The Next Phase in

Operational Risk Management:

Critical Control Management (CCM)

JIM JOY

Page 2: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Critical Control Management (CCM)

1. Why do we need to improve Operational Risk Management?

2. The development approach of the ICMM CCM guide

3. Overview of the CCM process steps

4. Suggested CCM implementation planning required to facilitate effective adoption, maximising value realisation.

Page 3: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Mining ‘Serious Claims’ vs General Industry Source: Safe Work Australia

0

10

20

30

40

2000–01 2001–02 2002–03 2003–04 2004–05 2005–06 2006–07 2007–08 2008–09 2009–10 2010–11 2011–12p

Cla

ims p

er

1000 e

mplo

ye

es

General Industry

Mining

Page 4: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Fatalities in the Australian industry - Source: Safe Work Australia

From 2007–08 to 2011–12, 36 Mining workers died (average about 7 per year)

3.84 fatalities per 100 000 workers, almost 70% higher than the national rate of 2.29.

Vehicle incidents - 8 fatalities.

Falls from height - 5 fatalities.

Being hit by falling objects - 5 fatalities.

Being hit by moving objects (including ground) - 4 fatalities.

In 2013-14 – 16 mining workers died

In 2014-15 – 9 mining workers died (plus possible 2 more)

Page 5: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

• Poor quality lists of unwanted events

• Too many unwanted events

• Limited identification & review of controls

• Too many controls

• Critical controls?

• Accountability?

• Control quality assurance?

Need better management of critical controls

Page 6: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Critical Control Management (CCM)

1. Why do we need to improve Operational Risk Management?

2. The development approach of the ICMM CCM guide

3. Overview of the CCM process steps

4. Suggested CCM implementation planning required to facilitate effective adoption, maximising value realisation.

Page 7: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

ICMM CCM Project Objective

Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety (H&S) risk management process

The guide will include:

a definition for ‘critical controls’,

the process for identifying critical controls,

the process for defining performance and assurance criteria for critical controls, and

an understanding of how to assess and manage to achieve control effectiveness.

Page 8: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

http://www.icmm.com/publications

Page 9: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Critical Control Management (CCM)

1. Why do we need to improve Operational Risk Management?

2. The development approach of the ICMM CCM guide

3. Overview of the CCM process steps

4. Suggested CCM implementation planning required to facilitate effective adoption, maximising value realisation.

Page 10: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety
Page 11: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

11

Risk Matrix plus materiality criteria

A

(Very Likely)

Has occurred

several times in

the past Low Moderate High Extreme Extreme

B

(Likely)

Has occurred

at some time in

the past Low Moderate High High Extreme

C

(Possible)

Could occur

multiple times

on this site Low Moderate Moderate High Extreme

D

(Unlikely)

Could occur

once during

the life of the

facility

Low Low Moderate Moderate High

E

(Rare)

Unlikely during

the life of the

facility Low Low Low Low Moderate

LOW MINOR MODERATE MAJOR CRITICAL

Consequences

Lik

elih

oo

d

Page 12: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety
Page 13: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

CONTROLS

Cause

Cause

Cause

Initiating

Event

Consequence

Consequence

Consequence

The Bowtie Analysis (BTA) method

Page 14: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety
Page 15: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

ACARP C23007 - Report June 2015

Controls are:

Acts – a description of what a person should do

Objects – a device that works without an act(s), or

Systems – combination of act(s) and object(s)

Page 16: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Specifiable Measurable Auditable

ACARP C23007 - Report June 2015

Page 17: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

To define ‘Control Optimisation’ methods for determining

tolerable risk at sites.

The Team:

Maureen Hassall Chris Doran

Marcus Punch Jim Joy

ACARP C23007: SELECTION AND OPTIMISATION OF RISK CONTROLS

Page 18: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Risk Controls

Critical Control

Page 19: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

a process for

selecting ‘critical

controls’

Page 20: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

1. What are the CC specific objectives?

2. What are the CC performance

requirements?

3. What are the current checking

activities within the management

systems?

4. What can be sampled for verification?

5. What is the target CC performance?

Page 21: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety
Page 22: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Critical

Control

Critical

Control

CCMP for

Vehicle

Collisions

Material Unwanted Event (MUE) Owner

CC 1 Owner

CC 1 verification activity 1

CC 1 verification activity 2

CC 2 Owner

CC 2 verification activity 1

CC 2 verification activity 2

CC 2 verification activity 3

Page 23: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety
Page 24: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Dashboard

Page 25: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Critical Control Management (CCM)

1. Why do we need to improve Operational Risk Management?

2. The development approach of the ICMM CCM guide

3. Overview of the CCM process steps

4. Suggested CCM implementation planning required to facilitate effective adoption, maximising value realisation.

Page 26: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety
Page 27: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

CCM integration Critical Control

Information

Full Site Risk Mgmt.

Change / Issue Risk Mgmt.

Task Planning Risk Mgmt.

‘Stop & Think‘ Risk Mgmt.

Page 28: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Risk Rank Focus

Work Process CCM

CC Management

Control Effectiveness

Control Focus

Page 29: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

CCM Survey of 12 Australian Coal Mining Companies

6 large international miners, 2 large contractors, 4 moderate to small

Asked about

1. Interest in CCM? (11 very interested, 1 maybe)

2. Current status re CCM? – general, mindsets and process detail

3. Ideas to move CCM forward by 2020?

Page 30: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Risk Rank Focus

Work Process CCM

CC Management

Control Effectiveness (BTA+)

Control Focus

4

1

7

Is your (Australian coal)

company currently operating

CCM initiatives at sites?

Page 31: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Risk Identification & Prioritisation

Bowtie Analysis and Control Effectiveness

12

4

4

• Site driven

• Seem OK with CC selection

but….

• Systematic verification / reporting ‘in progress’

• Incident investigation varies /

so learning varies

Page 32: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

• CCM is a major positive step

change

• Management of the change is

part of the ‘journey’

• Other internal & external

stakeholders should join the

‘journey’

• Current RM quality, leadership

and ‘mindset’ issues can

affect the changes!

Page 33: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

• All considered …..

• Good CCM can much

more effectively and

efficiently manage the

risks of mining

catastrophes

Page 34: The Next Phase in Operational Risk Management: Critical ... · ICMM CCM Project Objective Produce a user-friendly guide outlining a model end-to-end ‘material’ health and safety

Critical Control Management (CCM)

1. Why do we need to improve Operational Risk Management?

2. The development approach of the ICMM CCM guide

3. Overview of the CCM process steps

4. Suggested CCM implementation planning required to facilitate effective adoption, maximising value realisation.