Upload
phuong-le
View
227
Download
0
Embed Size (px)
Citation preview
7/29/2019 TRA Edge+PresentationW505
1/10
TRA EDGE+ Introduction
NPI 01/02/2005
7/29/2019 TRA Edge+PresentationW505
2/10
Operation Support /NPI 2 All rights reserved 2003, Alcatel
8PSK
Output Power
GMSK
Output Power
35/45 W
Medium Power
60 WHigh Power
12/15 W 25/30 W
TRX Edge+ Medium PowerTRAGE : GSM900
TRADE : DCS 1800
TRX Edge MPTRAP: GSM1900
TRX EdgeMedium PowerTRAL : GSM850
TRAG: GSM900TRAD DCS1800
TRX Edge High PowerTAGH : GSM900
TADH : DCS 1800
EDGE+ TRX
8PSKOutput Power
Coverage
Oriented
Network
Capacity
Oriented
Network
BTS InformationTRA EDGE & EDGE+Positioning 1/9
TRX Edge + High PowerTAGHE : GSM900
TADHE : DCS 1800
7/29/2019 TRA Edge+PresentationW505
3/10
Operation Support /NPI 3 All rights reserved 2003, Alcatel
BTS InformationA9100 BTS Transceiver Data Overview 2/9
7/29/2019 TRA Edge+PresentationW505
4/10
Operation Support /NPI 4 All rights reserved 2003, Alcatel
TRA Medium Power GSM 900 TRAG
LBO for 30.06.2005
Last delivery date of TRAG 30.09.2005
Replaced by TRAGE
DCS 1800 TRAD
LBO for 30.06.2005
Last delivery date of TRAD 30.09.2005
Replaced by TRADE
TRA High Power GSM 900 TAGH
LBO for 30.06.2005
Last delivery date of TAGH 30.09.2005
Replaced by TAGHE
DCS 1800 TADH
LBO for 30.06.2005 Last delivery date of TADH 30.09.2005
Replaced by TADHE
BTS InformationTRA MP & TRA HP Last Buy Order Information 3/9
Switch to new TRA Edge+ is mandatory as soon as possible
Parallel
production until
last delivery date
7/29/2019 TRA Edge+PresentationW505
5/10
Operation Support /NPI 5 All rights reserved 2003, Alcatel
TRA EDGE+MP IntroductionTransparent support from B7.2 MR6 Ed7
From B6 AQ25M-2 to B7.2 MR6 Ed05 : need of a new BTS software
TRA Edge+MP fully introduced from B8 MR4
Main milestones DR1 passed July 2003
Sub-DR2 passed March 2004
DR4 Q3 2004
June04 for B7 MR6 ed07
August04 for B8 MR4
October04 for B6.2 AQ25N
DR5/GADR 31/01/2005
BTS InformationTRA EDGE+MP Introduction 4/9
GADR TRA EDGE+ MP passed 31/01/2005
7/29/2019 TRA Edge+PresentationW505
6/10
Operation Support /NPI 6 All rights reserved 2003, Alcatel
First-off status B7.2 MR6 ed7 1/2Orange NL:11TRADE(2testbed+9pilots) Acceptance in Velizy Lab platform in W439-W440 : no problem encountered ; Report received
29/09/04
Pilot in NL starting beginning 4th October'04 : 9 TRADE were installed in 3 BTS, 9 cells
W41/42 : Pilot zone migration + QoS reference collected (for counters and TRA Edge+ stability
analysis purposes)
W43/44 : New TRX installation + QoS/Test campaign (counters analysis in MR6ed7 first offcontext, BSS operations especially on sites with new TRXs, OMC alarms post treatment for
TRA stability analysis)
1 FR 3BKA25FBR151081 : Wrong board name in remote inventory for TRX Edge+; the board
name in the OMCR RI file is shown as TRADE? instead of TRADE; problem solved in all B8
versions. FR closed
Greenlight & report for MR6 Ed7 & TRX Edge+ granted 15 Nov'04Official letter from Orange NL
BTS InformationTRA EDGE+MP Introduction 5/9
7/29/2019 TRA Edge+PresentationW505
7/10
Operation Support /NPI 7 All rights reserved 2003, Alcatel
First-off status B8 MR4 2/2
Russ ia : Vimpelcom :4TRADE&4TRAGE TRA EDGE+ delivery 15th Nov04 (late delivery due to logistical & contractual issues)
Commissioning BTS, HW checks 2 days
Vimplecom Tests steps description :
1. Basic O&M tests in lab.
2. GSM/GPRS Pilot Zone
8 cells :1 TRADE & 1 TRAGE in each cell
GSM/HO/GPRS KPIs evolution monitoring : indicators are in line with expectations.
3. E2E EDGE performance test1. In Vimpelcom test platform / lab tests
1 GSM + 1 DCS
Ping, FTP download & Upload, Web page, Videostreaming performance observation
2. In Commercial Area / Drive tests conditions 5 cells : 1 GSM + 4 DCS
Ping, FTP download & Upload, Web page, Videostreaming performance observation
In commercial cells : Additional End to End tests executed W504
2 cells : DCS Ping, FTP & Web Page download , FTP upload, MCS distribution, DL EGPRS radio tests
* Ping, FTP upload test show no degradation
* FTP & Web Download show clear improvements
* Global results are in line with expectation.
The Commercial Zone & Platform results are OK and in line with expectations
BTS InformationTRA EDGE+MP Introduction 6/9
7/29/2019 TRA Edge+PresentationW505
8/10
Operation Support /NPI 8 All rights reserved 2003, Alcatel
BTS InformationTRA EDGE+ MP Introduction 7/9
Releases
Rel B7 MR6 ed 3,4,5UseofBTS/BSCsoftware
ofMR6ed730/06/04
Rel B7 MR6 ed 730/06/04
Only BTS/BSC Software ReplacementNo RIT
Rel B7 MR5Anewed04
29/07/04
Rel B7 MR4Anewed11
29/07/04
Rel B6.2 AQ25M- 2AnewedAQ25N
11/10/04
Rel B8 MR4ForFirstOff18/08/04
OthersEndOct04
TRA EDGE+ MPFully supportedRIT Introduced
B7MR6Ed7
7/29/2019 TRA Edge+PresentationW505
9/10
Operation Support /NPI 9 All rights reserved 2003, Alcatel
TRA EDGE+HP Introduction Support in B6 AQ25N Support from B7.2 MR6 Ed7 & B8 MR4
TRA Edge+ HP fully introduced from B8 MR5
Main milestones TAGHE (GSM)
Sub-DR2 passed August04
Sub-DR4 passed End Nov04
Sys -DR4 passed End Nov04
TADHE (DCS)
Sub-DR2 passed Nov04
Sub-DR4 passed Jan05
Sys -DR4 passed Jan05
First Off activities : 1st FO in B8 MR5 ed2: Vodacom RSA for TAGHE (for TADHE not confirmed) 2nd FO to be identified?
BTS InformationTRA EDGE+HP Introduction 8/9
7/29/2019 TRA Edge+PresentationW505
10/10
Operation Support /NPI 10 All rights reserved 2003, Alcatel
BTS InformationTRA EDGE+HP Introduction 9/9
Releases
Rel B7 MR6 ed 3,4,5UseofBTS/BSCsoftware
ofMR6ed730/06/04
Rel B7 MR6 ed 730/06/04
Supported only with BTS/BSC Software ReplacementNo RIT
Rel B7 MR5Anewed04
29/07/04
Rel B7 MR4Anewed11
29/07/04
Rel B8 MR5ForFirstOffEndOct04
OthersEndDec04
TRA EDGE+ HPFully supportedRIT Introduced
B8MR5