.Building Maintenance Division
Letters Tracking
SN Department Description Ref # Date In-charge Action Status Remarks
Proj & Supl √ Space frame shade at main & secondary gates PCS/L/007/09 12-Jan
√ CBD/BM/03/2009 12-Jan Noaman closed
Proj & Supl√ PCS/L/006/09 12-Jan
BHHSC
√ Proposal To Transfer Mr. Sammie E. Bano BHHSC/MII/005/09 12-Jan
PGD√ Maintenance @ Passport Office, Gov't Area CBD/BM/032/2009 11-Jan
BHHSC √ Application for any position BHHSC/MII/004/09 10-Jan
TMD√ New marine control room at office park building TMD-04/003/09 10-Jan
CTD√ Transfer of custody of portable offices CTIN/9537/09 7-Jan
Proj & Supl√ PCS/L/228/08 5-Jan
JAD√ New AGOC Headquarters Building JAD/586/2008 5-Jan
Proj & Supl√ PCS/L/228/08 5-Jan
TMD√ TMD-04/001/09 1-Jan
BHHSC√ BHHSC/MII/179 28-Dec
ISD
√ 2009- KJO In-House Safety Training Programs ISD?SF-1226/08 22-Dec Nawaf closed
ITD√ Request for Computer Printers CBD/BM/1624/2008 22-Dec closed Letter send to ITD
In-coming
Out-going
Nawaf Hadi
SaudiElevator
Request for meeting for elevator at KJOheadquarters building
letter send tocontractor
letter send tocontractor
Quotation of Spare Parts and Repair of SlidingDoor @ Utility Dep't
Nawaf Hadi
Nawaf
Hadi
Nawaf Hadi
Nawaf Hadi
Nawaf Hadi
Intent to Extend Service Period and Not-To-ExceedValue for Contract No. HT490 BM05 Hadi
Nawaf Hadi
Quotation for Supply of Submersible Pumps @School
Nawaf Hadi
,250 Near South Jetty and Office Park MarinControl Tower (@ Head Quarter Building)
Nawaf Hadi
Mr. Naif M. Al-Muzaini-031-0541, as TemporaryReplacement for Multi-Craft Forman
Nawaf
submitted to
CBD/Admin
اشرة اكوتية نفط اخليجKUWAIT GULF OIL COMPANY
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 2/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
Proj & Supl√ Unpaid Vacation (National) CBD/BM/1622/2008 21-Dec Nawaf closed
Proj & Supl√ Annual Vacation for a National Forklift Operator CBD/BM/1621/2008 21-Dec Nawaf closed
10 Proj & Supl
√ Annual Vacation for a National Forklift Operator PCS/L/221/08 20-Dec Nawaf closed
9 Proj & Supl√ Vacation W/O Salary for a National Accountant PCS/L/220/08 18-Dec Nawaf closed
8 Proj & Supl √ Space Frame Shade @ Main and Secondary Gates PCS/L/219/08 18-Dec
7 BHHSC√ Acceptance of Quantity Surveyor (National) CBD/BM/1608/2008 15-Dec closed
6 PCD √ Walkthrough @ Material Test Laboratory Building PCD/MP/2763/08 15-Dec Nawaf closed
5 BHHSC √ Permanent Replace of Public Relation Officer BHHSC/MII/167 3-Dec
4 PCD √ As-Built Drawings for Villas-Softcopy PCD/MP/2659/08 3-Dec
3 BHHSC √ BHHSC/MII/168 3-Dec
2 FAD√ CBD/BM/1601/08 3-Dec Noaman closed letter send to FAD
1 Proj & Supl √ PCS/L/216/08 3-Dec
BHHSC√ Replacement of Munif Muhana Al-Banagee CBD/PB/1597/2008 2-Dec Bader closed
810 Proj & Supl √ PCS/L/214/08 2-Dec
809 Proj & Supl √ PCS/L/215/08 2-Dec
808 FAD √ FAD-939/08 2-Dec
807 Proj & Supl√ Partial Vacation of National Foreman CBD/BM/1596/08 1-Dec closed
806 PGD √ PGD/LG/394/08 1-Dec Hussain
805 BHHSC √ Replacement of Manpower BHHSC/MII/171 30-Nov closed
804 TMD √ TMD-04/747/08 30-Nov Noaman closed
letter send tocontractor
letter send tocontractor
Hadi
Nawaf letter send tocontractor
Nawaf Hadi
Schedule of Holiday for the Month of Dcember 2008
Nawaf Hadi
Payment for HT490BM05 & HT662CB07Contracts
Quotation for Relocation of Materials from KJOExisting Yard to New Store near Heliport Area
Nawaf Hadi
letter send tocontractor
Quotation for Relocation of Materials from KJO
Existing Yard to New Store near Heliport Area
Nawaf
HadiQuotation for Relocation of Materials from KJOExisting Yard to New Store near Heliport Area
Nawaf Hadi
Payments of HT490BM)%, buildingf Materialsservices & HT662CB07-rental of AC Units
Nawaf Hadi
Nawaf Hadi
letter send tocontractor
Request to Install 5 Split A/C Units @ TrafficDepartment
Hadi
Suspension of Helicopter Flights for 600 Hr/Annual Inspection
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 3/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
803 √ CPD/RPT/255/08 30-Nov
802 Proj & Supl √ Partial Vacation of National Foreman PCS/L/210/08 30-Nov
801 BHHSC √ Acceptance of General foreman BHHSC/MII/166 30-Nov
800 MARCO √ Spaare Parts for York Package A/C Units 31.17/ F-2696 29-Nov Hussain
799 TMD√ TMD-04/748/08 29-Nov
798 BHHSC√ Proposed Hiring of National Electrician BHHSC/MII/165 27-Nov
797 Proj & Supl√ PCS/L/212/08 27-Nov
796√ CBD-BM Storage Shed @ Lot 35, Triangular Area CBD/BM/1599/2008 25-Nov Noaman closed
795√ CBD/BM/1572/2008 25-Nov Noaman closed
794 Proj & Supl√ PCS/L/209/08 25-Nov
793 MSD √ Stabilization Unit in KJOH MSD/Ad/037/08 24-Nov Hadi
792 BHHSC√ CBD/BM/1512/2008 23-Nov closed
791 Proj & Supl√ Noara Rubber Flooring @ KJO Hospital PCS/L/104/08 23-Nov closed
790 Proj & Supl√ PCS/L/105/08 23-Nov
789 MTD√ Request to Issue Material from Scrap CBD/BM/1599/2008 23-Nov Noaman closed letter send to MTD
788 Proj & Supl√ Revised Quotation for Portable Cabinet Unit PCS/L/2006/08 23-Nov
787 HRD√ CBD Representaative for "Joint HOP Committee" HRD-C08-036 23-Nov CBD/PB
786 BHHSC√ Access Permit After 3:00 PM BHHSC/MII/162 23-Nov Nawaf
785 Proj & Supl√ PCS/L/101/08 19-Nov
784 Al-Busaili√ CBD/BM 1546/2008 17-Nov Saeed closed
RelocationPlan Team
Evacuation of Japanese School {Parts and StoreRoom for Spare Parts
Nawaf
Nawaf Hadi
Relocation of TMD Building no. 240 and 245 near South Jetty
Nawaf Hadi
Nawaf
Quotation for Supply and Installation of Heater for Sauna @ KJO Fitness Center
Nawaf Hadi
RelocationPlan Team
letter send torelocation Team
Relocation
Plan Team
Proposed CBD-BM Storage Shed @ Lot 35,
Triangular Area
letter send to
relocation TeamQuotation for Relocation of Mechanical Roomfitness Center
Nawaf Hadi
Manpower Replacement (Architect/Interior Designer)
Nawaf letter send tocontractor
Hadi
Quotation for Supply of Diesel Tank @ CoastGuard Hadi
Hadi
Quotation for Relocation of Mechanical Roomfitness Center Hadi
CONTRACT NO. HT662CB07, Supply of Spareparts for York A/C units
letter send tocontractor
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 4/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
783 BHHSC√ Hiring of national Employee BHHSC/MII/157 17-Nov Nawaf
782 Proj & Supl√ Quotation for repair of Plotter Machine PCS/L/100/08 17-Nov
781 Proj & Supl
√ Quotation for portable cabin Unit PCS/L/199/08 17-Nov
780 BHHSC√ Replacement of Mr. Talal R. Humaidan CBD/PB/1535/08 12-Nov Bader sent to contractor closed sent to BHHSC
779 CMNC√ Replacement CMNC/0099/08 11-Nov Nawaf
778 Aquarius√ Project 8438/ KJO Fitness Center PSRT/08.639 10-Nov
777 Proj & Supl√ PCS/L/193/08 10-Nov
776 Proj & Supl
√ PCS/L/191/08 10-Nov
775 Proj & Supl√ PCS/L/192/08 10-Nov
774 Proj & Supl√ PCS/L/190/08 10-Nov
773 Al-Busaili√ CBD/BM 1518/2008 9-Nov Saeed closed
772 MPC√ CBD/BM 1519/2008 9-Nov Saeed closed letter send to PCD
771 Proj & Supl
√ PCS/L/188/08 8-Nov
770 Al-Busaili√ AB/288/08 8-Nov Saeed reply to conractor closed
769 BHHSC√ Vehicle Shortage BHHSC/MII/154 8-Nov Nawaf
768 MPC√ Additional Items Observed @ New Office Park CBD/BM 1514/2008 8-Nov Noaman closed letter send to PCD
767 ISD√ New ISD Building ISD/PS-1158/08 8-Nov
766 BHHSC√ Temporary Replacement of General Foreman CBD/PB/1463/08 5-Nov Nawaf closed
765 TMD√ Replacement of roofing sheets TMD-04/682/08 5-Nov
Nawaf Hadi
Nawaf
Hadi
Nawaf Hadi
Supply of New Water Heaters in the Fitness Center CONTRACT NO. HT490BM05
Nawaf
- -2nd floor in floor Building # 100 CONTRACT
NO. HT490BM05
Nawaf
Annual Vacation for Forklift Operator CONTRACT NO. HT490BM05
Nawaf
Annual Vacation for Accountant CONTRACT NO. HT490BM05
Nawaf
CONTRACT NO. HT662CB07, Supply of Spareparts for York A/C units
letter send tocontractor
Random Commisioning of AHU of HVAC Systemof Office Park Building
Space Frame Shade @ Main and Secondary Gates
CONTRACT NO. HT490BM05
Nawaf
HadiCONTRACT NO. HT662CB07, Material ReceiptAcknowledgement
Nawaf Hadi
Letter send tocontractor
Nawaf Hadi
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 5/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
764 EDD√ EDD/D/1347/08 5-Nov
763 BHHSC√ CBD/BM 1508/2008 5-Nov Nawaf closed
762 PGD√
CBD/BM/1507/2008 5-Nov Nawaf closed letter send to PGD761 BHHSC
√ Applicattion for any Position BHHSC/MII/152 4-Nov
760 BHHSC√ BHHSC/MII/153 4-Nov closed
759 ERD√ Mr. Noaman Al-Shaheen ,Badge No. 11645 CBD/BM/1500/2008 3-Nov Noaman closed Letter send to ERD
758 Proj & Supl
√ PCS/L/186/08 3-Nov
757 Proj & Supl √ Safety Training Course PCS/L/185/08 3-Nov Nawaf
756 FAD√ FAD Nominee for KJO Service Center FAD-559/08 1-Nov closed
755 BHHSC√ Manpower Update BHHSC/MII/152 1-Nov closed
754 CBD/RG√ Irrigation Syatem@ PRD Building, South Area CBD/BM/1511/2008 1-Nov Zoabi closed
753 PRD√ General Maintenance of PRD Gauging, South Area CBD/BM/1488/2008 29-Oct Nawaf closed Letter send to PRD
752 PGD
√ PGD/350/2008 28-Oct Saeed
751 Proj & Supl√ PCS/L/182/08 26-Oct Alex
750 BHHSC√ BHHSC/MII/146 25-Oct Nawaf closed
749 FMD√ CBD/BM/1439/08 20-Oct Nawaf closed Letter send to FMD
748 Oger √ Training of Diesel transfer Pumps 20-Oct FMD returned to FMD closed
747 PGD√ General Maintenance of Governor Guest House PGD/347/2008 20-Oct Husam closed
746 PCD√ PCD/MP/2350/08 19-Oct Nawaf closed
Base Course construction and Putting Sand Barrier @ KJO Explosives Stores Area
Nawaf Hadi
Performance of Hajj Pilgrimage (Mr. SohailAhmmed)
letter send tocontractor
Decorative Painting in Governor's House, Gov't
Area Nawaf Hadi
Performance of Hajj Pilgrimage Mr. SohailAhmmed
Nawaf Hadi
Quotation for Supply and Installation of FabricCurtains for KJO Hospital CONTRACT NO.HT490BM05
Nawaf Hadi
Nawaf Hadi
Letter send toCBD/RG
Annual Meeting of the Saudi Kuwait/Kuwaiti
Permanent Joint Committee Curtain for Girls Intermediate School Contract NO.HT490BM05
Vacation Schedule of Mr. Mohammad Jahangir Badge # 031-0521-General Foreman
Girls Intermediate School (Power CableConnection to Busbar)
KJO/GPCD/8446/PM/L0096-08
Taking Possession of Pump Room and ChillersBuilding @ Integrated Workshop Area
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 6/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
745 BHHSC√ Expired Equipment Registration CBD/BM/1418/08 18-Oct Nawaf closed
744 BHHSC√ Manpower Replacement (Labor Helper) CBD/BM/1416/08 18-Oct Nawaf closed
743 BHHSC√ Extension of Vacation CBD/BM/1415/08 18-Oct Nawaf closed
742 Proj & Supl√ Space Frame Shade @ Main & Secondary Gates CBD/BM/1410/08 15-Oct Nawaf closed
741 BHHSC√ Repair of Pool Car # 884-Toyota Corolla CBD/BM/1409/08 15-Oct Nawaf closed
740 FMD
√ FMD/BSD/08/965 14-Oct
739 BHHSC √ Vacation Extension BHHSC/MII/145 14-Oct Nawaf closed
738 BHHSC √ Equipment Registration Expired BHHSC/MII/144 13-Oct Nawaf closed
737 Proj & Supl√ PCS/L/177/08 12-Oct
736 Al-Busaili √ Permission to Undergo Further Examination 1557/11/10/08 11-Oct Saeed
735 BHHSC √ Incident Report BHHSC/MII/142 11-Oct Nawaf forwarded to ISD closed
734 BHHSC√ Permanent Replacement of Mr. Khushid Alam BHHSC/MII/143 11-Oct Nawaf closed
733 Al-Busaili √ Material Receipt Acknowledgement AB/286/08 11-Oct Saeed
732 ESD√ 8-Oct
731 FAD√ FAD-514/08 7-Oct Nawaf
730 Al-Busaili√ 1526/11/10/08 7-Oct Saeed closed
729 Al-Busaili √ Application for Vacation 1534/11/10/08 7-Oct Saeed
728 FMD√ CBD/BM/1368/2008 7-Oct Nawaf closed Letter send to FMD
727 PGD
√ CBD/BM/1367/2008 7-Oct Nawaf closed Letter send to PGD
726 BHHSC √ CBD/PB/1359/08 6-Oct Nawaf closed
725 Proj & Supl √ PCS/L/174/08 6-Oct Nawaf
Letter send tocontractor
Letter send tocontractor
Letter send tocontractor
Letter send tocontractor
Letter send tocontractor
Minutes of Meeting for Requests to CBD for FMD New Integrated Workshop Area and Related Issues
Nawaf SaeedHadi
Space Frame Shade @ Main And Secodary Gates
NO. HT490BM05 Materails Supply Services for Building Maintenance
Nawaf Joe
Office Space for ESD (Inspection and CorrosionDivision)
ESD/I&Q/QAQC/M1932/08
FAD Office Space Building Assignment in the
New Office Park BuildingManpower Maintenance for Central A/C on EidHolidays
Power Disconnection @ Girls School RepresentaveOffice
General Maintenance of Governor's House (GuesHouse A) Additional Items-Removal of Wall Paper and Apply Decorative Painting
Urgent Replacement of Mr. Pio Rene Y. Tortula-Civil Engineer Letter send tocontractor Quotation for Supply of Sound System for GirlsPrimary School Contract No. (HT490BM05)
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 7/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
724 EMD √ EMD Nomination for Offices Shifting Schedule EMD-01-478-08 6-Oct
723 EDD √ Urgent Request for Replacement of Lock EDD/A/1255/08 6-Oct Nawaf closed
722 CBD/Adm
√ Office Parking Slot Assignment CBD/ADM/1354/08 5-Oct Noaman closed
721 FMD√ General Maintenance of Civil Affairs Building CBD/BM/1357/08 5-Oct Noaman close Letter send to FMD
720 BHHSC√ Accident Repair of Vehicle # 884-Toyota Corolla BHHSC/MII/141 5-Oct Nawaf closed
719 Proj & Supl
√ PCS/L/173/08 4-Oct Nawaf closed
718 BHHSC √ Access Permit through main Gate fax 29-Sep Nawaf no action closed
717 Al-Busaili √ Report on New Villa E-12 29-Sep Saeed
716 Al-Busaili √ 1529/11/10/08 29-Sep Saeed closed
715 Proj & Supl√ PCS/L/171/08 28-Sep Nawaf
714 PCD√ Water Filter @ New Villa's Kitchen CBD/BM/1353/08 28-Sep Noaman closed Letter send to PCD
713 BHHSC√ Declared Eid Al-Fitr Holidays BHHSC/MII/139 28-Sep Nawaf closed
712 BHHSC√ Replacement of Manpower General Foreman CBD/BM/1350/08 28-Sep Nawaf closed
711 Proj & Supl√ PCS/L/168/08 28-Sep Nawaf closed
710 Al-Jalhami√ Al-J/399/2008 27-Sep Nawaf closed
709 PCD√ Electrical Plans @ Cafeteria, Office Park CBD/BM/1343/08 27-Sep Noaman closed Letter send to PCD
708 Al-Busaili √ Materials Receipt Acknowledgement CBD/BM/1333/08 22-Sep Saeed closed
Approved froroutine maintenance
Letters forwarded to
CBD/BMContractors
Demolition and Disposal of Debris from OldSecurity forces Building And Two NeighboringTwo GArages Contract NO. HT490BM05Materails Supply Services for BuildingMaintenance
Changes in Schedule of Manpower Maintenancefor Central A/C on Eid Holidays
.HT490BM05 Materails Supply Services for Building Maintenance
Letter send tocontractor
.HT490BM05 Materails Supply Services for Building Maintenance
.for Sewage and Fresh Water Piping System( Returned from Vacation)
Letter send tocontractor
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 8/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
707 BHHSC√ CBD/BM/1341/08 22-Sep Nawaf closed
706 PCD√ CBD/BM/1342/08 22-Sep Noaman closed Letter send to PCD
705 PCD √ CBD/BM/1339/08 22-Sep Noaman closed Letter send to PCD
704 Al-Busaili √ Update of National Employees Data ref. 1508 22-Sep Saeed
703 Al-Jalhami √ Al-J/300/2008 22-Sep
702 BHHSC √ General Foreman Position BHHSC/MII/137 22-Sep
701 Proj & Supl √ PCS/L/169/08 22-Sep Nawaf
700 CTD √ Relocation of our Offices CTIN/8761/08 20-Sep Noaman forwarded to PCD closed
699 BHHSC √ Arrived From Vacation BHHSC/MII/136 20-Sep Nawaf closed
698 BHHSC √ Access Permit After 3:00 PM BHHSC/MII/133 19-Sep Noaman make letter to ISD closed
697 BHHSC√ Manpower Update BHHSC/MII/135 19-Sep Nawaf closed
696 PGD √ Maint. For Rep Office @ 1st Girls Primary School PGD/CDS/75/08 19-Sep Nawaf
695 Proj & Supl√ Space Frame Shade @ Main And Secondary Gates CBD/BM/1326/08 17-Sep Hadi closed
694 PGD√ Request for the Pressence of Mr. Hussain Al-Boadi CBD/BM/1308/08 16-Sep Nawaf Reply to PGD closed Letter sent to PGD
693 PGD√ General Maintenance of Civil Affairs Building CBD/BM/1314/08 16-Sep Nawaf closed Letter send to PGD
692 Proj & Supl√ Temporary Replacement of Purchaser CBD/BM/1313/08 15-Sep Nawaf closed
691 FMD√ CBD/BM/1312/08 15-Sep Alex Follow-up closed Letter send to FMD
690 Proj & Supl √ PCS/L/168/08 15-Sep send to CBD GR
689 Proj & Supl
√ PCS/L/167/08 15-Sep send to CBD GR
Daily Submittals of Personnel Control Sheets(PCS)
Letter send tocontractor
Request for Joint Meeting for HVAC System @ New Family Area and Mosque
Items need to be Rectified and Completed @New
Office Park
for Sewage and Fresh Water Piping System( Returned from Vacation)
Nawaf Hadi
Nawaf Hadi
No. HT490BM05 Materilas Supply Services for Building Maintwenance
Letter send tocontractor
Letter send tocontractor
Reconnection of Flood Light in Football Area @Ammoriya Boys School
Quotation for Supply and Installation of KitchenItem @ Offshore Contract No. HT490BM05
Shammari(CBD GR)
Quotation for Supply and Installation of KitchenItem @ Offshore Contract No. HT490BM05
Hmoud M.Shammari(CBD GR)
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 9/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
688 CTD √ CTIN/8765/08 15-Sep closed
687 PGD √ Urgent Request for the Installation Security Force PGD/328/2008 14-Sep
686 PGD √ Request for the Pressence of Mr. Hussain Al-Boadi PGD/57/2008 13-Sep Nawaf Reply to PGD closed
685 Al-Busaili √ A/B/285/08 13-Sep Saeed closed Reply to contractor
684 Proj & Supl √ PCS/L/165/08 13-Sep
683 Proj & Supl √ Temporary Replacement of Purchaser PCS/L/166/08 13-Sep no objection closed Reply to contractor
682 BHHSC√ Annual Vacation of National (Plumber) CBD/BM/1305/08 10-Sep Nawaf closed
681 PCD √ PCD/ON/2171/08 10-Sep Saeed
680 Al-Busaili √ 9-Sep Saeed
679 PCD √ PCD/ON/1944/08 9-Sep Saeed
678 BHHSC√ Vacation Request (Munif M. Al Banaki) BHHSC/MII/134 8-Sep Nawaf no objection closed
677 BHHSC√ BHHSC/MII/132 8-Sep Nawaf no objection closed
676 BHHSC√ BHHSC/MII/131 8-Sep Nawaf closed
675 BHHSC √ Project Completion @ Boys & Girls School CBD/BM/1281/08 7-Sep Alex closed
674 ITMP√ Stable Power Supply @ CBD Area, Office Park CBD/BM/1272/08 6-Sep Noaman closed Letter sent to ITMP
673 Proj & Supl√ PCS/L/164/08 6-Sep closed
672 ITMP√ Faulty Power in CBD Area of HQ Building CSD-116/2008 3-Sep Noaman reply to ITMP closed
671 Proj & Supl√ PCS/L/163/08 3-Sep closed
670 BHHSC
√ Vacation Schedule (Mr. Waleed Ali) BHHSC/MII/130 2-Sep Nawaf no objection closed
669 BHHSC√ General Maintenance of Government School CBD/BM/1270/08 31-Aug Nawaf closed
Status Report on the Subject Submitted to JTC andLOC (HT490 BM 05)
Nawaf Hadi
SaeedHadi
to coordinate withPCD
Contract No. HT 662 CB 07 - Material ReceiptAcknowledgement
Notification Regaaeding Not-To-Exceed Value for Contract HT490BM05
Nawaf Hadi
Nawaf Hadi
Letter send tocontractor
Procedure of Start-up, Pre-Commissioning,Commissioning And Testing of HVAC Equipment
Contract No. HT 662 CB 07 - Application for Sick Leave
Submittal of As-Built Documents & Drawings of HVAC
Permanent Replacement of Manpower ( Mr.Shakeel Kawari)
Updated Muslim Employees under Contract HT489 BM 05
Letter send to
contractor
Revised Quotation for Raised Floor Panel for PMCR
ZoabiHadi
Supply and Erection of Space Frame @ Main AndSecondary Gate
Nawaf Hadi
send comments tocontractos
Letter send tocontractor
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 10/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
668 Proj & Supl√ Othman Mosque Shed CBD/BM/1271/08 30-Aug Hadi closed
667 JOC√ JOC/SEC-0196/08 30-Aug closed
666 CTD
√ CTIN/8616/08 30-Aug closed
665 ESD√ Information Technology Master Plan II ESD-FP-116/08 30-Aug
664 Proj & Supl√ PCS/L/175/08 27-Aug Nawaf
663 Proj & Supl√ PCS/L/172/08 27-Aug Nawaf
662 FMD√ FMD/BSD/08/854 27-Aug CBD-OS closed Send to CBD-OS
661 CTD √ CTIN/8602/08 27-Aug
660 CTD√ CTIN/8604/08 27-Aug closed
659 BHHSC√ Contractor's Time Schedule @ Ramadan CBD/BM/1258/08 27-Aug Nawaf closed
658 CMNC√ Employment CMNC/6680/08 26-Aug Saeed no objection closed
657 CTD√ Notice to Biddeer No. 1 (HT 734CB08) CTFX/1494/08 26-Aug coordinate with PB closed
656 Proj & Supl √ Contractor Safety Performance Report PCS/L/161/08 25-Aug Roy closed
655 CTD√ CTIN/8564/08 25-Aug coordinate with OS
654 Proj & Supl√ PCS/L/160/08 24-Aug
653 CTD√ Request for a site visit (HT 734CB08) CTIN/8564/08 24-Aug
652 Proj & Supl√ PCS/L/158/08 24-Aug
651 BHHSC√ BHHSC/MII/127 23-Aug no objection closed
Letter send tocontractor
Development 20,000 sq. meter for Schlumber for their Relocation
Nawaf Hadi
Request for Extension of Bid Submission Date
(Tender HT 734 CB 08) Manpower Supply for Building Maintenance Nawaf Hadi
SaeedHadi
Quotation for Supply of Diesel Tanks Contract No.(HT490BM05)
Space Frame Shade @ Main and Secondary GatesContract No. (HT490BM05)
Fresh Water Underground Leaks @ FMD NewIntegrated Workshop Area
Tender Inquiries (Tender HT 734 CB 08)
Manpower Supply for Building Maintenance
Nawaf
Hadi
Status Report on the subject Submitted to JTC andJOC (HT 767 CB 08)
Nawaf Hadi
Letter send tocontractor
Nawaf Hadi
send letter to Abdul
Wahab
Installation of Marble Tile in the Tender OpeningRoom Hadi
Proposal for Maintenance of Swimming Pools andJacuzzis
Nawaf Hadi
Nawaf Hadi
Quotation for Supply of Submirsible Pump for KJO Hospital Hadi
coordinate withMSD
Holy Month of Ramadan Time Schedule for Emplyees
Nawaf
SaeedHadi
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 11/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
650 BHHSC√ Unacceptable Medical Leave BHHSC/MII/127 23-Aug reply to contractor closed
649 BHHSC
√ BHHSC/MII/128 23-Aug closed
648 BHHSC
√ Update Manpower List National & Non National BHHSC/MII/126 19-Aug closed
647 BHHSC√ Partial Vacation of Multicrft Foreman CBD/BM/1239/08 19-Aug Nawaf closed
646 FMD√ CBD/BM/1237/08 18-Aug Alex close Letter send to FMD
645 CTD√ Requested Information CBD/BM/1238/08 18-Aug Noaman close Letter send to CTD
644 Proj & Supl√ PCS/L/155/08 18-Aug
643 Proj & Supl√ PCS/L/154/08 18-Aug
642 FMD√ CBD/BM/1229/08 17-Aug Noaman close Letter send to FMD
641 BHHSC√ Vacation Request (Mr. Salim Al-Shammari) BHHSC/MII/125 17-Aug Nawaf close
640 BHHSC√ Replacement of Manpower Plumber CBD/BM/1224/08 16-Aug Nawaf close
639 Proj & Supl√ CBD/BM/1225/08 16-Aug Nawaf close
638 ISD√ CBD/BM/1223/08 13-Aug Noaman close Letter send to ISD
637 PCD√ Handling Over of Sanitary Drainage System PCD/MP/2012/08 13-Aug
636 PCD√ PCD/MP/2011/08 13-Aug
635 CTD√ CTIN/8459/08 13-Aug
634 CTD√ CTIN/8456/08 13-Aug Hadi
633 BHHSC √ Access Permit After 3:00 PM BHHSC/MII/124 13-Aug Noaman Letter sent to ISD close
Nawaf Hussam
Contractor's Safety and Performance Report for theMonth of August 2008
Nawaf SaeedHadi
HussamHadi Nawaf
Letter send tocontractor
Power Supply for Relocated Portables @ GirlsIntermediate School
Supply of Monument for KJO Round-AboutContract HT490BM05
Nawaf cc:Hadi
from Old Security Forces Building @ Two Neighbouring Garages Contract No. HT490BM05
Nawaf cc:Hadi
Construction of Office and Storsge for A/C ShopMaintenance Crew, Offshore Area
Letter send tocontractor
Contract HT490BM/05 (Partial Vacation of Foreman "National")
Letter send tocontractor
Personnel and Vehicle ( Access Permit After 3:00P.M.)
Handling Over of Road and Storm DrainageSystem
Contract No. HT 490 BM 05 "Materials Servicesfor Building Maintenance
Hadicc:Nawaf
South Area Guard House & Replacement of Hydraulic Barrier"
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 12/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
632 PCD
√ 90% Designed Review Meeting PCD/MP/1976/08 11-Aug
631 FMD√ Isolation of Power Supply CBD/BM/1214/08 11-Aug Noaman close Letter send to FMD
630 TMD √ TMD-04/526/08 11-Aug Hadi
629 BHHSC√ BHHSC/MII/122 11-Aug Hussam close
628 BHHSC√ Replacement of Manpower BHHSC/MII/121 11-Aug no objection close
627 CTD√ CTIN/8435/08 11-Aug Hadi
626 CTD√ CTIN/8374/08 10-Aug Nawaf close
625 CTD
√ CTIN/8423/08 10-Aug Nawaf
624 BHHSC
√ Replacement of manpwer (Plumber) BHHSC/MII/121 10-Aug Nawaf No Objection close
623 Proj & Supl
√ PCS/L/153/08 9-Aug
622 Proj & Supl
√ Partial Vacation for a National Foreman PCS/L/148/08 9-Aug No Objection close
621 FMD √ CBD/BM/1208 9-Aug Noaman close Letter send to FMD
620 Proj & Supl√ Water Proofing @ OCP and LQP CBD/BM/1207 9-Aug Noaman
619 Proj & Supl
√ PCS/L/148/08 6-Aug
618 BHHSC
√ Termination Of National Employee's BHHSC/MII/120 6-Aug closed
617 TMD √ PRE-Heliport Refueling System Test Meeting TMD-04/500/08 6-Aug Mahmod
616 CTD √ Agreement "Draft" 6-Aug Saeed
Nawaf FaisalHadi
Replacement of Asbestos Shed @ Heliport FuelStorage Tank
Annual Vacation (Mr. Abdul Rahman Hawas Al-Shammari)
Nawaf cc:Hadi
reply letter send tocontractor
Tender No. HT734CB08-Manpower Supply for Building Maintenance (Tender Inquiry)
HQ157BF01(Manpower Supply Services foBuilding Maintenance) Information Request
Status Report on the Subject Submitted to JTC and
JOC
Reply Letter sendto contractor
Quotation for Fabrication, Supply and Installationof Sun Shade for Othman Bin Affan Mosque( Contract HT490BM05)
Hadicc:Nawaf
Hadicc:Nawaf
Reply Letter sendto contractor
Existing Flood Light in Football Area @Ammoriya Boys School
Letter send tocontractor
Quotation for Fabriacation, Supply & Installationof Sun Shade for Othman Bin Affan Mosque
Nawaf Hadi
HussamHadi
Nawaf reply Letter tocontractor
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 13/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
615 MIS√ Issuing Entry Gate Pass CBD/1189/08 6-Aug Saeed Letter send to ISD
614 PCD
√ PCD/ON/1926/08 5-Aug Zoabi close
613 BHHSC √ Request for Short Vacation BHHSC/MII/119 5-Aug Hadi closed
612 Proj & Supl√ PCS/L/147/08 4-Aug Hadi
611 Proj & Supl
√ PCS/L/146/08 4-Aug Hadi
610 CTD√ CTIN/8321/08 4-Aug Hadi
609 Proj & Supl√ PCS/L/144/08 4-Aug Hadi
608 Proj & Supl√ Emergency Leave for Project Manager PCS/L/143/08 4-Aug Hadi
607 Proj & Supl√ PCS/L/139/08 4-Aug Hadi
606 Al-Busaili√ Contract No. HT 662 CB 07 - Unpaid due Invoices A/B/284/08 3-Aug Saeed
605 BHHSC
√ Vacation Request BHHSC/MII/118 30-Jul closed
604 Al-Busaili√ Contract HT 662 CB 07 CBD/PB/1181/08 30-Jul close
603 Al-Busaili√ 26-Jul Saeed
602 MIS√ Supply Power to Round About CBD/BM/1150/08 23-Jul Noaman Letter send to MIS
601 MSD √ PHCC Wastewater Treatment Issue MSD/AD/014/08 22-Jul Hadi
600 BHHSC√ National (Laborer/Helper) BHHSC/MII/115 21-Jul closed
599 BHHSC√ Annual Vacation BHHSC/MII/114 21-Jul
598 FMD
√ CBD/BM/1131/08 21-Jul Alex Letter send to FMD closed
597 BHHSC√ Asbestos Handling BHHSC/MII/113 21-Jul Hadi cc:Nawaf close
Wooden Boxes for Flow Meter & AssociatedPiping Spools
wooden boxes made by CA/Comm'tyGroup
Qoutation for Supply and Installation of Car Parking Umbrella For KJO Service Center
Quotation for Supply and Erection of Space Frame@ Main Transportation Gates and KLO ServiceCenter
Tender No. HT 762 CB08 " Upgrading of FireTraining Center Facilities
Non-Availability of H & R Johnson PRGI WhiteTiles for KJOH
Quotation for Supply of Raise Floor Panel for PMCR
Hadi Nawaf
Letter send tocontractor
Changing with Split Cooline A/C with another Brand
Hussamcc:Nawaf
Hussamcc:Hadi
Power Disconnection and Reconnection for 02
Portables
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 14/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
596 CTD√ Transmittal Copies of Contract CTIN/8102/08 21-Jul Hadi cc:Nawaf
595 Proj & Supl√ PCS/L/139/08 21-Jul Zoabi closed
594 Al-Busaili√ AB/312/08 21-Jul Saeed close
593 BHHSC√ Civil Affairs (Passport Office) Government Area BHHSC/MII/112 21-Jul Hussain cc:Hadi
592 BHHSC√ BHHSC/MII/111 21-Jul closed
591 PCD √ HVAC System PCD/ON/1744/08 21-Jul Saeed
590 TMD√ CBD/BM/1129/08 20-Jul Noaman closed Letter sent to TMD
589 TMD
√ Underground Water Leak @ South Jetty TMD-04/463/08 17-Jul Noaman closed
588 Proj & Supl
√ PCS/L/137/08 16-Jul
587 BHHSC √ Workforce Without Work Assignment BHHSC/MII/110 16-Jul Nawaf closed
586 ESD√ 16-Jul closed
585 Proj & Supl
√ PCS/L/135/08 14-Jul closed
584 PCD √ Check out of New Fresh Water System PCD/MP/1718/08 13-Jul Noaman closed
583 PCD√ PCD/MP/1717/08 13-Jul Noamn closed
582 BHHSC
√ Request for Work Requisition BHHSC/MII/109 13-Jul closed
581 PCD√ PCD/MP/1719/08 13-Jul Noaman closed
580 BHHSC √ Basic Safety Course for Technical BHHSC/MII/108 12-Jul Nawaf closed
579 Al-Busaili√ Bank Guarantee for Completion of Installation 1260/22/07/08 12-Jul Saeed
578 Proj & Supl√ Raised Floor Panel for PMCR CBD/BM/1099/08 12-Jul Noaman closed
Qoutation for Supply of Raised Floor Panels for PMCR (Contract No. HT 490BM05)
Contract No. HT 662 CB 07- National Manpower Agreement Copies and Payroll
Update National Manpower for the Month of August 2008
Hussamcc:Hadi
Request for a Meeting Regarding UnfilledUndergound Water Pipe @ South Jetty
Lettter sent to TMDcc: PCD
Recttify leakage of water pipe And
reply to TMD
Revised Quotation for Supply & Installation of Venitian Blinds for FMD Integrated Workshop
Nawaf Hadi
Sliding Windows @ New Water DistributionBuilding, North Area
EST/TS/SES/L-355/08
Mahmodcc:Zoabi
Quotation for Fabriacation, Supply & Installationof Sun Shade for Othman Bin Affan Mosque
Hadi Nawaf
Temporary Storage Areas for Furniture @ HQBuilding 100
Hadi Nawaf
Walkthrough for Handling Over of Portable Water System (Phase 1) HQ 399 PC O4
Lettter sent tocontractor
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 15/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
577 PCD
√ Villa HVAC Training PCD/MP/1651/08 12-Jul
576 Al-Busaili√ National Manpower List 1203/09/07/08 12-Jul Saeed cc:Nawaf closed
575 BHHSC
√ Cancellation of Remaining Vacation BHHSC/MII/107 12-Jul closed
574 ESD√ 12-Jul
573 CTD√ LAD Comments on Review of Tender Documents CTIN/8125/08 12-Jul Hadi cc:Nawaf
572 Proj & Supl
√ PCS/L/133/08 9-Jul
571 CBD/PB√ CBD/PB/1083/08 9-Jul closed
570 Al-Jalhami
√ Al-J/300/2008 7-Jul closed
569 BHHSC√ Replacement of Manpower (Plumber) 7-Jul Nawaf No Objection closed
568 ESD√ Hand0ver of Old Homeownership to Municipality ESD-FP-99/08 7-Jul
567 BHHSC
√ Request for Short Vacation BHHSC/MII/101 7-Jul
566 BHHSC
√ BHHSC/MII/104 7-Jul
565 BHHSC
√ Request for Short Vacation BHHSC/MII/102 7-Jul
564 MTD√ Tender No. T8-007 "EUBIQ Power Connection" MTD-AD/115/08 7-Jul
563 BHHSC
√ Miscellaneous KJO Hospital Projects 7-Jul Noaman closed
Saeed cc:Nawaf & Hadi
Hussamcc:Nawaf &Hadi
Survey and Assestment of Existing Ring WallFoundation
ESD/I&C/OIS-082/08
Nawaf cc:Hadi
Revised Quotation for Supply & Installation of Venitian Blinds for FMD Integrated Workshop
Nawaf Hadi
Temporary Assignment of Mr. Hejab Mohammed
Al-Rowaili (Badge # 13458) to BuildingMaintenance
Nawaf Hadi
Contract No. GT 575 CB06 Maintenance Servicesfor Sewage and Fresh Water Piping System( Returned from Vacation)
Nawaf SaeedHadi
CBD/BM/1224/2008
Reply Letter sent toContractor
Nawaf Hadi
Hussam Hadicc:Nawaf
Resignation of National Labor/Helper (Mr. Talal R,Al-Humadan)
Nawaf Hadi& Hussam
Hussam Hadicc:Nawaf
Nawaf Hadi
CBD/BM/
1089/2008
Letter sent to
Contractor
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 16/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
562 Al-Jalhami
√ 7-Jul Noaman Reply to Contractor closed
561 Al-Jalhami
√ Al-J/300/2008 7-Jul Noaman closed
560 Al-Jalhami
√ Al-J/300/2008 6-Jul Nawaf closed
559 UTD√ New Water Plant Control Room A/C Unit 6-Jul Noaman closed Letter sent to UTD
558 BHHSC√ 6-Jul Noaman Reply to Contractor closed
557 BHHSC√ North Area Round About Concreting BHHSC/MII/103 6-Jul Noaman Reply to Contractor closed
556 BHHSC
√ Short Vacation of Eng'r Ali Al-Hajri CBD/BM/1073/2008 6-Jul Noaman closed
555 BHHSC√ Request for Short Vacation BHHSC/MII/100 6-Jul Noaman Reply to Contractor closed
554 Proj & Supl√ CBD/BM/1074/08 6-Jul Noaman closed
553 Proj & Supl√ PCS/L/133/08 6-Jul Noaman Reply to Contractor closed
552 BHHSC√ CBD/BM/ /2008 5-Jul Noaman closed
551 CTD √ Processing of Contractor Invoices FAD-351/08 2-Jul
550 MTD√ Material Master Creation in SAP 1195 2-Jul
549 Al-Jahlami√ 2-Jul Noaman closed
548 BHHSC√ Temporay Replacement (General Foreman) 2-Jul Noaman closed
547 BHHSC√ Temporay Replacement (General Foreman) 2-Jul Noaman closed
546 BHHSC√ Annual Vacation of Nationals(Labor/Helper) 1-Jul Noaman closed
545 BHHSC√ Annual Vacation of National (Carpenter) 1-Jul Noaman closed
544 BHHSC√ Annual Vacation of Nationals(Clerk/Typist) 1-Jul Noaman closed
Contract No. GT 575 CB06 Maintenance Servicesfor Sewage and Fresh Water Piping System(temporary Replacement of Mason)
CBD/BM/1070/2008
Letter sent toContractor
Contract No. GT 575 CB06 Maintenance Servicesfor Sewage and Fresh Water Piping System
Contract No. GT 575 CB06 Maintenance Servicesfor Sewage and Fresh Water Piping System(Arrival From Vacation)
CBD/BM/1069/2008
Permit of Entry & Gate Pass for Contractor'sPersonnel and Vehicles
CBD/BM/1070/2008
Letter sent toContractor
Letter sent toContractor
Letter sent to
Contractor Letter sent toContractor
(Contract No. HT 490BM05) TemporaryReplacement of Laborer
Letter sent toContractor
Replacement of Laborer (Contract No. HT490BM05)
Letter sent toContractor
General Maintenace of Civil Affairs Building,Gov't Area
Letter sent toContractor
Regarding Provide Water Supply to Soccer Clubfrom New Fresh Water System
CBD/BM/1182/2008
Letter sent toContractor
CBD/BM/1182/2008
Letter sent toContractor
CBD/BM/1061/2008
Letter sent toContractor
CBD/BM/1060/2008
Letter sent toContractor
CBD/BM/1057/2008
Letter sent toContractor
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 17/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
543 BHHSC√ 1-Jul Noaman closed
542 TMD√ Painting NFPA Hazard Identification Marking TMD-04/433/08 1-Jul closed
541 BHHSC √ Manpower Update BHHSC/MII/099 1-Jul Nawaf
540 BHHSC √ BHHSC/MII/098 1-Jul Nawaf closed
539 BHHSC√ BHHSC/MII/097 1-Jul Nawaf closed
538 BHHSC√ Annual Vacation of Nationals(Labor/Helper) 30-Jun Noaman closed
537 BHHSC√ Annual Vacation of Nationals(Labor/Helper) 30-Jun Noaman closed
536 PCD√ Tender Documents Final Review (Rev. 0) CTIN/7991/08 30-Jun Nawaf cc:Hadi
535 PGD
√ PGD/258/2008 30-Jun Nawaf cc:Hadi closed
534 PCD√ PCD/MP/1591/08 29-Jun Noaman closed
533 Al-Jalhami
√ CBD/BM/1045/08 29-Jun Nawaf closed
532 PCD√ Check Out of New Sewage System CBD/BM/1048/08 29-Jun Noaman closed Letter sent to PCD
531 PCD√ Check Out of New Fresh Water System CBD/BM/1047/08 29-Jun Noaman closed Letter sent to PCD
530 BHHSC √ Hiring of Electrical Engineer BHHSC/MII/096 29-Jun Nawaf
529 BHHSC√ BHHSC/MII/095 29-Jun Nawaf
528 Al-Jalhami√ Al-J/08 28-Jun Noaman Letter sent to PCD closed Letter sent to PCD
527 Al-Jalhami√ Al-J/08 28-Jun Noaman Letter sent to PCD closed Letter sent to PCD
526 PGD√ Ali Bin Abi Taleb Mosque PGD/257/2008 28-Jun
525 Proj & Supl
√ PCS/L/127/08 28-Jun Nawaf
524 BHHSC√ BHHSC/MII/094 28-Jun Nawaf cc:Hadi
General Maintenance @ Security Force (BuildingB), Gov't Area
CBD/BM/1053/2008
Letter sent toContractor
M. Balawicc:Nawaf
Vacation Schedule of Mr. Glenn Brua ID # 031-0448 - General Foreman
Vacation Schedule of Mr. Duminda, U.W.B. ID #031-0448 - General Foreman
CBD/BM/1059/2008
Letter sent toContractor
CBD/BM/1058/2008
Letter sent toContractor
General Maintenance of Civil Affairs Building
Gov't AreaRegarding New Potable Water System (HQ 399 PC04)
Contract No. GT 575 CB06 Maintenance Servicesfor Sewage and Fresh Water Piping System(Replacement of Driver)
Letter sent toContractor
Annual Vacation (Al-Dhahir - Clerk/Typist) & (Al-Banaqee - Painter)
Regarding Check Out of New Sewage SystemManhole
Regarding Check Out of New Sewage SystemManhole
Saedcc:Nawaf
Qoutation for Wall to wall Carpet & Venitian
Blinds for New Villas (Contract No. HT 490BM05)Contractor's Safety Performance Report for Monthof June 2008
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 18/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
523 BHHSC √ Annual Vacation (Faisal Al-Shammri) BHHSC/MII/093 28-Jun Nawaf no objection closed
522 BHHSC √ Annual Vacation (Moha'd Saad Al-Majeed) BHHSC/MII/092 28-Jun Nawaf no objection closed
521 BHHSC √ Annual Vacation (Hamad Al-Qathani) BHHSC/MII/091 28-Jun Nawaf no objection closed
520 BHHSC √ Annual Vacation (Nasser Al-Qathani) BHHSC/MII/090 28-Jun Nawaf no objection closed
519 BHHSC√ BHHSC/MII/089 28-Jun closed
518 Al-Busaili√ CBD/BM/1038/08 28-Jun Saed closed
517 Proj & Supl√ CBD/BM/1037/08 28-Jun Nawaf closed
516 PGD√ Urgent Requisition CBD/BM/1035/08 25-Jun Nawaf closed Letter sent to MPG
515 UTD/PCD√ CBD/BM/1036/08 25-Jun Saed closed
514 Al-Busaili √ Qoutation for Oil Pump Assembly QT/564/08 25-Jun Saeed
513 Al-Busaili √ Qoutation for Oil Pump Assembly Fax 25-Jun Saeed
512 Al-Busaili √ Qoutation for Oil Pump Assembly Fax 25-Jun Saeed
511 Proj & Supl√ PCS/L/131/08 24-Jun Nawaf
510 Proj & Supl√ PCS/L/130/08 23-Jun Nawaf
509 FMD√ FMD/OND/662/08 23-Jun Nawaf closed
508 CTD √ SAP-MM CTIN/7920/08 21-Jun closed
507 PGD √ HOP Handover Project Propoasal PGD/245/2008 21-Jun Nawaf
506 Al-Jalhami
√ Al-J/268/2008 18-Jun Nawaf
505 FMD√ FMD Monthly on Call Schedule (May-Jne, 2008) FMD/Ond/08/650 16-Jun
504 Proj & Supl
√ PCS/L/125/08 16-Jun Nawaf
503 Proj & Supl
√ PCS/L/124/08 16-Jun Nawaf
502 Al-Busaili√ AB/282/08 16-Jun Saeed Closed
501 EDD√ Request to Check and Repair Air Compressor EDD/A/909/08 16-Jun Noaman Reply to EDD Closed
PRD Gauging Building Start Date and CompleteionDate
Zoabicc:Nawaf
Contract No. HT 662 CB 07 Supplyof Spare Parts for New Power Plant
Letter sent tocontracor
Contract No. HT490BM05 Distributionof Telephone Lines
Letter sent to Al-Fozzan
Discussed Matters during HVAC Meeting for NewControl Room
Letter sent toMPC/MUT
Connection of Telephone Lines @ Triangular Area(Contract No. HT490BM05)
Delivery for the Model Sculpture (munument)Contract No. HT490BM05
North Area Stock Materilas for LigthingMaintenance
Contract No. GT 575 CB06 Maintenance Servicesfor Sewage and Fresh Water Piping System
Qoutation for Supply and Installation of Handrail@ Fitness Center (Contract No. HT 490BM05)
Qoutation for Supply and Installation of Heater Elements for Jacuzzi @ Fitness Center (Contract
No. HT 490BM05)
Contract No. HT 662 CB 07- Replacement of
Employee
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 19/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
500 ITD√ Nomination for MM Training CBD/GR/1004/08 15-Jun Noaman closed Letter send to ITD
499 PGD√ CBD/BM/994/2008 15-Jun Nawaf closed Letter sent to PGD
498√ CBD Observation During UAT CBD/GR/974/08 14-Jun CBD/GR closed
497 PGD√ CBD/BM/986/2008 14-Jun Nawaf closed Letter sent to PGD
496 BHHSC
√ CBD/BM/975/2008 12-Jun Nawaf closed
495 FMD√ FMD/OND/08/620 12-Jun Ahmed closed
494 BHHSC √ Request for Short Vacation BHHSC/MII/071 12-Jun Nawaf closed
493 Al-Jalhami
√ Al-J/233/2008 12-Jun Nawaf No objection closed
492 Al-Qathani√ 192/AAQKH/08 12-Jun Saeed
491 Proj & Supl
√ CBD/BM/976/2008 11-Jun Nawaf Closed
490 Al-Busaili√ AB/283/08 9-Jun Saeed
489 ERD√ Request to Attain Work Permit Issuer Course CBD/BM/957/2008 7-Jun Nawaf closed Letter sent to ISD
488 ERD √ CBD/BM/ /2008 7-Jun Nawaf closed Letter sent to ERD
487 ERD√ ER/PA/836/08 4-Jun Nawaf Reply to ERD closed
486 BHHSC √ Arrived from Vacation BHHSC/MII/085 4-Jun Nawaf closed
485 PGD√ Guard Room at Authman Bin Affan Mosque CBD/BM/947/2008 3-Jun Nawaf closed Letter sent to PGD
484 Al-Jalhami√ Temporary Replacement of Labors CBD/BM/940/2008 3-Jun Nawaf closed
483 Proj & Supl
√ PCS/L/115/08 2-Jun Zoabi Purchase order closed
482 Proj & Supl√ Contractor's Office @ Triangular Area CBD/BM/935/2008 2-Jun Nawaf closed
General Maitenance of Civil Affairs Building,Gov't Area
Al-Ofoq,ITD
Letter send to Al-Ofoq
General Maitenance of Khafji Jail Phase 1 andPhase 2
Contract No. HT 489 BM 05 Meting withManpower Recruitment Committee
Letter sent tocontractor
Letter received bycontractor (14/06/08)
Broken Fresh Water Line Below Electric Busbar Chamber
Contract No. GT 575 CB06 Maintenance Services
for Sewage and Fresh Water Piping System
Letter sent to
contracor Contract# HT584 BF 95 Rentalof A/C Units
Contract No. HT 490 BM 05 Schedule of Interviewfor Srorekeeper Candidates
Letter sent tocontractor
Letter received bycontractor (12/06/08)
Contract No. HT 662 CB 07- Acceptance of Invoices
Renewal of Service Contract of Mr. Alexander A.Fernandez, B. No. 57047
Service Contract of Mr. Alexander A. Fernandez,B. No. 57047
Letter sent tocontractor
Received byContractor
Qoutation for Mail Boxes @ New Power Plant
South Area (Contract No. HT 490BM05)
Letter sent tocontractor
Received byContractor
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 20/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
481 Al-Jalhami
√ Al-J/237/2008 1-Jun Nawaf closed
480 Al-Busaili√ AB/282/08 1-Jun Saeed
479 Al-Busaili √ AB/281/08 1-Jun Saeed
478 BHHSC √ Manpower Update BHHSC/MII/080 31-May Nawaf closed
477 Proj & Supl√ Contractor Safety Performance report PCS/L/114/08 28-May Nawaf
476 BHHSC √ Hiring of Electrical Engineer " National" BHHSC/MII/079 28-May Nawaf
475 TMD√ TMD-04/342/08 28-May Saeed
474 CTD√ CTIN/7611/08 28-May Nawaf
473 CTD
√ CTIN/7610/08 28-May Nawaf
472 MSD√ MSD/089/08 28-May Ismail cc:Nawaf
471 FMD√ Broken Fresh Water Line Below Bus Bar CBD/BM/916/2008 27-May Noaman closed letter send to FMD
470 ITD√ Modification in the 2nd Data Center ITD-CSD-422/2008 25-May Noaman executed closed
469 BHHSC√ CBD/BM/892/08 25-May Nawaf closed
468 Al-Jalhami √ Regarding to Check out New Fresh Water System 25-May Noaman Letter send to PCD closed
467 CTD √ National Manpower CTFX/0913/08 25-May Mr. Saeed Reminder
466 PCD√ PCD/MP/1265/08 25-May Mr. Nawaf
465 Al-Jalhami
√ Al-J/2015/2008 25-May
464 PCD√ Damage Fresh Water Line CBD/BM/883/08 24-May Noaman Letter sent to PCD closed
463 Proj & Supl
√ PCS/L/113/08 24-May
462 CBD/RG√ Construction of Perimeter Fence @ Retirees Club CBD/RG/048/05/08 22-May Nawaf
Contract No. GT 575 CB06 Maintenance Servicesfor Sewage and Fresh Water Piping System
Contract No. HT 662 CB 07- Changes to some A/CUnits
Contract No. HT 662 CB 07- Replacement of
Employee
Supply of Tea & Coffee for South Jetty RecreationFacility
Status Report on the Subject Submitted to JTC andJOC
Status Report on the Subject Submitted to JTC and
JOCQuotation for Sewage Pump for KJOH (Contract #HT490BM05)
Resignation of Mr. Meshaal M. Al-Shamarri(Helper-National)
Letter sent to TeamLeader CMNC
Existing Underground Utilities ObstructingConstruction @ Zone 3B (Near South Jetty)
Contract No. GT 575 CB06 MaintenanceServices for Sewage and Fresh Water PipingSystem ( Vacation of 02 Labor)
Technical Limitations in Producing of Expanded
Polystyrene Décor for Monument
Nawaf
Joe
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 21/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
461 BHHSC√ Resignation of Mr. Meshaal M. Al-Shammari BHHSC/MII/077 19-May Nawaf closed
460 BHHSC √ Contractor Manpower Update BHHSC/MII/076 19-May Nawaf
459 PCD√ PCD/ON/1222/08 19-May Mr. Nawaf execute work Closed
458 PRD√ 19-May Mr.Noaman Letter sent to PRD Letter sent to PRD
457 ESD√ 19-May Mr. Nawaf
456 PRD√ PRD-OF-322/08 19-May Noaman Closed
455 ESD√ 18-May Mr. Nawaf Closed
454 CTD√ CTIN/7505/08 18-May
453 PGD√ Annual Maintenance of Gov't School PGD/CDS/43/08 18-May
452 CTD √ National Manpower CTFX/0913/08 18-May Mr. Saeed
451 BHHSC√ Temporary Replacement (Multi-crafts Foreman) CBD/BM/862/08 18-May Nawaf closed
450 BHHSC√ Manpower Replacement (Muti-craft Foreman) CBD/BM/862/08 18-May Nawaf closed
449 BHHSC √ Additional Support Manpower BHHSC/MII/075 17-May Nawaf
448 PRD√ General Maintenance of PRD Chemical yard CBD/BM/854/08 13-May Noaman Letter sent to PRD closed
447 FMD √ CBD/BM/857/08 13-May Noaman Letter sent to FMD closed
446 TMD√ TMD-04/293/08 12-May Saeed
445 CMNC
√ CBD/BM/850/08 12-May Noaman closed
444 CMNC
√ Proposed Electrical Engineer (National) CBD/BM/853/08 12-May Noaman closed
Letter sent to TeamLeader CMNC
Wooden Boxes for Flow Meter & AssociatedPiping Spools
Specification of Exhaust Fan for OCP Kitchen,Offshore
Al-Jazeera Guest House Hairline CracksInvestigation
ESD/TS/SES/L-236/08
Replacement of Exhaust Fan of Kitchen @ OCP,Offshore
Al-Jazeera Guest House Hairline CracksInvestigation
ESD/TS/SES/L-233/08
Sent drwings toESD
Changes to supply requirements for some A/CUnits
Mr. Saeedcc:Mr. Nawaf
Mr. Nawaf cc:Mr. Saeed
Received byContractor
Received byContractor
North Area Stock Materilas for LigthingMaintenance
Installation of Split-Type Air-Conditioning Units@ Heliport Hangar Workshop
Candicate for Recruitment in Vacancy of a National Storekeper
Letter sent to TeamLeader CMNC cc:Proj. & Supplies
Letter sent to TeamLeader CMNCcc:BHHSC
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 22/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
443 CMNC√ Hiring of Labor helper -National CBD/BM/853/08 12-May Noaman closed
442 ISD√ CBD/BM/853/08 12-May Noaman Letter sent to ISD closed
441 MSD √ KJO Hospital Water System MSD/083/08 12-May
440 EDI
√ EDB/067/08 10-May FYI closed
439 Al-Qathani √ Rental of A/C Units 167/AAQKH/08 10-May Saeed
438 Proj & Supl√ PCS/L/108/08 10-May Nawaf cc:Hadi
437 Proj & Supl√ PCS/L/110/08 10-May Nawaf cc:Hadi closed
436 Proj & Supl √ PCS/L/107/08 10-May Hadi cc: Nawaf
435 Proj & Supl√ PCS/L/106/08 7-May Nawaf cc:Hadi
434 Proj & Supl√ PCS/L/105/08 7-May Nawaf cc:Hadi closed
433 BHHSC√ Temporary Replacement (Labour Helper) CBD/BM/802/08 7-May Nawaf closed
432 Proj & Supl
√ PCS/L/101/08 6-May Nawaf cc:Hadi closed
431 BHHSC
√ CBD/BM/815/08 6-May Hadi closed
430 BHHSC √ Vacation of Ranjit Fernando BHHSC/MII/073 6-May Nawaf Closed
429 Busaili √ Contract 879 6-May Saeed
428 CBD/OS√ General Maintenance of Fire Station 02 S/A CBD/BM/816/08 6-May Noaman Closed
427 ISD√ General Maintenance of Fire Station 02 S/A CBD/BM/814/08 6-May Noaman Letter sent to ISD Closed
426 CTD √ CTIN/7413/08 6-May Noaman Closed
Letter sent to TeamLeader CMNC
Permit of Entry & Gate Pass for Contractor'sEmergency Crew
Hadi
cc:Nawaf
JTC Concurrence and JOC Approval for Issuanceof Tenders HT 744 CB08 & HT 734 CB08)
Hadi Nawaf
Quotation for Supply of Marble Counter @Offshore
Candicate for Recruitment in Vacancy of a National Storekeper
Letter sent to TeamLeaderCMNC
Drawings for Single Panic Steel Door @ KJOService Center
Reminder for Price Adjustment for Material SupplyServices For Building Maintenance
Candicate for Recruitment in Vacancy of a National Storekeper
Letter sent to TeamLeaderCMNC
Letter sent tocontractor
Received byContractor
Candicate for Recruitment in Vacancy of a
National Storekeper
Letter sent to Team
Leader CMNC
Contract No. HT849BM05 (Manpower SupplyContractor for Building Maintenance) Fire Station02
Letter sent tocontractor
Received byContractor
Letter sent toCBD/OS
Materials Supply Service for Building Maintenance(HT744CB08)
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 23/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
425 Proj & Supl√ PCS/L/104/08 6-May Noaman Letter sent to MIS Closed
424 MEM, MIS√ Asbestos removal @ Car Shade of House D-48 CBD/BM/810/2008 6-May Nawaf Closed
423 Proj & Supl√ Annual Vacation of Accountant CBD/BM/809/2008 6-May Nawaf Closed
422 PRD √ General Maintenance of PRD Chemical Yard PRD/OS-337/08 6-May Noaman Closed
421 Al-Jalhami√ 5-May Mahmod closed
420 BHHSC √ Access Permit After 3:00 Pm BHHSC/MII/062 5-May Nawaf
419 BHHSC √ Work Permit Refresher Course BHHSC/MII/071 5-May Nawaf Letter sent to ISD Closed
418 BHHSC√ BHHSC/MII/063 5-May Nawaf Letter sent to ISD Closed
417 CMNC√ CBD/BM/803/2008 5-May Nawaf Closed
416 Proj & Supl√ Fax 5-May Noaman Letter sent to MSD closed
415 Proj & Supl√ PCS/L/103/08 5-May Noaman Letter sent to MSD closed
414 Proj & Supl√ PCS/L/102/08 5-May Noaman Letter sent to MSD closed
413 BHHSC√ Hiring of Labor helper -National BHHSC/MII/070 5-May Nawaf closed
412 CMNC
√ Recruitment Procedures and Qualifications CBD/BM/795/2008 5-May Nawaf Closed
411 CTD √ Effectiveness of Resignation CTIN/7395/08 5-May Nawaf
410 Proj & Supl√ Temporary Replacement Supervisor CBD/BM/794/08 4-May Noaman closed
409 MSD√ Panaromic Examination Lights CBD/BM/793/2008 4-May Noaman Letter sent to MSD Closed
408 BHHSC √ Temporary Replacement BHHSC/MII/069 4-May Nawaf Closed
407 Proj & Supl√ Return of National Foreman from Vacation PCS/L/098/08 3-May Nawaf closed
406 Proj & Supl
√ Resignation of National Bookeeper PCS/L/097/08 3-May Nawaf closed
Temporary Access Permit to South Area (PRDMain Store)
Letter sent to MEM,MIS
Letter sent tocontractor
Letter received bycontractor
Reason to leak from Sewage Manhole @ Heliport #02
Weekend/Holiday and after 3:00 PM Access Permit( Emergency Crew)
Termination of Mr. Faisal Bane Al-Qathani Labor Helper-National
Letter sent toCMNC
Quotation for Supply of Myers Non-ClogSubmersible Sewage Pump for KJOH
Quotation for Supply of Myers Non-ClogSubmersible Sewage Pump for KJOH
Quotation for Supply of Myers Non-ClogSubmersible Sewage Pump for KJOH
Letter sent to TeamLeader CMNC
Letter sent to TeamLeader CMNC
Letter was received by CMNC
Letter sent tocontractor
Received byContractor
Letter received byMSD
Letter sent tocontractor
Letter sent to TeamLeader CMNC
Letter was received by CMNC
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 24/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
405 TMD√ Installation of Split type A/C Units 2 Heliport TMD-04/271/08 3-May Saeed
404 MSD√ Miscellaneous KJO Hospital Projects MSD/078/08 3-May Hadi cc: Nawaf
403 Proj & Supl
√ PCS/L/096/08 3-May Noaman Letter sent to MSD closed
402 Busaili√ Payment AB/273/08 3-May
401 Proj & Supl√ Issuance of Entry Gate Pass(S/A) PCS/L/099/08 3-May Noaman Letter send to MIS closed
400 CBD/PB
√ CBD/PB/777/08 30-Apr Noaman closed
399 MIS√ Issuance of Entry Gate Pass CBD/BM/772/2008 30-Apr Noaman
398 BHHSC√ Chain Link Fence @ MTD New Scrap Yard BHHSC/MII/068 30-Apr
397 Al-Jalhami
√ Al-J/200/2008 30-Apr Noaman closed
396 MIS√ Issuance of Entry Gate Pass CBD/BM/772/2008 30-Apr Noaman Letter send to MIS
395 BHHSC√ BHHSC/MII/068 30-Apr Balawi
394 ISD√ 30-Apr Noaman
393 BHHSC√ Supply of Airconditioning Unit BHHSC/MII/067 29-Apr Nawaf cc:Saeed
392 BHHSC √ Supply of Airconditioning Unit BHHSC/MII/067 29-Apr Nawaf
391√ General Maintenance of Fire Station Building 29-Apr Noaman
390 TMD√ Signboard Requirement at South Jetty 29-Apr Noaman
389 CTD√ Annual Leave of PMSS Employee 29-Apr Noaman
388 Proj & Supl √ Annual Vacation for National Accountant PCS/L/084/08 28-Apr Nawaf Replied to contactor Closed
Clarification for Halogen Cool-Light Technology
for Panaromic Examination Lights @ KJO Hospital
Saeed cc: Nawaf
Waiting for MCBsignature
Complete Documents and Drawing Issued for Construction (EWO #011/07-Miscellaneous for KJO Hospital Projects
Mhamodcc:Nawaf
Maintenance Services for Sewage and Fresh Water Piping System
reply Letter sent tocontractor
Letter was received by contractor
Chain LInk Fence @ MTD New Scrap Yard - North Area
Installation of Portable Partition at CCTVMonitoring Center
Letter sent to ISD30/04/08
Waiting for MCBsignature
RelocationPlan Team
Letter sent to ISD29/04/08
Waiting for MCBsignature
Letter sent to TMD29/04/08
Waiting for MCBsignature
Letter sent to CTD29/04/08
Waiting for MCBsignature
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 25/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
387 Proj & Supl
√ PCS/L/093/08 28-Apr Hussam
386 CTD
√ 28-Apr Saeed
385 PRD√ General Maintenance of PRD Chemical Yard CBD/BM/757/07 28-Apr Noaman Closed
384 ISD√ CBD/BM/756/07 28-Apr Saeed Closed
383 Proj & Supl√ PSC/L/094/08 28-Apr Hadi cc: Nawaf
382 Proj & Supl
PSC/L/093/08 28-Apr Hadi cc: Nawaf
381 BHHSC
√ BHHSC/MII/066 28-Apr Nawaf, Hadi
380 Al-Busaili
√ Rental of A/C Units & HVAC Maintenance CBD Ref# 815 28-Apr Saeed Closed
379 ISD
√ CBD/BM/747/07 27-Apr Noaman Closed
378 CTD√ CTIN/7313/08 27-Apr Hadi cc: Nawaf
377 Al-Busaili√ HVAC, Split & Window A/C Staff for Acceptance AB/271/08 27-Apr
376 ISD, MTD
√ CBD/BM/745/07 26-Apr Noaman Closed
375 BHHSC√ 26-Apr Noaman
374 Proj & Supl√ Wash Basin Mixer for D-21 PSC/L/086/08 26-Apr Nawaf cc: Hadi
373 MTD
√ CBD/BM/744/07 26-Apr Noaman Closed
Wind Load Guarantee for Econotilt SandwichPanel, Walls & Roof for Two Portables at SpringCamp
Supply of Ceiling Type, Wireless Control Split A/Cand more Windows A/C of Contract HT662CB07
Letter sent to CTD28/04/08
Waiting for MCBsignature
Letter sent to PRD28/04/08
Letter was received by PRD
Rental of A/C Units (Contract HT584BF95)Renewal of IDs for Personnel & Vehicles
Letter sent to ISD28/04/08
Letter was received by ISD
Supply of Polysterene Décor for Monument at KJORoundabout
Wind Load Guarantee for Econotilt SandwichPanel, Walls & Roof for Two Portables at SpringCamp
Assignment of Routine Maintenance Carpenters
Areawise
Forwarded to CBD-GR thru e-mail
Permit of Entry & Gate Pass for Contractor’sPersonnel (Working after Office Hours in SBQ North Area)
Letter sent to ISD27/04/08
Letter was received by ISD
Manpower Supply Service for BuildingMaintenance
Saeed cc: Nawaf
Chain link Fence @ MTD New Scrap Yard - NorthArea
Letter sent to ISD,MTD 26/04/08
Letter was received by ISD, MTD
GM Start (Chain link Fence @ MTD New ScrapYard - North Area)
Letter sent tocontractor 26/04/08
Waiting for MCBsignature
Installation of Split Type Air-Conditioning Units at
Helicopter Hangar
Letter sent to MTD
26/04/08
Letter was received
by TMD
D i i R f # D I h A i S R k
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 26/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
372 ISD
√ CBD/BM/738/07 23-Apr Noaman Closed
371 Proj & Supl√ Working after Office Hours in SBQ North Area PSC/L/085/08 23-Apr Noaman Closed
370 HRD √ In-House Traing Directories 2008 HRD/133/08 22-Apr Nawaf FYI closed
369√ CBD/BM/730/07 22-Apr Noaman Closed
368 PGD√ CBD/BM/729/07 22-Apr Noaman Closed
367 ISD, FMD√ Electrical Lightings at New Villas 22-Apr Noaman
366 HRD√ Authority for Training/Conference Travel HRD/CDD/004/08 22-Apr Closed
365 HRD √ HR/140/08 22-Apr Nawaf, Saeed
364 Proj & Supl√ Annual Vacation for a National Accountant PSC/L/084/08 22-Apr Nawaf cc: Hadi
363 TMD
√ CBD/BM/720/07 21-Apr Noaman Closed
362 BHHSC
√ CBD/BM/719/07 21-Apr Nawaf Closed
361 TMD √ Signboard Requirement at South Jetty TMD-04/259/08 21-Apr Noaman Closed
360 ISD
√ General Maintenance of Fire Station Building ISD/FM-496/08 21-Apr Noaman Closed
359 BHHSC√ Termination of Employee BHHSC/MII/064 21-Apr Nawaf cc: Hadi closed
358 BHHSC
√ Emergency Vacation (Multi-crafts Foreman) CBD/BM/712/07 20-Apr Nawaf Closed
357 Al-Jalhami
√ Submission of Monthly Invoice CBD/BM/709/07 20-Apr Nawaf Closed
Permit of Entry & Gate Pass for Contractor’sPersonnel (Working after Office Hours in SBQ North Area)
Letter sent to ISD23/04/08
Letter was received by ISD
Forwarded to ISD23/04/08
BHHSC,CMNC, etc Manpower Supply for Building Maintenance
(Replacement of Helper)Letter sent tocontractor 22/04/08
Letter was received by contractor
Maintenance Works at Al-Rafea Border (Portable& Chainlink Fence) -Secure Budget
Letter sent to PGD22/04/08
Letter was received by PGD
Letter sent to ISD,FMD 22/04/08
Waiting for MCBsignature
Hussain cc: Nawaf
English Language Program (ELP) Placement TestFeedback
North and South Jetty Crude Oil Sample Container Drum
Letter sent to TMD21/04/08
Letter was received by TMD
Overall Uniform and Personal ProtectiveEquipment (PPE)
Letter sent tocontractor 21/04/08
Letter was received by contractor
reply sent to TMD29/04/08
Referred to RPT for their advise29/04/08
Letter sent to TeamLeader CMNC
Letter sent tocontractor 20/04/08
Letter was received by contractor
Letter sent tocontractor 20/04/08
Letter was received by contractor
SN D t t D i ti R f # D t I h A ti St t R kO
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 27/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
356 BHHSC
√ Senior Project Manager CBD/BM/707/07 19-Apr Nawaf Closed
355 CBD-RG√ Family Area Beach Playground Report 19-Apr Nawaf closed
354 TMD√ TMD-04/251/08 19-Apr Noaman Closed
353 EDD√ 2009-2013 Business Plan EDD/BP/341/08 19-Apr Hadi cc: Nawaf
352 Proj & Supl√ PSC/L/082/08 19-Apr Nawaf, Hadi
351 Proj & Supl
√ PSC/L/081/08 17-Apr Nawaf, Hadi Closed
350 Proj & Supl
√ Non-Availability of Concrete Hollow Block PSC/L/080/08 17-Apr Nawaf, Hadi349 ISD
√ CBD/BM/702/07 16-Apr Nawaf Closed
348 ISD √ Traffic Violation ISD/SF-464/08 16-Apr Nawaf
347 SEW
√ SL J0100-2008 16-Apr Nawaf cc: Hadi
346 Al-Busaili√ Rental of A/C Units & HVAC Maintenance CBD Ref# 736 16-Apr Closed
345 BHHSC√ Vehicle Shortage BHHSC/MII/061 16-Apr Nawaf cc: Hadi
344 Proj & Supl
√ PSC/L/078/08 15-Apr Nawaf cc: Hadi Closed P.O. was requested
343 ISD, ESD√ 14-Apr Nawaf Closed
342 ISD, ESD
√ Guard Room at Authman Bin Affan Mosque CBD/BM/695/07 14-Apr Nawaf Closed
341 BHHSC√ CBD/BM/694/07 14-Apr Nawaf Closed
Letter sent tocontractor 19/04/08
Letter was received by contractor
Letter sent to CBD-RG 19/04/08
Waiting for MCBsignature
North and South Jetty Crude Oil Sample Container Drum
Reply to TMD sent21/04/08
Quotation for Supply & Inst. Of Plain Plastic SheetCover for B-04
List of Non-National Personnel for MaterialsSupply Service for Building Maintenance Contract
Issuance of Temporary Entry/Gate Pass (M/SDorma Arabian Co.)
Letter sent to ISD16/04/08
Waiting for MCBsignature
Original Manifest for Handling, Containing,Transportation & Disposing of Asbestos from KJO
Saeed cc: Nawaf
Revised Quotation for Supply & Inst. Of Waterproof Cantilever Car Sheds at KJO Servicecenter
KJO Service Center Smoking Room & Car Sheds(Government Area)
Letter sent to ISD,ESD 14/04/08
Waiting for MCBsignature
Letter sent to ISD,ESD 14/04/08
Letter was received by ISD, ESD
GM Start (KJO Service Center Smoking Room &Car Sheds - Government Area)
Letter sent tocontractor 14/04/08
Letter was received by contractor
SN Department Description Ref # Date In charge Action Status RemarksI O t
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 28/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
340 BHHSC
√ CBD/BM/692/07 14-Apr Nawaf Closed
339 BHHSC
√ Emergency Vacation (Multi-crafts Foreman) CBD/BM/689/07 14-Apr Nawaf Closed
338 BHHSC
√ Emergency Vacation BHHSC/MII/060 14-Apr Nawaf cc: Hadi Closed
337 Proj & Supl√ PSC/L/079/08 14-Apr Nawaf Closed
336 Proj & Supl√ PSC/L/077/08 13-Apr Nawaf
335 FMD
√ Street Lightings at Various Locations CBD/BM/676/07 12-Apr Noaman Closed
334 ITD√ CBD/BM/675/07 12-Apr Noaman Closed
333 MSD
√ CBD/BM/674/07 12-Apr Noaman Closed
332 HRD √ Authority for Training/Conference Travel HRD/CDD/003/08 12-Apr Nawaf
331 BHHSC√ Provide Skilled Electrician BHHSC/MII/059 12-Apr Nawaf cc: Hadi
330√ Rental of A/C Units 102/AAQKH/08 12-Apr Closed
329 Al-Busaili √ Postponed the Meeting for Next Week SL J0088-2008 9-Apr Nawaf, Hadi
328 Proj & Supl
√ Partial Vacation for Accountant (National) CBD/BM/669/07 8-Apr Noaman Closed
327 ISD√ CBD/BM/661/07 8-Apr Noaman Closed
326 ISD√ CBD/BM/660/07 8-Apr Noaman Closed
325 TMD√ TMD-04/230/08 8-Apr Closed
324 BHHSC √ Senior Project Manager 8-Apr Nawaf cc: Hadi
323 Proj & Supl√ Partial Vacation for a National Accountant PSC/L/076/08 7-Apr Nawaf cc: Hadi Closed
GM Start (Guard Room at Authman Bin AffanMosque - Government Area)
Letter sent tocontractor 14/04/08
Letter was received by contractor
Letter sent tocontractor 14/04/08
Letter was received by contractor
Reply to contractor sent 14/04/08
Temporary Access Permit to South Area (PRDMain Service Store)
Forwarded to ISD16/04/08
Quotation for Electromagnets Lock & ProximityReader
Letter sent to FMD12/04/08
Letter was received by FMD
IDP Fence near Al-Jazeerah House (Turnover of Padlock Key)
Letter sent to ITD12/04/08
Letter was received by ITD
Building Maintenance Requirement (Business Plan
for 2009-2013) Letter sent to MSD12/04/08
Letter was received by MSD
A. Al-Qahtani
Saeed cc: Nawaf, Hadi
Forwarded to ISD28/04/08
Letter sent tocontractor 09/04/08
Letter was received by contractor
Protection of Material Storage Yard near FireStation
Letter sent to ISD08/04/08
Letter was received by ISD
Provision of Freshwater Line & Drainage System at New Fire Building
Letter sent to ISD08/04/08
Letter was received by ISD
Installation of Split Type A/C Units at Helicopter Hangar
Saeed cc: Nawaf
Reply sent to MTD26/04/08
BHHSC/CFM/111/6
92Reply sent09/04/08
SN Department Description Ref # Date In-charge Action Status RemarksIn Out
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 29/50
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
322 BHHSC√ Sick Leave BHHSC/MII/058 6-Apr Nawaf cc: Hadi
321 BHHSC√ Propose Electrical Engineer "National" BHHSC/MII/057 6-Apr Nawaf cc: Hadi
320 FMD
√ CBD/BM/651/07 5-Apr Noaman Closed
319
√ CBD/BM/640/07 5-Apr Nawaf Closed
318 Al-Busaili√ Installation of Split & Window A/C CBD Ref# 656 5-Apr Closed
317 Proj & Supl√ Salary of Employees 2-Apr Nawaf
316 ISD
√ Issuance Entry Gate Pass (MARCO) CBD/BM/633/07 2-Apr Saeed Closed
315 ISD, PGD
√ CBD/BM/628/07 2-Apr Nawaf Closed
314 Proj & Supl√ PSC/L/074/08 2-Apr Nawaf, Hadi
313 Proj & Supl
√ Sample for Stainless Steel Monument CBD/BM/625/07 1-Apr Nawaf Closed
312 ISD√ CBD/BM/622/07 1-Apr Nawaf Closed
311 HRD√ English Language Program (ELP) Placement Test HR/107/08 1-Apr Nawaf, Saeed
310 Proj & Supl√ PSC/L/073/08 1-Apr Nawaf cc: Hadi Closed
309 ERD√ ER/PA/472/08 31-Mar Closed
308 BHHSC√ BHHSC/MII/056 31-Mar Nawaf cc: Hadi Closed
307 SEW
√ SL J0082-2008 31-Mar Nawaf cc: Hadi
Handover of Electrical Lighting Works at North
Area to CBD
Letter sent to FMD
05/04/08
Letter was received
by FMD
CMNC,BHHSC Resignation of Mr. Khalid R. Al-Anizi (Helper-
National)
Letter sent toCMNC & contractor 05/04/08
Letter was received by CMNC &contractor
Saaed cc: Nawaf
Pending with Mr. Nawaf
Letter sent to ISD
02/04/08
Letter was received
by ISD
Re-partition at New Saudi-Kuwaiti JointCommittee Building
Letter sent to ISD,PGD 02/04/08
Letter was received by ISD, PGD
Price Adjustment for Material Supply Services for Building Maintenance
Letter sent tocontractor 01/04/08
Letter was received by contractor
Issuance of Temporary Entry/Gate Pass (M/SElegance Tent)
Letter sent to ISD01/04/08
Letter was received by ISD
Quotation for Supply & Inst. Of Cantilever Shedsat KJO Service Center
Parties in Honor of Employees Eligible for Continuous Service Awards
Saeed cc: Nawaf
Resignation of mr. Khalid Al-Anizi (Helper- National)
Forwarded toCMNC 05/04/08
Procedure for Handling, Containing, Transportation
& Disposing Asbestos from KJO
SN Department Description Ref # Date In-charge Action Status RemarksIn- Out-
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 30/50
SN Department Description Ref # Date In charge Action Status RemarksIn-coming
Out-going
306 BHHSC
√ Temporary Replacement (Multi-crafts Foreman) CBD/BM/616/07 30-Mar Nawaf Closed
305 ISD√ CBD/BM/615/07 30-Mar Noaman Closed
304 PGD√ CBD/BM/614/07 30-Mar Nawaf Closed
303 CMNC
√ CBD/BM/610/07 30-Mar Nawaf Closed
302 MSD √ Action Plan for Hospital Maintenance - 2008 MSD/O54/08 30-Mar Nawaf, Hadi
301 Proj & Supl√ PSC/L/069/08 30-Mar Nawaf cc: Hadi Closed
300 SEW√ SL J0081-2008 30-Mar Noaman Closed
299 PGD
√ Requirements for Process of Visa Requisitions PGD/P&R/24/2008 29-Mar Salama file closed
298 JOC
√ JOC/SEC-0065/08 29-Mar FYI closed
297 UTD√ Contractors’ Offices at Triangular Area CBD/BM/600/07 29-Mar Noaman Closed
296 CTD
√ CBD/BM/599/07 29-Mar Noaman Closed
295 Proj & Supl
√ PSC/L/068/08 29-Mar Nawaf cc: Hadi Closed
294 Proj & Supl√ PSC/L/067/08 29-Mar Nawaf cc: Hadi Closed
293 Al-Busaili√ Problems faced During Installation AB/249/08 29-Mar Closed
292 Proj & Supl
√ PSC/L/064/08 26-Mar
Letter sent tocontractor 30/03/08
Letter was received by contractor
Temporary Gate Pass for Manpower & Trucks for Loading Asbestos from KJO
Letter sent to ISD30/03/08
Letter was received by ISD
Remodeling Of Office (Central Investigation
Department)
Letter sent to PGD
30/03/08
Letter was received
by PGD
Resignation of Mr. F.K. Al-Dakheel (Helper- National)
Letter sent toCMNC 30/03/08
Letter was received by CMNC
Quotation for Gypsum Ceiling Decoration Worksfor CID Manager's Office
Temporary Gate Pass for Manpower & Trucks for Loading Asbestos from KJO
Forwarded to ISD30/03/08
To seek executive management Approval for a totalfund of US$ 110, 000 for the Fencing @ The ExTransportation Garage and Relocatio of ACMCAssets. All Cost Incirred for Relocation Activitieswill be bak Chargaed to ACMC Retention Moneywith KJO
Hadi Nawaf
Letter sent to UTD29/03/08
Letter was received by UTD
Certificate of Insurance (Transportation, Treatmentand Disposal of Asbestos Containing Material-ACM)
Letter sent to CTD29/03/08
Letter was received by CTD
Quotation for Wooden Decoration Works &Gypsum Ceiling Decoration Works for CIDManager's Office
Delivery of Chainlink Fence for Khafji RoadPerimeter Fence
Saeed cc: Nawaf, Hadi
Quotation for Supply & Inst. Of Panic Bar Devices
at Offshore
Nawaf, Hadi,
Leo
SN Department Description Ref # Date In-charge Action Status RemarksIn- Out-
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 31/50
p p gIncoming
Outgoing
291 Proj & Supl
√ PSC/L/063/08 26-Mar Closed
290 Proj & Supl
√ PSC/L/062/08 26-Mar Closed
289 BHHSC√ BHHSC/MII/053 26-Mar Nawaf Closed
288 SEW√ Insurance Copy SL J0080-2008 26-Mar Nawaf, Hadi Closed
287 BHHSC
√ Replacement of Manpower (Quantity Surveyor) CBD/BM/567/07 25-Mar Nawaf Closed
286 CTD√ Manpower Service for Building Maintenance CTIN/7067/08 25-Mar
285 PCD
√ Handover of final As-Built Drawings & Documents PCD/ON/0718/08 25-Mar Noaman Closed
284 Proj & Supl
√ Temporary Replacement of Laborer CBD/BM/572/07 24-Mar Nawaf Closed
283 Proj & Supl
√ Annual Vacation of Foreman (National) CBD/BM/571/07 24-Mar Nawaf Closed
282 CTD√ Status Report on the Subject Submitted to EDI CTIN/7061/08 24-Mar
281 TMD√ TMD-04-193-08 24-Mar Closed
280 CTD√ CBD/BM/550/07 23-Mar CBD-PB Closed
279 MDD√ MDD/054/08 23-Mar Closed
278 BHHSC√ Arrived from Vacation BHHSC/MII/053 23-Mar Closed
277 Al-Busaili
√ Office, Warehouse & Workshop AB/246/08 23-Mar Closed
276 Proj & Supl
√ PSC/L/058/08 20-Mar Closed
275 FMD√ Handover of Electrical Lighting Works to CBD 19-Mar Salamah
Quotation for Supply & Inst. Of Steel Fence inHouse B-04
Noaman, Nawaf cc: Hadi
Quotation for Supply & Inst. Of Steel Fence inHouse B-04
Noaman, Nawaf cc: Hadi
Resignation of Mr. F.K. Al-Dakheel (Helper- National)
Forwarded toCMNC 29/03/08
Forwarded to CTD29/03/08
Letter sent tocontractor 25/03/08
Letter was received by contractor
Noaman cc: Nawaf
Letter sent tocontractor 24/03/08
Letter was received by contractor
Letter sent tocontractor 24/03/08
Letter was received by contractor
Noaman cc: Nawaf
Relocation of Underground Septic Tank @ OilspillWarehouse
Noaman cc: Nawaf
Belongs to CBD-PB
Materials Supply Service for Building Maintenance(HT490BM05)
Letter sent to CTD23/03/08
Letter was received by CTD
Business Plan for 2009-2013 (Catering ServiceBudget)
Noaman, Nawaf, Hadi
Nawaf cc: Noaman
Saeed cc: Noaman, Nawaf, Hadi
Quotation for Wooden Decoration Works for GIA
Manager's Office
Noaman cc:
Nawaf Letter sent to FMD19/03/08
Waiting for MCBsignature
SN Department Description Ref # Date In-charge Action Status RemarksIn- Out-
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 32/50
p gcoming going
274 FDP-1√ Petrojet OCP HVAC System MRQ PD-KJO/0805/08 19-Mar
273 ISD√ ISD/F&M-338/08 19-Mar Noaman Closed
272 ISD√ ISD/F&M-324/08 19-Mar Noaman Closed
271 FMD
√ CBD/BM/533/07 18-Mar Saeed Closed
270 BHHSC√ 17-Mar Nawaf Closed
269 PGD√ CBD/BM/521/07 17-Mar Saeed Closed
268 PGD√ CBD/BM/518/07 17-Mar Noaman Closed
267 EDD √ EDD/A/245/08 17-Mar Closed
266 BHHSC√ Packages On Hold BHHSC/MII/049 17-Mar Closed
265 Proj & Supl
√ Annual Vacation for a National Foreman PSC/L/055/08 17-Mar Closed
264 Proj & Supl
√ Temporary Replacement of a Laborer PSC/L/054/08 16-Mar Closed
263 ISD √ CBD/BM/505/07 15-Mar Noaman Closed
262 FMD
√ CBD/BM/503/07 15-Mar Noaman Closed
261 PGD√ Request for Cost Estimation PGD/1105/08 15-Mar Closed
260 HRD √ In-House Course Nomination HRD-CDD/47/08 15-Mar Noaman Closed
259 Proj & Supl√ PSC/L/053/08 15-Mar
258 Proj & Supl
√ Quotation for Steel Door Panic Device at Offshore PSC/L/050/08 15-Mar Closed
257 Proj & Supl√ PSC/L/049/08 15-Mar
Saeed cc: Nawaf, Hadi
Protection of Material Storage Yard near FireStation
Reply sent to ISD08/04/08
Provision of Freshwater Line & Drainage System(New Fire Building)
Reply sent to ISD08/04/08
Electrical Connection of Split A/C Units at Al-Zohour Girls School
Letter sent tocontractor 18/03/08
Letter was received by FMD
Attendance Sheet and PCS for Processing &Payment
Letter sent tocontractor 17/03/08
Waiting for MCBsignature
Missing Window & Split A/C Units from SecurityForce
Letter sent to PGD17/03/08
Letter was received by PGD
Permit to Work at Offshore-Gathering Station(Repair of OCP Rooftop)
Letter sent to PGD17/03/08
Letter was received by PGD
Request to Repair/Replace Door Lock of KJOExplosives Stores
Noaman cc: Nawaf
Noaman cc: Nawaf
Nawaf cc: Noaman
Reply sent tocontractor 24/03/08
Nawaf cc: Noaman
Reply sent tocontractor 24/03/08
Permit at Offshore (Inspection for the Installation
of Steel Door Panic Device)
Letter sent to ISD
15/03/08
Letter was received
by ISD
General Maintenance of House D-119 (FamilyArea) - Activate Power Supply
Letter sent to FMD15/03/08
Letter was received by FMD
Nawaf cc: Noaman
Reply sent to PGD30/03/08
Quotation for Supply of Store Shelves at Triangular Area
Noaman cc: Nawaf
Noaman cc:
Nawaf
Forwarded to ISD
15/03/08Quotation for Supply of Aerial Work Platform for Othman Bin Affan Mosque
Nawaf cc: Noaman
SN Department Description Ref # Date In-charge Action Status RemarksIn- Out-
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 33/50
coming going
256 Proj & Supl√ PSC/L/048/08 15-Mar Closed
255 Proj & Supl√ PSC/L/047/08 15-Mar Closed
254 BHHSC√ Pedestrian Access Gates BHHSC/MII/048 15-Mar
253 BHHSC
√ Temporary Replacement BHHSC/MII/046 15-Mar Closed
252 BHHSC
√ CBD/BM/498/07 12-Mar Nawaf Closed
251
√ CBD/BM/497/07 12-Mar Nawaf Closed
250 BHHSC
√ Emergency Vacation of Mr. Piorene Y. Tortola CBD/BM/487/07 12-Mar Nawaf Closed
249 CTD√ End of Contract for TMSS Employee CBD/BM/486/07 12-Mar Nawaf Closed
248 CTD√ CTFX/10616/08 12-Mar
247 ISD
√ CBD/BM/482/07 11-Mar Noaman Closed
246 MTD
√ CBD/BM/468/07 11-Mar Noaman Closed
245 FMD
√ CBD/BM/476/07 11-Mar Noaman Closed
244 ESW
√ CBD/BM/467/07 11-Mar Noaman Closed
243 MSD
√ Catering & Building Maintenance Requirement MSD/043/08 11-Mar Closed
242 HRD√ In-House Course Confirmation HRD-CDD/44/08 11-Mar Noaman Closed
Quotation for Supply of Aerial Work Platform for Othman Bin Affan Mosque
Nawaf cc: Noaman
Quotation for Destruction & Removal of Fountainnear Othman Bin Affan Mosque
Nawaf cc: Noaman
Noaman cc: Nawaf
Noaman cc: Nawaf
Reply to contractor sent 30/03/08
Termination of Mr. Mohd. Neda Al-Shammari(Helper-National)
Letter sent tocontractor 12/03/08
Letter was received by contractor
CMNC,BHHSC Termination of Mr. Fahad A’Aziz Al-Faraj
(Helper-National)
Letter sent toCMNC & contractor 12/03/08
Letter was received by CMNC &contractor
Letter sent tocontractor 12/03/08
Letter was received by contractor
Letter sent to CTD12/03/08
Letter was received by CTD
Transportation, Treatment & Disposal of AsbestosContaining Materials
Noaman cc: Nawaf
Permit of Entry & Gate Pass for Contractor’sPersonnel and Vehicles (General Maintenance atFamily Area)
Letter sent to ISD11/03/08
Letter was received by ISD
Contract HT566MT05 “Rental of Heavy DutyEquipment” (Gate Pass for Equipment)
Letter sent to MTD11/03/08
Letter was received by MTD
General Maintenance of PRD Chemical Yard(South Area) - Activate Power Supply
Letter sent to FMD11/03/08
Letter was received by FMD
Transportation, Treatment & Disposal of AsbestosContaining Materials (ACM)
Letter sent tocontractor 11/03/08
Letter was received by contractor
Noaman cc: Nawaf, Saeed,
HadiReply was sent thrue-mail
SN Department Description Ref # Date In-charge Action Status RemarksIn- Out-
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 34/50
coming going
241 CBD-PB
√ Risk Assessment Report 2008 CBC/PB/462/08 10-Mar Closed
240 UTD√ Upcoming Insurance Survey for 2008 UTD/PS/120/08 10-Mar
239 CBD-GR
√ Pending Works at House D-120 9-Mar Closed
238 BHHSC√ Substandard Materials BHHSC/MII/044 9-Mar Closed
237 BHHSC
√ Emergency Vacation of Mr. Pio Tortola BHHSC/MII/044 9-Mar Closed
236 ISD√ Issuing Entry Gate Pass CBD/BM/439/07 8-Mar Saeed Closed
235 Proj & Supl
√ CBD/BM/436/07 8-Mar Nawaf Closed
234 BHHSC
√ Substandard Materials CBD/BM/435/07 8-Mar Nawaf Closed
233 EMD√ Catering & Building Maintenance Requirement EMD-01-116-08 8-Mar Closed
232 MSD√ MSD/046/08 8-Mar Closed
231 BHHSC
√ Temporary Replacement BHHSC/MII/043 8-Mar Closed
230 BHHSC
√ BHHSC/MII/042 8-Mar Closed
229 BHHSC√ North Area Electrical Works BHHSC/MII/041 8-Mar Closed
228 BHHSC√ BHHSC/MII/040 8-Mar Closed
227 Proj & Supl
√ PSC/L/044/08 8-Mar Closed
226 Proj & Supl
√ PSC/L/043/08 8-Mar Closed
Noaman cc: Nawaf, Hadi
Email was sent toMr. Saeed D.25/03/08
Noaman cc: Nawaf
Nawaf cc:
Noaman Nawaf cc: Noaman
Nawaf cc: Noaman
Reply to contractor sent 12/03/08
Letter sent to ISD08/03/08
Letter was received by ISD
Substandard Plumbing Material Used in KhafjiHall
Letter sent tocontractor 08/03/08
Letter was received by contractor
Letter sent tocontractor 08/03/08
Letter was received by contractor
Noaman cc: Nawaf, Hadi
Budget for Light Refreshments & Snacks for theYear 2009
Noaman cc: Nawaf, Hadi
Nawaf cc: Noaman
Reply to contractor sent 12/03/08
A/C Units Use at Contractor's Emergency Room &KJO Inspector Office
Saaed cc: Noaman, Nawaf
Noaman cc: Nawaf
Personnel Control Sheets (PCS) for Processing &Payment
Noaman cc: Nawaf
Quotation for Supply & Inst. Of Stainless SteelMonument at KJO Roundabout
Nawaf cc: Noaman, Hadi
Quotation for Supply & Inst. Of Stainless SteelMonument at KJO Roundabout
Nawaf cc: Noaman, Hadi
SN Department Description Ref # Date In-charge Action Status RemarksIn-i
Out-i
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 35/50
coming going
225 CBD-RG√ North Area Roundabout (Monument Foundation) 5-Mar Nawaf Closed
224 JAD
√ Installation of Air Conditioners JAD/084/2008 5-Mar Closed
223 Al-Busaili
√ Project Representative AB/229/08 5-Mar Closed
222 BHHSC√ Replacement of Burnt-out Lamps and Lightings 4-Mar Salamah
221 Proj & Supl
√ CBD/BM/425/07 4-Mar Saeed Closed
220 Proj & Supl
√ CBD/BM/424/07 4-Mar Noaman Closed
219 FMD
√ CBD/BM/418/07 4-Mar Noaman Closed
218 BHHSC
√ BHHSC/MII/039 4-Mar Closed
217 Proj & Supl
√ PSC/L/042/08 4-Mar Closed
216 Proj & Supl√ PSC/L/040/08 4-Mar Closed
215 CTD√ CBD/BM/412/07 3-Mar Noaman Closed
214 BHHSC
√ CBD/BM/409/07 3-Mar Noaman Closed
213 ERD
√ ER/PA/317/08 3-Mar Closed212 RPT
√ Contractors Offices at Triangular Area CBD/BM/398/07 2-Mar Noaman Closed
Letter sent to CBD-RG 05/03/08
Waiting for MCBsignature
Saaed cc: Noaman, Nawaf
Saaed cc: Noaman, Nawaf
Letter sent tocontractor 04/03/08
Waiting for MCBsignature
Start-up and Commissioning of A/C Units inAuthman Bin Affan Mosque
Letter sent tocontractor 04/03/08
Letter was received by contractor
Delay in Supply of Materials for Cultural Tent(Automatic Sliding Door)
Letter sent tocontractor 04/03/08
Letter was received by contractor
Disconnection of Temporary Power Supply atAuthman Bin Affan Mosque
Letter sent to FMD04/03/08
Letter was received by FMD
Contractor Site Office at Triangular Area Contact Numbers
Nawaf, Noaman, Saeedcc: Hadi
Supply & Inst. Of Automatic Sliding Door at
Cultural Tent
Nawaf, cc:
Noaman, Hadi
Reply to contractor
sent 04/03/08Quotations for Supply & Inst. Of HVAC Sytem for Radhwa Mess Hall Kitchen
Nawaf, cc: Noaman
Transportation, Treatment and Disposal of Asbestos Containing Material (ACM)
Letter sent to CTD03/03/08
Letter was received by CTD
Personnel Control Sheets (PCS) for Processing &Payment
Letter sent tocontractor 03/03/08
Letter was received by contractor
Parties in Honor of Employees Eligible for
Continuous Service Awards
Saeed cc: Noaman ,
Nawaf Letter sent to RPT02/03/08
Letter was received by RPT
SN Department Description Ref # Date In-charge Action Status RemarksIn-i
Out-i
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 36/50
coming going
211 BHHSC√ Contractor's Office Transfer at Triangular Area BHHSC/MII/037 2-Mar Closed
210√ Missing A/C Units 039/AAQ/08 2-Mar Closed
209 FMD√ CBD/BM/391/07 1-Mar Noaman Closed
208 PGD√ CBD/BM/386/07 1-Mar Noaman Closed
207 FMD, PRD
√ CBD/BM/384/07 1-Mar Noaman Closed
206 ERD√ Catering & Building Maintenance Requirement ER/ADM/298/08 1-Mar Closed
205 Al-Busaili
√ Request for Approval AB/241/08 28-Feb Closed
204 Al-Busaili
√ Weekly Report AB/240/08 28-Feb Closed
203 ISD√ 24-Feb Nawaf Closed
202 ISD√ CBD/BM/381/07 24-Feb Salamah Closed
201√ CBD/BM/379/07 24-Feb Nawaf Closed
200 BHHSC
√ GM Start (Retiree Club Recreation - Gov’t Area) CBD/BM/378/07 24-Feb Nawaf Closed
199 ISD√ CBD/BM/377/07 24-Feb Nawaf Closed
198 BHHSC
√ CBD/BM/376/07 24-Feb Nawaf Closed
197 BHHSC
√ CBD/BM/374/07 24-Feb Noaman Closed
Noaman cc: Nawaf
Ali Al-Qahtani Saeed cc:
Noaman, Nawaf
General Maintenance of House D-119 at FamilyArea (Reconnection of Power Supply)
Letter sent to FMD01/03/08
Letter was received by FMD
Permit to Work at Offshore-Gathering Station(Repair of OCP Rooftop)
Letter sent to PGD01/03/08
Letter was received by PGD
Repair of OCP Rooftop (Offshore GatheringStation)
Letter sent to FMD,PRD 01/03/08
Letter was received by FMD, PRD
Noaman cc: Nawaf, Saeed
Saeed cc:
Noaman
Saeed cc: Noaman, Nawaf
Monument Foundation at Roundabout – NorthArea
Letter sent to ISD24/02/08
Waiting for MCBsignature
A/C Contract No. HT584BF95 Working Hoursduring Summer
Letter sent to ISD24/02/08
Letter was received by ISD
CBD-RG,RPT General Maintenance of Retiree Club Recreation
(Government Area)Letter sent to CBD-RG, RPT 24/02/08
Letter was received by CBD-RG, RPT& MCB
Letter sent tocontractor 24/02/08
Letter was received by contractor
General Maintenance of Retiree Club Recreation(Government Area)
Letter sent to ISD24/02/08
Letter was received by ISD
GM Start (Monument Foundation @ Roundabout - North Area)
Letter sent tocontractor 24/02/08
Letter was received by contractor
Contractor’s Offices at Triangular Area (Handover
of Keys)
Letter sent to
contractor 24/02/08
Letter was received
by contractor
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 37/50
coming going
196
√ CBD/BM/369/07 24-Feb Noaman Closed
195 ITD√ Request for New User Name CBD/BM/368/07 24-Feb Nawaf, Noaman Closed
194 CTD√ CBD/BM/366/07 24-Feb CBD-PB Closed
193 BHHSC
√ Contractor's Office at Triangular Area BHHSC/MII/036 24-Feb Closed
192 BHHSC
√ CBD/BM/362/07 23-Feb Nawaf Closed
191 MTD, CTD
√CBD/BM/360/07 23-Feb Noaman Closed
190 PCD√ As-Built Drawings CBD/BM/359/07 23-Feb Noaman Closed
189√ CBD/PB/361/07 21-Feb CBD-PB Closed
188 ISD, PGD
√ Re-Partition @ KJO Main Building - North Area CBD/BM/349/07 20-Feb Noaman Closed
187 BHHSC
√ CBD/BM/348/07 20-Feb Noaman Closed
186 ISD, PGD
√ Minaret @ Security Force (North Area) CBD/BM/346/07 20-Feb Noaman Closed
185 BHHSC√ GM Start (Minaret @ Security Force - North Area) 20-Feb Noaman
184 Proj & Supl
√ Safety Training Courses CBD/BM/338/07 19-Feb Nawaf Closed
183 PCD
√ PCD/MP/0419/08 19-Feb Closed
FAD,CTD,Al-Jalhami Delayed Submission of Monthly Invoice (Contract
# GT575CB06)
Letter sent to FAD,CTD, contractor 24/02/08
Letter was received by FAD, CTD &contractor
Letter sent to ITD24/02/08
Letter was received by ITD
Manpower Supply Service for BuildingMaintenance
Letter sent to CTD24/02/08
Letter was received by CTD
Nawaf cc: Noaman
Forwarded thru e-mail to ITD & RPT
Extension of Contract of Mr. Robert M. Hermoso – General Foreman
Letter sent tocontractor 23/02/08
Letter was received by contractor
Rental of Heavy Duty Equipment - Mobilization of
Track Loader 973C
Letter sent to MTD,
CTD 23/02/08
Letter was received
by MTD, CTDLetter sent to PCD23/02/08
Letter was received by PCD
All KJOManagers Business Plan 2009-2013 (Catering & Building
Maintenance Requirement)Letter sent to PCD21/02/08
Letter was received by all Departments
Letter sent to ISD,PGD 20/02/08
Letter was received by ISD, PGD
GM Start (Re-Partition New Saudi-Kuwaiti JointCommittee Building) Letter sent tocontractor 20/02/08
Letter was received by contractor
Letter sent to ISD,PGD 20/02/08
Letter was received by ISD, PGD
Letter sent tocontractor 20/02/08
Waiting for MCBsignature
Letter sent tocontractor 19/02/08
Letter was received by contractor
Connection of Water Line to the "Material TestLaboratory Building" near Existing Fire TrainingCenter
Noaman cc: Nawaf
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 38/50
coming going
182 FMD√ New Distribution Network FMD/OND/07/180 19-Feb Closed
181 BHHSC
√ BHHSC/MII/034 19-Feb Nawaf Closed
180 Al-Busaili
√ Approval of Vehicles AB/233/08 19-Feb Closed
179√ Replacement of Operator CBD Ref# 354 19-Feb Noaman Closed
178 BHHSC
√ Safety Training Course Nominees – Year 2008 CBD/BM/333/07 18-Feb Nawaf Closed
177 BHHSC
√ CBD/BM/332/07 18-Feb Nawaf Closed
176 LAD√ General Maintenance of LAD CBD/BM/331/07 18-Feb Noaman Closed
175 BHHSC
√ Contractor’s Offices at Triangular Area CBD/BM/330/07 18-Feb Noaman Closed
174 Al-Jalhami
√ Contractor’s Offices at Triangular Area CBD/BM/329/07 18-Feb Noaman Closed
173 PGD√ PGD/69/2008 18-Feb Nawaf Closed
172 PGD√ PGD/67/2008 18-Feb Nawaf, Hadi Closed
171 CTD√ Rental of Heavy Duty Equipment CTIN/16796/08 18-Feb Noaman Closed
170 CMNC √ Interview for Selection & Hiring of Nationals CMNC/6654/08 17-Feb Saeed Closed
169 ESD
√ ESD/I&C/OIS-23/08 17-Feb Noaman
168 Proj & Supl
√ Safety Training Course PSC/L/035/08 17-Feb Closed
167 Al-Busaili
√ Weekly Report AB/230/08 17-Feb Closed
Noaman cc: Nawaf
Extension of Contract of Mr. Robert Hermoso -General Foreman
Reply to contractor sent 23/02/08
Saeed cc:
Nawaf Integ.Logistics
Letter sent tocontractor 18/02/08
Letter was received by contractor
Manpower Replacement (Planner Scheduler/General Foreman)
Letter sent tocontractor 18/02/08
Letter was received by contractor
Letter sent to LAD18/02/08
Letter was received by LAD
Letter sent tocontractor 18/02/08
Letter was received by contractor
Letter sent tocontractor 18/02/08
Letter was received by contractor
Re-paint Building Affiliated to the Ministry of Foreign Affairs
Re-Partition Cost for New Government ComplexApproved
Forwarded to MTD23/02/08
Repair of Shed Foundations & Painting Works for Twin Agent, Air Foam Station & Air Foam HoseLine Station located at South Area
Nawaf cc: Noaman
Reply to contractor sent 19/02/08
Saeed cc: Noaman, Nawaf
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 39/50
coming going
166 PGD√ CBD/BM/314/07 16-Feb Saeed Closed
165 Al-Busaili
√ CBD/BM/312/07 16-Feb Saeed Closed
164 Al-Busaili√ CBD/BM/311/07 16-Feb Saeed Closed
163 PGD√ PGD/63/2008 16-Feb Nawaf Closed
162 Al-Busaili
√ Request for Visa AB/229/08 14-Feb Closed
161 Al-Busaili
√ Request for Marine ID AB/228/08 14-Feb Closed
160 Proj & Supl
√ CBD/BM/301/07 13-Feb Nawaf Closed
159 BHHSC√ Temporary Replacement (Painter) 13-Feb Nawaf Closed
158 CMNC
√ Interview for Selection & Hiring of Nationals CMNC/6653/08 13-Feb Closed
157 BHHSC
√ Temporary Replacement of Safety Engineer BHHSC/MII/033 13-Feb Closed
156 BHHSC
√ Safety Training Course Nominees - Year 2008 BHHSC/MII/032 13-Feb Closed
155 Al-Busaili
√ Approval of Vehicles AB/227/08 13-Feb Closed
154 Al-Busaili
√ Approval of Employees AB/226/08 13-Feb Closed
153 Al-Jalhami
√ CBD/BM/300/07 12-Feb Nawaf Closed
Re-partition at KJO Main (Saudi-KuwaitiCommittee) Building
Letter sent to PGD16/02/08
Letter was received by PGD
Approval of Manpower for Installation of A/CUnits for Contract HT662CB07
Letter sent tocontractor 16/02/08
Letter was received by contractor
Approval of Vehicles for Installation of A/C Unitsfor Contract HT662CB07
Letter sent tocontractor 16/02/08
Letter was received by contractor
Repairing the Irrigation System @ Governor'sBuilding
Belongs to CBD-RG
Saeed cc: Noaman, Nawaf
Faxed to A/C Shop23/02/08
Saeed cc: Noaman, Nawaf
Faxed to A/C Shop23/02/08
Cleaning & Work of Waterproofing Coat on SteelSurface in Offshore
Letter sent tocontractor 13/02/08
Letter was received by contractor
Letter sent tocontractor 13/02/08
Waiting for MCBsignature
Saeed cc: Noaman, Nawaf
Noawaf cc:
Noaman
Reply to contractor
sent 23/02/08
Noawaf cc: Noaman
Reply to contractor sent 18/02/08
Saeed cc: Noaman, Nawaf
Reply to contractor sent 16/02/08
Saeed cc: Noaman, Nawaf
Reply to contractor sent 16/02/08
Temporary Replacement for Mr. Raymond JoelLuyun
Letter sent tocontractor 12/02/08
Letter was received by contractor
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 40/50
g g g
152 Proj & Supl
√ CBD/BM/298/07 12-Feb Nawaf Closed
151 ERD√ Mr. Mishal F. Al-Nami (B.N. 21289) CBD/BM/293/07 12-Feb Nawaf Closed
150 CTD
√ Transmittal Copies of Contract CTIN/16722/08 12-Feb Closed
149 BHHSC
√ Temporary Replacement (Multi-crafts Foreman) CBD/BM/292/07 11-Feb Nawaf Closed
148 MPC√ CBD/BM/288/07 11-Feb Nawaf Closed
147 PGD√ CBD/BM/282/07 11-Feb Nawaf Closed
146 BHHSC
√ Temporary Replacement BHHSC/MII/031 11-Feb Nawaf Closed
145 ISD√ CBD/BM/271/07 10-Feb Nawaf Closed
144 CBD-KS√ 10-Feb Nawaf Closed
143 BHHSC
√ CBD/BM/270/07 10-Feb Nawaf Closed
142 Proj & Supl
√ Emergency Leave of Foreman (National) CBD/BM/266/07 9-Feb Nawaf Closed
141 BHHSC
√ North Area Electrical Works CBD/BM/265/07 9-Feb CBD-PB Closed
140 BHHSC
√ CBD/BM/268/07 9-Feb Noaman Closed
139 ISD√ CBD/BM/267/07 9-Feb Noaman Closed
138 HRD √ In-House Courses Nomination Absence HR/CCD/33/08 9-Feb Saeed Closed
Chainlink Fence & G.I. Pipes for CommunicationTower Fence
Letter sent tocontractor 12/02/08
Letter was received by contractor
Letter sent to ERD12/02/08
Letter was received by ERD
Nawaf, Noaman, Saeedcc: Hadi
Letter sent tocontractor 11/02/08
Letter was received by contractor
Scattered Debris beside the Road to Heliport &Other Areas
Letter sent to PCD11/02/08
Waiting for MCBsignature
Minaret at Security Force - North Area (SecureBudget)
Letter sent to PGD11/02/08
Letter was received by PGD
Reply to contractor sent 13/02/08
Al-Zohour Girls School Prayer Hall and Shed @Walkway - Family Area
Letter sent to ISD10/02/08
Letter was received by ISD
Al-Zohour Girls School Prayer Hall and Shed @Walkway - Family Area
Letter sent to CBD-KS 0/02/08
Waiting for MCBsignature
GM Start (Al-Zohour Girls School Shed @Walkway & Prayer Hall - Family Area)
Letter sent tocontractor 10/02/08
Letter was received by contractor
Letter sent tocontractor 09/02/08
Letter was received by contractor
Letter sent tocontractor 09/02/08
Letter was received by contractor
GM Start (Security Force Toilet & Prayer Shed - North Area)
Letter sent tocontractor 09/02/08
Letter was received by contractor
General Maintenance of Security Force Toilet &Prayer Shed - North Area
Letter sent to ISD09/02/08
Letter was received by ISD
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 41/50
137 Proj & Supl
√ PSC/L/031/08 9-Feb Closed
136 Proj & Supl
√ PSC/L/029/08 9-Feb Closed P.O. was requested
135 TMD √ Life Ring Holder TMD-04/97/08 6-Feb Closed Completed
134 ISD√ ISD/PS-159/08 6-Feb Noaman Closed
133 PGD
√ PGD/CDS/17/08 6-Feb Closed Completed
132√ Return of Replacement Track Loader 973C CBD Ref# 256 6-Feb Closed
131 Al-Jalhami√ Vacuum Tanker Al-J/066/08 6-Feb closed
130 Al-Jalhami
√ Replacement of Field Supervisor Al-J/065/08 6-Feb Closed
129 BHHSC
√ Communication Tower Fence BHHSC/MII/030 6-Feb Closed
128 MARCO
√ Contractor Employees Uniform Dress Code CBD/BM/244/07 5-Feb Noaman Closed
127√ Contractor Employees Uniform Dress Code CBD/BM/243/07 5-Feb Noaman Closed
126 Proj & Supl
√ Contractor Employees Uniform Dress Code CBD/BM/242/07 5-Feb Noaman Closed
125 BHHSC
√ Contractor Employees Uniform Dress Code CBD/BM/241/07 5-Feb Noaman Closed
124 Al-Jalhami
√Contractor Employees Uniform Dress Code CBD/BM/239/07 5-Feb Noaman Closed
Chainlink Fence & G.I. Pipes for CommunicationTower Fence
Nawaf cc: Noaman
Reply to contractor sent on 12/02/08
Quotation for Supply & Inst. Of Automatic SlidingDoors at Cultural Tent
Nawaf cc: Noaman, Hadi
Nawaf cc: Noaman
Installation of Portable Partition at CCTVMonitoring Center
Reply sent to ISD30/04/08
Repair of Sewers & Bathrooms at Horse RidingClub
Nawaf cc: Noaman, Hadi
Integ.Logistics
Nawaf cc: Noaman
Nawaf cc: Noaman
Nawaf cc: Noaman
Reply sent tocontractor 12/02/08
Nawaf cc: Hadi, Noaman
Letter sent tocontractor 05/02/08
Letter was received by contractor
A. Al-Qahtani Letter sent tocontractor 05/02/08
Letter was received by contractor
Letter sent tocontractor 05/02/08
Letter was received by contractor
Letter sent tocontractor 05/02/08
Letter was received by contractor
Letter sent to
contractor 05/02/08
Letter was received
by contractor
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 42/50
123 Proj & Supl
√ PSC/L/028/08 5-Feb Closed P.O. was requested
122 Proj & Supl
√ Two Days leave for National Foreman PSC/L/027/08 5-Feb Nawaf cc: Hadi Closed
121 Proj & Supl
√ Annual Vacation of Forklift Operator (National) CBD/BM/238/07 4-Feb Nawaf Closed
120 BHHSC
√ CBD/BM/237/07 4-Feb Nawaf Closed
119 BHHSC
√ CBD/BM/236/07 4-Feb Nawaf Closed
118 PGD√ Inspection of Mosque CBD/BM/228/07 4-Feb Nawaf Closed
117√ Re-Partition @ KJO Main Building - North Area 4-Feb Nawaf Closed Pending
116 BHHSC√ 4-Feb Nawaf Closed Pending
115 BHHSC
√ Replacement of Manpower (Quantity Surveyor) CBD/BM/227/07 4-Feb Noaman Closed
114 BHHSC√ Manpower Temporary Replacement BHHSC/MII/029 4-Feb Closed
113 BHHSC
√ Vacation Leave BHHSC/MII/028 4-Feb Closed
112 BHHSC
√ Vacation Leave BHHSC/MII/027 4-Feb Closed
111 BHHSC
√ CBD/BM/212/07 3-Feb Noaman Closed
Quotation for A/C Duct Cleaning Services for Khafji Hall
Saeed cc: Noaman, Nawaf, Hadi
Reply sent tocontractor 09/02/08
Letter sent tocontractor 04/02/08
Letter was received by contractor
Emergency Leave Request (Mr. Sultan Mohd. Al-Khaldi)
Letter sent tocontractor 04/02/08
Letter was received by contractor
Urgent Vacation Request (Mr. Suliman S. Al-Ateeq)
Letter sent tocontractor 04/02/08
Letter was received by contractor
Letter sent to PGD04/02/08
Letter was received by PGD
ISD, ESD,PGD Letter sent to ISD,
ESD, ISD 04/02/08
GM Start (Re-Partition @ KJO Main Building - North Area)
Letter sent tocontractor 04/02/08
Letter sent tocontractor 04/02/08
Letter was received by contractor
Noaman cc: Nawaf
Reply to contractor sent 11/02/08
Nawaf cc: Noaman
Reply to contractor sent 04/02/08
Nawaf cc: Noaman
Reply to contractor sent 04/02/08
Annual Vacation Request (Mr. Mohd. Saad Al-Majeed)
Letter sent tocontractor 03/02/08
Letter was received by contractor
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 43/50
110 BHHSC
√ Replacement for Electrical Engineer Position CBD/BM/207/07 3-Feb Noaman Closed
109 TMD√ South Jetty Lamp Post & Other Similar Structures TMD-04/83/08 3-Feb Closed
108 PCD
√ Site Visit for Existing H-Building PCD/MP/0266/08 3-Feb Closed107 PCD
√ PCD/MP/0264/08 3-Feb
106 MCB√ 2006 Balance Leave CBD/Admin/221/08 3-Feb Closed
105 Proj & Supl
√ PSC/L/025/08 3-Feb Closed
104 Proj & Supl√ Annual Vacation for National Forklift Operator PSC/L/022/08 3-Feb Closed
103 BHHSC
√ CBD/BM/200/07 2-Feb Noaman Closed
102 ITD√ Hospital Communication Room’s Equipment CBD/BM/199/07 2-Feb Noaman Closed
101 BHHSC
√ CBD/BM/194/07 2-Feb Noaman Closed
100 ISD√ CBD/BM/195/07 2-Feb Noaman Closed
99 PCD
√ As-Built Drawings PCD/MP/0260/08 2-Feb Closed
98 MCB√ Contractor Employees Uniform/Dress Code CBD/Admin/201/08 2-Feb Closed
97 BHHSC
√ Request for Annual Vacation BHHSC/MII/026 2-Feb Closed
96 Al-Busaili
√ Contract HT662CB07 AB/222/08 2-Feb Closed
95 ITD
√ Request for Power Extension ITD-CSD-103/2008 30-Jan Noaman
Letter sent tocontractor 03/02/08
Letter was received by contractor
Noaman cc: Nawaf
Noaman cc:
Nawaf Drawings for HRD Building Furniture &Equipment
Noaman, Nawaf, Saeed
Noaman, Nawaf, Saeed
Quotation for Supply & Inst. Of WaterproofingMaterials with Primer-41 for Coast Guard
Noaman cc: Nawaf
Nawaf cc: Noaman
Annual Vacation Request (Mr. Adel Ayedh Al-Anezi)
Letter sent tocontractor 02/02/08
Letter was received by contractor
Letter sent to ITD02/02/08
Letter was received by ITD
GM Start (ISD Offshore Communication Center Building)
Letter sent tocontractor 02/02/08
Letter was received by contractor
General Maintenance of ISD OffshoreCommunication Center Building
Letter sent to ISD02/02/08
Letter was received by ISD
Noaman cc:
Nawaf
Reply sent
23/02/08Distributed toemployees
Nawaf cc: Noaman
Reply to contractor sent on 03/02/08
Saeed cc: Noaman, Nawaf, Hadi
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 44/50
94 BHHSC
√ Manpower Replacement (Structural Engineer) CBD/BM/196/07 30-Jan Noaman Closed
93 BHHSC√ Temporary Replacement (Emergency Vacation) 30-Jan Noaman
92 BHHSC
√ CBD/BM/185/07 30-Jan Noaman Closed
91 MTD
√ Transfer of A/C Parts to MTD MTD-AD- /08 30-Jan Closed
90 FMD
√ FMD/BSD/08/082 30-Jan Closed
89 BHHSC√ Annual Vacation Request BHHSC/MII/025 30-Jan Closed
88 BHHSC√ Termination of Fahad A/Aziz Al-Faraj BHHSC/MII/023 30-Jan Closed
87 BHHSC
√ BHHSC/MII/022 30-Jan Closed
86 Proj & Supl√ PSC/L/022/08 30-Jan Closed
85 ISD
√ Provision of Fresh Water to New Fire Building ISD/FM-098/2008 29-Jan Noaman closed cc only to CBD
84 SAP√ CBD/BM/178/07 29-Jan Noaman Closed
83 Proj & Supl
√ CBD/BM/173/07 29-Jan Noaman Closed
82 Al-Busaili
√ CBD/PB/172/08 29-Jan CBD-PB Closed
81 MCB√ Standard Format of Inter-Office Memos/Letters CBD/Admin/181/08 29-Jan Closed
Letter sent tocontractor 30/01/08
Letter was received by contractor
Letter sent tocontractor 30/01/08
Waiting for MCBsignature
GM Start (Repair of Leakage @ Coast GuardBuilding - North Area)
Letter sent tocontractor 30/01/08
Letter was received by contractor
Saeed cc: Noaman, Nawaf
Relocation Related Work by CBD for IntegratedOffice Bldg., Overhaul Store Bldg., & MaintenanceWorkshop, Offshore Bldg.
Reply sent on02/02/08 by e-mail
Nawaf cc: Noaman
Reply to contractor sent on 02/02/08
Nawaf cc: Noaman
Forwarded toCMNC 12/03/08
Termination of Mohd. Neda Al-Shammari - Helper (National)
Nawaf cc: Noaman
Reply to contractor sent on 12/03/08
Technical Drawing for Automatic Sliding Doors atCultural Tent
Noaman cc: Nawaf
Request for Data Cleansing Letter sent to SAP29/01/08
Letter was received by SAP
Iqama and KJO ID of Projects & SuppliesEmployees (Non-National)
Letter sent tocontractor 29/01/08
Letter was received by contractor
Mobilization Status Review Meeting (ContractHT662CB07)
Letter sent tocontractor 29/01/08
Letter was received by contractor
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 45/50
80 CTD
√ Transmittal Copies of Contract CTIN/16565/08 29-Jan Closed
79 BHHSC
√ Temporary Replacement BHHSC/MII/021 29-Jan Closed
78 EDD √ EDD/D/064/08 28-Jan Closed CBD-PB
77 FMD√ FMD/MPD/08/072 28-Jan Closed
76 Proj & Supl
√ PSC/L/019/08 28-Jan Closed
75 ISD√ 27-Jan Nawaf Closed
74 CBD-RG
√ CBD/BM/158/07 27-Jan Nawaf Closed
73 MTD
√ CBD/BM/156/07 27-Jan Nawaf Closed
72 CPD√ Access to CPD Share Folder CBD/AD/154/08 27-Jan CBD Admin Closed
71 PGD√ PGD/CDS/11/08 27-Jan Nawaf Closed
70 Proj & Supl√ PSC/L/020/08 27-Jan Closed Cancelled
69 MTD, ISD
√ Re-Partition @ MTD Offices (North Area) CBD/BM/148/07 26-Jan Nawaf Closed
68 BHHSC
√ CBD/BM/147/07 26-Jan Nawaf Closed
67 ISD√ ISD/PS-89/08 26-Jan Noaman Closed
66 BHHSC
√BHHSC/MII/018 26-Jan Closed
65 Proj & Supl√ PSC/L/018/08 24-Jan Closed P.O. was requested
Saeed cc: Noaman, Nawaf
Noaman cc: Nawaf
Reply to contractor sent 30/01/08
Base CourseConstruction & Putting Sand Barrier atKJO Explosives Stores Area Noaman cc: Nawaf
Demolition of Old Power Plant Contract #HQ418ES04
Noaman cc: Nawaf
Cleaning & Work of Waterproofing Coat on SteelSurface in Offshore
Noaman cc: Nawaf
Reply to contractor sent 13/02/08
New Mosque, Store & Kitchen Portables at SpringCamp
Letter sent to ISD27/01/08
Waiting for MCBsignature
New Mosque, Store & Kitchen Portables at SpringCamp
Letter sent to CBD-RG 27/01/08
Letter was received by CBD-RG
GM Start (New Mosque, Store & Kitchen Portables@ Spring Camp)
Letter sent tocontractor 27/01/08
Letter was received by contractor
Letter sent to CPD27/01/08
Letter was received by CPD
Removing Mobile Home at 1st Girls PrimarySchool
Quotation for Supply & Inst. Of Automatic SlidingDoors at Cultural Tent
Noaman cc: Nawaf, Hadi
Letter sent to MTD& ISD 26/01/08
Letter was received by MTD & ISD
GM Start (Re-Partition @ MTD Offices - NorthArea)
Letter sent tocontractor 26/01/08
Letter was received by contractor
Minor Maintenance of Security Control Center Building
Replacement of Electrical Engineer (Mohd Al-Sheban)
Noaman cc: Nawaf
Reply to contractor sent 03/02/08
Quotation for Steel Door with Panic Device for PRD Main Store
Noaman cc: Nawaf
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 46/50
64 MTD
√ To Transfer all A/C Shop Spare Parts to MTD CBD/BM/143/07 23-Jan A/C Shop Closed
63 BHHSC
√ CBD/BM/139/07 23-Jan Nawaf Closed
62 BHHSC
√ Manpower Replacement (Standby Driver) CBD/BM/138/07 23-Jan Nawaf Closed
61 BHHSC
√ Additional Support Manpower CBD/BM/137/07 23-Jan Nawaf Closed
60 BHHSC
√ CBD/BM/124/07 21-Jan Noaman Closed
59 ITD, ISD
√ Communication Tower Fence (North Area) CBD/BM/123/07 21-Jan Noaman Closed
58 FMD
√ CBD/BM/120/07 21-Jan Nawaf Closed
57 EMD
√ New Employee Orientation Program CBD/PB/111/07 21-Jan CBD-PB Closed
56 ITD√ Hospital Communication Rooms' Equipment ITD-CSD-077/2008 21-Jan Closed
55 BHHSC
√ Proposed Structural Engineer BHHSC/MII/013 21-Jan Closed
54 CBD-PB
√ CBD/PB/108/08 20-Jan Nawaf Closed
53 Al-Jalhami√ ISD Training Courses Al-J/029/2008 20-Jan Closed
52 Proj & Supl
√ PSC/L/015/08 20-Jan Closed
Letter sent to MTD23/01/08
Letter was received by MTD
Proposed Temporary Replacement for Multi-craftForeman
Letter sent tocontractor 23/01/08
Letter was received by contractor
Letter sent tocontractor 23/01/08
Letter was received by contractor
Letter sent tocontractor 23/01/08
Letter was received by contractor
GM Start (Communication Tower Fence - NorthArea)
Letter sent tocontractor 21/01/08
Letter was received by contractor
Letter sent to ITD &FMD 21/01/08
Letter was received by ITD, ISD
General Maintenance of House D-119 at FamilyArea (Disconnection of Main Power Supply Line &Connection of Temporary Power)
Letter sent to FMD21/01/08
Letter was received by FMD
Letter sent to EMD21/01/08
Letter was received by EMD
Noaman cc: Nawaf
Reply to ITD sent02/02/08
Nawaf cc: Noaman
Reply to contractor sent 30/01/08
Submission of Warranty Certificate & Installation,Operation & Maintenance Manual
Noaman cc: Nawaf
Forwarded to CBDAdmin
Quotation for Supply & Inst. Of Aluminum Tube &
Sheet at Laundry Room of KJO New Villas
Nawaf cc:
Noaman
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 47/50
51 Proj & Supl
√ PSC/L/014/08 20-Jan Closed
50 Proj & Supl
√ PSC/L/013/08 20-Jan Closed
49 BHHSC
√ Replacement of Manpower (General Foreman) CBD/BM/104/07 20-Jan Nawaf Closed
48 Al-Busaili
√ CBD/131/07 19-Jan A/C Shop Closed
47 Al-Busaili
√ Approval of Vehicles of Contract # HT662CB07 CBD/130/07 19-Jan A/C Shop Closed
46 BHHSC
√ GM Start - Cultural Tent (Family Area) CBD/BM/100/07 19-Jan Nawaf Closed
45 ISD√ General Maintenance of Cultural Tent 19-Jan Nawaf Closed
44 CBD-GR
√ General Maintenance of Cultural Tent CBD/BM/098/07 19-Jan Nawaf Closed
43 TMD√ South Jetty Berth Numbering TMD-04/38/08 19-Jan Closed
42 Proj & Supl√ PSC/L/011/08 19-Jan Closed P.O. was requested
41 Proj & Supl√ Safety Training Program PSC/L/009/08 19-Jan Nawaf Closed
40 BHHSC
√ Permanent Replacement BHHSC/MII/012 19-Jan Nawaf Closed
39 BHHSC√ Safety Training Schedule BHHSC/MII/011 17-Jan Nawaf Closed
38 BHHSC
√ CBD/BM/093/07 16-Jan Noaman Closed
37 ITD √ Additional Nomination for Al-Ofoq SAP Phase II CBD/ADM/088/08 16-Jan CBD-Admin Closed
Quotation for Supply & Inst. Of Aluminum Tube &Sheet at Laundry Room of KJO New Villas
Nawaf cc: Noaman
Quotation for Supply & Inst. Of Aluminum Tube &Sheet at Laundry Room of KJO New Villas
Nawaf cc: Noaman
Letter sent tocontractor 20/01/08
Letter was received by contractor
Approval of Sample of Window & Split A/C Unitsof Contract # HT662CB07
Letter sent tosupplier 20/01/08
Letter was received by supplier
Letter sent tosupplier 20/01/08
Letter was received by supplier
Letter sent tocontractor 19/01/08
Letter was received by contractor
Letter sent to ISD19/01/08
Waiting for MCBsignature
Letter sent to CBD-GR 19/01/08
Letter was received by CBD-GR
Noaman cc: Nawaf
Quotation for Supply of Kirby Sandwich Panels for PRD Main Store
Noaman cc: Nawaf
Forwarded to CBDAdmin
Reply to contractor sent 20/01/08
Forwarded to CBDAdmin
Personnel Control Sheets (PCS) for Processing &Payment
Letter sent tocontractor 16/01/08
Letter was received by contractor
Letter sent to ITD16/01/08
Letter was received by ITD
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 48/50
36 BHHSC
√ Permanent Replacement BHHSC/MII/010 16-Jan Nawaf Closed
35 ITD√ Hospital Communication Rooms' Equipment ITD-CSD-053/2008 15-Jan Closed
34 CBD Admin√ Removal of Car Parking Sign Plates E-mail 15-Jan
33 BHHSC
√ Manpower Temporary Replacement BHHSC/MII/009 15-Jan Nawaf Closed
32 BHHSC
√ Work Request (Painting Works at Heliport) BM Letter 14-Jan Nawaf Letter not sent Closed
31 CBD-GR
√ CBD/BM/072/07 14-Jan Nawaf Closed
30 CBD-RG√ CBD/BM/071/07 14-Jan Nawaf Closed
29 MSD√ Materials for KJOH MSD/B&F/012/08 14-Jan Closed
28 Proj & Supl
√ Delay in Supply of Materials for PRD Main Store CBD/BM/054/07 13-Jan Noaman Closed
27 ISD√ CBD/BM/052/07 13-Jan Noaman Closed
26 CTD
√ Transportation, Treatment & Disposal of ACM CTIN/6410/08 13-Jan Closed
25 Proj & Supl√ PSC/L/008/08 13-Jan Closed
24 BHHSC
√ Additional Support Manpower BHHSC/MII/008 13-Jan Closed
23 Proj & Supl√ Technical Drawing for Emergency Door at KJOH PSC/L/007/08 10-Jan
22 Proj & Supl√ Temporary Access Permit to South Area PSC/L/006/08 10-Jan Noaman Closed
21 BHHSC
√ Renewal of ID for Royee Dominsy (Clerk/Typist) CBD/BM/046/07 9-Jan Noaman Closed
Reply to contractor sent 18/02/08
Noaman cc: Nawaf
Reply to ITD sent02/02/08
Noaman cc: Nawaf
Reply to contractor sent 23/01/08
Contractor wasinformed verbally
General Maintenance of Radhwa Mess Hall (FinalInspection Report)
Letter sent to CBD-GR 14/01/08
Letter was received by CBD-GR
General Maintenance of Radhwa Recreation (FinalInspection Report)
Letter sent to CBD-RG 14/01/08
Letter was received by CBD-RG
Noaman cc: Nawaf, Hadi
Letter sent tocontractor 13/01/08
Letter was received by contractor
Issuance of Temporary Entry/Gate Pass Letter sent to ISD13/01/08
Letter was received by ISD
Noaman cc:
Nawaf Quotation for A/C Duct Cleaning Services for Cultural Tent
Nawaf cc: Noaman
Noaman cc: Nawaf, Hadi
Reply to contractor sent 23/01/08
Noaman cc: Nawaf
Forwarded to ISD10/01/08
Letter sent tocontractor 09/01/08
Letter was received by contractor
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
20 ERD √ Conflict of Interest & Business Ethics Policy ER/PA/0036/08 9-Jan Closed
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 49/50
19 Proj & Supl√ PSC/L/005/08 9-Jan Closed Cancelled
18 BHHSC
√ Permanent Replacement BHHSC/MII/007 8-Jan Closed
17 BHHSC
√ BHHSC/MII/005 8-Jan Noaman Closed
16 ISD√ 7-Jan Noaman
15 PCD√ Drawings of Master Plan New Villas 7-Jan Noaman
14 MTD
√ Supply Contract of Industrial Gases (3) Years CBD/037/07 7-Jan CBD-Admin Closed
13 Proj & Supl √ PSC/L/004/08 7-Jan Noaman Closed
12 Proj & Supl√ PSC/L/003/08 7-Jan Closed P.O. was requested
11 Proj & Supl√ PSC/L/002/08 7-Jan Closed P.O. was requested
10 ISD√ Renewal of ID for Al-Jalhami Personnel CBD/BM/026/07 6-Jan Nawaf Closed
9 MTD√ MTD General Maintenance MTD/AD/002/08 6-Jan
8 ISD
√ Issuing Entry Gate Pass CBD/BM/019/07 2-Jan Nawaf Closed
7 Proj & Supl
√ CBD/BM/018/07 2-Jan Nawaf Closed
6 FMD
√ CBD/BM/016/07 2-Jan Nawaf Closed
5 CTD√ Status Report on the Subject Submitted to EDI CTIN/6353/08 2-Jan Closed
4 CTD√ Multi-visa for PMSS Employee CBD/BM/014/07 1-Jan Noaman Closed
Quotation for Supply & Inst. Of Aluminum Slidingat Headquarters Building
Noaman cc: Nawaf
Noaman cc: Nawaf
Reply to contractor sent 23/01/08
Issuance of Temporary Gate Pass Forwarded to ISDthru email 08/01/08
Issuance of Temporary Entry/Gate Pass Letter sent to ISD07/01/08
Waiting for MCBsignature
Letter sent to PCD07/01/08
Waiting for MCBsignature
Letter sent to MTD07/01/08
Letter was received by MTD
Temporary Access Permit to South Area (PRD
Main Service Store)
Forwarded to ISD
07/01/08
Quotation for Supply & Inst. Of PanoramicExamination Lights & Door at KJOH
Noaman cc: Nawaf, Hadi
Quotation for Supply & Inst. Of PanoramicExamination Lights & Door at KJOH
Noaman cc: Nawaf, Hadi
Letter sent to ISD06/01/08
Letter was received by ISD
Noaman cc: Nawaf
Letter sent to ISD
02/01/08
Letter was received
by ISD
Revised Quotation for Repair, Amendment & Re-installation of Emergency Door at KJOH
Letter sent tocontractor 02/01/08
Letter was received by contractor
Radhwa Mess Hall Store Room (Locate Source of Power Supply)
Letter sent to FMD02/01/08
Letter was received by FMD
Noaman cc: Nawaf, Hadi
Letter sent to CTD02/01/08
Letter was received by CTD
SN Department Description Ref # Date In-charge Action Status RemarksIn-coming
Out-going
8/8/2019 Tracing Letter Report
http://slidepdf.com/reader/full/tracing-letter-report 50/50
3 BHHSC
√ CBD/BM/006/07 31-Dec Nawaf Closed
2 FMD
√ CBD/BM/004/07 31-Dec Nawaf Closed
1 BHHSC
√ CBD/BM/003/07 31-Dec Nawaf Closed
Vacation Request of Mr. Mesha’al M. Al-Shammari
Letter sent tocontractor 01/01/08
Letter was received by contractor
Portable near Main Gate -Family Area (LocateSource of Power Supply)
Letter sent to FMD31/12/07
Letter was received by FMD
General Maintenance of House D-119 (ResumeWorks)
Letter sent tocontractor 31/12/07
Letter was received by contractor