1,1001,100++ Practitioners Trained (as of 4/1/13) 5,000000++

Professional Capacity BuildingProfessional Capacity BuildingNational TIM Train-the-Trainer ProgramNational TIM Train-the-Trainer Program

Page 12: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

TtT Student Evaluations TtT Student Evaluations SummarySummary

Sample question- Sample question-

The content of this training appropriately built on my existing knowledge of TIM.

Strongly Agree 70% +/-Agree 26% +/-Neutral 3-4%Disagree or < 1% Strongly disagree

12

Page 13: Traffic Incident Management Program AASHTO SSOM Meeting April 9, 2013 AASHTO SSOM Meeting April 9, 2013

Questio

ns?

Questio

ns?Comments?