The investigation and prevention of the increased load of phosphorus by the Luga River. L . K . Korovin General Director, SPbPO Ecology and Business Chairman, HELCOM LAND. Phosphorus loads by the Luga River according to the Russian state monitoring ( St. Petersburg UGMS ). - PowerPoint PPT Presentation

Citation preview

Page 1: The investigation and prevention of the increased load of phosphorus by the Luga River

L.K. KorovinGeneral Director, SPbPO Ecology

and BusinessChairman, HELCOM LAND

1

Page 2: The investigation and prevention of the increased load of phosphorus by the Luga River

Years P-PO4 t/a Р tot. t/a2001-2007 100 3002008 456,8 6452009 1789,6 2392,62010 1095 1356

2

Page 3: The investigation and prevention of the increased load of phosphorus by the Luga River

3

Date Flowm3/s

P-PO4,mg/l

Ptot. (filtered sample)

mg/lPtot.(Unfiltered sample)

mg/l

16.01 54,1 0,007 0,020 0,026

25.02 45,5 1,520 3,086 3,377

22.03 56,9 0,020 0,036 0,060

17.04 320 0,869 1,050 1,160

06.05 101 0,031 0,045 0,052

02.06 72,2 0,006 0,008 0,009

02.07 69,4 0,006 0,017 0,069

06.08 41 1,847 2,039 2,188

03.09 101 0,005 0,011 0,050

05.10 214 1,166 1,200 1,24205.11 228 0,015 0,023 0,04703.12 206 0,010 0,026 0,044

Page 4: The investigation and prevention of the increased load of phosphorus by the Luga River

Date Sampling location

Laboratory Р tot. mg/l

Р –РО4 mg/l

31.10.2011

Kingisepp SPB UGMS 0,041 -

Kingisepp SYKE 0,037 0,0130.11.2011

Kingisepp SPB UGMS 0,074 -

Kingisepp SYKE 0,072 0,016Kingisepp MetropoliLab. 0,072 0,015Ust-Luga SPB UGMS 0,291 -Ust-Luga SYKE 0,377 0,272Ust-Luga MetropoliLab. 0,360 0,262

16.12.2011

Kingisepp SPB UGMS 0,056 -

Kingisepp SYKE 0,056 -Ust-Luga СSPB UGMS 0,263 -Ust-Luga SYKE 0,330 -

4

Page 5: The investigation and prevention of the increased load of phosphorus by the Luga River

Sampling location Р tot., mg/l Р-РО4, mg/lGorsky Brook(dissipating discharge of treated Phosphorit wastewater)

9,7 8,7

Verhovskoy Brook(outside Phosphorit industrial area)

123,0 110,0

5

Page 6: The investigation and prevention of the increased load of phosphorus by the Luga River

Sampling location

Laboratory Р-РО4, mg/l Р tot., mg/l

Gorny Brook (WWTP outlet)

TSLATI(Rosprirodnadzor)

2,7 3,1

EuroChem laboratory

2,8 2,9

Verhovskoy Brook TSLATI(Rosprirodnadzor)

8,8 9,2

EuroChem laboratory

8,5 9,3

6

Page 7: The investigation and prevention of the increased load of phosphorus by the Luga River

* Kaj Forsius, (BALTHAZAR, HELCOM), * Seppo Knuuttila, SYKE, * Karl-Johan Lehtinen, NEFCO, * Risto Valo, senior consultant, Poyry,Finland, * Kristiina Isokallio, Director, Ministry of Environment, Finland, * Anatoly Grabovsky – Head of Department, Roshydromet in NW Russia* Vasily Fedorov – Rosprirodnadzor in NW Russia* Sergey Ermolov – Chairman, State Control Committee, Natural Resources Use and

Environmental Safety of the Leningrad Oblast –* Leonid Korovin – General Director, SPbPO Ecology and Business, * Larisa Makarova – Deputy General Director, International Cooperation, SPbPO Ecology and

Business* Igor Schelkunov – Administrative Director, OAO MHK EuroChem* Alexander Tugolukov – Technical Director, OAO MHK EuroChem* Ilya Kuftin – OAO MHK EuroChem* Vladimir Torin – OAO MHK EuroChem* Vladimir Erlykov – Executive Director, OOO PG Phosphorit* Sergey Sheibak – Technical Director, OOO PG Phosphorit* Piotr Kravtsov – Administrative Director, OOO PG Phosphorit

7

Page 8: The investigation and prevention of the increased load of phosphorus by the Luga River

8

1. Daily control of phosphorus concentrations in the Verhovskoy Brook by Phosphorit Testing laboratory

2. Agreement between Phosphorit and NW Hydromet Department concerning financing of hydrological and hydrochemical observations of the water bodies in the Luga River area

3. Construction of pumping facility in the area of phosphogypsum storage in order to pump ground water at the rate of 200 cubic meters per hour and pass it to wastewater neutralization station for phosphorus removal and then to WWTP

4. Reconstruction of WWTP

Page 9: The investigation and prevention of the increased load of phosphorus by the Luga River

Protection screen is eventually repaired and tight bunding is made at phosphogypsum storage site

200 cubic meters per hour ground water pumping facility installed and put into operation at phosphogypsum storage site and water is pumped to wastewater neutralization station for phosphorus removal and further treatment at WWTP

An agreement is signed between Phosphorit and NW Roshydromet Department concerning financing of hydrological and hydrochemical observations of water bodies in the Luga River catchment area

Samples from Verhovskoy Brook are taken and analyzed daily to monitor phosphorus content in the Verhovskoy Brook water.

9

Page 10: The investigation and prevention of the increased load of phosphorus by the Luga River

Samples taken twice a month (COD, Р tot., Р-РО4, N tot.) – 11 months (154 samples)

3 sampling locations (2 samples: left bank and middle of the Luga River): 50 m upstream of the Gorsky mouth (dissipating

discharge of Phosphorit wastewater) 500 m downstream of wastewater outlet 50 m downstream of the Luga and Verhoskoy intersection

Ust-Luga (1 sampling site)

10

Page 11: The investigation and prevention of the increased load of phosphorus by the Luga River

11

Sampling sites№ 1а; 1б

0.05 km upstream of Gorsky mouth(left bank of the Luga river and its middle)

№ 2а; 2б

0.5 downstream of the Gorsky and Luga intersection (left bank of the Luga river and its middle)

№ 4а; 4б

0.5 km downstream of the Verhovskoy and Luga intersection(left bank of the Luga river and its middle)

№ 5 Luga mouth

Page 12: The investigation and prevention of the increased load of phosphorus by the Luga River

12

Date Р-РО4mg/l

Date Р-РО4Mg/l

Date Р-РО4mg/l

25.01.12 8,5 03.02.12 5,2 13.02.12

7,6

27.01.12 6,3 04.02.12 4,9 14.02.12

7,1

28.01.12 7,9 06.02.12 5,2 15.02.12

7,3

29.01.12 5,1 07.02.12 6,2 16.02.12

7,2

30.01.12 6,7 08.02.12 6,1 17.02.11

7,9

31.01.12 10,0 09.02.12 5,8 18.02.12

7,9

01.02.12 7,3 10.02.12 6,0 19.02.12

7,8

02.02.12 4,7 11.02.12 6,8

Page 13: The investigation and prevention of the increased load of phosphorus by the Luga River

13

Thank you very much!