Solution for industrial furnace and process
ABOUT COMPANY
A company d o o Zenica
The initial placement of products and services mainly related to thecustomers within the BiH.
Develoment of market sales caused intensive investment in equipment andfacilities as well as human resources of the company.
Siemens SIMATIC S S
termomatik . . . was established in 1987. as a privateenterprise with an unlimited liability. A company from its establishment is engagedin engineering, manufacturing and installation of industrail furnaces and industrialautomation.
Development of resources of the company enabled the carrying out engineeringwork and for the foreign market from which we can emphasize engineering ofindustrial furnaces and automation, software for programmable machines( 5 and 7, its own system based on microcontroller),engineering in the field of refractory and refractory lining as well as thedevelopment and manufacture of electronic equipment and steel constructionaccording to the order for their own purposes.
Today company employs highly professional staff of different types specializedfor industrial furnaces, automation, measurement and control, and refractory andcollaborate with leading domestic and foreign companies.
A company is trying to adjust to current standards of quality and environmentmanagement to ensure preconditions for the further development of the marketsales.
Business alignment to the standards of quality and environment in the field ofdevelopment of manufacture and sales of technological equipment and machineryas well as continuosly training of human resources in the application of methodsof quality and environmental protection are guarantee for the successfulpositioning of the company in the future.
We have not had trouble with suppliers in the purpose of performing our services,and environment analysis indicates that this trend will continue in the comingyears in business. Good business relations with suppliers and their concerns forquality is certainly facilitate the realization of our vision, mission and strategic andbusiness objectives. The company currently works with 60 users who are loyal tothe founding company. In the market we are recognized for quality, experienceand good business cooperation.
Products and markets
3
4
MANAGEMENT PROCESSES
M A N A G E M E N T P R O C E S S E S
M A I N P R O C E S S E S
S U P P O R T E D P R O C E S S E S
INTERNAL
AUDIT
MAINTENANCE
CONTROL
MEASURING CUSTOMER
SATISFACTION
PROCUREME
NT
CORRECTIVE AND
PREVENTIVE MEASURES
PROVIDING RESOURCES
CONTINUOUS
IMPROVEMENT
PROIZVODNJA IUGRADNJA AL
STOLARIJE
MARKET
RESEARCH
TECHNOLOGY
DEVELOPMENT, MANUFACTURE AND SALES OF
INDUSTRIAL,TECHNOLOGICAL AND EQUIPMENT FOR
ENVIRONMENTAL PROTECTION, AS WELL AS ELEKTRICAL,
MECHANICAL AND REFRACTORY SERVICES
ASSEMBLY
5
QUALITY POLICY AND ENVIRONMENTAL MANAGEMENT
Quality policy and environmental management is defined, documented andimplemented in the company Zenica on the following principles:
- Our moto is:;
- Our customers are in the central point of overall relations and activities, we wantto meet their requirements and exceed expectations;
- We strive to ensure the rights and environmentally friendly product with the rightprice and that he finds the right time on the market;
- We establish partnerships with our suppliers based on a fair basis in the purposeof long-term business cooperation, mutually beneficial, including the requirementsof environmental management system;
- company undertakes to persue the fulfillment of all requirementsof quality management and environment policy (policy which corresponds to thenature, extent and impacts on the environment), and be responsible for their ownactivities, products and services in all phases of the business process, therebypreventing pollution of the environment;
- We provide continuous control of the complement system, quality andenvironmental management, and training and employees motivation;
- We will take care of the conserve of natural resources and will reduce energyconsumption;
- We ensure the satisfaction of the interests of all stakeholders (customers,owners, employees, suppliers, communities) including complying of theobligation with applicable legal and other requirements that the organizationhas signed in relation to its environmental aspects;
- With preventive and remedial measure we prevent repetition of mistakes andthe formation of new faults;
- Constantly provide a favorable environment for establishing and reviewing setgoals of quality and environment in which environmental policy is framework forpermanent installation and monitoring of the operational framework andenvironmental goals;
- We provide passing, understanding and achievement of quality policy andenvironmental in entire company;
- Periodically (at least annully) reviewing the adequacy of the quality policy andenvironmental as well as effectiveness of applied measures, within questioningof the quality system and environmental management by the top managementto the board for the quality and the environment.
Quality policy and environment is defined on the basis of experience from theprevious period and suggestions of carrier of business functions and agreed onthe level of the top management in accordance with vision and strategy of thecompany.
All employees are familiar with the quality policy and the environment throughdirect supervisors, and the same is placed on the visible places in the company,website as well as on the advertising materials of the company, includingimmediate comunity.Constantly analyzing and redefining policies and goals of the qualiy andenvironmental management provide the conditions for the continuousimprovement of quality and environmental management, and preventionand reduction of environmental pollution.
termomatik
termomatik
“A satisfied client is what we aspire to and we are recognizedby the quality“
6
General
Manager
PRKAdvisor
Manager for refractorydepartment
Manager for electricaldepartment
Manager for mechanicaldepartment
department
Human ResourceManager
ProcurementEngineering of
refractory
Manufacture ofrefractory furnace
Assembly /
disassembly
Engineering
Manufacture
Engineering
Manufacture
Sales
PROTechnicalManager
Training
Administration andlegal
Finance andaccounting
Assembly /disassembly Assembly /
disassembly
Maintenance ofrefractory Maintenance
Maintenance
FUNCTIONAL ORGANISATIONAL CHART
7
CONTACT PERSONS:
Faruk Babić(Manager)
Amir Jaganjac
Damir Hadžiđulbić
Laris Babić
Samir Šabić
Hamed Lutvica
Maid Henjaković
Bećir Ljubunčić
Anes Berberović
(Deputy Manager)
Electrotechnical works:
Refractory works:
Mechanical works:
Measuring and regulation:
Mario Marunović
BASIC ACTIVITIES
- Industrial furnaces and automati- Defining project tasks- ing -technical- Optimi ation- Copyright monitoring
-- Steel constructions-- M
ENGINEERING
PROJECT ENGINEERING
onof the
Screen of thermo characteristicsz
Heating technique
Refractorye
-
- Siemens SIMATIC S5, S7, PCS7 and WinCC
- ,- Measurements and control,-
chanical engineeringHydraulics
- Automation- Measurements and controls
Industrial automation
Refractory lining
PROGRAMMING SUPPORT FOR PROGRAMMABLE AUTOMATION
Z
DEVELOPMENT AND PRODUCTION
REPRESENTATIVE FOR FOREIGN COMPANIES
- Development of electronic devices for own needs- Development of electronic devices on the basis of order- Low-serial production of advanced electronic devices- Low-serial production furnaces for heat treatment of plastic,heat treatment of metals and melting of non-ferrous metal
- Furnaces, industrial
-
REALI ATION OF INVESTMENT PROJECTS IN THECOUNTRY AND ABROAD
automation and devices for measuring and control(SIEMENS; KROMSCHRODER)Refractory and isolation materials (RHI)
8
REFERENCE LIST - ELECTRICAL WORKS
š, Croatia
Value: 25.000 €
- laboration of the project--
šanj, B&H
Reconstruction and modernization of lime , 1997/1998
Furnace for spark plugs, 1998
Measuring station Vitez with telemetry and visualisationin the dispatch centre in Zenica, 1999
shaft kilnInvestor: KALUN, Drni
E basicInstallationCommissioning
Investor: ENKER, Te
Modernization of the equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimization- Proving guaranteed parameters
Investor: USAID for JP “VODOVOD” Zenica, B&HValue: 56.000 BAM (approx. 28.632 €)
- D- I-- O- Proving guaranteed
Subcontractor to “Pomak” company, Split
-
LV project of overheads ports and external lighting, 1998Investor: USAID for JP “VODOVOD” Zenica, B&H
- Partially engineering- Delivery of equipment- Installation- Commissioning
Modernisation of equipment for measuring and control- Designing
elivery of equipmentnstallationCommissioning
ptimisationparameters
9
Annealing 40 tInvestor: Steel factory “ Š š, B&H
furnaceILIJA ” Ilija
10
šanj, B&HValue: 33.000 BAM (approx. 16.873 €)
-
Š” Ilijaš
Tunnel furnace No. 1, 1999
of the Annealing Furnace 40t
Pump station Guča Gora, construction of water supply
Investor: ENKER Te
Modernisation of equipment for measuring and control- Engineering- Delivery of equipment- Installation- Commissioning- Optimisation- Proving guaranteed parameters
Investor: Steel factory “ , B&HValue: 64.000 BAM (approx. 32.723 €)
- I
- Detection parameters
Investor: KALIM, Jelah, B&H
ILIJA
-
Mud thickener, 1999
Construction of furnace for galvanisation, 1999
Reconstruction , 1999
Investor: USAID for JP “VODOVOD” Zenica, B&H
- Delivery of equipment- Installation- Commissioning
- Engineering- Delivery of equipment- Installation- Commissioning- Optimisation
- Commissioning
Investor: USAID for Municipality Travnik, B&H
- EngineeringDelivery of equipment
- Work performance on construction of water supplies,pump station and water route
Subcontractor to “Metalno” company, Zenica
-
Delivery of equipmentnstallation
11
R f control of
Investor:
econstruction o furnacefor heat treatment of plates
VOEST-ALPINE Linz, Austria,12
Reconstruction of the heating and automationon the furnace for enameling
Reconstruction and modernisation of the automaticcontrol of atomizer, 2000
Reconstruction of the automatic control,
, 1999
Equipment for construction of exhausted ladles,2000
anj, B&H
VOLKSWAGEN Vogo
- Delivery manuals for handling and maintenance
Investor: HELIOS, Banović , B&HValue: 18.000 BAM (approx. 9.203 €)
Investor: ENKER, Teš
- Designing- Delivery of equipment- Work performace
Investor: , šć , B&HValue: 74.000 BAM (approx. 37.836 €)
- Engineering- Delivery of equipment- Installation
i
a
Furnace for thermal treatment of “MACRALON” V=500l, 2000
Automation and reconstruction of Annealing furnace K-9 (60 t), 2001
Investor: TRZ HAD , HadValue: 8.000 BAM (approx. 4.090 €)
- Designing- Engineering- Construction
BH STEEL - Steel factory ZENICA Zenica98 813 52 780
More then 90 % of furnace is completely new !
-- Delivery of equipment- nstallation- Engineering- Delivery of application software for PLC and OP- Commissioning- Detection of parameters- Copyright supervision
ŽI ži , B&H
Project of measuring, regulation and electro motor drive
ĆI ći
I
Investor: “ ” , B&HValue: 2 . BAM (approx. 1 . €)
13
T g-
Investor: F, B&H
ubular reactor for testin combustioncharacteristics of bio mass and coal
aculty of MechanicalEngineering, Sarajevo14
šanj, B&HValue: 33.600 BAM (approx. 17.179 €)
-
No. , 1
10 /2002
2 200
Ž-25-B
Tunnel furnace
Automation and reconstruction of Annealing furnace( 0 t), 2001
Reconstruction of automation of Annealingfurnace Ž-30-B (100 t)
Investor: ENKER Te
Modernisation of equipment for measuring and control- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Optimisation- Proving of guaraneed parameters
521 329 266 551
- Copyrights
67 950 34 742
-- D
- Installation
Project of measuring, regulation and electro motor drive
I
- Commissioning
, 2002
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)
More then 90 % of furnace is completely new !
-- Delivery of equipment- nstallation- Engineering- Delivery of application software for PLC and OP
- Commissioning- Proving of guaranteed parameters
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)
Designingelivery of equipment
- Engineering
- Delivery manuals for handling and maintenance
99 30 50 786
Reconstruction of automatic controls on furnaces H-60 and H-100
I
Commissioning
Furnaces H-60 (60 t) and H-100(100t), 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: .3 BAM (approx. . €)
- Designing- Delivery of equipment- nstallation- Engineering-
15
Press 10/2,5 MN and sInvestor: š , B&H
respective manipulatorUNIS-PRETIS NIS, Vogo ća-Sarajevo
16
Reconstruction of PLC equipment, sensors and hydraulic valvespress
, 2002of SMS 25/31,5 MN and 5 MN manipulator of 250 kNDANGO&DIENNENTHALL in the Blacksmith departmentInvestor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. . €)
- Designing- Delivery of equipment- Engineering
- nstallation- Commissioning- Parameters detection
Investor: BIMAL d.d. Br , B&HValue: 166.411,00 BAM (approx. 85.085,00 €)
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
1.154.000 590 030
I- Upgrade from SIMATIC S5-150 to S7-400
R silostomation of transportedsystem in Oil rafinery, 2003
econstruction and au
Automation and reconstruction of steamgeneration facilities in Oil rafinery, 2003
Automation and reconstruction of Oil rafinery, 2003
čko, Brčko
Investor: BIMAL d.d. Br , B&HValue: 83.182,00 BAM (approx. 42.530,00 €)
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
Investor: BIMAL d.d. Br , B&HValue: 435.492,00 BAM (approx. 222.664,00 €)
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
čko, Brčko
čko, Brčko
17
Press «Ivo Lola Ribar»Investor: PRETIS NIS, Vogošća-Sarajevo, B&H
18
Automation and reconstruction of oil supply plantfacilities in Oil rafinery, 2003
Automation and reconstruction of filtering intovinterisatio process facilities in Oil rafinery, 2003
Investor: BIMAL d.d. Br , B&HValue: 21.000,00 BAM (approx. 10.737,00 €)
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
Investor: BIMAL d.d. Br , B&HValue: 22.402,00 BAM (approx. 11.454,00 €)
- Designing- Delivery of equipment- Installation- Engineering-
čko, Brčko
čko, Brčkon
Commissioning
Investor: , B&HValue: 10.500,00 BAM (approx. 5.369,00 €)
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
Investor: , B&HValue: 16.032,00 BAM (approx. 8.197,00 €)
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
Investor: Đ Đ Ć Slavonski brod, CroatiaValue: 26.800,00 €
- Delivery of equipment- Engineering- Commissioning
Clean water supply system, 200
, 200
Reconstruction of the equipment for combustion, measurementand regulation in the furnace for normalisation of propane-butanebottles, 200
4
Cable factory –Testing device for breakdown voltage 4
4
BOSNALIJEK, Sarajevo
KAPIS TKT, Tomislavgrad
,URO AKOVI
19
Furnace for testing fire-resistant materialInvestor: PROTUPOŽARNI INSTITUT Sarajevo, B&H,
20
21
ILIJA ” Ilija
Measuring control station for natural gas 3.000 m3/hfor the electro-steel works, 2004
milling machine 4
Investor:
Investor: Steel factory “ Š š, B&H
- Designing- Delivery of equipment- Installation-
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H
- Delivery of equipment- Installation- Commissioning
“BIRA ć, B&H
- Delivery of equipment- Installation- Commissioning
Commissioning
Investor:Value: 190.000,00 €
- Designing- Delivery of equipment- nstallation- Commissioning- Parameters detection
Investor: , B&HValue:25.500,00 BAM (approx. 13.038,00 €)
- Delivery of equipment- Engineering-- Parameters detection
Refrigeration factory - filling machine for PUR-foam, 2004
Reconstruction of automation on , 200
” - refrigeration factory, Biha
VOEST-ALPINE Linz, Austria
I
FORESTER, Sarajevo
- Designing
Installation
R of controlssheet , 200
0 , 200
econstruction on furnace for thermal treatmentof s 4
Heating furnace 10 kg/h 4
,
Friction pressInvestor: PIROMETAL Brčko, B&H,
22
23
Heating furnace BH STEEL, 2004
Maintenance of electro-resistant in annealing furnace 4
epair o electro-resistant furnace
4
respective manipulator
UNIS-PRETIS NIS, Vogo
roject regulation and keeping the
IGMAN, Konjic B
delivery of heaters
of heaters
UNIS-PRETIS NIS, Vogo
Design
UNIS-PRETIS NIS, Vogo
Design
Investor: šć , B&H
- Delivery of burner equipment- Installation- P of furnace- Commissioning- Parameters detection
Investor: , &HValue: 15.500,00 BAM (approx. 7.925,00 €)
- Construction and(made from KANTHAL A-1)
- Installation of the heaters
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 53.750,00 BAM (approx. 27.481,00 €)
- Construction and delivery (made from KANTHAL A-1)- Installation of material and equipment- Project of control of maintenance of atmosphere protection- Commissioning
Investor: š , B&H
Reconstruction of PLC equipment, sensors and hydraulic valves of press- ing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Investor: š , B&H
- ing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
a-Sarajevo
ća-Sarajevo
ća-Sarajevo
, 200
General r s n 5 in MaintenanceDepartment with reconstruction of 3 furnaces, installation ofequipment for work under Ar or CO atmosphere protection,
200 /2005
Press 10/2,5 MN and s, 2005
Heating furnace 1000kg/h, 2005
2
Steel Plant - Station for tundish heatingInvestor: ARCELORMITTAL, Zenica, B&H
24
25
Remote control steam starting block 7
oncrete lant
utomatically controlled tubular reactor for testingcombustion characteristics of bio mass and coal, 200
nnealing chamber furnace
for of “ ” in ThermalPower Plant Kakanj, 2005
C P , 2005
A- 5
Laboratory furnace 20l/8kW, 2005
A , 2005
Investor: JP “ELKROPRIVREDA BIH , B&H
Investor: INGRUP Donji Vakuf, B&HValue:36.900,00 BAM (approx.18.867,00 €)
Automation engineering- Delivery of equipment-- Commissioning
Investor: F , B&HValue: 35.000,00 BAM (approx. 17.895,00 €)
- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Investor: TMD Gradač , B&HValue: 4.000,00 BAM (approx. 2.045,00 €)
- ing- Construction
Investor: HES-HENNINGSDORF Henningsdorf, Germany
- Designing- WinCC SCADA system- Delivery of equipment- Installation- Commissioning
”, Sarajevo
,
-
Installation
aculty of Mechanical Engineering,
,
Design
,
Sarajevo
ac
F , 2005urnace for melting non-ferrous metals 25l/6.3kWInvestor: UNIVERZAL PROGRES, Visoko, B&HValue: 6.000,00 BAM (approx. 3.068,00 €)
- Designing- Construction- Commissioning
Sugar factoryInvestor: “STUDEN-AGRANA”, Brčko, B&H
26
27
C P , 2005
F , 200
F , 200
R 200
, 200
oncrete lant - Reconstruction
urnace for melting non-ferrous metals 30,6l/6,3kW 6
urnace for melting non-ferrous metals 180l/14kW 6
econstruction and automation of hydrogenation drives, 6
Chamber for baking varnish 6
,
- E
Installation
11.000,00 5.625,00
ADIDA, Tunis
- Delivery of equipment- Engineering-- Commisioning
S-PRETIS NIS ogo a-Sarajevo
- Engineering
Investor: INGRUP Donji Vakuf, B&H
ngineering- Delivery of equipment-- Commissioning
Investor: UNIVERZAL PROGRES, Visoko, B&H
- Designing- Construction- Engineering
Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)
- Designing- Construction- Engineering
Investor: JValue:51.680,00 €
- Designing
Installation
Investor: UNI , V šć , B&HValue: 35.000,00 BAM (approx.17.895,00 €)
- Designing
- Installation- Commissioning
Recontruction and automation of level measuringin Oil factory, 2005
ultrasonic sensors
Investor: BIMAL d.d. Br , B&HValue: 15.486,00 BAM (approx. 7.917,00 €)
- Designing- Delivery of- Installation- Commissioning
čko, Brčko
Coke Oven Battery Plant - Biologicalwaste water treatmentInvestor: ARCELORMITTAL, Zenica, B&H28
29
Furnace for control of temperature sensors, 2006Investor: MITTAL STEEL , B&H
- ing- Installation- Engineering- Commissioning
Zenica
Design
Peeling facility in Oil factory, 2006
Cable factory, Extruder 2,5", 2006
Cable factory, Machine for rough drag-out of copper, 2007
Press «Ivo Lola Ribar», 2007
,
Design
,
.000,00 . ,00
- Engineering
Investor: BIMAL d.d Brčko, B&HValue: 212.704,00 BAM (approx. 108.753,00 €)
- ing- Engineering- Installation- Commissioning- Parameters detection
Investor: KAPIS TKT Tomislavgrad, B&HValue: 79.564,00 BAM (approx. 40.680,00 €)
- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Investor: KAPIS-TKT Tomislavgrad, B&HValue: 350.000,00 BAM (approx. 178.952 €)
- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Investor: PRETIS NIS, Vogošća-Sarajevo, B&HValue: 75 BAM (approx. 38 347 €)
- Designing
- Installation- Commissioning
,
Mobile stations for a heating of caldronsInvestor: Metalska industrija Varaždin-MIV,
Varaždin, Croatia30
31
.000,00 . ,00
- Engineering
Design
,
Design
Emcotest machine for measuring hardness 2007
Pellet dryer Machine, 2007
Automatic foundry for vehicles parts, 2008
Friction press, 2008
,“ “
Furnace for thermal treatment VPP, 2008
Investor: PRETIS NIS, Vogošća-Sarajevo, B&HValue: 130 BAM (approx. 66 468 €)
- Designing
- Installation- Commissioning
Investor: FIS, Vitez, B&HValue: 111.000,00 BAM (approx. 56.753,00 €)
- Designing- Engineering- Installation- Commissioning
Investor: “CIMOS”, Zenica, B&HValue: 4.000.000,00 BAM (approx. 2.045.167,00 €)
- ing- Engineering- Installation- Electro equipment and automation- Commissioning
Investor: PIROMETAL Brčko, B&HValue: 400.000,00 BAM (approx. 204.517,00 €)
- ing- Engineering- Installation- Commissioning
Investor: NT FORGING Novi Travnik, B&HValue: 296.000,00 BAM (approx. 151.342,00 €)
- Designing- Delivery of equipment- Engineering- Installation- Commissioning
,
Coke Oven Battery Plant - Plant fornaphtalene and ammoniaInvestor: ARCELORMITTAL, Zenica, B&H32
33
Furnace for testing fire-resistant material, 2008
Drying furnace, 2008
Steel Plant - Station for tundish heating 1,44 MW, 2008
,
- engineering
.000,00 ,00
Investor: PROTUPOŽARNI INSTITUT Sarajevo, B&HValue: 606.000,00 BAM (approx. 309.843,00 €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
Investor: UNIS-PRETIS NIS Vogošća-Sarajevo, B&HValue: 100.000,00 KM (approx. 51.129,00 €)
- Designing
- Installation- Commissioning
Investor: ARCELORMITTAL, Zenica, B&HValue: 50 BAM (approx. 25.565 €)
- Designing- Engineering- Installation- Commissioning
,
Coke Oven Battery Plant-Plant for naphtalene and ammonia 2008
Coke Oven Battery Plant-Biological waste water treatment, 2008
,
,00
,00
- Engineering
Investor: ARCELORMITTAL, Zenica, B&HValue: approx. 1.000.000 €
- Designing- Engineering- Installation- Automation- Commissioning
Investor: ARCELORMITTAL, Zenica, B&HValue: approx. 750.000 €
- Designing
- Delivery of equipment- Installation- Commissioning
Automatic foundry for car partsInvestor: “CIMOS”, Zenica, B&H
34
35
Design
Investor: “STUDEN-AGRANA”, Brčko, B&HValue: 2.430.000,00 BAM (approx. 1.242.439,00 €)
- ing- Installation- Electro equipment and automation- Commissioning- Parameters detection
Sugar factory, 2008
Investor: “BRIGO-INVEST”, Banovići, B&HValue: 40.000,00 BAM (approx. 20.00,00 €)
- ing- Engineering- Installation- Delivery of equipment- Commissioning
Design
Plant for the production of briquette, 2008
Furnaces for testing the resistance of materials, 2008
Induction melter furnaces, 2008
Mobile stations for a heating of caldrons, 2008/2009
. 0,00
Investor: NT FORGING Novi Travnik, B&HValue: 397.000,00 BAM (approx. 202.983,00 €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: 59.840,00 €
- Designing- Engineering- Installation- Commissioning
Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: 29 35 €
- Designing- Engineering- Installation- Commissioning
,
Retrofit f milling machine«WANDERER VC200»
o
36
37
Investor: STUDEN-AGRANA, Brčko, B&HValue: 175 BAM (approx. 89.476 €)
- Designing- Engineering- Installation- Automation- Commissioning
.000,00 ,00
Sugar factory, Boiler house 2008/2009,
Electro works in CIMOS - II phase, 2009
Protection of tanks from overloading, 2009
CIMOS - substation, 2009
Cable factory, Extruders 4,5", 2009
.000,00 00
- Engineering
Design
,
Design
,
Investor: CIMOS, Zenica, B&HValue: 754 BAM (approx. 385.514, €)
- Designing
- Delivery of equipment- Automation- Installation- Commissioning
Investor: “BIMAL”, Brčko, B&HValue: 42.000,00 BAM (approx. 21.474,00 €)
- ing- Engineering- Installation- Electro equipment and automation- Commissioning- Parameters detection
Investor: CIMOS Zenica, B&HValue: 668.000,00 BAM (approx. 341.543,00 €)
- ing- Engineering- Installation- Commissioning
Investor: KAPIS TKT Tomislavgrad, B&HValue: 210.000,00 BAM (approx. 107.371,00 €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
General overhaul of machine forremoving slag, ArcelorMittal Zenica
38
39
Re-circulation system of technological water, 2009
Machine for wire twisting „CIGARA”, 2009
EMP drives and temp. measurements on 8 cells of silo, 2009/2010
Dedusting of iron mixer on Steel Plant Department, 2010
,
Investor: Cement Plant Kakanj, B&HValue: 78.300,00 BAM (approx. 40.034,00 €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
Investor: KAPIS TKT Tomislavgrad, B&HValue: 55.000,00 BAM (approx. 28.121,00 €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
Investor: “BIMAL”, Brčko, B&HValue: 78.375,00 BAM (approx. 40.073,00 €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
,
Investor: “ArcelorMittal”, Zenica, B&HValue: approx. 60.000,00 €
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
Investor: “ArcelorMittal”, Zenica, B&HValue: 46.323,00 €
- Designing- Delivery of equipment- Installation- Commissioning
Air post on the location “LF” and “CCM” in Steel PlantDepartment, 2010
Installation of hydraulic and pneumatic valves,fitting pipes and hoses, electric worksFAGOR, SPAIN40
41
Burners and burners' armatures for air heating of the chamberfor sheet plastification, 2010
General overhaul of rotary excavator SH-630, no. 1352P.K. “Šikulje” - Lukavac, 2010/2011
Expansion of compressor station in BOF Steel Mill, 2011
Reconstruction of heating furnace LOI-SAAR,capacity 1.300 kg/h, 2011
Investor: “ArcelorMittal”, Skopje, FYR MacedoniaValue: 109.667,00 €
- Designing- Delivery of equipment- Installation- Commissioning- Parameters detection
Investor:
Investor: “ArcelorMittal”, Zenica, B&HValue: 150.360,00 BAM (approx. 76.877,00 €)
- Designing- Delivery of equipment- Installation- Commissioning
Investor: “NT FORGING”, Novi Travnik, B&HValue: 82.720,00 BAM (approx. 42.294,00 €)
- Designing- Delivery of equipment- Installation- Commissioning
JP ELEKTROPRIVREDA BIH D.D. Sarajevo,ZD Rudnici “Kreka” d.o.. Tuzla
Value: 4.450.000,00 BAM (approx. 2.275.249,00 €)
- Electrical designing and engineering based on Siemens equipment,- Video surveillance,- Lighting,- Installation,- Delivery of equipment,- Commissioning- Parameters detection
Reconstruction and automation of AnnealingFurnace Ž-25B in ArcelorMittal Zenica
42
43
Reconstruction of furnace for thermal treatment, 2011
System for measuring temperature inside the flowingtunnel furnace BTU, 2011
Delivery and commissioning of the communication and controlequipment in the HE Rama, 2011
Electrical design –electrical installations and automation controlof Depo 1, TE Tuzla, 2011
Investor: UNIS-TOK, Kalesija, B&HValue: 338.800 BAM (approx. 173.226,00 €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
Investor: SELK, Kutina, CroatiaValue: approx. 20.000,00 €
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
Subcontractor to “COMEL” SarajevoValue: 37.200,00 BAM (approx. 19.020,00 €)
- Designing- Delivery of equipment- Installation- Commissioning
Investor: JP ELEKTROPRIVREDA BIH D.D. Sarajevo,Power Plant Tuzla
Value: 23.000 €
- Designing of automation, video surveillance, monitoringand control based on Siemens Simatic S7
F forSkopje, Macedonia
urnace galvanizing sheetin ArcelorMittal
44
45
REFERENCE LIST - REFRACTORY WORKS
Reconstruction , 1999
Lime shaft kiln, 1999
Electric arc furnace 10t, 2001
of the Annealing Furnace 40T
Lime shaft kiln, 1999
Lime shaft kiln No. 1, 1999
Furnace for thermal treatment of “MACRALON” V=500l, 2000
Boiler «Pelluchi» type, 2000
Investor: Steel factory “ Š š, B&HValue: 64.000 BAM (approx. 32.723 €)
Delivery of equipment- Installation- Commissioning
- Reconstruction of the refractory wall
- Reconstruction of the refractory wall
- Reconstruction of the refractory wall(installed approx. 160t of material)
Investor: TRZ HADŽ Ć , Hadž ćValue: 8.000 BAM (approx. 4.090 €)
- Engineering
Investor: KONJUH, Živinice
Investor: Steel factory “ Š š, B&H
-
ILIJA ” Ilija
-
Investor: KALIM, Jelah, B&H
Investor: KALUN, Drniš, Croatia
Investor: INGRAM, Srebrenik, B&H
I i , B&H
, B&H
- Engineering of hanging arch
ILIJA ” Ilija
Design of the project of refractory walls 10 t of electrical furnacefor casting of melt up to 25 t, monitoring of performance during lining
I i
Beaching area in ArcelorMittal ZenicaSpill transport system for ladle
46
47
Automation and reconstruction of Annealing furnace K-9 (60 t), 2001
econstruction of Annealing furnace Ž (100 t), 2001/2002
EProject of high temperature refractory isolation of furnaceProject of refractory walls of furnaceDelivery of refractory and high temperature isolation materials
Investor: ENKER, Tešanj, B&H
- Delivery and installation of refractory material in the bell ofhigh-temperature chamber furnace
Investor: INGRAM, Srebrenik, B&H
Reconstruction of refractory wall on furnace No 3-Installation of 90 t of material
- Project of high temperature refractory isolation of furnaceProject of refractory walls of the wagon of furnaceDelivery of refractory and high temperature isolation materials
Investor: BIRA, Refrigeration factory, Biha
Deliver of refractory material and reconstruction of refractorywalls of boilers 1 and 2
Investor: KONJUH, Živinice, B&H
Reconstruction of refractory wall of boiler-Delivery of material-Work performance-Installation of approx. 10 t of refractory material
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 298.813 BAM (approx. 152.780 €)
More then 90 % of furnace is completely new !
- ngineering---
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 521.329 BAM (approx. 266.551 €)
More then 90 % of furnace is completely new !
- Engineering
--
High-temperature bell furnace, 2001
Lime shaft kiln No. 3, 2001
R -25-B
Boilers No 1 & 2, 2002
Boiler “Peluchi”, 2002
ć, B&H
-
Upgrading of truck with mobile equipmentStation for testing of gas
48
49
Investor: KALUN, Drniš, Croatia
- Inspection and reporting on refractory liningcondition in the furnace No. 2
Investor: ENKER, Tešanj, B&H
- Deliver and installation of refractory material into two bells ofhigh-temperature chamber furnace
Investor: KONJUH, Živinice
- Delivery of material, work performance- Installed around 8 t of refractory material
Investor: INGRAM, Srebrenik, B&HValue: 22.615,00 BAM (approx. 11.562,00 €)
Reconstruction of the refractory lining on furnace 1(Nearly 125 t of refractory material installed)
Investor: Steel factory “LIJAŠ”, Ilijaš, B&HValue: 46.000,00 BAM (approx. 23.520,00 €)
Reconstruction of the refractory lining of the wagonand reparation of the refractory lining of furnace
- Engineering- Delivery of refractory material- Installation
Investor: BH STEEL, Zenica, B&H
- Engineering of refractory covering- Delivery of material for refractory lining, approx. 100 m3- Installation of material- Commissioning
Investor: BH STEEL, Zenica, B&H
- Installation of material, approx. 160m3
Lime shaft kiln No. 2, 2002
High-temperature bell furnace, 2003
Chair factory - Reconstruction of refractory lining of boiler, 2003
Lime shaft kiln No. 1, 2004
Annealing furnace 40t, 2004
Tunnel furnace DANIELLI, Rolling Mill III, 2004
Electric Steel Plant, Stetting chamber, Line Chamber, 2004
, B&HValue: 25.090,00 BAM (approx. 12.828€). 2 Contracts
Hot Blast Stoves VP-4 in ArcelorMittal Zenica
50
Hot Blast Stoves VP-4
51
Investor: BH STEEL, Zenica, B&H
- Installation of material, approx. 300 t
Investor: Steel factory “LIJAŠ”, Ilijaš, B&H
- Delivery of material for lining- Supervision during construction
Investor: FORESTER, Sarajevo
- Engineering
UNIS-PRETIS NIS, Vogo
IGMAN, Konjic B
- Delivery of refractory material
UNIS-PRETIS NIS, Vogo
Electric Steel Plant, first lining of two bath tub of 100 t furnace, 2004
Electric Arc Furnace 10t, 2004
Heating furnace 100 kg/h, 2004
Heating furnace BH STEEL, 2004
Maintenance of electro-resistant in annealing furnace 4
epair o electro-resistant furnace
4
, B&HValue: 25.500,00 BAM (approx. 13.038,00 €)
a-Sarajevo
ća-Sarajevo
Investor: šć , B&H
- Installation og refractory lining
Investor: , &HValue: 15.500,00 BAM (approx. 7.925,00 €)
- Engineering
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 53.750,00 BAM (approx. 27.481,00 €)
- Installation of material
Investor: š , B&H
- Engineering
, 200
General r s n 5 in MaintenanceDepartment with reconstruction of 3 furnaces, installation ofequipment for work under Ar or CO atmosphere protection,
200 /2005
Heating furnace 1000kg/h, 2005
2
Steam drying plant for drying of sampledmaterial such as pellets, sand, dust, etc.
52
53
Investor: KALUN, Drniš, Croatia
- Reconstruction of refractory lining, approx. 110 t material
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla
Reparation of refractory lining in channels of hot gases, channelsand hopper of fire-place and collector of chimney of block 6
- Installation of approx. 70 t of material
Investor: Steel factory “ILIJAŠ”, Ilijaš
- Delivery of material for refractory lining- Delivery of material for covers- Supervision during construction
aculty of Mechanical Engineering,
- Supervision during construction
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla
Reparation of refractory lining in hot gases channels and hopper ofboiler combustion in boiler 5 of block 4
- Installation of approx. 33 t of material
Lime furnace, 2005
Power Plant, Block 6, 2005
Electric Arc Furnace, 2005
utomatically controlled tubular reactor for testingcombustion characteristics of bio mass and coal, 200
Power Plant Tuzla, Block 4, Boiler 5, 2005
, B&H
Sarajevo
A- 5
Investor: F , B&HValue: 35.000,00 BAM (approx. 17.895,00 €)
- Engineering- Delivery of material- Construction
F , 2005urnace for melting non-ferrous metals 25l/6.3kWInvestor: UNIVERZAL PROGRES, Visoko, B&HValue: 6.000,00 BAM (approx. 3.068,00 €)
- Engineering
54
Deduster in foundry for car partsInvestor: “CIMOS”, Zenica, B&H
55
Investor: JP “KANTONALNA BOLNICA”, Zenica, B&H
Reparation of refractory lining of boiler
- Delivering and Installation of approx. 3 t of material
,
Engineering
- Engineering and installation of ceramic fibers in the arch of furnace
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla
Reparation of refractory lining in hot gases channels and hopper ofboiler combustion in boiler 5 of block 4
- Installation of approx. 30 t of material
Investor: GIRK “KALUN”, Drniš, Croatia
Investor: Steel factory “ILIJAŠ”, Ilijaš
- Delivery of material for furnace lining- Installation of material
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla
Reparation of refractory lining in hot gases channels and hopper ofboiler combustion in boiler 5 of block 4
- Installation of approx. 50 t of material
Cantonal hospital - Boiler-room, 2005
Furnace K-9, 2006
Power Plant Tuzla, Block 4, Boiler 5, 2006
Electric Arc Furnace 10t, 2006
Power Plant Tuzla, Block 4, Boiler 5, 2006
Laboratory furnace 20l/8kW, 2005Investor: TMD Gradač , B&HValue: 4.000,00 BAM (approx. 2.045,00 €)
-- Construction
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H
ac
, B&H
Lime F , 2006urnace
Reparation of refractory lining, approx. 90 t of material-
Lubrication DC motor driveCostumer: NESMA Co. Saudi Arabia,for porpose of ARAMCO Co.56
57
11.000,00 5.625,00
S-PRETIS NIS ogo a-Sarajevo
- Engineering
- Delivering and Installation of approx. 150 t of material
Investor: Energoinvest termoaparati "E-TAT", Sarajevo, B&H
- Reconstruction of the refractory lining of the wagon
Investor: “LIVTEX”, Livno, B&H
Reparation of refractory lining
Investor: GIRK “KALUN”, Drniš, Croatia
Investor: JP “KANTONALNA BOLNICA”, Zenica, B&H
Reparation of refractory lining of boiler
- Delivering and Installation of approx. 5,5 t of material
Investor „ATB SEVER LIVNICA OKA“, oka, Serbia
F , 200
, 200
urnace for melting non-ferrous metals 180l/14kW 6
Chamber for baking varnish 6
Reconstruction of refractory lining of the furnace "SALEM", 2006
Annealing furnace, 2006
Cantonal hospital - Boiler-room, 2007
Refractory lining of channel furnace IRV 70, 2007
Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)
- Construction- Engineering
Investor: UNI , V šć , B&HValue: 35.000,00 BAM (approx.17.895,00 €)
- Installation- Commissioning
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H
Č Č
Boiler KLM 100 TPK
urnace
, 2006
Lime F , 2006
Reparation of refractory lining, approx. 98 t of material
-
-
Bag filters for dedusting of exhaust gas insugary rafinary «STUDEN-AGRANA» Brčko, B&H
58
59
Investor: GIRK “KALUN”, Drniš, Croatia
- Reparation of the bottom of furnace
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla
Reparation of refractory lining in hot gases channels and lining rearof the boiler approx. 320 m2 and reparation of lining at the entrancein the chimney-approx. 70 m2
-Installation of approx. 200 t of material
Investor: „ArcelorMittal“ Zenica, B&H
Repairing of refractory lining of hot blast stoves VP-4
- Installation of approx. 3.500 t of refractory material
Investor: „ArcelorMittal“ Zenica, B&H
Runner lining on cast house of VP-4
- Installation of approx. 650 t of refractory material
Investor: "NT FORGING" Novi Travnik, B&H
- Engineering of refractory lining- Installation of refractory lining- Commissioning- Parameters detection
Furnace D-soel 14/5/94
Power Plant Tuzla, Block 5, 2007
Assembling and reconstruction of new Foundry
Hot Blast Stoves VP-4, 2008
Cast house of VP-4, 2008
Furnace for annealing - large continuous facility, 2008
, 2007
, 2008
Investor: NT-FORGING, Novi Travnik, B&H
Investor: “CIMOS”, Zenica, B&H
- Engineering
Lime F , 2007urnace
Reparation of refractory lining, approx. 20 t of material-
Refractory lining of the 1.300t Mixer No.1in ArcelorMittal Zenica
60
61
Investor: “CALUCEM”, Pula, Croatia
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 600 t of refractory material
ArcelorMittal, Zenica, B&H
- Installation of approx. 660 t of refractory material
Investor: JP “KANTONALNA BOLNICA”, Zenica, B&H
Sanation of refractory lining of boiler
- Delivery and installation of material 4,0 t
Investor: „ArcelorMittal“ Zenica, B&H
- Installation of ca 590 t of refractory material
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla
Reparation of refractory lining in hot gases channelsand lining of boiler 3 and 4
- Installation of approx. 100t of material
Furnace for testing fire-resistant material, 2008
, 2008
Investor: PROTUPOŽARNI INSTITUT Sarajevo, B&HValue: 606.000,00 BAM (approx. 309.843,00 €)
- Engineering- Delivery of equipment and refractory material- Installation- Commissioning- Parameters detection
Investor:
,
Mixer refractory lining 1.300 t, 2008
Convertor refractory lining 1 and 2
Cantonal hospital - Boiler-room, 2008
Refractory lining of 20 ladles for iron transport, 2008
Power Plant Tuzla, Block 3, 2008
Furnace refractory lining for cement casting, 2008
Installation of approx. 300 t of refractory material-
Coiling machine for cablesInvestor: KAPIS TKT, Tomislavgrad
62
63
Investor: ArcelorMittal, Zenica, B&H
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 500 t of refractory material
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 160 t of refractory material
Investor: CIMOS TMD CASTING, Zenica, B&H
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 2.300 t of refractory material
Investor: JP “KANTONALNA BOLNICA”, Zenica, B&H
Reparation of refractory lining of boiler
- Delivering and Installation of approx. 3 t of material
Investor: GIRK “KALUN”, Drniš, Croatia
Investor: ArcelorMittal, Zenica, B&H
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 950 t of refractory material
Annual contract for 2008: Refractory lining of ladles forpig-iron transport
Convertor lininig 1 and 2 (regular reparation)
Reparation of runners on the casting platform VP-4, 2008
Reparation of refractory walls of Channel Induction Furnace
Annual contract for 2009: Convertor Lining
Cantonal hospital - Boiler-room, 2009
Annual contract for 2009: Refractory lining of ladles forpig-iron transport
Annual contract for 2009: Refractory lining of ladles for hotmetal transport and charging
, 2008
, 2009
Reparation of refractory lining, approx. 250 t of material-
Lime F , 2009urnace No.1
Refractory lining of ladlesInvestor: ArcelorMittal Zenica
64
65
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 2.000 t of refractory material-
- Installation of approx. 900 t of refractory material- - Installation of approx. 370 t
of refractory material
- Installation of approx. 50 t of refractory material
Investor: ArcelorMittal, Zenica, B&H
Reparation of refractory lining of boiler KO No1
- Installation of approx. 50t of refractory material
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 175 t of refractory material
Investor:
- Project of refractory lining- Installation of refractory materials- Commissioning- Parameters detection
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 1.750 t of refractory material-
- Installation of approx. 900 t of refractory material- - Installation of approx. 150 t
of refractory material
- Installation of approx. 50 t of refractory material- - Installation of approx. 450 t of
refractory material-
- Installation of approx. 5.000 t of refractory material
Annual contracts for 2010:
Boiler - Convertor
Heating furnace 100t/h,"SALEM" Rolling Mill, 2010
Heating furnace for forging, 11,5t/day
Annual contracts for 2011:
Convertor Lining
Refractory lining of ladles for hot metal transport and charging
Runners for iron lining and slag VP-4
Convertor Lining
Refractory lining of ladles for hot metal transport and charging
Runners for iron lining and slag VP-4
Gunning of convertor and mixer
, 2010
, 2011
Refractory works in ladle in the hall of steel work
UNIS-TOK, Kalesija, B&H
-
-
-
-
Refractory lining of tuber segments and beaching runners
Refractory lining of tuber segments and beaching runners
66
Refractory lining of furnace K-25AInvestor: ArcelorMittal Zenica
67
Investor: NT FORGING
- Project of refractory lining- Installation of refractory materials- Commissioning- Parameters detectionl
Investor: Steel factory “ILIJAŠ”, Ilijaš
- Delivery of material for lining of furnace and two covers- Installation of material into three furnaces
Heating furnace for forging 1,5 t/h
Electric Arc Furnace 10t, 2011, B&H
, Novi Travnik, B&H
68
Refractory works on the «SALEM» heating furnace100t/h in Rolling Mill Department, ArcelorMittal Zenica
69
REFERENCE LIST - MECHANICAL WORKS
Furnace for spark plugs, 1998
of the Annealing Furnace 40t
Investor: ENKER, Teš
Modernization of the equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimization- Parameters detection
Investor: USAID for JP “VODOVOD” Zenica, B&H
- Delivery of equipment- Installation- Commissioning
- Engineering- Delivery of equipment- Installation- Commissioning- Optimisation
Investor: Steel factory “ Š š, B&H
Delivery of equipment- Installation- Commissioning- Detection parameters
Investor: USAID for Primary school “GOJEVIĆI , B&H
anj, B&H
Subcontractor to “Metalno” company, Zenica
Investor: KALIM, Jelah, B&H
ILIJA ” Ilija
Reapir-
”, Municipality Fojnica
- Engineering- Delivery of equipment- Works
Mud thickener, 1999
Construction of furnace for galvanisation, 1999
Reconstruction , 1999
Reconstruction of boiler room and hot water network, 1999
70
General overhaul of rotary excavator SH-630P.K. «Šikulje», Lukavac
71
Pump station Guča Gora, construction of water supply, 1999
Reconstruction of the heating on the furnace for enameling
Furnace for thermal treatment of “MACRALON” V=500l, 2000
Automation and reconstruction of Annealing furnace K-9 (60 t), 2001
Automation and reconstruction of Annealing furnaceŽ (100 t), 2001/2002
SMS 25/31,5 MNand 5 MN manipulator of 250 kN DANGO&DIENNENTHALL inthe Blacksmith department
Investor: USAID for Municipality Travnik, B&H
- EngineeringDelivery of equipment
- Work performance on construction of water supplies,pump station and water route
Investor: HELIOS, Banović , B&H
Investor: TRZ HADŽ Ć , Hadž ć
Investor: Orašje Municipality, Orašje
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 298.813 BAM (approx. 152.780 €)
More then 90 % of furnace is completely new !
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 521.329 BAM (approx. 266.551 €)
More then 90 % of furnace is completely new !
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. . €)
- Delivery of equipment- Engineering- nstallation- Commissioning
-
I i , B&H
, B&H
- Engineering- Mechanical Project of mantle and chimney of furnace- Project of gas and air installation- Delivery of equipment
- Engineering- Mechanical Project of mantle and chimney of furnace- Project of gas and air installation- Delivery of equipment
1.154.000 590 030
I
, 1999
Pump station „KOSTR “, Water supply, 2000
-25-B
Reconstruction of hydraulic valves of press
, 2002
i
I i
Č
General overhaul of rotary excavator SH-630P.K. «Šikulje», Lukavac
72
73
Reconstruction of steam generation facilities in Oil rafinery, 2003
Reconstruction of oil supply plant facilities in Oil rafinery, 2003
Reconstruction of the equipment for combustion, measurementand regulation in the furnace for normalisation of propane-butanebottles, 200
Refrigeration factory - filling machine for PUR-foam, 2004
,
” - refrigeration factory, Biha
Investor: BIMAL d.d. Br , B&HValue: 83.182,00 BAM (approx. 42.530,00 €)
- Delivery of equipment- Installation- Engineering- Commissioning
Investor: BIMAL d.d. Br , B&HValue: 21.000,00 BAM (approx. 10.737,00 €)
- Delivery of equipment- Installation- Engineering- Commissioning
Investor: Đ Đ Ć Slavonski brod, CroatiaValue: 26.800,00 €
- Delivery of equipment- Engineering- Welded vessels- Commissioning
Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H
- Delivery of equipment- Installation- Commissioning
Investor: “BIRA ć, B&H
- Delivery of equipment for filling machine- Installation- Commissioning
čko, Brčko
čko, Brčko
4
Measuring control station for natural gas 3.000 m3/hfor the electro-steel works, 2004
URO AKOVI
Furnace for heating of model plates, 15kWInvestor: CIMOS TMD CASTING, Zenica
74
75
R of sheet , 200
0 , 200
, 200
Press 10/2,5 MN and s, 2005
econstruction furnace for thermal treatment of s 4
Heating furnace 10 kg/h 4
Heating furnace BH STEEL, 2004
Maintenance of electro-resistant in annealing furnace 4
respective manipulator
VOEST-ALPINE Linz, Austria
I
FORESTER, Sarajevo
- Designing
Installation
UNIS-PRETIS NIS, Vogo
roject regulation and keeping the
IGMAN, Konjic B
delivery of heaters
UNIS-PRETIS NIS, Vogo
Design
Investor:Value: 190.000,00 €
- Delivery of equipment- nstallation- Commissioning- Parameters detection
Investor: , B&HValue:25.500,00 BAM (approx. 13.038,00 €)
- Delivery of equipment- Engineering-- Parameters detection
Investor: šć , B&H
- Delivery of burner equipment- Installation- P of furnace- Commissioning- Parameters detection
Investor: , &HValue: 15.500,00 BAM (approx. 7.925,00 €)
- Construction and(made from KANTHAL A-1)
- Installation of the heaters
Investor: š , B&H
Reconstruction of hydraulic valves of press- ing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
,
a-Sarajevo
ća-Sarajevo
Remount of rotary furnace, «IGMAN» Konjic
76
77
Heating furnace 1000kg/h, 2005
0 , 200
A- 5
Laboratory furnace 20l/8kW, 2005
F , 200
Heating furnace 10 kg/h 4
utomatically controlled tubular reactor for testingcombustion characteristics of bio mass and coal, 200
urnace for melting non-ferrous metals 30,6l/6,3kW 6
UNIS-PRETIS NIS, Vogo
Design
FORESTER, Sarajevo
- Designing
Installation
aculty of Mechanical Engineering,
,
Investor: š , B&H
- ing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Investor: , B&HValue:25.500,00 BAM (approx. 13.038,00 €)
- Delivery of equipment- Engineering-- Parameters detection
Investor: F , B&HValue: 35.000,00 BAM (approx. 17.895,00 €)
- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Investor: TMD Gradač , B&HValue: 4.000,00 BAM (approx. 2.045,00 €)
- Engineering- Installation- Commissioning
Investor: UNIVERZAL PROGRES, Visoko, B&H
- Engineering- Construction- Commissioning
ća-Sarajevo
Sarajevo
ac
Furnace for thermal treatment VPPInvestor: NT FORGING, Novi Travnik
78
79
F , 200
, 200
Press «Ivo Lola Ribar», 2007
“Emcotest“ machine for measuring hardness 2007
Pellet dryer Machine, 2007
urnace for melting non-ferrous metals 180l/14kW 6
Chamber for baking varnish 6
Furnace for control of temperature sensors, 2006
,
11.000,00 5.625,00
S-PRETIS NIS ogo a-Sarajevo
- Engineering
Zenica
.000,00 . ,00
- Engineering
.000,00 . ,00
- Engineering
Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)
- Engineering- Installation- Commissioning
Investor: UNI , V šć , B&HValue: 35.000,00 BAM (approx.17.895,00 €)
- Installation- Commissioning
Investor: MITTAL STEEL , B&H
- Installation- Engineering- Commissioning
Investor: PRETIS NIS, Vogošća-Sarajevo, B&HValue: 75 BAM (approx. 38 347 €)
- Installation- Commissioning
Investor: PRETIS NIS, Vogošća-Sarajevo, B&HValue: 130 BAM (approx. 66 468 €)
- Installation- Commissioning
Investor: FIS, Vitez, B&HValue: 111.000,00 BAM (approx. 56.753,00 €)
- Engineering- Installation- Commissioning
Re-circulation system of technological waterin Cement Plant Kakanj
80
81
Friction press, 2008
Furnace for thermal treatment VPP, 2008
Furnace for testing fire-resistant material, 2008
Drying furnace, 2008
Steel Plant - Station for tundish heating 1,44 MW, 2008
Coke Oven Battery Plant-Biological waste water treatment, 2008
,
,
,
- engineering
.000,00 ,00
,00
- Engineering
Investor: PIROMETAL Brčko, B&HValue: 400.000,00 BAM (approx. 204.517,00 €)
- Engineering- Installation- Commissioning
Investor: NT FORGING Novi Travnik, B&HValue: 296.000,00 BAM (approx. 151.342,00 €)
- Engineering- Installation- Commissioning
Investor: PROTUPOŽARNI INSTITUT Sarajevo, B&HValue: 606.000,00 BAM (approx. 309.843,00 €)
- Engineering- Installation- Commissioning
Investor: UNIS-PRETIS NIS Vogošća-Sarajevo, B&HValue: 100.000,00 KM (approx. 51.129,00 €)
- Installation- Commissioning
Investor: ARCELORMITTAL, Zenica, B&HValue: 50 BAM (approx. 25.565 €)
- Engineering- Installation- Commissioning
Investor: ARCELORMITTAL, Zenica, B&HValue: approx. 750.000 €
- Installation- Commissioning
,
Hydraulic power unit of platform for converterlining in ArcelorMittal Zenica
82
83
ARCELORMITTAL, Zenica, B&HValue: approx. 70.636 €
Investor: CIMOS, Zenica, B&HValue: 754 BAM (approx. 385.514, €)
- Delivery of equipment- Installation- Commissioning
,00
- Dismantling of existing equipment- Delivery- Installation and supervision- Trial work and parameterisation- Commissioning
.000,00 00
- Engineering
Mechanical works in CIMOS - II phase, 2009
Furnaces for testing the resistance of materials, 2008
Induction melter furnaces, 2008
Mobile stations for a heating of caldrons, 2008/2009
. 0,00
Investor:
Investor: NT FORGING Novi Travnik, B&HValue: 397.000,00 BAM (approx. 202.983,00 €)
- Engineering- Delivery of equipment- Installation- Commissioning
Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: 59.840,00 €
- Engineering- Installation- Commissioning
Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: 29 35 €
- Engineering- Installation- Commissioning
,
Equipment for preserving of temperature of liquid metal inmixer in Steel Mill Department – “ArcelorMittal Zenica”, 2009
Dedusting of iron mixer on Steel PlantDepartment in ArcelorMittal Zenica
84
85
Re-circulation system of technological water, 2009
Machine for wire twisting „CIGARA”, 2009,
- Engineering and attest technical documentation- Procurement and delivery of equipment- Installation- Trial work- Parameter detection
Investor: Cement Plant Kakanj, B&HValue: 78.300,00 BAM (approx. 40.034,00 €)
- Engineering- Delivery of equipment- Installation- Commissioning
Investor: KAPIS TKT Tomislavgrad, B&HValue: 55.000,00 BAM (approx. 28.121,00 €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
Investor: “ArcelorMittal”, Zenica, B&HValue: 46.323,00 €
- Designing- Delivery of equipment- Installation- Supervision- Commissioning
Investor: “ArcelorMittal”, Skopje, FYR MacedoniaValue: 109.667,00 €
- Designing- Delivery of equipment- Installation- Supervision- Commissioning- Parameters detection
Investor: IVEX, Usora, B&HValue: 71.000,00 BAM (approx. 36.300,00 €)
,
Air post on the location “LF” and “CCM” in Steel PlantDepartment, 2010
Burners and burners' armatures for air heating of the chamberfor sheet plastification, 2010
Upgrading of truck with mobile equipment,Station for testing of gas, 2010
Administrative office and workshop
86
87
JP "ELEKTROPRIVREDA BiH" Sarajevo,Power
Construction of the system for emergency oil evacuationTurbo unit of blocks 5. and 6. TE “KAKANJ” KAKANJ
General overhaul of rotary excavator SH-630, no. 1352P.K. “Šikulje” - Lukavac, 2010/2011
Reconstruction of heating furnace LOI-SAAR,capacity 1.300 kg/h, 2011
Expansion of compressor station in BOF Steel Mill, 2011
Reconstruction of furnace for thermal treatment, 2011
, 2010
-Procurement and delivery of equipment-Installation and Supervision- Commissioning
JP ELEKTROPRIVREDA BIH D.D. Sarajevo,ZD Rudnici “Kreka” d.o.. Tuzla
Value: 4.450.000,00 BAM (approx. 2.275.249,00 €)
- Dismantling of existing equipment- Procurement and delivery of equipment- Installation and Supervision- Parameters detection and Commissioning
- Dismantling of existing equipment- Procurement and delivery of equipment- Installation and Supervision- Commissioning
- Mechanical engineering- Procurement and delivery of equipment- Installation and Supervision- Parameters detection and Commissioning- Revision of project documentation
Investor: UNIS-TOK, Kalesija, B&HValue: 338.800 BAM (approx. 173.226,00 €)
- Engineering, control and running furnace- Procurement and delivery of equipment- Installation and Supervision- Trial work- Parameters detection and Commissioning
Investor:Plant Kakanj, B&H
Value: 94.716,00 BAM (approx. 48.427,00 €)
Investor:
Investor: “NT FORGING”, Novi Travnik, B&HValue: 82.720,00 BAM (approx. 42.294,00 €)
Investor: “ArcelorMittal”, Zenica, B&HValue: 150.360,00 BAM (approx. 76.877,00 €)
,
© Copyright by termomatik
LOCATION OF COMPANY
Ltd Zenica
42, Juraja Neidharta Street
72000 Zenica, B&H
phone: +387 32 44 88 10
fax: +387 32 32 44 88 27
web site: www.termomatik.com
e-mail: [email protected]
termomatiktermomatik