25
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting February 4, 2004

The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

Embed Size (px)

Citation preview

Page 1: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

The Petroleum Registry of Alberta Energizing the flow of information

Pipeline and Meter Station Reporting Changes

Meeting February 4, 2004

Page 2: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Agenda

– Introductions

– Purpose of the Meeting

– Reporting Changes

Background

Design Changes

– Implementation

– Other

Page 3: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Purpose of the Meeting

• Inform the Operators of the changes to the pipeline and meter station reporting

• Discuss the Implementation Process and Timing of the changes

• Capture any other input from the Pipeline Operators

Page 4: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Background of Reporting Changes

• TCPL is required to report many “paper” pipelines in order for the Registry to accommodate the large number of meter stations and “auto” population of activities.

• ATCO also has large files with many meter stations and “auto” population of activities --- requires processing after Registry hours.

• Volumetric Changes to a single meter station require the entire PL to be resubmitted – results in large amount of processing in order to change one number.

Page 5: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Background of Reporting Changes Cont’d

• Some pipeline to pipeline activities are not able to be reported under the current setup and rules.

• Liquids Pipelines and Terminals are unable to report DISP’s to Alberta facilities when they control the measurement of the product.

• Changes required to reflect the true business process for pipelines

• Funding– Shared equally between Industry, DOE and EUB– Total cost = $126 K

Page 6: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Design Changes

• Reporting done at the MS level versus the PL– Transactions will begin at the meter station (MS)

and the Registry will autopopulate the Pipeline activity.

– CSO’s are restricted at the MS to the specific activities (i.e. at a 631 type MS, the CSO can only report receipts).

– ISC’s will be required at the meter station but the Registry will not autopopulate them where they are not needed (no ISC’s at the PL).

Page 7: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Design Changes - con’t

Key TermsField relates to a meter station that receive gas from facilities

that are inside the Royalty network i.e. GS, GP, IF

Interconnect relates to meter stations where the gas is leaving (flowing out of) a pipeline to another facility these other facilities includes other pipelines, BT, GS, GP, IF, PL

Interconnect Receipt and Interconnect Disposition meter stations are the same type of meter stations except an interconnect receipt meter station will be reported by the receiving facility operator (receipts will populate dispositions) and the interconnect disposition meter station will be reported by the disposing facility operator (dispositions will populate receipts).

Page 8: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Design Changes - con’t

Key Terms

Autopopulate Flag is an infrastructure item that indicates the volume, energy and ISCs (where applicable) transactions will be created to flow through (in and out of) the meter station to the facilities connected on both ends of the meter station. It can only be used when there is a one to one relationship between the meter station and a single facility connected on each end of the meter station i.e. the meter station receives from a single facility and delivers to a single facility.

Page 9: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Design Changes - con’t

Meter Station Sub type Definitions631 Field Receipt Meter Station

This subtype of meter station handles field Receipts from producing facilities. Gas DISP to this type of MS is a Royalty Trigger and requires an SAF/OAF to be submitted.

632 Interconnect Receipt Meter Station

This subtype of meter station handles gas leaving the pipeline it is linked to. The PL operator will report the MS REC from the PL. The CSO can only report the MS DISP to facilities other than the linked PL if the auto populate flag set is set to No. If the auto populate flag is set to Yes the PL operator will report the MS REC from the PL and the Registry will auto populate the DISP to the other facility.

Page 10: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Design Changes - con’t

Meter Station Sub type Definitions633 Interconnect Disposition Meter Station

This subtype of meter station handles gas leaving the pipeline it is linked to. The PL operator may report the MS REC from the PL. The CSO may report the MS DISP to facilities other than the linked PL if the auto populate flag is set to No. However if the auto populate flag is set to Yes the CSO may report the DISP to the single facility linked downstream from the MS and the Registry will auto populate the REC from the linked PL.

634 Interconnect Non Reconciled Meter Station

This subtype of meter station is used to identify when gas is leaving or entering the PL the MS is linked to via a non-reporting entity. For example Gas from or gas to Saskatchewan. It should always be 100% out of balance. Only the linked PL should be reported in the from/to field at this type of MS.

Page 11: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Design Changes - con’t

Meter Station Sub type Definitions635 Registry Summary Non Reporting Meter Station

This subtype of meter station is not used for volumetric reporting in the Registry.

636 Non Reporting Meter Station

This subtype of meter station is not used for volumetric reporting in the Registry.

637 NEB Regulated Field Receipt Meter Station

This subtype of meter station handles field Receipts from producing facilities. Gas DISP to this type of MS is a Royalty Trigger and requires an SAF/OAF to be submitted.

Page 12: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Design Changes – con’t

Meter Station Sub type Definitions

638 NEB Regulated Interconnect Receipt Meter Station

This subtype of meter station handles gas leaving the pipeline it is linked to. If the MS is reporting in the Registry. The PL operator will report the MS REC from the PL. The CSO can only report the MS DISP to facilities other than the linked PL if the auto populate flag set is set to No. If the auto populate flag is set to Yes the PL operator will report the MS REC from the PL and the Registry will auto populate the DISP to the other facility.

Page 13: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Design Changes - con’t

Meter Station Sub type Definitions

639 NEB Regulated Interconnect Disposition Meter Station

This subtype of meter station handles gas leaving the pipeline it is linked to. If the MS is reporting in the Registry. The PL operator may report the MS REC from the PL. The CSO may report the MS DISP to facilities other than the linked PL if the auto populate flag is set to No. However if the auto populate flag is set to Yes the CSO may report the DISP to the single facility linked downstream from the MS and the Registry will auto populate the REC from the linked PL.

Page 14: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

MS Subtype 631 & 637

PL/MS Oper reports DISP to PL w/ISC

CSO reports REC w/ISC from multiple facilities

Linked Pipeline – REC from MS No ISC Auto

GPDISP to MS w/ISC Auto

IFDISP to MS w/ISC Auto

Design Changes - con’t

MS Subtype 631 & 637 with No Auto populate

Page 15: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Linked PipelineREC from MS No ISC Auto

GPDISP to MS w/ISC Auto

MS Subtype 631 & 637

PL/MS Oper reports DISP to PL w/ISC

MS REC from GP w/ISC Auto

Design Changes - con’t

MS Subtype 631 & 637 with Auto Populate

Page 16: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

MS Subtype 632 & 638

PL/MS Oper reports REC from PL w/ISC

CSO reports DISP w/ISC to multiple facilities

Linked Pipeline – DISP to MS No ISC Auto

GP*REC From MS No ISC Auto

IF*REC from MS w/ISC Auto

PL*REC From MS No ISC Auto

* IF’s only will have ISCs populated

Design Changes - con’t

MS Subtype 632 & 638 with No Auto Populate

Page 17: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

MS Subtype 632 & 638

PL/MS Oper reports REC from PL w/ISC

MS DISP to GP w/ISC Auto

Linked Pipeline – DISP to MS No ISC Auto

GP*REC from MS No ISC Auto

* IF’s only will have ISCs populated

Design Changes - con’t

MS Subtype 632 & 638 With Auto Populate

Page 18: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

MS Subtype 633 & 639

PL/MS Oper reports REC from PL w/ISC

CSO reports DISP to multiple Facilities w/ISC

Linked Pipeline – DISP to MS No ISC Auto

GP*REC from MS No ISC Auto

GS*REC from MS No ISC Auto

IF*REC from MS w/ISC Auto

* IF’s only will have ISCs populated

Design Changes - con’t

MS Subtype 633 & 639 with No Auto Populate

Page 19: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Linked Pipeline – DISP to MS No ISC Auto

IF*REC from MS w/ ISC Auto

MS Subtype 633 & 639

MS REC from PL w/ISCAuto

CSO reports DISP to Single Facility w/ISC

* IF’s only will have ISCs populated

Design Changes - con’t

MS Subtype 633 & 639 With Auto Populate

Page 20: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Linked Pipeline – DISP to MS No ISC Auto

MS Subtype 634

PL/MS Operator reports REC from PL No ISC

No DISP created MS 100% out of balanceNo CSO

Design Changes - con’t

MS Subtype 634 Gas Leaving the Pipeline (PL)

Page 21: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Linked Pipeline –REC from MS No ISC Auto

MS Subtype 634

PL/MS Operator reports DISP to PL No ISC

No REC created MS 100% out of balanceNo CSO

Design Changes - con’t

MS Subtype 634 Gas Entering the Pipeline (PL)

Page 22: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Implementation

– Steering Committee approval was received January 21, 2004

– Development has commenced and is to be completed and system tested by March 31st

– Acceptance Testing will occur in April

– Conversion, by the Registry, to the new process is estimated at 5 days and will take place right after the EUB deadline – approx. May 20th

Page 23: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Implementation - con’t

• Prior to implementation of the changes, cleanup and validation is needed on existing data– Pipeline operators need to validate existing Meter

station subtypes (email any required changes to [email protected])

– Any “pending” records need to be accepted (operator must Submit)

– Pipeline operators need to clean up outstanding EUB non-compliance issues, where possible

Page 24: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Implementation ScheduleTask Date Required

Complete Validation of MS Subtypes (MS operators)

February 28th

Facility operators accept “pending” records and balance MS and PL’s

March 31st

Registry Development Complete

March 31st

Registry Acceptance Testing

April 1 – 30th

Pipeline Companies test batch file submission

April 15 – May 15th

Registry Conversion May 20 – 25th

Go Live with new process May 26th

Page 25: The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting

The Petroleum Registry of Alberta

Other Items

• Confirm the Change Leader– Email: [email protected] with the name,

phone number, and email of contact person

• Pipeline Splits– Electronic uploads to the pipeline companies

– Availability mid-year for industry to use