44
Channeled Adhesive CI Design A systems approach to the building enclosure

(THIS PAGE INTENTIONALLY LEFT BLANK)...Channeled Adhesive CI Design BASF Corporation - Wall Systems 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P 800.221.9255 OTE B OTHERS

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Channeled Adhesive CI DesignA systems approach to the building enclosure

(THIS PAGE INTENTIONALLY LEFT BLANK)

1. Typical Channeled Adhesive

2. Typical Application

3. Typical Application over CMU

4. Typical Application over Brick

5. Typical Aesthetic Reveal

6. Typical Corner Mesh Application with Flexguard 4, Intermediate 6 or 12

7. Typical Pipe Penetration

8. Typical Light Fixture

9. Typical Expansion Joint

10. Typical Expansion Joint at Change in Substrate

11. Typical Expansion Joint at Floorline

12. Typical Drainage at Floorline

13. Typical Abutment to Brick with Drainage at Floorline

14. Typical Abutment to Brick

15. Typical Termination at Foundation

16. Typical Termination at Foundation (Flush)

17. Typical Window Head (Flush)

18. Typical Window Head with Weep Tubes (Flush)

19. Typical Window Head with Diverter Track (Flush)

20. Typical Window Head with Sealant End Dam

21. Typical Window Jamb (Flush)

22. Typical Window Sill (Flush)

23. Typical Window Head (Recessed)

24. Typical Window Jamb (Recessed)

25. Typical Window Sill (Recessed)

26. Typical Flanged Window Head (Recessed)

27. Typical Flanged Window Jamb (Recessed)

28. Typical Flanged Window Sill (Recessed)

29. Typical Coping

30. Typical Parapet Cap

31. Typical Kick-Out Flashing

32. Typical Roof Edge Flashing

33. Typical Section at Fascia/Soffit

34. Typical Core Mounted Railing Attachment

35. Typical Railing Attachment

36. Typical Sign Attachment

Continuously Insulated Wall System

Channeled Adhesive CI Design Details

TABLE OF CONTENTS

Notes:

Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

The details within represent BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. They are presented in good faith by BASF Wall Systems. The details are subject to change without notice. BASF Wall Systems accepts no liability for the end use of the details. For conditions not shown, consult BASF Wall Systems for review of specific detail.

Install BASF materials in accordance with current installation instructions.•

(THIS PAGE INTENTIONALLY LEFT BLANK)

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-01 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• Apply mixed base coat to entire surface of insulation board using a stainless steel trowel with 1/2” x 1/2” (13 mm x 13 mm) notches spaced 2” (50 mm) apart. Ribbons of adhesive must be applied parallel to the 2’ (610 mm) dimension of the EPS insulation board to ensure they are vertical when the EPS insulation board is applied to the substrate.

• Set EPS insulation board into place and apply pressure over entire surface of board to ensure positive uniform contact and high initial grab. Do not slide board into place.

TYPICAL CHANNELED ADHESIVE

CA-01 Typical Channeled Adhesive

APPROVED EPS INSULATION BOARD

VERTICAL NOTCHES OF SENERGY ADHESIVE / BASE COAT APPLIED TO APPROVED EPS INSULATION BOARD

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-02 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a means for drainage is provided at system termination.

TYPICAL APPLICATION

CA-02 Typical Application

FRAMING*

ACCEPTABLE SHEATHING*

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

FLASHING*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-03 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a means for drainage is provided at system termination.

TYPICAL APPLICATION OVER CMU

CA-03 Typical Application Over CMU

CONCRETE MASONRY UNITS*

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

FLASHING*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a means for drainage is provided at system termination.

CAD-04 180503

TYPICAL APPLICATION OVER BRICK

CA-04 Typical Application Over Brick

BRICK*

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

FLASHING*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-05 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• Maintain a minimum 3/4” (19 mm) thick EPS insulation board behind all reveals and aesthetic grooves.

• Reinforcing mesh shall be continuous and care shall be taken to ensure reinforcing mesh is not cut during base coat application.

• Horizontal reveals shall provide for outward positive drainage.

• Reveals must not occur at the abutment of two pieces of EPS insulation board.

TYPICAL AESTHETIC REVEAL

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

AESTHETIC REVEAL

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

(* NOTE: BY OTHERS)

Channeled Adhesive CI Design

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• Ensure FLEXGUARD 4, INTERMEDIATE 6 or 12 reinforcing mesh is lapped a minimum of 8” (203 mm) around corners.

CAD-06 180503

TYPICAL CORNER MESH APPLICATIONWITH FLEXGUARD 4, INTERMEDIATE 6 OR 12

CA-06 Typical Corner Mesh Application with Flexguard 4,Intermediate 6 or 12

FRAMING*

ACCEPTABLE SHEATHING*

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

SENERSHIELD-R/-RS/-VB

APPROVED EPS INSULATION BOARD

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

SENERGY CORNER MESH EMBEDDED IN SENERGY BASE COAT

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-07 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced basecoat.

• Ensure all penetrations into the system are properly sealed.

• Provide continuous air seal around perimeter of penetration prior to EPS insulation board application.

• Do not apply finish to areas that will receive sealant.

TYPICAL PIPE PENETRATION

CA-07 Typical Pipe Penetration

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

BACKER ROD AND SEALANT (WIDTH PER DESIGN)*

SEALANT AT PERIMETER OF PENETRATION*

PIPE*

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-08 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure all penetrations into the system are properly sealed.

TYPICAL LIGHT FIXTURE

CA-08 Typical Light Fixture

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

SET FLANGE IN SEALANT*

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

LIGHT HOUSING*

LIGHT FIXTURE*

SEALANT*

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-09 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Do not apply finish to areas that will receive sealant.

• Ensure drainage plane is continuous and unobstructed at expansion joint.

• Install expansion joints in the system at all changes in substrate, through existing expansion joints, floor lines in multi-level wood frame construction, and where movement is anticipated. It is the sole responsibility of the design professional to determine specific expansion joint location, placement and design.

TYPICAL EXPANSION JOINT

FRAMING*

ACCEPTABLE SHEATHING*

BASF WS FLASH WITH FLASHING PRIMER

APPROVED EPS INSULATION BOARD

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

COLOR COAT

BACKER ROD AND SEALANT (WIDTH PER DESIGN)*

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

SENERSHIELD-R/-RS/-VB

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-10 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Do not apply finish to areas that will receive sealant.

• Ensure drainage plane is continuous and unobstructed at expansion joint.

• Install expansion joints in the system at all changes in substrate, through existing expansion joints, floor lines in multilevel wood frame construction, and where movement is anticipated. It is the sole responsibility of the design professional to determine specific expansion joint location, placement and design.

TYPICAL EXPANSION JOINT AT CHANGE IN SUBSTRATE

CA-10 Typical Expansion Joint at Change in Substrate

ACCEPTABLE SHEATHING*

ACCEPTABLE SUBSTRATE*

BASF WS FLASH WITH FLASHING PRIMER

SENERSHIELD-R/-RS/-VB

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

COLOR COAT

BACKER ROD AND SEALANT (WIDTH PER DESIGN)*

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

APPROVED EPS INSULATION BOARD

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-11 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Do not apply finish to areas that will receive sealant.

• Install expansion joints in the system at all changes in substrate, through existing expansion joints, floor lines in multilevel wood frame construction, and where movement is anticipated. It is the sole responsibility of the design professional to determine specific expansion joint location, placement and design.

• It is recommended that a means for drainage is provided at every third floor. (See TYPICAL DRAINAGE AT FLOORLINE detail).

TYPICAL EXPANSION JOINT AT FLOORLINE

FLOOR SLAB*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

COLOR COAT

BACKER ROD AND SEALANT (WIDTH PER DESIGN)*

SENERGY FAUX BRICK

BASF WS FLASH WITH FLASHING PRIMER

SENERSHIELD-R/-RS/-VB

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-12 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Do not apply finish to areas that will receive sealant.

• Install expansion joints in the system at all changes in substrate, through existing expansion joints, floor lines in multilevel wood frame construction, and where movement is anticipated. It is the sole responsibility of the design professional to determine specific expansion joint location, placement and design.

• It is recommended that a means for drainage is provided at every third floor.

TYPICAL DRAINAGE AT FLOORLINE

FLOOR SLAB*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

BASF METALLIC EFFECTS

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

FLASHING*

BASF WS FLASH WITH FLASHING PRIMER

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BACKER ROD AND SEALANT (WIDTH PER DESIGN)*

COLOR COAT

SENERSHIELD-R/-RS/-VB

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

(* NOTE: BY OTHERS)

Channeled Adhesive CI Design

CAD-13 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a means for drainage is provided at system termination at brick.

• Brick ties not shown for clarity.

• Brick must be installed per local code requirements.

TYPICAL ABUTMENT TO BRICKWITH DRAINAGE AT FLOORLINE

CA-13 Typical EIFS Abutment to Brick with Drainage at Floorline

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

FLASHING*

BACKER ROD AND SEALANT (WIDTH PER DESIGN)*

BRICK*

BASF WS FLASH W/ FLASHING PRIMER

SENERSHIELD-R/-RS/-VB

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-14 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a continuous drainage plane is maintained at system abutment to brick.

• Brick ties not shown for clarity.

• Brick must be installed per local code requirements.

TYPICAL ABUTMENT TO BRICK

CA-15 Typical EIFS Abutment to Brick

FRAMING*

ACCEPTABLE SHEATHING*

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

BASF MAXFLASH OR BASF SHEATHING FABRIC OR BASF WS FLASH WITH FLASHING PRIMER

SENERSHIELD-R/-RS/-VB

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

BACKER ROD AND SEALANT*

BRICK*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-15 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a means for drainage is provided at system termination at foundation.

• Terminate system a minimum of 8” (203 mm) above grade.

• Extend system a minimum of 2” (50 mm) and a maximum of 12” (305 mm) at the sole plate foundation transition.

TYPICAL TERMINATION AT THE FOUNDATION

CA-14 Typical Termination at Foundation

FRAMING*

ACCEPTABLE SHEATHING*

BASF MAXFLASH OR BASF SHEATHING FABRIC OR BASF WS FLASH WITH FLASHING PRIMER

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

FLASHING*

SEALANT*

FOUNDATION*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-16 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a means for drainage is provided at system termination at foundation.

• Place weep tubes a minimum of 24” (610 mm) on center.

• Do not apply finish to areas that will receive sealant.

TYPICAL TERMINATION AT FOUNDATION (FLUSH)CA-16 Typical Termination at Foundation (Flush)

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

BASF WS FLASH WITH FLASHING PRIMER

BACKER ROD AND SEALANT (WIDTH PER DESIGN)*

WEEP TUBE*

FOUNDATION*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-17 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a means for drainage is provided at system termination at window head.

• Provide end-dams at flashing terminations.

• Provide continuous air seal around interior perimeter of window. Contact window manufacturer for specific installation instructions.

TYPICAL WINDOW HEAD (FLUSH)CA-17 Typical Window Head (Flush)

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

FLASHING*

WINDOW*

SEALANT*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-18 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a means for drainage is provided at system termination at window head.

• Provide end-dams at flashing terminations.

• Provide continuous air seal around interior perimeter of window. Contact window manufacturer for specific installation instructions.

• Do not apply finish to areas that will receive sealant.

TYPICAL WINDOW HEAD (FLUSH) WITH WEEP TUBES

CA-18 Typical Window Head (Flush) with Weep Tubes

FRAMING*

ACCEPTABLE SHEATHING*

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

APPROVED EPS INSULATION BOARD

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

BACKER ROD AND SEALANT*

WEEP TUBES*

FLASHING*

SEALANT*

WINDOW*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-19 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Provide continuous air seal around interior perimeter of window. Contact window manufacturer for specific installation instructions.

• Ensure that the diverter flashing extends 6” (152 mm) beyond opening on either side of the opening to allow potential moisture to drain down the wall to the side of the opening. BASF MAXFLASH or SHEATHING FABRIC embedded in SENERSHIELD-R/-RS/-VB or WS FLASH must be extended over flange of flashing. Maintain a minimum of 3/4” (19 mm) EPS insulation thickness. Ensure the diverter track flashing is sloped to provide a means for drainage.

TYPICAL WINDOW HEAD (FLUSH) WITH DIVERTER TRACK

CA-19 Typical Window Head (Flush) with Diverter Track

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

DIVERTER TRACK*

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

BACKER ROD AND SEALANT

WINDOW*

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-20 180503

TYPICAL WINDOW HEAD WITH SEALANT END DAM

CA-33 Window Head Flashing w/ Sealant End Dam

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

ACCEPTABLE SEALANT*

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

FLASHING*

SEALANT*

WINDOW*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-21 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure water-resistive barrier is properly applied into the rough openings in accordance with application guidelines and code requirements prior to EPS insulation board application.

• Do not apply finish to areas that will receive sealant.

• Provide a back wrapped type joint with backer rod and sealant at system terminations to dissimilar materials, ensuring that a water tight seal is achieved (width per design).

• Provide continuous air seal around interior perimeter of interior window. Contact window manufacturer for specific installation instructions.

TYPICAL WINDOW JAMB (FLUSH)

CA-21 Typical Window Jamb (Flush)

FRAMING*

ACCEPTABLE SHEATHING*

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

COLOR COAT

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BACKER ROD*

SEALANT*

WINDOW*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-22 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure water-resistive barrier is properly applied into the rough openings in accordance with application guidelines and code requirements prior to EPS insulation board application.

• Do not apply finish to areas that will receive sealant.

• Provide a back wrapped type joint with backer rod and sealant at system terminations to dissimilar materials, ensuring that a water tight seal is achieved (width per design).

• Provide continuous air seal around interior perimeter of interior window. Contact window manufacturer for specific installation instructions.

TYPICAL WINDOW SILL (FLUSH)

CA-22 Typical Window Sill (Flush)

WINDOW*

SEALANT*

COLOR COAT

BACKER ROD*

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

ACCEPTABLE SHEATHING*

FRAMING*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Do not apply finish to areas that will receive sealant.

• Ensure a means for drainage is provided at system termination at soffit/fascia transition.

• Provide a back wrapped type joint with backer rod and sealant at system terminations to dissimilar materials, ensuring that a water tight seal is achieved (width per design).

• Provide continuous air seal around interior perimeter of interior window. Contact window manufacturer for specific installation instructions.

CAD-23 180503

TYPICAL WINDOW HEAD (RECESSED)

CA-20 Typical Window Head Recessed

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

BACKER ROD AND SEALANT*

WINDOW*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-24 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure water-resistive barrier is properly applied into the rough openings in accordance with application guidelines and code requirements prior to EPS insulation board application.

• Do not apply finish to areas that will receive sealant.

• Provide a back wraptped type joint with backer rod and sealant at system terminations to dissimilar materials, ensuring that a water tight seal is achieved (width per design).

• Provide continuous air seal around interior perimeter of interior window. Contact window manufacturer for specific installation instructions.

TYPICAL WINDOW JAMB (RECESSED)

CA-23 Typical Window Jamb (Recessed)

FRAMING*

ACCEPTABLE SHEATHING*

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

BACKER ROD AND SEALNT*

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WINDOW*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure water-resistive barrier is properly applied into the rough openings in accordance with application guidelines and code requirements prior to EPS insulation board application.

• Ensure that metal pan flashing extends onto the system a minimum of 2” (50 mm) down the face and that end dams are provided.

• Provide continuous air seal around interior perimeter of interior window. Contact window manufacturer for specific installation instructions.

TYPICAL WINDOW SILL (RECESSED)

CAD-25 180503

CA-24 Typical Window Sill (Recessed)

WINDOW*

PAN FLASHING WITH END DAMS*

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

SEALANT*

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

APPROVED EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

ACCEPTABLE SHEATHING*

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

TYPICAL FLANGED WINDOW HEAD

CAD-26 180503

CA-17A Typical Flanged Window Head

FRAMING*

ACCEPTABLE SHEATHING*

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

FLASHING*

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

WINDOW*

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-27 180503

TYPICAL FLANGED WINDOW JAMB

TYPICAL FLANGED WINDOW JAMB

CA-21A Typical Flanged Window Jamb (Flush)

FRAMING*

ACCEPTABLE SHEATHING*

SENERSHIELD-R/-RS/-VB

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

BACKER ROD AND SEALANT

WINDOW*

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-28 180503

TYPICAL FLANGED WINDOW SILL

CA-22A Typical Flanged Window Sill

WINDOW*

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

BACKER ROD AND SEALANT*

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

APPROVED EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

FRAMING*

ACCEPTABLE SHEATHING*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-29 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure that metal coping/ flashing extends onto the system a minimum of 2” (50 mm) down the face.

TYPICAL COPING

METAL COPING*

ROOF SYSTEM*

CLEAT*

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

SEALANT*

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

APPROVED EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

ACCEPTABLE SHEATHING*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-30 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• Provide a minimum 6:12 slope for all horizontal surfaces. Senergy requires the use of a roofing system or metal cap flashing for sloped surfaces over 24” (610 mm).

• Additional layers of mesh reinforced base coat is recommended when sloped surfaces exceed 12” (305 mm).

• Ensure a means for drainage is provided at system termination.

• Terminate system a minimum of 8” (203 mm) above roof.

• Maintain a minimum 1” (25 mm) thick EPS insulation board.

TYPICAL PARAPET CAP

CA-26 Typical Parapet Cap

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

ACCEPTABLE SHEATHING*

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

APPROVED EPS INSULATION BOARD

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

FLASHING*

BOND BREAKER TAPE*

SEALANT*

TERMINATION BAR*

COUNTER FLASHING*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-31 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure a means for drainage is provided at system termination at roof.

• Terminate system a minimum of 2” (50 mm) above roof.

• Ensure step flashing is a minimum of 2” (50 mm) behind system.

• Kick-out flashing shall be a minimum of 4” (102 mm) in height.

• Do not apply finish to areas that will receive sealant.

TYPICAL KICK-OUT FLASHINGCA-27 Typical Kick-Out Flashing

ACCEPTABLE SUBSTRATE*

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

SENERSHIELD-R/-RS/-VB

APPROVED EPS INSULATION BOARD

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

FLASHING*

BASF MAXFLASH OR BASF SHEATHING FABRIC EMBEDDED IN SENERSHIELD-R/-RS/-VB OR BASF WS FLASH WITH FLASHING PRIMER

STEP FLASHING*

ROOF SHINGLES*

BACKER ROD AND SEALANT*

KICK OUT FLASHING*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-32 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure that metal coping/flashing extends onto the system a minimum of 2” (50 mm) down the face.

TYPICAL ROOF EDGE FLASHING

CA-28 Typical Roof Edge Flashing

ROOF SYSTEM*

ROOF EDGE FLASHING*

CLEAT*

SEALANT*

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

SENERSHIELD-R/-RS/-VB

ACCEPTABLE SHEATHING*

APPROVED EPS INSULATION BOARD

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-33 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with installation instructions and applicable code.

• Verify substrate is flat, free of fins or planar irregularities greater than 1/4” in 10”.

• Install wall system first followed by lamina application at soffit.

TYPICAL APPLICATION AT SOFFIT / FASCIACA-33 Fascia / Soffit

FRAMING*

EIFS OR OTHER CLADDING AS SPECIFIED*

SEALANT*

SOFFIT*

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

ACCEPTABLE SUBSTRATE*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-34 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure all penetrations into the system are properly sealed.

TYPICAL CORE MOUNTED RAILING ATTACHMENT

RAILING*

FILLET BEAD OF SEALANT AT PERIMETER OF BASE COVER*

RAILING BASE COVER SET IN SEALANT*

BACKER ROD AND SEALANT*

WRAP SENERGY BASE COAT AND SENERGY REINFORCING MESH

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

APPROVED EPS INSULATION BOARD

SENERSHIELD-R/-RS/-VB

ACCEPTABLE SUBSTRATE*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-35 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure all penetrations into the system are properly sealed.

TYPICAL RAILING ATTACHMENT

FRAMING*

ACCEPTABLE SUBSTRATE*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

SLEAVE SET IN SEALANT*

WOOD BLOCKING*

MECHANICAL FASTENER SET IN SEALANT*

RAILING*

Channeled Adhesive CI Design

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255] www.senergy.basf.com

* NOTE: BY OTHERS

This detail represents BASF Corporation - Wall Systems (hereinafter BASF Wall Systems) latest recommendations. It is presented in good faith by BASF Wall Systems. The detail is subject to change without notice. BASF Wall Systems accepts no liability for the end use of the detail. For conditions not shown, consult BASF Wall Systems for review of specific detail. For the most current version of this literature, please visit our website at www.senergy.basf.com.

CAD-36 180503

• Install BASF materials in accordance with current installation instructions.

• Unsatisfactory conditions shall be reported to the General Contractor and corrected before the application of BASF products.

• Verify all materials are installed in accordance with current installation instructions.

• All terminations must be fully encapsulated with mesh reinforced base coat.

• Ensure all penetrations into the system are properly sealed.

• Blocking or other structural support required for sign attachment.

TYPICAL SIGN ATTACHMENT

CA-36 Typical Sign Attachment

FRAMING*

ACCEPTABLE SUBSTRATE*

SENERSHIELD-R/-RS/-VB

SENERGY ADHESIVE / BASE COAT APPLIED TO EPS INSULATION BOARD

APPROVED EPS INSULATION BOARD

SENERGY LAMINA: SENERGY BASE COAT SENERGY REINFORCING MESH SENERGY FINISH COAT

SIGN*

SEALANT AT PERIMETER OF PENETRATION*

SLEAVE SET IN SEALANT*

WOOD BLOCKING*

MOUNTING BRACKET*

MECHANICAL FASTENER SET IN SEALANT*

WASHER*

NOTES

NOTES

NOTES

WarrantyBASF warrants this product to be free from manufacturing defects and to meet the technical properties on the current Product Bulletin, if used as directed within shelf life. Satisfactory results depend not only on quality products but also upon many factors beyond our control. BASF MAKES NO OTHER WARRANTY OR GUARANTEE, EXPRESS OR IMPLIED, INCLUDING WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE WITH RESPECT TO ITS PRODUCTS. The sole and exclusive remedy of Purchaser for any claim concerning this product, including but not limited to, claims alleging breach of warranty, negligence, strict liability or otherwise, is shipment to purchaser of product equal to the amount of product that fails to meet this warranty or refund of the original purchase price of product that fails to meet this warranty, at the sole option of BASF. In the absence of an extended warranty issued by BASF, any claims concerning this product must be received in writing within one (1) year from the date of shipment and any claims not presented within that period are waived by Purchaser. BASF WILL NOT BE RESPONSIBLE FOR ANY SPECIAL, INCIDENTAL, CONSEQUENTIAL (INCLUDING LOST PROFITS) OR PUNITIVE DAMAGES OF ANY KIND. Purchaser must determine the suitability of the products for the intended use and assumes all risks and liabilities in connection therewith. This information and all further technical advice are based on BASF’s present knowledge and experience. However, BASF assumes no liability for providing such information and advice including the extent to which such information and advice may relate to existing third party intellectual property rights, especially patent rights, nor shall any legal relationship be created by or arise from the provision of such information and advice. BASF reserves the right to make any changes according to technological progress or further developments. The Purchaser of the Product(s) must test the product(s) for suitability for the intended application and purpose before proceeding with a full application of the product(s). Performance of the product described herein should be verified by testing and carried out by qualified experts.

BASF Corporation - Wall Systems | 3550 St Johns Bluff Rd South Jacksonville, Florida 32224 P: 800.221.9255 F: 904.996.6300 www.senergy.basf.com© 2018 BASF Corporation rev 180503

For the most current version of this literature, please visit our website at www.senergy.basf.com.