9
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007

The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

The MERIT High-Power Target

Experiment H. Kirk (BNL)

CERN

November 1, 2007

MERIT Experiment in the TT2a Area

Solenoid & Hg loop

Upstream beam elements (new) Quadrupoles for final focusing Collimator Beam profile measurement Beam intensity measurement

Beam dump

Racks & electronics

N2 Exhaust lineMaterial access shaft

Personnel access

Sectional view of the MERIT Experiment

1234

Syringe PumpSecondaryContainment

Jet Chamber

ProtonBeam

Solenoid

Proton Beam

Hg Jet

Installed in the CERN TT2a Line

Before Mating

After Mating and Tilting

FastVision 1 FastVision 2

SMD

video camera

20 m/s Hg jet, 7 Tesla field

0.1 ms/frame 2 ms/frame

Hg Jet March 3, 2007 @ MIT

April 18, 2023 M. Palm, CERN - AB/ATB/EA 6

The Pump/Probe Detectors ACEM (Aluminum Cathode Electron Multiplier)Diamond

+/- 10 degrees

+/- 20 degrees

In beam line, upstream of target

Behind dump in beam line

A 3TP Pump Pulse and a 1TP Probe Pulse with 1ms delay

Beam 8035, B=7T, V=15m/s Oct. 31, 2007

Viewport 2, 100µm/frame, Total 1.6ms

Viewport 3, 6ms

Viewport 3, 10ms

Pump 15TP Probe 5TPdT = 2.3μs

Beam 8037, B=7T, V=15m/s Oct. 31, 2007

Viewport 2, 100µm/frame, Total 1.6ms

Viewport 3, 16ms

Viewport 3, 12ms

Pump 15TP Probe 5TPdT = 700μs