Meaning
Need of thinking process
Tools used in thinking process
Thinking process used in product designing
The thinking process was oriented by DR.ELIYAHU
GOLDRATT TOM.
It is a mechanism that allows us to verbalize, construct,
analyze, and communicate cause and effect relationships to
propose feasible solutions to the problems.
Thinking process is needed to stop the failure of organizations, by giving the answer of:
WHAT TO CHANGE?
WHAT TO CHANGE TO?
HOW TO MAKE CHANGE?
There are seven tools used in thinking process. These are:
Current reality treeEvaporating CloudCore Conflict CloudFuture Reality TreeNegative Branch ReservationsPrerequisite TreeTransition Tree
A Current Reality Tree (CRT) is a way of analyzing many system or organizational problems at once. By identifying root causes common to most or all of the problems, the CRT can greatly aid focused improvement of the system.
UDE 1Engine will not start
UDE 1Engine will not start
UDE 2A.C.is not working
UDE 2A.C.is not working
UDE 3Car radio sounds unclear
UDE 3Car radio sounds unclear
The speakers are blocked
Air is not able to circulate
Air is not able to circulate
Fuel is not getting to engine
Fuel is not getting to engine
Engine need fuel in order to run
Engine need fuel in order to run
The air intake is full of water
The air intake is full of water
The speakers are under water
The speakers are under water
There is water in fuel line
There is water in fuel line
The car is in swimming pool
The handbrake stops the car from rolling into swimming pool
The handbrake stops the car from rolling into swimming pool
The handbrake is faultyThe handbrake is faulty
A future reality tree allow us to test the future outcome, using known cause and effect to check that what we want is what we will get.
The Future Reality Tree is the validation that a collection of injections will turn all of the UDE’s into DE’s
The car engine starts &run
(Desirable outcome)
Air conditioner works (Desirable outcome )
radio sounds normal (Desirable outcome )
Fuel get’s to the car engine
(Desirable effect )
Air is available to circulate
(Desirable effect )
The fuel line is clear (Desirable effect)
Air tank is clear
(Desirable effect )
The speakers are not under water (Desirable effect )
Car does not fall into swimming pool
(Natural effect )
The hand break stops the car to rolling into swimming pool
Engine needs fuel to run
The speakers are functioning well
(Desirable effect )
Repair the hand break
(Injection 1)
The Evaporating Cloud is used to address the question
What to Change to….
The Evaporating Cloud is suited to finding a solution to conflict between two parties or two points of view. The method requires the participants to find 'win-win' solutions because it emphasizes that both parties are trying to reach the same ultimate goal.
REQUIRMENT
B (reduce set up cost per unit)
C (reduce carrying cost per unit)
OBJECTIVE
A(reduce cost per unit)
PREREQUISITE
D (run large batches)
D (run small batches)
CONFLICT
CONFLICT(Not enough D)
B
C
A
SOME MORE D
SOME D
Core conflict cloud is looking for deeper conflicts that create the undesirable effects.
It does this by combining the positive aspects of both tools;Current realty tree – shows the core problem as the
source of many undesirable effects.
Cloud – shows the core problem is not the product of any one person.
By researching EOQ (Assumption)
Buy in large quantity (prerequisite A)
Buy in large quantity (prerequisite A)
Buy in small quantity (Prerequisite B)
Buy in small quantity (Prerequisite B)
Obtain lower cost shipping (Assumption)
Obtain bulk purchase discount (REQUIRMENT A)
Reduce storage cost (REQUIRMENT B)
Reduce interest on inventory (Assumption)
Delay in giving order (Undesirable effect)
Low material cost(OBJECTIVE)
By researching EOQ (Assumption)
A negative branch reservation is a cause and effect analysis
that proves how one entity leads to a negative outcome.
In the language of the Thinking Processes, a Reservation
exists that if we act on an injection in the
Future Reality tree, there will result a Branch that leads
to an undesirable, Negative result. Hence it is called the
"Negative Branch Reservation" or NBR.
It is the tree that allows us to overcome the obstacles that stop us from implementing our plan.
No well-defined ES Architecture
No well-defined PM Body of Knowledge
It shows know where we stand.We can identified the core problem.We found an injection (one or more) that produces the
desired effects.We found the milestones of the journey--the intermediate
objectives (IO’s).The question now is What specific actions must we take?
Internal re construction
(Need)
25000 equity shares of Rs.10 each
(Current position)
25000 equity shares of Rs.10 each
(Current position)
25000 equity shares of Rs.10 Each converted into20000 fully paid eq. shares of Rs.10 each
(Current position)
25000 equity shares of Rs.10 Each converted into20000 fully paid eq. shares of Rs.10 each
(Current position)
Proposal approved in AGM
(RESULT)
Proposal approved in AGM
(RESULT)
Present reconstruction scheme in AGM
(Initiator's action)
Present reconstruction scheme in AGM
(Initiator's action)
Saving in share capital employed
(RESULT)
Saving in share capital employed
(RESULT)
Transfer reserves &saving into capital reduction a\c
(Initiator's action)
Transfer reserves &saving into capital reduction a\c
(Initiator's action)
Getting sufficient amount to write off losses (RESULT)
Getting sufficient amount to write off losses (RESULT)
Write off all losses
(Initiator's action)
Write off all losses
(Initiator's action)
Completion of recapitalization of company
(IO)
Completion of recapitalization of company
(IO)
Type of Product
Integration Mode
The Role of TP
Tool used
New Product Series What to Change?
What to Change To? FTPA
How to make Change?
Upgraded Product
Parallel What to Change?
CRTFRT
How to make Change?
PRTTT
Customized Product
Feed Back How to make Change?
FRTPRTTT