SHRP2 Implementation | July 22, 2014
Implementation UpdateAASHTO RAC Meeting, July 22, 2014
Debra Elston, Director, Office of Corporate Research, Technology, and Innovation Management, FHWAJim McDonnell, Program Director, Engineering, AASHTO
SHRP2 Implementation | July 22, 2014
What we’ll cover
• Implementation milestones• SHRP2 budget• Project management system• Program evaluation• Implementation assistance update• Continual improvement• Next steps
SHRP2 Implementation | July 22, 2014
Implementation Milestones
SHRP2 Implementation | July 22, 2014
Implementation Status to Date
Of the more than 100 research projects, we are moving forward with 64 products in 42 distinct implementation efforts
SHRP2 Deployment Snapshot100+ Research projects Original projects undertaken by TRB
64 Implementable products As prioritized by FHWA and AASHTO
42 Total anticipated implementation efforts
64 products implemented as 42 products/product bundles
27 Efforts on the street 24 in IAP rounds 1 – 4 + 3 additional deployments = 64% deployment
15 Efforts remaining 36 percent remaining
12 Planned efforts 9 new products in rounds 5 & 6 + 3 non IAP
3 Product disposition TBD R01, R06F, C40
SHRP2 Implementation | July 22, 2014
Implementation Budget
$126.0
$5.0
$5.3$7.4
$12.5$11.8
SHRP2 Implementation Budget (in $M)
Product Development & Implementation * (75%)
Pre implementation (3%)
Communications & Out-reach (3%)
Program Administration (4%)
Contingency (8%)
FHWA/AASHTO Implemen-tation Staff (7%)
Focus Area BreakdownRenewal - $40.5Capacity - $24.6Reliability - $27.7Safety - $33.4
SHRP2 Implementation | July 22, 2014
Project Management and Tracking
• 2-pronged, quarterly tracking system in place– MS Project– Narrative, qualitative report
• Quarterly reporting structure– Universal template, Highlights, Challenges– Summary report per focus area per quarter
• Key highlights from first quarterly report – Example– Approaching milestone of 50000 trained in L12/32 TIM– Champions and opinion leaders identified for C06– Showcases, demos and workshops held for R04, R05, R09, R10
& R26
SHRP2 Implementation | July 22, 2014
SHRP2 Program Evaluation
Products
OutputsCompleted R&T
Implementation Activities (Workshops, Training,
Grants,Lead Adopters, etc.)
Knowledge DisseminationSpecification AdoptedChange in Behavior
Innovation Tested/Deployed
Saved Time, Money or Lives
Outcomes
Impacts/BenefitsSelect Product
Evaluations
Implementation Assistance
Results
Tracking System
SHRP2 Implementation | June 2014 7
SHRP2 Implementation | July 22, 2014
Implementation Assistance ProgramSo Far…• SHRP2 IAP projects underway in 48 states; more coming in round 4• Applications Received (Rounds 1-4): 414
– from 49 State DOTs + DC DOT– from 38 MPOs– from 10 tribes, 6 “others,” FHWA/FLH
• Awards (Rounds 1-3): 65 recipients received 146 awards (representing work on 180 projects*)
– 44 State DOTs + DC DOT– 16 MPOs– 1 tribe, 3 “others,” FHWA/FLH
• Beyond the IAP – successful implementation efforts ongoing in Traffic Incident Management (L12) – 41 states involved
• Thus, all 50 states + DC are engaged in SHRP2 implementation
SHRP2 Implementation | July 22, 2014
Implementation Assistance
SHRP2 Implementation | June 2014 9
SHRP2 Implementation | July 22, 2014
Implementation AssistanceRound 4
Economic Analysis Tools bundle – C03/11Advanced Travel Analysis Tools bundle – C10/04/05/16
Pavements: New Composite Pavement Systems – R21 Rapid Technologies to Enhance QC on Asphalt Pavements – R06C Tools to Improve PCC Pavement Smoothness During Construction – R06EStructures: Nondestructive Testing for Concrete Bridge Decks – R06A Nondestructive Testing for Tunnel Linings – R06G Service Life Design for Bridges – R19AProject Delivery: Managing Risk in Rapid Renewal Projects – R09 Innovative Strategies for Managing Complex Projects – R10
Reliability Data and Analysis Tools bundle – L02/05/07/08 (C11)
Concept to Countermeasure – Research to Deployment Using the SHRP2 Safety Databases
SHRP2 Implementation | July 22, 2014
Planning for more products
Product IPW IAP roundPlanWorks (C01) Fall 2014 Round 5Capacity Process Bundle (C02/08/09/12/15) Spring 2014 Round 5Service Limit State Design for Bridges (R19B) Fall 2014 Round 53D Utility Location Data Repository (R01A) Winter 2014 Rounds 5 & 6Utility Locating Technologies/Innovation in Locating Deep Utilities (R01B/C)
Winter 2014 Round 6
Techniques to Fingerprint Construction Materials (R06B)
Fall 2014 Round 6
Advanced Methods to Identifying Pavement Delamination (R06D)
Fall 2014 Round 6
WISE: Workzone Impact Estimation Software (R11)
Summer 2014 Round 6
Nondestructive Testing for Concrete Bridge Decks (R06A)
Winter 2013 Round 6
Round 5 – January 2015Round 6 – June 2015
SHRP2 Implementation | July 22, 2014
We are listening…
Challenge Solution Result
Engage transportation agencies in every state
State visits; increased targeted outreach and communication; better time intervals throughout IAP; examination of widest potential audience
As of Round 4, all but 2 AASHTO member departments have applied through the IAP. MPOs, local DOTs, and others are also applying.
Connect customers and facilitate peer-to-peer knowledge transfer
Updated GoSHRP2 site features In the Field section; commitment to contributing to peer exchange; updated contact info on site
More availability of user data and stronger linkage of peer connections
Streamline the post-selection IAP activities
Use lessons learned to standardize process
Expectations are managed, funds are allocated more timely, and projects are initiated quicker
SHRP2 Implementation | July 22, 2014
The future
• Continual process improvement• Coordination between AASHTO and FHWA• Keeping pace with product developments • Key successes• Safety implementation• Reauthorization• Questions, feedback from the Implementation
Advisory Committee• www.fhwa.dot.gov/goshrp2