The Partnership for Onondaga Creek
is a voice for the Community and the environment
advocating for better,
Non-polluting solutions for Onondaga Creek and Lake.
Armory Square is the heart of Syracuse
During a big storm about 13 million gallons of
sewage combined with stormwater From our sewer system
The problem
Onondaga Creek
Why Now?
The County was Forced though Court Order (ACJ) to Reduce Overflows
The County plans to do only the minimum
OUR VISIONA creek that is
Healthy
BeautifulAn asset to the community
The approved technologies are
1. Vortex Treatment Facilities2. Storage3. Sewer separation
The County’s Minimal Plan
• A Four Swirler Regional Treatment Facility
• Use Chlorine as a disinfectant
• Discharge partially treated sewage back into the creek
• Cost – Project Cost $74,080,000– Annual O&M $1,058,000
• However…
“Optimization” Bait and Switch?
• In the Facilities Plan the county recognizes a need for a mixture of all three technologies, in order to– increase the efficiency of the RTF– Result in fewer discharges into the creek– Smaller facility at the Trolley site
Neither of these plans enhances the creek or creates a climate for economic
development
Creates a climate for economic development
Underground storage is common throughout the USA
•Keep sewage underground•Saves the ratepayer operating costs•It has placement flexibility•Provides land use options,
It is widely used and often preferred because…
Possibilities to add storage Erie Blvd Storage System 1.8MG
Harrison trunk
3.0MG West Onondaga Trunk
2MG
West Jefferson Trunk
3.5MG
Fayette St. Trunk
Eliminate the rest of the Problem through sewer
separation
Approximate area to be separated
Which Creek Would You Choose for Armory
Square?
The Creek walk along San Antonio, Texas
http://w
ww
.chen
-be
cker.o
rg/g
allery/a
lbum
s/sana
nton
io/IM
G_
058
8.size
d.jp
g
Onondaga Creek at Walton St. Bridge
For Armory Square
For the Onondaga Nation
For all of us…