PERSPECTIVE
A-1
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
P
D
's
Q
U
A
R
T
E
R
S
C
H
A
P
E
L
E
N
T
R
A
N
C
E
G
A
T
E
O
U
T
P
O
S
T
P
O
W
E
R
M
O
T
O
R
P
O
O
L
O
U
T
P
O
S
T
F
L
A
G
P
O
L
E
S
E
C
U
R
IT
Y
S
E
C
U
R
IT
Y
O
U
T
P
O
S
T
S
E
C
U
R
I
T
Y
P
A
R
A
D
E
G
R
O
U
N
D
G
R
A
N
D
S
T
A
N
D
P
P
S
C
B
U
IL
D
IN
G
R
A
N
G
E
F
IR
IN
G
H
P
U
C
I
D
U
P
C
L
O
P
I
U
P
I
A
S
A
D
M
I
N
B
P
O
B
U
I
L
D
I
N
G
C
O
V
E
R
E
D
B
A
S
K
E
T
B
A
L
L
C
O
U
R
T
P
N
C
O
F
U
T
U
R
E
F
U
T
U
R
E
O
N
-
B
A
S
E
H
O
U
S
I
N
G
F
U
T
U
R
E
O
N
-B
A
S
E
H
O
U
S
IN
G
E
X
P
A
N
S
I
O
N
F
U
T
U
R
E
C
O
N
C
E
S
S
I
O
N
A
I
R
E
&
O
T
H
E
R
F
A
C
I
L
I
T
I
E
S
H
O
U
S
E
N
S
EW
G
A
T
E
2
O
U
T
P
O
S
T
S
E
C
U
R
IT
Y
P
A
R
K
I
N
G
A
R
E
A
P
A
R
K
I
N
G
A
R
E
A
P
A
R
K
I
N
G
A
R
E
A
P
A
R
K
I
N
G
A
R
E
A
P
A
R
K
I
N
G
P
A
R
K
I
N
G
B
A
R
R
A
C
K
S
W
A
T
E
R
R
E
S
E
R
V
O
I
R
LOCATION MAP
E
X
I
S
T
I
N
G
R
O
A
D
THIS
SITE
7.5M
4.5M 8.5M 5M
ramp up ramp up
4.5M
3M
WORK BENCH
AIR COMPRESSOR
SERVICE BAY SERVICE BAY
CABINET
CA
BIN
ET
CABINET
OFFICE
STO.
step up
MAIN ENTRY
B
concrete
ramp
F L O O R P L A N
SCALE 1:100MTS
LN. OF ROOF
18M
@ 3
.0
0 m
trs. W
AL
L H
T.
A
1.5M
LN
. O
F R
OO
F
W1
D1
W1
W2
D4
D3
D2.a
W4W5
D2
LN. OF ROOF
2M
CR
W4
1.5M
1.3M
W3 W3
WORK BENCH
D5
D5CR
step
dn.
trench drain
7.5M
4.5M 8.5M 5M
R O O F P L A N
SCALE 1:100MTS
LN. OF ROOF
18M
LN
. O
F R
OO
F
ramp up
7.5M
1M
1M
FD
@ 3.00 mtrs. WALL HT.
@ 3
.0
0 M
. W
AL
L H
T.
@ 3.00 M. WALL HT.
1M1M
BUILDING LINE
BUILDING LINE
concrete
ramp
step
FD
step
FD
dn. dn.
CAR WASH
SERVICE BAY
FD
CAR WASH
SERVICE BAY
C
A
BC
B
A
C
A
BC
ramp up
A-2
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
AWNING WINDOW
STEEL CSEMENT WINDOW
REAR ELEVATION
W4 W5
W3 W3
0.1M
4M
2M
3M
0.5M
ROLL UP DOOR
FASCIA BOARD
ROOFING SHTS.
G.I . LONG SPAN
PAINTED FINISHED
PLAIN CEMENT, PLASTERED
STEEL CSEMENT WINDOW
GLASS DOOR
ON ALUM. FRAME
3.00M
FRONT ELEVATION
SCALE 1:100MTS
NGL
HT. OF ROLL-UP OPENING
HT. OF ROLL-UP CASE
BOTTOM OF GUTTER
APEX OF ROOF
NGL
BOTTOM OF GUTTER
SCALE 1:100MTS
PAINTED FINISHED
PLAIN CEMENT, PLASTERED
STL. CASEMNT.
HT. OF WALL
PAINTED FINISHED
PLAIN CEMENT, PLASTERED
RIGHT-SIDE ELEVATION
W2
3.00M
NGL
BOTTOM OF GUTTER
CHB WALL
0.3M
2M
4M
0.1M
BOTTOM OF GUTTER
APEX OF ROOF
APEX OF FIREWALL
SCALE 1:100MTS
0.1M
4M
2M
ROOFING SHTS.
G.I . LONG SPAN
3.00M
NGL
BOTTOM OF GUTTER
APEX OF ROOF
NGL
BOTTOM OF GUTTER
3M
W4
0.3M
APEX OF FIREWALL
CHB WALL
2M
APEX OF FIREWALL
LEFT-SIDE ELEVATION
3.00M
NGL
BOTTOM OF GUTTER
0.3M
2M
4M
0.1M
BOTTOM OF GUTTER
APEX OF ROOF
APEX OF FIREWALL
SCALE 1:100MTS
BOTTOM OF GUTTER
2M
APEX OF FIREWALL
C H B W A L L
0.3M
APEX OF FIREWALL
HT. OF WALL
W1 W1
D1
W3W3
A-3
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
0.1M
4M
2M
3.00M
APEX OF ROOF
3M
PAINTED FINISHED
PLAIN CEMENT, PLASTERED
SECTION THRU " A"
SCALE 1:100MTS
NGL
CEILING LINE
NGL
HT. OF WALL
PAINTED FINISHED
PLAIN CEMENT, PLASTERED
CEILING LINE
2M
APEX OF FIREWALL
0.3M
APEX OF FIREWALL
W3W3
0.6M
0.6M
D3 D4
SECTION THRU " C "
3.00M
NGL
BOTTOM OF GUTTER
0.3M
2M
4M
0.1M
BOTTOM OF GUTTER
APEX OF ROOF
APEX OF FIREWALL
SCALE 1:100MTS
HT. OF WALL
D2
D5
0.6M
0.6M
ht. of ramp
depth of ramp
0.25M
0.15M
TRENCH
DRAIN
ht. of ramp
depth of ramp
S E R V I C E B A Y
OFFICE
CAR WASH
SERVICE BAY
CAR WASH
SERVICE BAY
SECTION THRU " B "
3.00M
NGL
BOTTOM OF GUTTER
0.3M
2M
4M
0.1M
LINE OF BEAM
APEX OF ROOF
APEX OF FIREWALL
SCALE 1:100MTS
HT. OF WALL
CONCRETE
RAMP
SERVICE BAY
r o o f b e a m
W3
D1
W1 W2W4 W5
0.9M 0.8M
2.1M
0.7M0.7M1M
1.2M
0.9M
0.7M
1.2M
0.9M
1.2M
0.9M
0.4M
0.4M
0.8M
0.4M
0.4M
1.7M
1.7M
concrete
ramp
FD
DETAIL OF CONCRETE RAMP
step
dn.
FD
3.5M 1.8M
0.3M
1.2M
0.3M
0.6M
0.6M
FOR CAR WASHSERVICE BAY
flr.line
ht. of concrete ramp
steps dwn of conc. ramp
ALUMINUM
D2
SWING DOOR
SLIDING
D3
FLUSH DOOR
STEEL DOOR
D4
FLUSH DOOR
D5
PVC DOOR
STEEL AWNING WINDOW
W 5mm THK. CLEAR GLASS
W 12mmX12mm SQUARE BAR
STEEL CASEMENT WINDOW
W 5mm THK. CLEAR GLASS
W 12mmX12mm SQUARE BAR
FLR. LN.
FLR. LN.
SCHEDULE OF DOORS AND WINDOWS
SCALE 1:100MTS SCALE 1:100MTS
D2.a
PLAN
SECTION
2.8M
0.7M
2.1M
0.7M
1.4M
r o o f b e a m
r o o f b e a m
D2.a
STEEL DOOR
0.8M
1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 2 UNITS
2 SETS 1 SET 2 SETS 2 SETS 1 SET
A-4
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
15 W CFL BULB
3WIRE, 230 V & 60HZ
SERVICE ENTRANCE
DUPLEX CONV. OUTLET
ACU OUTLET
SINGLE PHASE
1 X 40W FLOU LAMP ( BOX TYPE )
LIGHTING POWER PANEL BOARD
CIRCUIT HOMERUN, IND. CKT. NO.
THREE GANG SWITCH
S
abc
SS
ab
ONE GANG SWITCH
TWO GANG SWITCH
2 X 40W FLOU LAMP W DIFFUSER
LPPNL
ELECTRICAL LAWS.
SUPPORTS AND FITTINGS.
1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN
3. NATURE OF WORKS FOR SERVICE ENTRANCE AND MAIN
FEEDER LINE SHALL BE DONE IN RIGID STEEL CONDUIT (RSC),
AND FOR POWER AND LIGHTING LAYOUT SHALL BE DONE IN
POLYVINYL CHLORIDE (PVC) SCHED. 40 WITH PROPER BOXES
4. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE
NEW AND OF THE APPROVED TYPE BY THE PHIL. STANDARD
AGENCY FOR EVERY INTENDED LOCATION AND PURPOSES.
2. THE SUPPLY TO THE BUILDING SHALL BE SINGLE PHASE
REQUIREMENTS OF THE MANILA ELECTRIC COMPANY, THE
OF THE PHILIPPINE ELECTRICAL CODE (PEC), THE
RULES AND REGULATION OF ALL LOCAL AND NATIONAL
AUTHORITIES CONCERNED IN THE ENFORCEMENT OF
3-WIRE, 230 VOLTS AND 60HZ.
STRICT CONFORMITY WITH THE LATEST APPROVED EDITION
LICENSED, REGISTERED ANDOR PROFESSIONAL ELECTRICAL ENGINEER.
AND SHALL BE UNDER THE DIRECT SUPERVISION FROM A DULY
PANEL BOARD - 1.50M.O.C. TO FIN. GRD. FLR. LN.
DUPLEX CONV. OUTLET - 0.30M.O.C. TO FIN. GRD. FLR. LN.
LIGHT SWITCHES - 1.40M ON CENTER TO FIN. GRD. FLR. LN.
8. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
5. SMALLEST SIZE OF WIRE AND CONDUIT DIAMETER TO BE
7. ALL WORKS HEREIN SHALL BE DONE IN WORKMAN-LIKE-MANNER
TYPE "THHN"" THWN " OR APPROVED EQUAL.
WITH 600 VOLTS HEAT RESISTANT THERMOPLASTIC WITH NYLON
6. WIRES AND CABLES TO BE USED SHALL BE PURE COPPER
3.5MMSQ. (NO. 12 AWG) AND 15 MMØ (1/2"Ø) ELECTRICAL
USED UNLESS SPECIFIED IN THE PLAN SHALL SHALL BE
STANDARD SIZE RESPECTIVELY.
S C H E D U L E O F L O A D S
LOAD DESCRIPTION
3
5
6
4
2
1
CKT. NO
LIGHTING OUTLET
SWITCHES
NUMBER OF
CONVENIENCE
S1
LIGHTING
VOLTS
230 V
S2 S3 S3w
VOLT-AMP
CB
AMPERE
SIZE OF WIRE & CONDUITS
AB BC CA 3O
7
8
10
9
It = 20920230 + 0.25 ( 12 ) = 93.96 A
TOTAL
USE :
2- 30 MM2 THHNTHW COPPER WIRE + 1- 8.0 MM2 THHNTHW WIRE ( G ) IN 32 MM DIA RSC PIPE
100 AT125 AF MAIN CB,2P, 60 HERTZ, 230 V IN 10 BRANCHES PANELBOARD, BOLT- ON TYPE
230 V
1O
WELDING MACHINE (SP)
HP
CONVENIENCE OUTLET
CONVENIENCE OUTLET
AIR COMPRESSOR (2.0 HP)(SP)
SPARE
5
1
1
1
1
3
1
2.61
18.78
12.00
600
5.22
3.91
1800
1800
7.83
5.22
1800
2760
5000
276012.00
21.74
30 A, 2P
30 A, 2P
30 A, 2P
20 A, 2P
20 A, 2P
20 A, 2P
20 A, 2P
20 A, 2P
20 A, 2P
9
12
2
900
1200
2-5.5 MM2 THHN WIRE20 MM DIA RSC PIPE
2-5.5 MM2 THHN WIRE20 MM DIA RSC PIPE
2-5.5 MM2 THHN WIRE20 MM DIA RSC PIPE
2-3.5 MM2 THHN WIRE15 MM DIA RSC PIPE
2-3.5 MM2 THHN WIRE15 MM DIA RSC PIPE
2-3.5 MM2 THHN WIRE15 MM DIA RSC PIPE
2-3.5 MM2 THHN WIRE15 MM DIA RSC PIPE
2-3.5 MM2 THHN WIRE15 MM DIA RSC PIPE
2-3.5 MM2 THHN WIRE15 MM DIA RSC PIPE
L.O. 1
100 AT MAIN C.B.
20 A20 A
M
LPPNL
3-WIRE, SINGLE PHASE
SERVICE ENTRANCE
( GROUNDING ) IN 32 MM DIA RSC PIPE
+ ( 1 ) 8.0 MM SQ. THW COPPER WIRE
2-30 MMSQ. THHNTHW COPPER WIRE
3
5
2
4
6
WELDING MACHINE
SPAREAIR COMPRESSOR
7
30 A30 A
9
8
10
L.O.
L.O.
C.O.
ACU
20 A
20 A
30 A
20 A
20 A
230 V, 60 HZ
RISER DIAGRAM
SCALE
NOT TO
LEGEND
GENERAL NOTES AND SPECIFICATION
LP
LIGHTING OUTLET
LIGHTING OUTLET
CONVENIENCE OUTLET
ACU (2.0 HP)
6
1
5
5
18
274 4
2300 10.00
2092090.96
C.O.
C.O.
WP
WEATHER PROOF OUTLET
SPECIAL PURPOSES OUTLET
SP
1
1
WALL LAMP
E-1
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
7.5M
4.5M 8.5M 5M
ramp upramp up
ramp up
4.5M
3M
WORK BENCH
AIR COMPRESSOR
CABINET
OFFICE
STO.
step up
MAIN ENTRY
LIGHTING LAYOUT
SCALE NTS
LN. OF ROOF
18M
@ 3
.0
0 m
trs. W
AL
L H
T.
1.5M
LN
. O
F R
OO
F
W1W1
W2
W4W5
LN. OF ROOF
2M
CR
W4
1.5M
1.3M
W3 W3
WORK BENCH
CR
@ 3.00 mtrs. WALL HT.
LN
. O
F R
OO
F
7.5M
4.5M 8.5M 5M
ramp upramp up
ramp up
4.5M
3M
CABINET
OFFICE
STO.
step up
MAIN ENTRY
POWER LAYOUT
SCALE NTS
LN. OF ROOF
18M
@ 3
.0
0 m
trs. W
AL
L H
T.
1.5M
LN
. O
F R
OO
F
W1W1
W2
W4W5
LN. OF ROOF
2M
CR
W4
1.5M
1.3M
W3 W3
CR
step
dn.
@ 3.00 mtrs. WALL HT.
LN
. O
F R
OO
F
S
c c z z
b b y y
a a x x
SabcSxyz
r s t
SrstS
S
S
a b c
a b c
Sabc
LP PNL
PP
1
PP
2
P
P
3
A
C
U
1
LP
1
LP
2
LP
3
WP
WP
WP
WP
WP
SP SP
Sab
E-2
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
12
0m
m
DETAIL OF CATCH BASIN
.3
0.1
0.1
0
.5
0 M
.
.10.10 .30
.50 M.
P L A N
S E C T I O N
P L A N
NOTE:
VERIFY SIZE OF SEPTIC TANK TO LOCATION
SEPTIC TANK DETAIL
NOT TO SCALE
1.5
0M
.5
5
3.20M
.80.15
.05.05
.30
.40
1.00.15
.4
0.5
5
.15 .80 .15
S E C T I O N
0.0
5
.1
5.3
0
1.8
0M
.05.05
.50
.40
.40M
0.0
5
0.0
5
3.20M
.80.151.00.15 .15 .80 .15
0.5M
0.0
5
P-1
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
WORK BENCH
AIR COMPRESSOR
SERVICE BAY SERVICE BAY
CA
BIN
ET
CABINET
OFFICE
STO.
concrete
ramp
GROUND FLOOR PLAN
SCALE 1:100MTS
LN. OF ROOF
@ 3
.0
0 m
trs. W
AL
L H
T.
LN
. O
F R
OO
F
LN. OF ROOF
WORK BENCH
R O O F P L A N
LN. OF ROOF
LN
. O
F R
OO
F
ramp up
FD
@ 3.00 mtrs. WALL HT.
@ 3
.0
0 M
. W
AL
L H
T.
@ 3.00 M. WALL HT.
concrete
ramp
FD FD
CAR WASH
LN
. O
F R
OO
F
SERVICE BAY
FD
CAR WASH
SERVICE BAY
CB CB CB CB CB
CBCBCBCBCBLC
DC
PVC PIPE75MMØ
PVC PIPE100MMØ
COFDWC
LAV WC FD
PVC PIPE100MMØ
150MMØ PVCSOIL PIPE
PVC PIPE75MMØ
PVC PIPE100MMØ
150M
MØ P
VCSO
IL PI
PE
CO
VENT PIPE50MMØ PVC VENT PIPE
50MMØ PVC
DRAI
N PI
PE15
0MMØ
PVC
DRAI
N PI
PE15
0MMØ
PVC
DRAI
N PI
PE15
0MMØ
PVC
DRAIN PIPE150MMØ PVC
DRAIN PIPE150MMØ PVC
DRAIN PIPE150MMØ PVC
DRAI
N PI
PE15
0MMØ
PVC
DRAIN PIPE150MMØ PVC
VSTR50MMØ PVC
VSTR50MMØ PVC
S A N I T A R Y L A Y O U T
WORK BENCH
AIR COMPRESSOR
SERVICE BAY SERVICE BAY
CA
BIN
ET
CABINET
OFFICE
STO.
concrete
ramp
GROUND FLOOR PLAN
SCALE 1:100MTS
LN. OF ROOF
@ 3
.0
0 m
trs. W
AL
L H
T.
LN
. O
F R
OO
F
LN. OF ROOF
WORK BENCH
FD
@ 3.00 mtrs. WALL HT.
concrete
ramp
FD FD
CAR WASH
LN
. O
F R
OO
F
SERVICE BAY
FAU
W A T E R L I N E L A Y O U T
M
GV
CV
20mmØCWL PIPE
WCLAV
FAUCV
WC
LAV
FAU FAU
GV12.5mmØCWL PIPE
LAV
GV GV
FAU
GV 20mmØCWL PIPE
12.5m
mØCW
L PIP
E
7.5M
4.5M 8.5M 5M
4.5M
3M
18M
1.5M
2M1.5M
7.5M
4.5M 8.5M 5M
18M
7.5M
1M
1M
1M1M
7.5M
4.5M 8.5M 5M
4.5M
3M
18M
1.5M
2M1.5M
P-2
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
7.5M
4.5M 4.25M 5M
4.5M
3M
F O U N D A T I O N P L A N
SCALE 1:100MTS
LN. OF ROOF
18M
1.5M
LN
. O
F R
OO
F
LN. OF ROOF
2M1.5M
LN
. O
F R
OO
F
C1F1
C1F1
C1F1
C1F1
C1F1 C1F1C1F1
C1F1
C1F1
C1F1C1F1
C1F1
4.25M
7.5M
4.25M 5M
4.5M
3M
13.5M
4.25M
C2F1 C2F1
C2F1
RB1 RB1 RB1
RB1 RB1 RB1
RB
1R
B1
RB
1R
B1
RB2 RB2 RB2
R O O F B E A M P L A N
SCALE 1:100MTS
7.5M
4.25M 5M
4.5M
3M
13.5M
4.25M
RB RB RB
RB RB RB
RB
RB
RB
RB
RB RB RB
TR
US
S
TR
US
S
TR
US
S
TR
US
S
TR
US
S
TR
US
S
TR
US
S
TR
US
S
TR
US
S
TR
US
S
TR
US
S
R O O F F R A M I N G P L A N
SCALE 1:100MTS
depth
.60m
depth
.60m
depth
.60m
SLAB ON FILL 0.60 M.B.W.
CO
NC
RE
TE
W
AL
L
S-1
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
4-10MMØ
@0.20 M.0.C.
LONGITUDINAL BARS
W F - 1 ( E X T E R I O R W A L L )
VERIF
Y
6"THK. CHB
NGL
GROUND FLR LN.
10MMØ REBARS
EARTH FILL
M.O.C.E.W.
COMPACTED
10MMØ VERT. &
HOR. BARS @ 0.60
DETAIL OF WALL-FOOTING
NOT TO SCALE
1.00M 7.50M 1.00M
.30
2.00
TOP CHORD - 2 - 6mm x 50mm x 50mm ANGLE BARBOTTOM CHORD - 2 - 6mm x 50mm x 50mm ANGLE BAR WEB MEMBER - 2 - 6mm x 38mm x 38mm ANGLE BARPURLINS - 50mm x 125mm @ 600mm O.C
T R U S S D E T A I L
SCALE 1:100MTS
SCHEDULE OF COLUMNS
C1C2
SCHEDULE OF FOOTINGS
F1
F2
SCHEDULE OF BEAMS
RB2
RB1
S-2
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED MOTORPOOL
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO, III
POLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Chief of Staff, ES
MANUEL G FABROS
Police Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent