Theory of ConstraintsBy
Eka Darmadi L 3094802May Eka S 3094814
Steven Auryn H - 3105812
8/12/2019 Theory of Constraints PPT
2/51
IntroductionWhat is TOC ?
8/12/2019 Theory of Constraints PPT
3/51
Introduction
What is TOC ??
8/12/2019 Theory of Constraints PPT
4/51
Introduction
TOC Focus on 3 Activities Throughput Inventory Operating Expense
8/12/2019 Theory of Constraints PPT
5/51
Introduction
In TOC we Increase Throughput
8/12/2019 Theory of Constraints PPT
6/51
Introduction
In TOC we Minimizing Inventory
8/12/2019 Theory of Constraints PPT
7/51
Introduction
In TOC we Decreasing Operating Expense
8/12/2019 Theory of Constraints PPT
8/51
Introduction
After we
Throughput Inventory Operating Expense
8/12/2019 Theory of Constraints PPT
9/51
Introduction
After we The Result
1. Financial Performance Profit
2. Return on Investment3. Cash Flow
8/12/2019 Theory of Constraints PPT
10/51
Introduction
Traditional View point Pressing in Increasing Throughput Decreasing Operating Expense Minimize inventory are not important
8/12/2019 Theory of Constraints PPT
11/51
Introduction
TOC Recognize lowering Inventory Help: Better Product Lower Price Responsiveness to Customer needs
8/12/2019 Theory of Constraints PPT
12/51
TOC Steps(Preview Only)
8/12/2019 Theory of Constraints PPT
13/51
TOC Step by Step
TOC Step:
1) Identify the organization Constraint(s)2) Exploit the binding Constraint(s)
3) Subordinate everything (step 2)4) Elevate the binding Constraint(s)5) Repeat the process
8/12/2019 Theory of Constraints PPT
14/51
TOC Step by Step
1. Identify the organization Constraint(s)
External Constraints Internal Constraints Loose Constraints Binding Constraints
8/12/2019 Theory of Constraints PPT
15/51
TOC Step by Step
2. Exploit the binding Constraint(s)
8/12/2019 Theory of Constraints PPT
16/51
TOC Step by Step
3. Subordinate everything (step 2)We are no longer think about efficiency
Assume that the grinding process by themaximum of its capacity
it will add number of work in process to thedrilling process, since the capacity ofprocessing in the drilling process is lowerthan the grinding process.
8/12/2019 Theory of Constraints PPT
17/51
TOC Step by Step
4. Elevate the binding Constraint(s)We Try to continue to improve
Adding more production can be solved byadding more shift in the drilling process .
8/12/2019 Theory of Constraints PPT
18/51
TOC Step by Step
5. Repeat the processTry to evaluate the whole process
Because the TOC objective is to continuallyimprove the performance by manage the
constraint
8/12/2019 Theory of Constraints PPT
19/51
TOCIllustration of Constraints
(Video)
8/12/2019 Theory of Constraints PPT
20/51
Illustration of Constraints
8/12/2019 Theory of Constraints PPT
21/51
Theory of Constraints
Case Study
8/12/2019 Theory of Constraints PPT
22/51
Background
8/12/2019 Theory of Constraints PPT
23/51
Background
Founded in :1970 Company Type : Manufacturing Product : Semiconductor, Fiber
Optic, Fiber Cable.
8/12/2019 Theory of Constraints PPT
24/51
The Problem
1. How Lucent become more productive ?2. How Lucent improve their performance ?3. How Lucent can Increase their profit ?
8/12/2019 Theory of Constraints PPT
25/51
Case Study
Problem Simulation
8/12/2019 Theory of Constraints PPT
26/51
TOC Implementation
Source: Tocca.com
8/12/2019 Theory of Constraints PPT
27/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
28/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
29/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
30/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
31/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
32/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
33/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
34/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
35/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
36/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
37/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
38/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
39/51
TOC Implementation
8/12/2019 Theory of Constraints PPT
40/51
TOC Implementation
Step 1: Identify Constraints
8/12/2019 Theory of Constraints PPT
41/51
TOC Implementation
Step 2: Squeeze or exploit the constraint
8/12/2019 Theory of Constraints PPT
42/51
TOC Implementation
Step 3: Subordinate to the constraintRemove all excessive WIP
8/12/2019 Theory of Constraints PPT
43/51
TOC Implementation
Step 3: Subordinate to the constraint
8/12/2019 Theory of Constraints PPT
44/51
TOC Implementation
Step 4: Elevate the constraint
8/12/2019 Theory of Constraints PPT
45/51
TOC Implementation
Step 5: Repeat the process
8/12/2019 Theory of Constraints PPT
46/51
TOC Implementation
After Implementing TOCThroughput from : 10 / Day
Become : 14 / Day
8/12/2019 Theory of Constraints PPT
47/51
TOC Result Lucent
1. The Product can developed twice Fast2. The Project can be completed on time3. Increase in profit
8/12/2019 Theory of Constraints PPT
48/51
TOCSummary
8/12/2019 Theory of Constraints PPT
49/51
TOC Summary
Theory of Constraints (TOC) is goodtheory for factory .
TOC main idea is buffer and rope
8/12/2019 Theory of Constraints PPT
50/51
Questionand Answer
8/12/2019 Theory of Constraints PPT
51/51
Thank YouFor Your
ttention