Jeremy Sokulsky, PE, MB Presiden 530-541-298 [email protected] TMDL & STORMWATER ACCOUNTING

TMDL & Stormwater Accounting

Embed Size (px)

Citation preview

Page 1: TMDL & Stormwater Accounting

Jeremy Sokulsky, PE, MBAPresident

[email protected]

TMDL & STORMWATER ACCOUNTING

Page 2: TMDL & Stormwater Accounting

LAKE CLARITY CREDITING PROGRAM

motivating effective action to improve lake clarity

Page 3: TMDL & Stormwater Accounting

Have you seen projects like these?

Page 4: TMDL & Stormwater Accounting

Load Reduction (100 kg/yr)

Cost ($100,000)

0

10

20

30

40

50

60

70

80

90

100

Limited connectivity to the waterbody results in small load reductions for the cost.

+ 150kg

+$1.8m

Page 5: TMDL & Stormwater Accounting

Load Reduction (100 kg/yr)

Cost ($100,000)

0

10

20

30

40

50

60

70

80

90

100

Infiltration basin above the grade, so does not actually receive water.

+ 0kg

+$0.8m

Page 6: TMDL & Stormwater Accounting

Load Reduction (100 kg/yr)

Cost ($100,000)

0

10

20

30

40

50

60

70

80

90

100

Reporting requirements do not result in follow-up maintenance.

+ 0kg

+$0.75m

Page 7: TMDL & Stormwater Accounting

GAO & others lack understanding of results…

…so program effectiveness is questioned and funding attacked.

Page 8: TMDL & Stormwater Accounting

Compliance is based on a checklist of

actions.Public opinion is based on dollars spent.

Page 9: TMDL & Stormwater Accounting

Compliance is based on a checklist of

actions.

TMDL & stormwater accounting unifies focus on water quality outcomes.

Public opinion is based on dollars spent.

Page 10: TMDL & Stormwater Accounting

How can we make our TMDLs more effective?

Page 11: TMDL & Stormwater Accounting

define baselines, goals & milestones.

TMDLs effectively…

15 Year Goal

10 Year Goal

5 Year Goal

Page 12: TMDL & Stormwater Accounting

Agricultural

Atmospheric

Stormwater - DOT

Point Sources

TMDLs Identify Source Categories with LAs & WLAs

Stormwater - Municipalities

Page 13: TMDL & Stormwater Accounting

defines site-scale incremental load reductions – credits

links on-the-ground actions to system-wide goals.

Accounting takes TMDLs one step further…

Page 14: TMDL & Stormwater Accounting

Use load reductions as reporting criteria in NPS grant programs.

TMDL Targets

Load Reduction (100 kg/yr)

0

20

40

60

80

100

120

140

160

180

200

NPS Program Goals

5 Year Goal

2 Year Goal

10 Year Goal

Page 15: TMDL & Stormwater Accounting

Load Reduction (100 kg/yr)

0

20

40

60

80

100

120

140

160

180

200

5 Year Goal

2 Year Goal

10 Year Goal

Use load reductions as effluent limits in MS4 permits.

TMDL Targets NPDES Permit Goals

Page 16: TMDL & Stormwater Accounting

TMDL & Stormwater accounting enables prioritization of…

what to do & where to do it.

Page 17: TMDL & Stormwater Accounting

what to do.

green gray o&m

Page 18: TMDL & Stormwater Accounting

Prioritized urban catchments based on expected load reduction potential.

where to do it.

Page 19: TMDL & Stormwater Accounting

TMDL & Stormwater accounting enables coordination between permitted entities.

City of South Lake Tahoe

CA DOT

Page 20: TMDL & Stormwater Accounting

Performance-Based Adaptive Management System

Page 21: TMDL & Stormwater Accounting

Model Expected Loading

Monitor• Targeted• Intensive

Improve Models

Adopt Improved Models

Use Models to Leverage Monitoring

compare modeled to observed results

establish load reduction hypothesispeer review &

comment

use models to prioritize where & what to implement

Page 22: TMDL & Stormwater Accounting

Is TMDL & stormwater accounting… worth the additional cost?

Page 23: TMDL & Stormwater Accounting

EXISTING TMDL & PERMITTING ACTIVITIES

TMDL & STORMWATER ACCOUNTING ACTIVITIES

EXPECTED COST CHANGE WITH ACCOUNTING

TMDL & Permit Development (Primarily Permitting Authority)

Develop TMDL Define site-scale credit $10,000 - $50,000

Develop MS4 permit Define load reduction targets $10,000 - $50,000

Define reporting requirements

Develop crediting protocols $40,000 - $200,000

Ad hoc reviews

Reporting & adaptive mgt(e.g. Chesapeake TAS & mgt system)

$20,000 - $100,000

Total additional cost/TMDL $80,000 - $400,000

Ongoing Planning, Implementation, Inspections & Reporting (Primarily Permittee)

Develop SWMP Load-based prioritization(e.g. SUSTAIN)

$50,000 - $400,000 (depends on modeling level of

effort)

Design & implement Estimate & register load reductions $10,000 - $40,000

Inspect & maintain Report inspection & maintenance results $5,000 - $50,000

Annual reporting Load reduction reporting & adaptive management $5,000 - $10,000

Total additional cost/5-yr $70,000 - $500,000

Page 24: TMDL & Stormwater Accounting

Load Reduction (100 kg/yr)

Cost ($100,000)

0

10

20

30

40

50

60

70

80

90

100

Load Reduction (100 kg/yr)

Cost ($100,000)

0

10

20

30

40

50

60

70

80

90

100 TMDL & Stormwater accountingPoorly performing projects

Performance and Cost Effectiveness Increase from TMDL & Stormwater Accounting.

Page 25: TMDL & Stormwater Accounting

Load Reduction (100 kg/yr)

Cost ($100,000)

0

10

20

30

40

50

60

70

80

90

100

Load Reduction (100 kg/yr)

Cost ($100,000)

0

10

20

30

40

50

60

70

80

90

100 TMDL & Stormwater accountingPoorly performing projects

Performance and Cost Effectiveness Increase from TMDL & Stormwater Accounting.

Page 26: TMDL & Stormwater Accounting

Jeremy Sokulsky, PE, MBAPresident

[email protected]

TMDL & STORMWATER ACCOUNTING