25
Versatile Link Versatile Link The Versatile Link Feasibility Demonstration (Project phase II) Francois Vasey, on behalf of the Versatile Link Team

The Versatile Link Feasibility Demonstration (Project phase II)

  • Upload
    gretel

  • View
    34

  • Download
    2

Embed Size (px)

DESCRIPTION

The Versatile Link Feasibility Demonstration (Project phase II). Versatile Link. Francois Vasey , on behalf of the Versatile Link Team. Versatile Link Project. Off-Detector Commercial Off-The-Shelf (COTS) Custom Protocol. On-Detector Custom Electronics & Packaging Radiation Hard. - PowerPoint PPT Presentation

Citation preview

Page 1: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

Versatile Link

The Versatile Link Feasibility Demonstration(Project phase II)

Francois Vasey, on behalf of the Versatile Link Team

Page 2: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 2

Versatile Link Project

● Optical Physical layer linking front- to back-end

● Bidirectional, ~5Gbps

● Versatile● Multimode (850nm) and Singlemode (1310nm) versions

● Point to Point and Point to Multipoint architectures

● Front-end pluggable module

● Joint Project Proposal submitted to ATLAS & CMS upgrade steering groups in 2007 and endorsed in 2008

● Project Kick-off: April 2008● Phase I: Proof of Concept (18mo)

● Phase II: Feasibility Study (18mo)

● Phase II: Consolidation (6mo)

● Phase III: Pre-production readiness (18mo)

On-DetectorCustom Electronics & Packaging

Radiation Hard

Off-DetectorCommercial Off-The-Shelf

(COTS)Custom Protocol

29 Sep 2011

Page 3: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 3

VL Versatility

Front-End VTRx Fibre Back-End TRx

EE laser, 1310nm SM LR-SFP+ TRx

VCSEL, 1310nm SNAP12’like Rx

InGaAs PIN, 1310nm Opto Engine Rx

VCSEL, 850nm MM SR-SFP+ TRx

GaAs PIN, 850nm SNAP12’like Tx,Rx, TRx

InGaAs PIN, 850nm

Opto Engine Tx, Rx, TRx

29 Sep 2011

Page 4: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 4

VL Options and feasibility in March 2011

Front-End VTRx Fibre Back-End TRx

EE laser, 1310nm

GBLD Drive current limitation

SM LR-SFP+ TRx

VCSEL, 1310nmCheck GBLD compliance Voltage

SNAP12’like RxSM Tx not (yet) available

InGaAs PIN, 1310nm Opto Engine RxSM Tx not (yet) available

VCSEL, 850nm

Check GBLD compliance Voltage

MM

RIA in cold at low dose rate

SR-SFP+ TRx

Tx OMA to meet power budget

GaAs PIN, 850nmResponsivity drop under irradiation

SNAP12’like Tx,Rx, TRxTx OMA to meet power budget

InGaAs PIN, 850nm Responsivity/Leakage to be confirmed

Opto Engine Tx, Rx, TRxTx OMA to meet power budget

29 Sep 2011

Page 5: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 5

Consolidation Phase: March-Sept 2011

● Consolidation Phase launched to address following issues:● Power budget

●In-detector fibre: Radiation Induced Attenuation in the cold

●Front-end Pin: Radiation Induced Responsivity Drop

●Back-end Tx: High OMA requirement downstream

● VTRx feasibility

●GBLD

●availability

●VCSEL compliance voltage

●Edge Emitter drive current

●Full prototype demonstration

● High Density Back-End Components Survey

29 Sep 2011

1

2

3

4

Page 6: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 6

Issue 1:Radiation-Induced Attenuation in the cold

● Optical Fibres will operate well under radiation in the cold

● See D. Hall’s talk, B5b

29 Sep 2011

Dose Rate:0.66 kGy(Si)/hr

A fibre is qualified if its total RIA is less than 1 dB

D. Hall et al

SM SM

MM MM

Page 7: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 729 Sep 2011

Issue 2: (1/2)Pin Radiation Induced Responsivity drop

Calorimeter Tracker J. Troska et al

Page 8: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 8

Issue 2: (2/2)Pin Radiation Induced Responsivity drop

● Only an issue at high fluences for MM GaAs Pin diodes● Calorimeter grade Versatile Link

●If MM

●use standard GaAs MM pins

●use COTS transmitter at backend

● Tracker grade Versatile Link

●If SM

●use InGaAs Pin

●use «COTS» transmitter (LR) at backend

●If MM

●use InGaAs Pin with upgraded transmitter at backend

29 Sep 2011

Page 9: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 9

Versatile Link System Specification

● Four Versatile Link flavours defined

● Power budget specified with margin for all flavours

● Jitter budget adapted from FC 4G standard

● Specs available as EDMS document CERN-0000090391

29 Sep 2011

Fibre Type Radiation Tolerance GradeCalorimeter-grade Tracker-grade

10 kGy, 5x1014 n/cm2 500 kGy, 2x1015 n/cm2,1x1015 h/cm2

SM

MM

Page 10: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 10

Back End components

● Can be COTS, except in Tracker grade MM(850nm) link

● Several SFP+ TRx modules successfully evaluated

● Parallel optics under evaluation

● See A. Prosser’s poster (optoelectronics and links)

29 Sep 2011

Fibre Type Radiation Tolerance GradeCalorimeter-grade Tracker-grade

10 kGy, 5x1014 n/cm2 500 kGy, 2x1015 n/cm2,1x1015 h/cm2

SM Min Tx OMA: -5.2dBm Min Tx OMA: -3.6dBm

MM Min Tx OMA: -3.2dBm Min Tx OMA: -1.6dBm

Page 11: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 11

COTS SM SFP+ TRx

29 Sep 2011

A. Prosser et al.

Measurement Norm

OMA -3.6 dBm*Rx Sensitivity -12.6 dBmExt. Ratio 3.0 dBTx. Eye Opening 60% of OMATx Rise Time 70 psTx Fall Time 70 psTx Total Jitter 0.25 of UITx Deterministic Jitter 0.12 of UIRx Total Jitter 0.34 of UIRx Deterministic Jitter 0.14 of UI

* Tracker Grade Version

OMA

Rx Sens

ER_Tx

Eye_Tx

1/Rise_Tx

1/Fall_Tx

1/TJ_Tx

1/DJ_Tx

1/TJ_Rx

1/DJ_Rx

Vendor 1Vendor 1Vendor 2Vendor 2Vendor 2Vendor 2Vendor 2Vendor 2Vendor 3Vendor 3

Page 12: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 12

MM Parallel Device Testing at 5 Gbps

29 Sep 2011

A. Prosser et al.

Page 13: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 13

Issue 3:GBLD ASIC availability

● GBLD-V3 assembled on VTRx:● Functional (marginally, with Zinput matching circuit)

● Drives VCSEL and Edge Emitter

● See C. Soos’ talk, B5b

● GBLD-V4 redesign● To be submitted in Nov 2011

● See G. Mazza’s poster (optoelectronics and links)

29 Sep 2011

Page 14: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 14

GBLD V3 + SM EEL

29 Sep 2011

C. Soos et al.

Page 15: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 15

GBLD V3 + MM VCSEL

29 Sep 2011

C. Soos et al.

Page 16: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 16

● Optical connector interface designed and fabricated using rapid 3D prototyping● Different materials

● Different designs

29 Sep 2011

Issue 4: (1/2)VTRx prototype demonstration

● Several VTRx prototype versions built and tested● SM, MM

● GBLD, TI-ONET LDD

● See C. Soos’ talk, B5b

Page 17: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 17

● SEU test of complete assembly● See J. Troska’s poster (optoelectronics and links)

● In-system performance being evaluated● A. Xiang, SMU

● Interfaces to higher system level being prepared● See P. Vichoudis’ talk, B5b

29 Sep 2011

Issue 4: (2/2)VTRx prototype demonstration

Page 18: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 18

SEU Test of VTRx prototype

● VTx

29 Sep 2011

● VRx

J. Troska et al.

SM

MM

Page 19: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 19

In System Performance of VTRx

● BER @ RT vs -30/+70● Uplink

● Downlink

29 Sep 2011

PRELIMINARYA. Xiang et al.

SM downlink

MM uplink

Page 20: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 20

VL project status, Sep 2011

29 Sep 2011

Front-End VTRx Fibre Back-End TRx

EE laser, 1310nm

GBLD Drive current OK

SM LR-SFP+ TRx

VCSEL, 1310nmGBLD compliance Voltage OK

Board-edge RxSM Tx not (yet) available

InGaAs PIN, 1310nm Opto Engine RxSM Tx not (yet) available

VCSEL, 850nm

GBLD compliance Voltage OK

MM

RIA in cold at low dose rate OK

SR-SFP+ TRx

Tx OMA to meet Tk power budget

GaAs PIN, 850nmResponsivity drop: Calo grade OK

Board-edge Tx,Rx, TRxTx OMA to meet Tk power budget

InGaAs PIN, 850nmAssembly to be confirmed: Tk grade

Opto Engine Tx, Rx, TRxTx OMA to meet Tk power budget

TKgrade

Calo&Tk

grade

Versatile Link Feasibility Demonstrated

Page 21: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team

Fallbacks for Tk-grade back-end transmitters

● What if SM array transmitters cannot be found?● Use single channel transmitter in broadcast mode

● Must foresee addressability at GBLD, GBT or GBT-SCA level

● SM PLC splitters tested and found to be radiation resistant

● What if MM high power transmitters cannot be found?● Select SM

● We believe SM and MM parallel optics will be found

29 Sep 2011 21

oRx

oTx

oRx

oTx

oRx

oTx

oRx

oTx

oRx

oRxoRxoRx

oTxsplitter

oRx

oRx

oTx

oRx

oTx

oTx

oTx

oRxoRxoRx

oTx

oRx

Page 22: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 22

Towards Versatile Link Project Phase III

29 Sep 2011

Common R&D

Generic Tendering 2015(depending on users commitment)

Detector specific R&D 2020

VL Phase II

VL Phase III ● 5G low power VTRx for Tk application● Low power VCSEL driver,

small footprint package

● 10G opto engine VnTx for Calo application● Driver array, VCSEL array,

package

● TOSA (MM)

● ROSA (GaAs 850)

● Fibre (MM)

● TRx (MM-calo)

● Opto-engine (MM-calo)

Page 23: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 23

Conclusion

● Versatile Link feasibility demonstrated● Detailed specifications

● Components shortlist

● Irradiation test results

● VTRx prototype

● System demonstrators

● Cost book

● Versatile Link phase III defined● Completion of generic R&D

● Launch of detector specific R&D for 2020 applications

● Launch of generic tendering for 2015 applications, if commitment

● https://espace.cern.ch/project-versatile-link/public/

29 Sep 2011

Page 24: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 24

Credits

● CERN● Jan Troska, Vincent Bobillier, Spyros Papadopoulos, Christophe Sigaud, Csaba

Soos, Pavel Stejskal, Sarah Storey, et al.

● Fermilab● Alan Prosser, Mark Bowden, John Chramowicz, et al.

● Oxford● Todd Huffman, David Hall, Nick Ryder, Tony Weidberg, et al.

● Southern Methodist University● Annie Xiang, Andie Liu, Kent Liu, Jingbo Ye, et al.

29 Sep 2011

Page 25: The Versatile Link Feasibility Demonstration (Project phase II)

Versatile Link

[email protected] on behalf of Versatile Link team 25

Downstream Versatile Link Power Budget

● Tracker-grade back-end transmit power must be boosted to compensate radiation penalties

● Calorimeter-grade power budget compatible with COTS component specs

29 Sep 2011