1
SkarfjellSpanande utbygging
A subsidiary of BASF – We create chemistry
Svein IldgrubenGovernment Relations Manager
2
WintershallWorldwide activities
Largest German internationally active oil and gas producer, with headquarters in Kassel, Germany
Wintershall is a subsidiary of BASF, the world's leading chemical company with more than 100,000 employees
The North Sea is one of Wintershall’s core regions.
4
Wintershall in NorwaySuccessful growth – We make things happen
Maria Brage VegaSkarfjell
Exploration Development Production Company
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
0
100
200
300
400
500
600
700
800
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Production
Employees
Wintershall Norge 10 years
Chart1
20062006
20072007
20082008
20092009
20102010
20112011
20122012
20132013
20142014
20152015
20162016
Employees
Production
3
0
7
0
16
0
45
3000
90
3000
139
3000
167
3000
406
40000
453
60000
460
72000
468
80000
Sheet1
EmployeesProduction
200630
200770
2008160
2009453000
2010903000
20111393000
20121673000
201340640000
201445360000
201546072000
201646880000
5
Vega Subsea Field
A subsidiary of BASF – We create chemistry
6
The Vega Field
First production in 2010
Consists of the fields Vega North, Vega Central and Vega South
Tie-back to the Gjøa platform, operated by ENGIE
Transfer of operatorship from Statoil in 2015
Gas and condensate field
Our first operated subsea productionBlocks 35/7 - 35/8 - 35/11
55,6%
28,3%
7,3%
4,4%4,4%
Petoro AS
BayerngasNorge AS
ENGIE E&P Norge AS
Idemitsu Petroleum Norge AS
VegaGAS
Wintershall Norge AS
Chart1
W
28.3
7.3
4.4
4.4
Sales
55.6
Sheet1
Sales
W55.6
28.3
7.3
4.4
4.4
To update the chart, enter data into this table. The data is automatically saved in the chart.
7
Maria Field Development
A subsidiary of BASF – We create chemistry
8
Maria Field DevelopmentAwarded contracts
Subsea equipment (FMC)Kristin Mod EPCI (Statoil: Reinertsen)Heidrun Mod EPCI (Statoil: Aibel)Pipelines and subsea construction (Subsea 7)Heidrun/Kristin riser installation (Statoil: DeepOcean/Subsea 7)Rig contract (Odfjell Drilling)
Stavanger
Bergen
TrondheimKristiansund
Maria
Bodø
9
Skarfjell FieldDevelopment
A subsidiary of BASF – We create chemistry
10
Skarfjell Field Development
Wintershall Norge is the operator Partners are Capricorn Norge, BayerngasNorge, Edison Norge and DEA NorgeLocated in the north-eastern North Sea, south west of the Gjøa fieldDiscovered in 2012 Recoverable resources between 60-140 million boeChosen development concept: subsea tieback to GjøaDetailed planning and design studies are ongoingPDO planned for Q1 2018
Our second subsea development
11
Skarfjell Field DevelopmentSelected concept – tie-back to Gjøa
8” Production
Two 4-slot drill centres
Dedicated water injection and
production templates
Distance between templates 1km
12” and 8” isolated production
pipelines
12” water injection pipeline
6” gas lift pipeline
Integrated service umbilical
Pipeline length 17-18 km
12
Skarfjell Field Development
DG2 concept based on 4-slot template solution as recommended from the concept study based on:
Optimum flow assurance Reduced overall costStandardisation
DG2 concept based on 7“ Horizontal X-mas treesystem as recommended from the concept study based on:
StandardisationSystem flexibility Requirements from D&W
Subsea Production System Design
13
Skarfjell Field Development
Important elements:
Reduction of CAPEX
Reduction of offshore man-hours
Schedule impact
Weight management
Gjøa modifications
14
Skarfjell Field DevelopmentProject timeline
ASSESS (Stage 1)
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
SELECT(Stage 2)
DEFINE(Stage 3)
EXECUTE(Stage 4)
Project Stage
BOK, DG1
Dev. Screening21/8
Appraisal
Concept Select Ph. I Ph. II
31/1
BOV, DG2
Execution Phase
Define Phase
Q1
First Oil, DG4
Q3
PDO, DG3
15
Skarfjell Field Development
Rethink procurement strategies
Pipeline and Subsea Construction scope (PSC) – change strategy from independent engineering contractor to design competition between installation contractors
Subsea Production System (SPS) –change strategy to maximize standardization and efficiency in project execution
Implementation of «Lean Project Execution» - through FEED phase
«Fit for purpose» solutions
Technical requirements
Quality requirements
Documentation requirements
Project management
Collaboration
Unlock the full cost reduction potential
16
17
Lysbildenummer 1WintershallWintershall in NorwayLysbildenummer 5The Vega FieldLysbildenummer 7Maria Field DevelopmentLysbildenummer 9Skarfjell Field DevelopmentSkarfjell Field DevelopmentSkarfjell Field DevelopmentSkarfjell Field DevelopmentSkarfjell Field DevelopmentSkarfjell Field DevelopmentLysbildenummer 16Lysbildenummer 17