The T9 beam line for tests. Lau Gatignon, LHCb meeting, 10 March 2014. The East Area(PS). The East Area B eams ( Schematic view - till 2012 !). IRRAD. T7 beam (not used ). S-target. EASTC. DIRAC. EASTB. N-target. T9 beam 12 (15) GeV /c. EASTA. T10 beam - PowerPoint PPT Presentation
Citation preview
The T9 beam line for tests
Lau Gatignon, LHCb meeting, 10 March 2014
The T9 beam line 2Lau Gatignon, 10 March 2014
The T9 beam line 3
The East Area(PS)
Lau Gatignon, 10 March 2014
The T9 beam line 4
The East Area Beams (Schematic view - till 2012!)
EASTA
EASTB
EASTC
DIRAC
CLOUD
IRRAD
T7 beam (not used)
T9 beam12 (15) GeV/c
T10 beam 6 GeV/c, 60 mr T11: 3.6 GeV/c, 150 mrad
N-target
S-ta
rget
Lau Gatignon, 10 March 2014
The T9 beam line 5
The East Area Beams (Schematic view – From 2014!)
EASTA
EASTBIRRAD
CLOUD
T9 beam12 (15) GeV/c
T10 beam 6 GeV/c, 60 mr T11: 3.6 GeV/c, 150 mrad
N-target
Lau Gatignon, 10 March 2014
The T9 beam line 6Lau Gatignon, 10 March 2014
EXAMPLE OF A PS SUPER-CYCLE
Or e.g. :(part of s.c.) The super-cycle can now be
re-programmed ‘on the fly’
The T9 beam line 7Lau Gatignon, 10 March 2014
SOME TYPICAL PS CYCLES
User Momentum Flat top Intensity Duration Comments
SFTPRO 14 GeV/c – Up to 3 1013 1.2 s Need 2 to fill SPS *)
CNGS 14 GeV/c – Up to 3 1013 1.2 s Need 2 to fill SPS *)
LHC 26 GeV/c – 1.4 1011/bunch 1.2 s
EASTA 24 GeV/c 0.4 s 2-3 1011 2.4 s For T9+T10 tests + CLOUDEASTB 24 GeV/c 0.4 s 1.2 1011 2.4 s For new IRRAD facility
EASTC 24 GeV/c 0.4 s Up to 5 1011 2.4 s No longer needed
TOF 20 GeV/c – 8 1012 1.2 s
AD – 1.5 1013 1.2 s Only once per ~90 seconds
MD Variable parameters
The T9 beam line 8
The supercycles proposed for 2014+
Lau Gatignon, 10 March 2014
The T9 beam line 9Lau Gatignon, 10 March 2014
The T9 beam line 10Lau Gatignon, 10 March 2014
The T9 beam line 11Lau Gatignon, 10 March 2014
East Area Test Beams
The T9 and T10 beam lines are mixed beams.Their maximum flux is 106 per EASTA cycle.Both beams are served from a common target,together also with the T11 beam for CLOUD.The flat top is 0.4 seconds.The number of EASTA cycles is defined by the physics coordinator, depending on the overall schedule, but is normally 2 per super-cycle. When CLOUD runs up to 3.
Each beam line is equipped with 1 (T10) or 2 (T9)threshold Cerenkov counters, a scintillator anda Delay wire chamber.
Parameter T9 T10
Maximum momentum (GeV/c) 12 6
Production angle (mrad) 0 61.6
Beam length to ref. focus (m) 55.8 34.9
Beam height above floor (m) 2.50 2.505
Ang.acceptance Horiz (mrad) Vertic (mrad)
±4.8±5.8
±5.4±13.9
Acc. Solid angle (msterad) 87 224
Theor. momentum resol. (%) 0.24 0.24
Max. momentum band (%) ±10 ±8
Magnification at ref. focus 1.0, 1.2 0.8, 0.6
Protons on North target ~2.5 1011
Max. flux (depending on p, Q) 106 106
The T9 beam line 12Lau Gatignon, 10 March 2014
The T9 beam line 13Lau Gatignon, 10 March 2014
Beam rates
p
p
For wide open collimators, i.e. Dp/p ≈ ±7.5%
The T9 beam line 14Lau Gatignon, 10 March 2014
Beam Composition
With electron enriched target (otherwise e± strongly reduced)
p
p
The T9 beam line 15Lau Gatignon, 10 March 2014
The T9 beam line 16Lau Gatignon, 10 March 2014
The T9 beam line 17Lau Gatignon, 10 March 2014
The T9 beam line 18Lau Gatignon, 10 March 2014
The T9 beam line 19Lau Gatignon, 10 March 2014
Monitoring the beam
The T9 beam line 20Lau Gatignon, 10 March 2014
The T9 beam line 21Lau Gatignon, 10 March 2014
A Delay WireChamber.
The upstream support houses a 10 cm ∅scintillator
The T9 beam line 22Lau Gatignon, 10 March 2014
The T9 beam line 23Lau Gatignon, 10 March 2014Threshold Cerenkov counter
The T9 beam line 24Lau Gatignon, 10 March 2014
The T9 beam line 25Lau Gatignon, 10 March 2014
The T9 beam line 26Lau Gatignon, 10 March 2014
Required preparation steps
• Contact me in time with all questions. Organise a visit in T9.We will then also fix details of the layout of your installation.
• All participants must have a dosimeter and the basic safety training• Submit ISIEC form• Let us know if you need X/Y tables. They need to be booked.• Contact us if you need gas and also your FGSO if you need flammable gas• Take appointment (well before run) for patrol right training,
2-3 persons will be authorised• When your installation is ready contact B.Pichler for a safety visit• Organise a beam training for the team at the start of your beam time• Look at the East Area web page where you will find lots of useful details:
http://gatignon.web.cern.ch/gatignon/EastArea