16
1 Skarfjell Spanande utbygging A subsidiary of BASF – We create chemistry Svein Ildgruben Government Relations Manager

Title of the presentation - sfjfk.custompublish.com€¦ · Title: Title of the presentation Author: Peter Schwarz Created Date: 11/17/2017 3:17:36 PM

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    SkarfjellSpanande utbygging

    A subsidiary of BASF – We create chemistry

    Svein IldgrubenGovernment Relations Manager

  • 2

    WintershallWorldwide activities

    Largest German internationally active oil and gas producer, with headquarters in Kassel, Germany

    Wintershall is a subsidiary of BASF, the world's leading chemical company with more than 100,000 employees

    The North Sea is one of Wintershall’s core regions.

  • 4

    Wintershall in NorwaySuccessful growth – We make things happen

    Maria Brage VegaSkarfjell

    Exploration Development Production Company

    0

    10000

    20000

    30000

    40000

    50000

    60000

    70000

    80000

    90000

    0

    100

    200

    300

    400

    500

    600

    700

    800

    2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

    Production

    Employees

    Wintershall Norge 10 years

    Chart1

    20062006

    20072007

    20082008

    20092009

    20102010

    20112011

    20122012

    20132013

    20142014

    20152015

    20162016

    Employees

    Production

    3

    0

    7

    0

    16

    0

    45

    3000

    90

    3000

    139

    3000

    167

    3000

    406

    40000

    453

    60000

    460

    72000

    468

    80000

    Sheet1

    EmployeesProduction

    200630

    200770

    2008160

    2009453000

    2010903000

    20111393000

    20121673000

    201340640000

    201445360000

    201546072000

    201646880000

  • 5

    Vega Subsea Field

    A subsidiary of BASF – We create chemistry

  • 6

    The Vega Field

    First production in 2010

    Consists of the fields Vega North, Vega Central and Vega South

    Tie-back to the Gjøa platform, operated by ENGIE

    Transfer of operatorship from Statoil in 2015

    Gas and condensate field

    Our first operated subsea productionBlocks 35/7 - 35/8 - 35/11

    55,6%

    28,3%

    7,3%

    4,4%4,4%

    Petoro AS

    BayerngasNorge AS

    ENGIE E&P Norge AS

    Idemitsu Petroleum Norge AS

    VegaGAS

    Wintershall Norge AS

    Chart1

    W

    28.3

    7.3

    4.4

    4.4

    Sales

    55.6

    Sheet1

    Sales

    W55.6

    28.3

    7.3

    4.4

    4.4

    To update the chart, enter data into this table. The data is automatically saved in the chart.

  • 7

    Maria Field Development

    A subsidiary of BASF – We create chemistry

  • 8

    Maria Field DevelopmentAwarded contracts

    Subsea equipment (FMC)Kristin Mod EPCI (Statoil: Reinertsen)Heidrun Mod EPCI (Statoil: Aibel)Pipelines and subsea construction (Subsea 7)Heidrun/Kristin riser installation (Statoil: DeepOcean/Subsea 7)Rig contract (Odfjell Drilling)

    Stavanger

    Bergen

    TrondheimKristiansund

    Maria

    Bodø

  • 9

    Skarfjell FieldDevelopment

    A subsidiary of BASF – We create chemistry

  • 10

    Skarfjell Field Development

    Wintershall Norge is the operator Partners are Capricorn Norge, BayerngasNorge, Edison Norge and DEA NorgeLocated in the north-eastern North Sea, south west of the Gjøa fieldDiscovered in 2012 Recoverable resources between 60-140 million boeChosen development concept: subsea tieback to GjøaDetailed planning and design studies are ongoingPDO planned for Q1 2018

    Our second subsea development

  • 11

    Skarfjell Field DevelopmentSelected concept – tie-back to Gjøa

    8” Production

    Two 4-slot drill centres

    Dedicated water injection and

    production templates

    Distance between templates 1km

    12” and 8” isolated production

    pipelines

    12” water injection pipeline

    6” gas lift pipeline

    Integrated service umbilical

    Pipeline length 17-18 km

  • 12

    Skarfjell Field Development

    DG2 concept based on 4-slot template solution as recommended from the concept study based on:

    Optimum flow assurance Reduced overall costStandardisation

    DG2 concept based on 7“ Horizontal X-mas treesystem as recommended from the concept study based on:

    StandardisationSystem flexibility Requirements from D&W

    Subsea Production System Design

  • 13

    Skarfjell Field Development

    Important elements:

    Reduction of CAPEX

    Reduction of offshore man-hours

    Schedule impact

    Weight management

    Gjøa modifications

  • 14

    Skarfjell Field DevelopmentProject timeline

    ASSESS (Stage 1)

    2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

    SELECT(Stage 2)

    DEFINE(Stage 3)

    EXECUTE(Stage 4)

    Project Stage

    BOK, DG1

    Dev. Screening21/8

    Appraisal

    Concept Select Ph. I Ph. II

    31/1

    BOV, DG2

    Execution Phase

    Define Phase

    Q1

    First Oil, DG4

    Q3

    PDO, DG3

  • 15

    Skarfjell Field Development

    Rethink procurement strategies

    Pipeline and Subsea Construction scope (PSC) – change strategy from independent engineering contractor to design competition between installation contractors

    Subsea Production System (SPS) –change strategy to maximize standardization and efficiency in project execution

    Implementation of «Lean Project Execution» - through FEED phase

    «Fit for purpose» solutions

    Technical requirements

    Quality requirements

    Documentation requirements

    Project management

    Collaboration

    Unlock the full cost reduction potential

  • 16

  • 17

    Lysbildenummer 1WintershallWintershall in NorwayLysbildenummer 5The Vega FieldLysbildenummer 7Maria Field DevelopmentLysbildenummer 9Skarfjell Field DevelopmentSkarfjell Field DevelopmentSkarfjell Field DevelopmentSkarfjell Field DevelopmentSkarfjell Field DevelopmentSkarfjell Field DevelopmentLysbildenummer 16Lysbildenummer 17