Tom Donaghe Resume 2016

Embed Size (px)

Citation preview

Tom Donaghe

Tom DonagheConstruction Consultant /Chief Inspector /Journeyman Welder

31 Medicine Lodge Road Gillette, WY. 82718307-257-0246307- 670-2465 [email protected]

Experience Summary:

Over 30 years experience, welding and inspection in the oil/gas pipeline industry. Knowledgeable in all aspects of compressor, plant and pipeline construction.

OSHACompetent person, ExcavationCompetent person, Confined spaceLock out/Tag outHot workStorm water prevention

f. Adult/child first aid g. Environmental emergencies h. Adult/child CPRInfant CPR

H2s certified

Safe Gulf/Safe land USA (PEC100063051)T.R.A.P (terror response action procedure)Basic oilfield orientation

HAZCOM Anadarko Company Certified Welding Inspector

Certified welder with multiple companies (Heli-arc and Sub-arc)

Career highlights include:

Wood Group PAC / Project Lead Conoco Phillips / Eagle Ford field, Kennedy Texas / February 2013 to present.

Contact John Bednorz @ 1- 832-409-8907

Project - Gathering system numerous pipelines ranging from 4 to 8 in diameter and from five hundred feet to five miles in length.

Responsibilities Represent Conoco Phillips and their best interest on location. Ensure Conoco Phillips safety and quality specifications are held to the highest standards. Coordinate with engineering, project management, NDT and contractors. Maintain daily and weekly reports along with all project documentation.Assume responsibility for all aspects of construction on the project.

McDaniel Technical Services / Chief inspector Phillips 66 / Murray ID/ Lodge Grass MT/ Sheridan WY. /August 2012 to February 2013

Contact Josh Jansuek @ 1-918-294-3565

Project - 8.500 wall Horizontal Directional Drill (HDD) 12,885ft, Lodge Grass Mt. 10 Block valve fabrication and installation Murray ID.

Responsibilities Represent Phillips 66 and their best interest on location. Ensure Phillips 66 safety and quality specifications are held to the highest standards, Coordinate with engineering, project manager, inspectors and the contractors. Delegate responsibilities to inspectors on location; maintain daily, weekly and monthly reports along with project documentation. Assume responsibility for all aspects of construction on the project.

McDaniel Technical Services / Senior welding inspector / Midwest WY / Gillette WY. / Vernal Utah. / Anadarko Petroleum Corporation/ Compressor station and pipeline construction. October 2007 to July 2012.

Contact Josh Jansuek @ 1-918-294-3565

Project - Gathering system numerous pipelines ranging from 2 to 24 in diameter and from five hundred feet to thirty miles in length. Set and tied in thirty-nine 1400HP screw compressors to date.

Responsibilities Represent Anadarko Petroleum Corporation and their best interest on location.

Pipeline responsibilities Safety, test welders, clearing and grading right of way, stringing, bending, welding inspection stainless steel and carbon steel fabrication, front end, firing line and tie in, as built tie in and right of way reroute, coating, ditching, lowering in, back fill, final clean up, installation of line markers and cathotic test stations, air, and hydrostatic test, maintain daily progress reports and coordinate with multiple contractors and NDT.

Compression responsibilities Safety, site location, site and pad construction, concrete and steel pipe supports, receive and set multiple 1400 HP Toromont screw compressors, welding inspection, stainless steel, carbon steel pipe fabrication, supports, bolt up, paint, blow down existing stations, tie in and purge additional units, coordinate with Anadarko operations, contractors and NDT. NLW Consulting / Williston ND. Construction Consultant / Hess Cooperation /Fabrication and pipeline construction/ July 2007 to October 2007.

Contact Nicky Wilson @ 1-682-558-1061

Project - Gathering system numerous 6 steel 4 polly, 3 fiber spar ranging from two to four miles in length.

Responsibilities Represent Hess Cooperation and their best interest on location. Safey, take measurements, draw isometrics, steak right of way, welding inspection, clearing and grading right of way, stringing, bending, welding inspection fabrication, front end, firing line and tie in, coating, ditching, lowering in, back fill, final clean up, line markers, cathotic test stations, hydrostatic test, coordinate with Hess operations, contractors and NDT maintain daily progress reports.

Gulf Interstate/Houston TX Chief Inspector for Energy Transfer Company Dallas TX. /Compressor Station and pipeline / December 2006 to June 2007

Contact - Gulf Interstate @ 1-713-850-3500

Project - 12, 10, 6 and 4 steel pipelines through residential areas ranging from two to twelve miles. Set and tied in 2000HP reciprocating compressor.

Responsibilities Represent ETC and their best interest on location. Coordinate with inspectors, contractors and NDT on a daily basis, take measurements draw isometrics, red line drawings, keep job notebook and daily progress reports, insure safety and overall integrity of main line construction and compressor fabrication.

Universal Ensco, Inc. / Houston TX. Fabrication inspector / Pipeline / Puget Sound Energy September November 2006

Contact Red Peeples @ 1- 970 640 8482

Project -12 pipeline twenty-two miles through residential areas and cross country. Responsibilities Represent Puget Sound Energy and their best interest on location, safety, welding inspection over fabrication and tie in, red line drawings, maintain daily progress reports, ditching, coating, NDT and back fill.

Donaghe Welding Services, Gillette WY. Welding services / November 2005 September 2006 Responsibilities Shop fabrication and miscellanies welding.

Contact - Tom Donaghe @ 1-307-670-2465 Yates Petroleum / Gillette WY Material receiving and reconciliation / October 2005 November 2005 Responsibilities Receive, store, ship and document pipe, fittings and valves.

Contact - Saunda Phillips @ 1-307-680-8187

QIS Inspection Services / Salt Lake City Utah Welding Inspector / Northwest Pipeline / June 2003 August 2003

Contact QIS @ 1-405-604-9500

Project -36 pipeline twenty miles.

Responsibilities Represent North WEST PIPELINE and their best interest on LOCATION, SAFETY, welding inspection with tie in CREW, COATING, DITCHING, padding and back FILL, NDT AND hydrostatic testing.

QIS Inspection Services Salt Lake City Utah Utility Inspector / Williams / October December 2002 Contact QIS @ 1-405-604-9500

Project - Kern River Project Red Rock Canyon Las Vegas Nevada. Responsibilities Represent Williams Gas and their best interest on location, safety, and vegetation relocate prior to clearing right of way through national forest.Maintain daily progress reports; coordinate with contractor and Government environmental inspector. Sterling Construction Gillette WY. Welder pipeline and fabrication / November December 2001

Smith Pipeline and Construction Gillette WY. Welder Pipeline and fabrication / August November 2001

Sterling Construction Gillette WY. Welder Pipeline and fabrication / September 2000 August 2001

Hettinger Construction Gillette WY. Welder pipe fabrication / August September 2000

Detailed work history is available on request.

References:

Bruce Yates - (Conoco Phillips area supervisor Kennedy Texas) 830-400-9136

Nicky L Wilson (Anadarko, Chief inspector Carlsbad NM.) 682-558-1061

Red Peebles (PSE Chief Inspector Clay Elam WS) 970-640-8482

Gary Goins (Anadarko construction manager Gillette WY) 307-670-6055