IDBAMHERSTMA
Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board.
IntegratedDesignBuildingUniversityofMassachuse8s,Amherst
UniversityofMassachuse8sBuildingAuthorityTheFirstCompositeCLTBuildinginUnitedStates
TomS.Chung,AIA,LEEDBD+C,NCARB
PrincipalLeersWeinzapfelAssociates
UPenn Gateway Building
LEERS WEINZAPFEL ASSOCIATES • 2007 AIA Firm of the Year
• Top Ten_Architect 50_2015
• Over 65 National and Regional Design Awards
• 5 LEED Gold Projects
• Over 100 National and International Publications
MGH Museum of Innovation and Medical History
LEERS WEINZAPFEL ASSOCIATES • 2007 AIA Firm of the Year
• Top Ten_Architect 50_2015
• Over 65 National and Regional Design Awards
• 5 LEED Gold Projects
• Over 100 National and International Publications
OSU East Regional Chilled Water Plant
LEERS WEINZAPFEL ASSOCIATES • 2007 AIA Firm of the Year
• Top Ten_Architect 50_2015
• Over 65 National and Regional Design Awards
• 5 LEED Gold Projects
• Over 100 National and International Publications
EQUILIBRIUM VANCOUVER, CANADA
EQUILIBRIUM VANCOUVER, CANADA
EQUILIBRIUM VANCOUVER, CANADA
IntegratedDesignBuilding
How Change of Building Systems was possible?
INTRODUCTION • Background & Context • Design Concept
PROCESS • Mass Timber Structure Design • Steel & Concrete Systems vs Wood Systems • Assuring the Client: Budget and Procurement • Code Review and Variance
DESIGN DETAILS & CONSTRUCTION • Central Commons and Courtyard Design
RegionalContextIntroducIon
RegionalContext
CampusMapwith3departments
SiteModel
CampusCirculaIonandContext
ConceptModel
BuildingConceptDiagram
WoodStructureandLandscape
ProgramOrganizaIon
SecIonalPerspecIve
ViewfromNPleasantStreet
ViewfromNPleasantStreet
ViewfromStockbridgeWay
IDBAMHERSTMADESIGNPROCESS
PredominanceofSteelinMAProcess:TimberStructureDesign
MassingOpIonsConsidered
ConceptModel
PreliminaryCentralSpaceViews
Steelvs.Timber:SchemaIcDesign
Steelvs.Timber:SchemaIcDesign
Steelvs.Timber:SchemaIcDesign
Steelvs.Timber:DesignDevelopment
Steelvs.Timber:DesignDevelopment
Revit Model
StructuralFramework
Revit Model
StructuralFramework
StructuralSystems
Steel Post & Beam
Concrete/Masonry Shafts
Steel/Concrete Floors
Steel Deck Roof
Steel Braces
GL Post & Beam
CLT Shafts
CLT/Concrete Floors
CLT Roof Glulam Braces
CHANGE IS POSSIBLE EVERYWHERE
GLPostandBeamBeamtocolumnConnec-ons
GLPostandBeamBeamtocolumnConnec-ons
GLPostandBeamBeamtocolumnConnec-ons
ShaTs
Concrete CLT
CLT/ConcreteFloors
CLT/ConcreteFloors
Holz-Beton-Verbund-System™ (HBV) Composite floor
CLT/Concrete Floors
Holz-Beton-Verbund-System™ (HBV) Composite floor
CLT/Concrete Floors
CLT/ConcreteFloors
CLT/ConcreteFloors
CLTRoof
CLTRoof
Steel CLT
GlulamBracing
GlulamBracing
ProjectTeamandStakeholdersProcess:AssuringtheClient
Project Team • Client: University of Massachusetts Building Authority
• User: University of Massachusetts, Amherst Architecture & Design, LARP, Building Construction & Technology
• Architectural / Structural Design Team: Architect: Leers Weinzapfel Associates Structural Design Engineer: Equilibrium Consulting SER: SGH
• AHJ: MA State Building Inspector MA Board of Appeals
• Construction Team:
Construction Manager Timber Fabricator and Installer
ProjectTeamandStakeholdersProcess:AssuringtheClient
ProjectTeamandStakeholdersProcess:AssuringtheClient
Key Issues • Danger of “Over Estimating Contingency” by Construction Managers or Cost Estimators due to the “Unknown”
• Importance of multiple Bidders
• Coordination of Fabricator and Installer Team
• Proper scoping of work for Bids. Especially if based on Progress Drawings • Consideration of Contractor Reputation and History. It’s a small world!
BiddingandProcurementProcess:AssuringtheClient
PreliminaryEsImatesProcess:AssuringtheClient
TimbervsSteelBudgetComparison
Fabricator/InstallerBidQuotes
CLT roof/floor panels and shear walls
CLT floor panels and glulam beams with composite concrete
AlternaIveStructuralSystemsProcess:CodeReview&Variance
AlternaIveStructuralSystemsProcess:CodeReview&Variance
TESTING
ConcealedCeilingAreasProcess:CodeReview&Variance
ConcealedCeilingAreasProcess:CodeReview&Variance
CentralCommonsandCourtyardDesign
CentralCommonsandCourtyardDesign
(Opposing)DesignParameters
MaximumplanIngwantedbutminimummaintenancedesiredHeaviestweightonthelongestspan
OpenatriumwantedwithminimumstructureheightWetgardenonawoodstructure
Nodirectloadpathononeside
Didwedoit?
CentralCommonsandCourtyardDesign
CourtyardConceptSketch
PreliminaryCourtyardPlan
PreliminaryCourtyardSecIon
CentralCommonsandCourtyardDesign
CentralSpaceStructuralConcepts
ZipperTrussPrecedent
ZipperTrussOpIons
ZipperTrussFinalConcept
ZipperTrussModel
StructuralLoadingEfficiency
CourtyardSoilProfileRequirements
ModifiedFinalCourtyardPlan
CourtyardModelViews
CourtyardPlan
CourtyardView
CommonsView
RhinosaurusModel
CentralConnectorStudies
CentralConnectorStudies
CentralConnectorStudies
CentralConnectorDesignAssist
GrasshopperParametricDefiniIon
RhinoModelDetail
Reflected Ceiling Plan
Profile and Layout
Construction Documents
CHANGEISPOSSIBLEEVERYWHERE!
CHANGEISPOSSIBLEEVERYWHERE!
CHANGEISPOSSIBLEEVERYWHERE!
CHANGEISPOSSIBLEEVERYWHERE!
CHANGEISPOSSIBLEEVERYWHERE!
CHANGEISPOSSIBLEEVERYWHERE!
CHANGEISPOSSIBLEEVERYWHERE!
CHANGEISPOSSIBLEEVERYWHERE!
CHANGEISPOSSIBLEEVERYWHERE!
THANKYOU!