37
Tracking the Benefits of Retro-Commissioning: M&V Results from Two Buildings 2007 National Conference on Building Commissioning May 4, 2007

Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

  • Upload
    ngokiet

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

Tracking the Benefits of Retro-Commissioning:M&V Results from Two Buildings2007 National Conference on Building Commissioning May 4, 2007

Page 2: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

2

Tracking the Benefits of Retro-Commissioning: M&V Results from Two Buildings

David Jump, Ph.D., P.E.Matt Denny, E.I.T.

Quantum Energy Services and Technologies, Inc.

Raul AbesamisPhysical Plant-Campus Services University of California, Berkeley

Acknowledgement:UC/CSU/IOU Partnership

Karl Brown

Page 3: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

3

Overview

This presentation will discuss:Current SituationBasic M&V RequirementsM&V Results for Two Campus BuildingsDiscussion & Conclusion

Page 4: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

4

Situation• RCx is a means to improve a building’s energy efficiency

OwnersEnergy Efficiency Programs

• “RCx Measures”Correct and optimize system operations

• Operational changes• Control system changes

Justification provided by measure cost-effectiveness

• RCx measure recommendations based on savings estimates

Page 5: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

5

Situation• RCx measure savings estimates are based on:

Design documentationEquipment specificationsMonitored operational data

• Independent data loggers• Control system trends

Bin models, engineering models, computer simulations, etc.

• Savings estimates = “real” savings?Model errorsIncomplete or inaccurate dataIncorrect assumptionsEtc.

Page 6: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

6

SituationRisks to Owner:

Savings not delivered, no return on investmentNo ability to track actual savingsSavings do not last:

• “Soft” measures that can be and often are defeatedEE Program Risks:

Program’s claimed savings do not stand up to third party reviewSavings lifetimes are shortNegative impact on program realization rates

Risk to Regulatory Agencies (e.g. PUCs, PSCs)Unreliable basis for program planning and accurate forecasting

Page 7: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

7

Need for Robust M&V in RCx ProjectsNeeds:• Demonstrate actual, verified energy savings benefits of RCx• Provide a mechanism to determine measure savings

persistence• Smooth process of third party EM&V in public-goods funded

RCx programs

Opportunities:• Standardization of M&V processes for RCx• Provide information tools for operators and owners to

maintain measure savings, and further improve energy performance

Page 8: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

8

What is Measurement and Verification?

IPMVP Chapter 3 says:

Energy Savings = Baseyear Energy Use – Post-Retrofit Energy Use ± Adjustments

• Baseline or post-installation energy use must be modeled

• Energy use model must be able to generate energy use data that can be compared with measured data, in order assure its accuracy

Page 9: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

9

0

100

200

300

400

500

600

700

Jan-0

5

Jan-0

6

Jan-0

7

Jan-0

8

Jan-0

9

Jan-1

0kW

kWactual kWbaseline

Baseline Period

Post-Installation Period

Quantifying Savings

Verified savings are based on energy measurements before and after improvements

Savings estimates are based on data collected in baseline period

Page 10: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

10

M&V Plan Requirements

• Based on IPMVP Guidelines (partial list):Select M&V OptionIdentify systems to be monitoredDefine baseline period and collect baseline dataDevelop baseline energy modelInstall measuresCollect post-installation dataDetermine savings

Page 11: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

11

Overlap of Data RequirementsRCx Plan

Description of ECM and intended result xDescription of ECM boundaries xDescription of baseyear conditions and energy data x

energy and demand profiles xoccupancy type, density, and periods xspace conditions for each operating period xequipment inventory xequipment operating practices xsignificant equipment problems x

Description of planned changes to baseyear conditions xIdentification of the post-retrofit periodEstablishment of conditions to which all energy measurements will be adjustedDocumentation of the procedures used to verify proper installation of the ECM xSpecification of IPMVP OptionSpecification of data analysis proceduresSpecification of metering points and meter characteristicsOption specific information (e.g. simulation software used under Option D)Specification of quality assurance proceduresQuantification of expected accuracy associated with the measurement and analysisSpecification of how results will be reported and documented xSpecification of data available for savings verification by a third partyDescriptions of how non-routine baseline adjustments will be madeDefinition of budget and resource requirements for the M&V effort x

IPMVP M&V Plan Requirements

Page 12: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

12

IPMVP M&V OptionsRetrofit Isolation Options:• Option A: Allows stipulation of some parameters• Option B: Retrofit isolation – continuous monitoring of parameters• Focus is on systems and equipment – similar to RCx.

Whole Building Options:• Option C: Utility bill analysis• Option D: Calibrated computer simulation

Sometimes used with isolated systems, as applicable• Used when savings distinguishable from variation in use (typ. >15%)

• For UC Berkeley, Option B was selectedMagnifies savings as a proportion of use+ addresses MBCx project goals: i.e. persistence, tools, etc.

Page 13: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

13

UC Berkeley – MBCx Program• Project funded under the UC/CSU/IOU Partnership’s Monitoring-

Based Commissioning (MBCx) ProgramRCx process enhanced by addition of permanent monitoring capability to understand system performance

• Diagnostics• M&V

Soda Hall:• Steam meters added

Tan Hall:• Electric and steam meters upgraded

Both: electric and steam meters connected to Web-based tool• MBCx project:

BAS capabilities in each building expanded with addition of points and programming to enable on-going M&V and diagnostics

Page 14: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

14

UC Berkeley MBCx Project

• UC Berkeley has significant monitoring resources to devote to this project

Web-based utility information system• Whole building kW and steam meters• Electric and steam trended at 15 minute intervals• Data stored indefinitely

Web-based points mapped from BAS• Chiller kW• BAS points trended at 1 minute intervals• Data stored for 6 months

Page 15: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

15

Soda Hall• UC Berkeley’s Computer Science Department (24/7 operation)• 109,000 ft2

• Energy Use Intensity: 174 kBtu/ft2-yr • 2 - 215 ton chillers (lead/lag)• Constant Speed Primary/Variable Speed Secondary Chilled Water

System• Two 2-speed, forced draft, open loop cooling towers• 3 Main VAV AHUs,

AHU1 serves building core, AHUs 3 and 4 serve the perimeter, with hot water reheat

• 11 computer room DX units, water cooled with variable speed pumps• Steam to hot water heat exchanger, 2 variable speed HW pumps

Page 16: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

16

Soda Hall Findings• Minimum VAV Box Damper Positions at 50%

Causes excessive reheat in perimeter zonesLittle modulation of fan VFD

• Several AHU VFDs broken or not modulatingReturn to designed VAV operationReturn to scheduled operation

• Re-establish supply air temperature set point reset control in AHU1

• Other measures

• Approximately 483,000 kWh (10%), 2.7M lbs/yr steam (51%)Estimated using DOE2 analysis

• Cost reduction $84,000 (14%), Payback 0.7 years

Page 17: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

17

Soda Hall Measures

Measure No. Description Implementation

DateEnergy, kWh/yr Energy, lbs/yr Dollars,

$/yr

Estimated Measure Cost, $

Payback, yr

AHU1-2Resume supply air temperature reset control and return economizer to normal operation 10/25/2006 129,800 266,250 $19,004 $1,550 0.1

AHU1-3 Repair/replace VFDs in return fans 10/25/2006 34,308 $4,460 $7,000 1.6

AHU1-4 Reduce high minimum VAV box damper position 3/9/2006 46,300 119,300 $6,973 $15,250 2.2

AHU3-2 & AHU4-2

Option 2: Reduce high minimum VAV box damper position

3/9/2006 30,600 2,328,100 $22,603 $17,250 0.8

AHU3-3 & AHU4-3

Re-establish scheduled fan operation and VAV AHU-3 (includes repair/replace VFD on return fan EF-17), AHU-4 (includes repair/replace VFDs on supply SF-18 and return EF-19 fans, and elimination of low VFD speed setting during the day)

10/25/2006 242,000 $31,460 $14,000 0.4

Total 483,008 2,713,650 $84,500 $55,050 0.7Percentage Savings 10% 51% 14%

Utility Data Steam 5,325,717 lbsElectricity 4,871,678 kWhr

Cost $621,575

Estimated Savings

Page 18: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

18

Soda Hall Affected SystemsSystem Equipment Affected

by ECM?Available Points

XMain Electric Meters (2) kWMain Steam Meters (2) lb

XChillers 1 and 2 kWPrimary Chilled Water Pumps P-5, P-6 StatusSecondary Chilled Water Pumps, P-3, P-4 VFD speed

XCooling Towers High/Low StatusCondenser Water Pumps P-7, P-8 Status

XAHU-1, SF-11, EF-12, EF-13 VFD speedAHU-2, SF-14, EF-15 StatusAHU-3, SF-16, SF-17 VFD speedAHU-4, SF-18, SF-19 VFD speedAHU-5, SF-20 Status

Chiller Room 181, SF-2, EF-2 StatusChiller Room 179, SF-3A, SF-3B, EF-1A, EF-1B Status

AC UnitsCondenser Water Pumps P-9, P-10 VFD speedAC-31 through AC-41 Status

XHot Water Pumps P-1, P-2 VFD Speed

Hot Water System

Whole Building

Condenser Water System

Chilled Water System

Air Distribution System

Chiller Room Fans

Page 19: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

19

Define the Baseline Period & Collect Data

• 8 months of trended data collected• Baseline period selected to cover widest range of operating

conditions ~ 3 months.

• Energy use for each system to be totaled each dayBasis for analysis and reporting

• “Spot” measurements of kW for constant load equipment• Short term logging of variable load equipment kW

Corresponding speed data from EMSRelationship between kW and speed developed

Page 20: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

20

“Proxy” Variable: VFD speed for kW

0

5

10

15

20

25

30

35

0 20 40 60 80 100 120

AHU-1 Fan Speed %

AH

U-1

Fan

kW

Actual Cubic polynomial

Page 21: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

21

Baseline Model: Soda Hall• Total Building Electric Building Steam

• Peak Period Electric HVAC System Electric

Page 22: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

22

Soda Hall M&V: HVAC Systems

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

2/9/20

062/1

1/200

62/1

3/200

62/1

5/200

62/1

7/200

62/1

9/200

62/2

1/200

62/2

3/200

62/2

5/200

62/2

7/200

63/1

/2006

3/3/20

063/5

/2006

3/7/20

0610

/31/20

0611

/2/20

0611

/4/20

0611

/6/20

0611

/8/20

0611

/10/20

0611

/12/20

0611

/14/20

0611

/16/20

0611

/18/20

0611

/20/20

0611

/22/20

0611

/24/20

0611

/26/20

0611

/28/20

06

Date

Dai

ly k

Wh

Use

HVAC Daily kWh Usage Baseline Post-Install Model

Date Break

Baseline Model:kWh = 79.9*OAT + 1129RMSE = 136 kWh

Baseline Period Post-Installation Period

Post-Install Model:kWh = 44.1*OAT - 336RMSE = 213 kWh

Page 23: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

23

Soda Hall: Estimated vs. Verified Savings

Whole Building HVAC SystemkWh 483,008 216,716 462,472kW - 22 50Lbs. Steam 2,713,650 854,407* based on eQUEST model** based on baseline and post-installation measurements and TMY OAT data

Verified Savings**Source Estimated

Savings*

Page 24: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

24

Tan Hall• UC Berkeley’s Chemistry and Chemical Engineering

Departments• 7 above-grade, 2 below-grade levels• 106,000 ft2

• 100% outside air through 4 VFD-controlled 100 HP supply fans

• Steam heating and CHW cooling coils in AHU• Separate exhaust system on roof: 4 VFD-controlled 60 HP

exhaust fans• 1 475-ton chiller, constant speed primary loop• Constant speed CW loop – Tower shared among buildings• Steam-to HW HX system, circulated to perimeter zone boxes

Page 25: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

25

Tan Hall Findings

• Chilled water and condenser water pumps operating in parallel instead of lead/lag

Balancing vales on each were closed downShut off one pump, rebalance flow and operate in lead/lag mode as intended

• Chiller outside air lockout temperature sequence not functioningOAT set point also too highCorrect operation and lower set point 2 °F

• Leaky steam valve in AHU – caused simultaneous heating and cooling

• Savings: 654,000 kWh (14%), 90 kW, 10.5 M lbs steam (62%)Estimated using bin analysis

• Cost reduction $154,000 (19%), Payback 0.02 years

Page 26: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

26

Tan Hall Measures

Measure No. Description Implementation

DateEnergy, kWh/yr

Energy, lbs/yr

Peak Demand,

kW

Dollars, $/yr

Estimated Measure Cost, $

Payback, yr

CHW-1 & CW-1

Eliminate simultaneous chilled water pump and condenser water pump operation 5/24/2006 68,849 - 33.3 $9,639 $2,900 0.3

CH-5Chiller outside air lockout temperature set point not operating 12/22/2005 361,184 - 0.5 $29,046 $0 -

CH-6Chiller outside air lockout temperature and Sat set point change 6/26/2006 119,767 - 8.3 $16,767 $0 -

AHU3-4 Eliminate simultaneous heating and cooling 5/24/2006 103,775 10,543,991 48.8 $98,880

Total 653,575 10,543,991 90.8 $154,332 $2,900 0.02

Percentage Savings 14% 62% 19%

Utility DataSteam 17,139,542 lbs

Electricity 4,720,647 kWhrCost $798,007

Estimated Savings

Page 27: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

27

Tan Hall Affected SystemsSystem Equipment Affected by

ECM?Available

PointsX

Main 480/277 Electric Meter kWMain 220/110 Electric Meter kWMain Steam Meter lbs/hr

XChiller (VS) kWPrimary Chilled Water Pumps CHWP-1, CHWP-2 (CS) Status

XCondenser Water Pumps CDWP-1, CDWP-2 (CS) StatusCooling Tower (CS, 2-speed) Not Avail.

AHU-3 XAHU-3 Supply Fans SF-1, SF-2, SF-3, SF-4 (CS) S/S & SpeedAHU-3 Exhaust Fans EF-1, EF-2, EF-3, EF-4 (CS) S/S & SpeedTerminal Boxes and Fume Hoods associated with AHU-3 NA

AHU-1AHU-1 Chemical Storage AH-1, SE-1 Status

AHU-2AHU-2 Chemical Storage AH-2, SE-2 Status

XHeat Exchanger HWC-1Hot Water Pumps HHWP-1, HHWP-2 Status

Lighting Circuits NAPlug Loads

Plug Load Circuits NA

Domestic Water Pumps NA

Whole Building

Chilled Water System

Condenser Water System

Heating Water System

Lighting System

Domestic Water

Page 28: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

28

M&V Models: Tan Hall

Whole Building Electric Whole Building Steam

Peak Period Electric Chilled Water System Electric

Page 29: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

29

Tan Hall M&V: Whole-Building Electric

0

5,000

10,000

15,000

20,000

25,000

6/1/2006 6/3/2006 6/5/2006 6/7/2006 6/9/2006 6/11/2006 6/13/2006 6/15/2006 6/17/2006 6/19/2006 6/21/2006 6/23/2006 6/25/2006

Date

Dai

ly k

Wh

0

10

20

30

40

50

60

70

80

Deg

. F

Total Building Daily kWh Average Daily Outside Air Temperature Baseline New Baseline

Baseline ModelR2 = 0.75RMSE = 581 kWh

New BaselineR2 = 0.88RMSE = 438 kWh

Page 30: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

30

Tan Hall M&V: Whole-Building Steam

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

6/1/2006 6/3/2006 6/5/2006 6/7/2006 6/9/2006 6/11/2006 6/13/2006 6/15/2006 6/17/2006 6/19/2006 6/21/2006 6/23/2006 6/25/2006

Date

Dai

ly S

team

lbs

0

10

20

30

40

50

60

70

80

Deg

. F

Steam Baseline New Baseline Average Daily Outside Air Temperature

New Baseline

Baseline Model

Page 31: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

31

Tan Hall M&V: Chilled Water System

0

1,000

2,000

3,000

4,000

5,000

6,000

6/1/2006 6/3/2006 6/5/2006 6/7/2006 6/9/2006 6/11/2006 6/13/2006 6/15/2006 6/17/2006 6/19/2006 6/21/2006 6/23/2006 6/25/2006

Date

Dai

ly k

Wh

0

10

20

30

40

50

60

70

80

Deg

. F

Chilled Water System Average Daily Outside Air Temperature Baseline New Baseline

New BaselineR2 = 0.95RMSE = 251 kWh

Baseline ModelR2 = 0.87RMSE = 486 kWh

Page 32: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

32

Tan Hall: Estimated vs. Verified Savings

Whole Building CHW SystemkWh 653,575 663,184 686,519kW 91 69Lbs. Steam 10,543,991 5,995,232* based on engineering calculations** based on baseline and post-installation measurements and TMY OAT data

Verified Savings**Source Estimated

Savings*

Page 33: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

33

Costs

Soda Hall 4,442$ 62,160$ 51,087$ 117,689$ Tan Hall 22,573$ 53,000$ 15,300$ 90,873$

Building Metering Costs

MBCx Agent Costs

In-House Costs Total

• Including all costs, project remains cost-effective:Soda Hall: 1.7 year paybackTan Hall: 0.7 year payback

• Added costs of metering hardware and software did not overburden project’s costs

• In private sector – metering costs lowerExisting electric metersSophisticated BAS systemsMBCx approach should be viable

Page 34: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

34

Discussion

• Consider new approach:Focus project resources on verified savings instead of estimated savings approach

• More rigorous savings analysis, more reliable results

• Install all low-cost measures • Estimate savings for only higher cost measures• Leave in place capability to track & tally savings• Diagnostic benefits of approach• Addresses savings persistence

Page 35: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

35

Discussion, cont.Integrating M&V into RCx:• Smoothes hand-off with program evaluation teams

RCx providers define M&V plans, collect baseline data, develop baseline modelsEvaluators review M&V plans, data, calculations

• Collect post-installation data, complete analysisMaintains independence between implementers and evaluatorsOwners receive benefits

• BarrierLack of understanding of M&VRCx programs need to require/provide training

Page 36: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

36

Conclusion• Soda & Tan Hall projects showed technique to integrate M&V

into RCx• Integrated M&V procedures may become tools for operators

and owners:For operators: diagnostic capability, track energy useFor owners: verification of savings

• Program benefits:Persistence of RCx savingsLess uncertainty on savingsPotential for smoother transition with evaluators

• Other benefitsEstablish new baselines for next project

Page 37: Tracking the Benefits of Retro-Commissioning: M&V … · Tracking the Benefits of Retro-Commissioning: ... Raul Abesamis Physical Plant ... • Re-establish supply air temperature

37

Related WorkM&V Guidelines:• Energy Valuation Organization’s International Performance

Measurement and Verification Protocol (IPMVP)New release available in December at: www.evo.org

• ASHRAE Guideline 14: www.ashrae.org

• California Commissioning Collaborative: Verification of Savings Project

Review current M&V methods within RCx projectsRecommend best practices for M&V in RCxDisseminate results