NDT Visual Testing during manufacturer audit

Joint measurement during manufacturer audit

Joint measurement during manufacturer audit

NDT Visual Testing

Preparation for welding – checking preheating

NDT Liquid Penetrant Test

NDT Visual Testing during manufacturer audit

Manufacturer audit

Examples of projects I was involved in:manufacturing audit of Kalmar Ship to Shore crane, destination: port

Finnsteve

Examples of projects I was involved in:manufacturing audit of Kalmar Ship to Shore crane, destination: port

Finnsteve

Examples of projects I was involved in:manufacturing audit of Kalmar Automatic Stacking Crane,

destination: port CTB Hamburg

Steel structure measurements

Alingment: Motor / gearbox / clutch / rope drum

Top flange levelling

Measurements of machining

Measurements of shafts delivered by subcontractor

Measurements of parts delivered by

subcontractor

Material hardness test

Anticorrosive preservation made by subcontractor –quality control

Anticorrosive preservation made by subcontractor – Dry Film Thickness measuring

Zinc coating made by subcontractor – quality control

Bolted Joints – tightening torque testing

Bolted Joints – tightening torque testing

Bolted Joints – tightening torque testing

Bolted Joints – tightening torque testing

Bolted Joints – tightening torque testing

Bolted Joints – tightening torque testing

Manual torque wrench – tightening torque testing

Manual torque wrench – tightening torque testing

Quantity and Quality audit at subcontractor

workshop

Surveying

• Reports from audits: progress and quality• Various methods of Measurement,

leveling, horizontal positioning…• Alingment by clock or laser gauge• NDT, mesurement reports• And many more…