15
The GRID and the The GRID and the Cardiff LAN upgrade Cardiff LAN upgrade Tom Wiersma INFOS Tom Wiersma INFOS 22 July 2003 22 July 2003

The GRID and the Cardiff LAN upgrade

  • Upload
    elijah

  • View
    24

  • Download
    0

Embed Size (px)

DESCRIPTION

The GRID and the Cardiff LAN upgrade. Tom Wiersma INFOS 22 July 2003. The Cardiff LAN upgrade - PowerPoint PPT Presentation

Citation preview

Page 1: The GRID and the Cardiff LAN upgrade

The GRID and the Cardiff The GRID and the Cardiff LAN upgradeLAN upgrade

Tom Wiersma INFOSTom Wiersma INFOS22 July 200322 July 2003

Page 2: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LAN GRID and Cardiff LAN The Cardiff LAN upgradeThe Cardiff LAN upgrade

A major joint project involving Cardiff A major joint project involving Cardiff University and the University of Wales University and the University of Wales College of Medicine to install a high College of Medicine to install a high speed local area network. SRIF funding speed local area network. SRIF funding targets GRID and research stakeholders targets GRID and research stakeholders and HEFCW Teaching and Learning and HEFCW Teaching and Learning funding ensures campus wide funding ensures campus wide connectivity.connectivity.

Page 3: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LAN GRID and Cardiff LAN Pervasive Networks LTD Contract HoldersPervasive Networks LTD Contract HoldersFoundry HardwareFoundry Hardware10 GE backbone moving to 40 GE 10 GE backbone moving to 40 GE 1000 Gigabit Server Connections1000 Gigabit Server Connections20,000 100 Mbps user outlets20,000 100 Mbps user outlets““Next Generation” hardware (2004)Next Generation” hardware (2004)Up to 100 Virtual NetScreen FirewallsUp to 100 Virtual NetScreen Firewalls

Page 4: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

Modular design methodology, allowing Modular design methodology, allowing organic growth and based on:organic growth and based on:

Core – Very High throughput switches and Core – Very High throughput switches and fibres linking major locationsfibres linking major locations

Distribution – Providing high bandwidth high Distribution – Providing high bandwidth high availability within major locationsavailability within major locations

Edge – Delivering services to customersEdge – Delivering services to customers

Page 5: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

Page 6: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

Page 7: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

BenefitsBenefits

High bandwidthHigh bandwidthBetter SecurityBetter SecurityBetter ResilienceBetter ResilienceManaged access through use of Managed access through use of CommunitiesCommunities

Page 8: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

Installation TimetableInstallation Timetable

CU “Core”, “Distribution” and limited CU “Core”, “Distribution” and limited “Edge” (SRIF) – Completed May 2003“Edge” (SRIF) – Completed May 2003CU remaining “Distribution” and “Edge” CU remaining “Distribution” and “Edge” (HEFCW T&L) – August 2003(HEFCW T&L) – August 2003UWCM – By October 2003UWCM – By October 2003

Page 9: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

Page 10: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

Project StagesProject Stages

STAGE ISTAGE IEmulates existing Layer 2 network Completion Emulates existing Layer 2 network Completion September 2003September 2003

STAGE IISTAGE IIMigration to Layer 3 network communitiesMigration to Layer 3 network communitiesFoundry MG8 40GE installation Foundry MG8 40GE installation Completion August 2004Completion August 2004

Page 11: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

Page 12: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

Page 13: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

IssuesIssues

Engineering problemsEngineering problemsMigrationMigrationExternal connectivityExternal connectivityCostCost

Page 14: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

Short Term ActionsShort Term Actions

Resolve engineering issuesResolve engineering issuesSolicit for trial GRID usersSolicit for trial GRID usersLayer 2 MigrationLayer 2 Migration

Page 15: The GRID and the Cardiff LAN upgrade

GRID and Cardiff LANGRID and Cardiff LAN

What are we aiming for?What are we aiming for?

To be able to go anywhere at anytime for To be able to go anywhere at anytime for any amount of safe, diverse data any amount of safe, diverse data

INSTANTLYINSTANTLY

Questions?Questions?