31
© 2005, Itron Inc. 1 altered APPA Uses, Costs, and Implementation of AMR/AMI Sharelynn Moore Product Line Manager, Energy Solutions September 24, 2007

The following content applies to this page only Presenter Name: 12pt Arial Bold, black

  • Upload
    shanta

  • View
    37

  • Download
    0

Embed Size (px)

DESCRIPTION

The following content applies to this page only Presenter Name: 12pt Arial Bold, black Presenter Title: 12pt Arial Italic, black Company Name: 12pt Arial Regular, black Location Name: 12pt Arial Regular, black Date: 12pt Arial Regular, black - PowerPoint PPT Presentation

Citation preview

Page 1: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 1

APPA

Uses, Costs, and Implementation of AMR/AMI

Sharelynn Moore

Product Line Manager, Energy Solutions

September 24, 2007

Page 2: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 2

Topics of Discussion Discuss Market & Business Drivers (Uses) Evaluation of AMR and AMI Review of what is being done today Key Concepts & Summary

Page 3: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc.

Market & Business Drivers

Traditional and Emerging Drivers

Page 4: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 4

Traditional AMR & Metering Market Drivers Primarily driven by Revenue Management & Customer Service

> Meter Reading Cost & Efficiency - Cost per read• Increased read rates• Hard to access• Reduced Call Center activity• Safety concerns• Door Key management

> Revenue Cycle Improvement - Meter to Cash• Reduced read to bill window

– Same Day Billing• Increased reading & billing accuracy

– Reduced manual data entry– Electromechanical to solid state metering

• Reduced estimates• Reduced rebilling and adjustments

Page 5: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 5

Traditional AMR & Metering Market Drivers Secondary Market Drivers Have Included (Most require FN)

> Deregulation (Daily settlement)• PECO• Duquesne• United Illuminating

> Operational Improvements• Off Cycle Reads

– Turn on / Turn off– Read On Request

• Forecasting Accuracy• Potential Asset Value Improvements

> Outage Management> Revenue Protection / Theft Detection> New Products & Services

• Consolidated Billing• Selectable Billing Cycles• Energy Efficiency• Reading for other Utilities

Page 6: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 6

Emerging Drivers Supply Concerns: Shifting generation strategies

> Expiring Supply Contracts• Transition structures and associated rate caps lapsing

> Demand Response: Peak load reduction • At both the residential and C&I levels

> Net Metering: Increased interest in distributed generation> Conservation: Establishment of a “culture of conservation” (Ontario)

• Heightened awareness of renewable generation Reliability: Highly visible and politically sensitive

> Delivery Constraints – Location Marginalized Pricing (LMP)> Asset Management – Underinvested through deregulation activities> Smart Grids: Intelligent Grids to the meter level

Public Policy: Still with no clear direction> Energy Bill: True impact to be determined at the state level. > Smart Metering: California, Ontario, Texas, New York > Time Based Rates: Directly linking price to generation cost

Page 7: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 7

Emerging Drivers Security: Heightened awareness and requirements

> Reduced or complicated site access> Increased internal security requirements

M&A Strategies: Automation key to achieving financial results> National Grid> Progress Energy

Increasing Uncollectible Revenues: With Decreasing Rate Recovery> Remote Disconnect> Load Limiters> Prepayment

Deregulation: Multiple energy market players require access to the consumption data for forecasting, scheduling and settlement

> System Operators (ISO/RTO) / Choice of Energy Supplier > Day Ahead Markets / Location Marginalized Pricing

Meter Data Management: Beginning to be seen as a key strategic resource> Sarbanes Oxley – Consistency of data and business rules> CapEx Planning – Complicated by multi-jurisdictional asset> Emerging as an enterprise requirement – Fundamental to deliver emerging drivers

Page 8: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc.

Evaluation of AMR and AMI

What is the difference?

Page 9: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 11

Differences between AMR/AMI Why does anybody care about the differences? AMR as we’ve known it Origin and definitions of AMI Comparing AMR and AMI

There isn’t a definitive answer – but maybe there are some useful differences

Page 10: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 12

Why Do We Care About the Differences? Lots of hype about AMI ...

... but a lack of clarity about how it differs from AMR Truth in advertising Tendency by some to equate “AMR” with “old” and “AMI” with “new” Important to define based on desired capability, not a simple label

Page 11: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 13

AMR As We’ve Known it Consisted of handhelds, mobile and “fixed networks”

> Fixed networks one- or one-and-a-half way Increasing cost continuum; presumably increasing functionality All depended on traditional business drivers

> Meter reading efficiencies, billing enhancements, reading flexibility, theft and tamper

Page 12: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 14

AMR As We’ve Known it, cont.

Growth in Cumulative AMR Shipments, 1996 - 2006

43.1%

23.6%

25.0%

24.4%

25.6%

24.4%

24.5%

17.7%

18.9%

19.9%

0

20

40

60

80

100

120

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

Year

Units

(Mill

ions

)0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

50.0%

Perc

ent G

row

th

Units

Growth Rate

Annual AMR Shipments, 1997 - 2006

20.2%

-16.9%

21.9%

30.6%

24.3% 20.3%

-7.4%

25.6%

26.0%

0

2

4

6

8

10

12

14

16

18

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

Year

Units

(Mill

ions

)

-20.0%

-10.0%

0.0%

10.0%

20.0%

30.0%

40.0%

Perc

ent G

row

th

Units

Growth Rate

Source: “The Scott Report: AMR Deployments in North America,” 2005 and 4th Quarter 2006

Page 13: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 15

AMR As We’ve Known it, cont. About three years ago, momentum started to gather for greater

functionality in fixed networks:

Outage notification and restoration

Innovative rates

(TOU, CPP)

On-demand reads

Remote connect / disconnect

Revenue assurance

Presentation to end users

Page 14: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 16

“Fixed Networks” V. Mobile AMRAll Utilities

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

1997 1998 1999 2000 2001 2002 2003 2004 2005

Year

Mobile

Fixed

Misc.

Electric Utilities

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

1997 1998 1999 2000 2001 2002 2003 2004 2005

Year

Mobile

Fixed

Misc.

Gas Utilities

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

1997 1998 1999 2000 2001 2002 2003 2004 2005

Year

Mobile

Fixed

Misc.

Water Utilities

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

1997 1998 1999 2000 2001 2002 2003 2004 2005

Year

Mobile

Fixed

Misc.

Source: Howard Scott, Cognyst Consulting, July, 2006

Page 15: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 17

“Traditional” AMR Benefits (Includes Fixed Networks)

Mostly operational savings:> Reduces labor costs> Eliminate manual data entry errors> Eliminate missed reads and repeat meter reader visits> Move-in, move-out reads (on demand reads)> Improves billing accuracy > Eliminates estimated meter reads> Improves employee safety> Reduces customer complaints> Improves management of delinquent accounts> Accelerates cash flow based on monthly billing> Decreased outage response times> Better detection of theft, outage, and leaks> Can bring back TOU reads

Page 16: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 18

What is AMI? “Advanced Metering AMR” used in 2003 Frost and Sullivan report California used “Advanced Metering Infrastructure” when considering

time-based rates in 2004 AMI = “smart metering” = “advanced metering?”

Page 17: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 19

What is AMI?, cont.

FERC says, “ ... a metering system that records customer consumption hourly or more frequently and that provides for daily or more frequent transmittal of measurements over a communication network to a central point.”

It refers to “ ... the full measurement and collection system, and includes customer meters, communication networks and data management systems.”

Less than 6% market penetration in the U.S.

What is it, anyway? What’s real? What’s it mean?

Page 18: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 20

What is AMI?, cont.

IDC Energy Insights:> “A subset of AMR with three main characteristics:

• Solid-state or computerized meters that collect time-series (interval) energy use data, programmable to support features like TOU rates

• Two-way communication between meters and utility• Able to support applications beyond meter reading, such as demand

response programs” Gartner, Inc.

> “ ... A composite technology made of several elements: consumption meters, a two-way communication channel and a data respository (meter data management).”

Page 19: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 21

AMR v. AMI Side-By-Side ComparisonFunctionality AMR AMI

Communication One way or one-and-a-half way Full 2 way

Read Frequency Monthly (mobile); daily (FN) Daily to hourly

Interval data and load profiling None (mobile) to hourly (FN) Hourly to 15 minute

On-demand reads OOR (mobile); lag time of mmmm minutes (FN)

Yes; lag time of sss seconds

Outage notification and restoration Inferred or “last gasp” Positive notification and restoration

Demand reset No Yes

Support for time-based rates TOU CPP-F, CPP-V, RT

Revenue assurance Basic Enhanced

Disconnect and load limiting Virtual disconnect “Hard” c/dc +load limits

Net metering 200 kw and above All customers

Monitoring of meter quantities Only C&I All customers

Remote device configuration Limited parameters Upgradeable firmware

Prepay metering No Yes, but not typical in U.S.

HAN connectivity No Yes, plus presentment

Meter data management No Yes

Page 20: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 22

Cost Comparisons (per endpoint)

Category Mobile AMR Fixed Network

AMI

All in costs $1 - $2 per meter $5 - $20 per meter $60 - $90 per meter

Page 21: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc.

What is being done today?

AMI Activity

Page 23: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 25

Why AMI ? Key Emerging Drivers

> Energy Supply - Not enough in the right places> Reliability

Resulting Public Policy> Energy Policy Act (“EPACT”)

• Net Metering (Section 1251)• Smart Metering (Section 1252)• Time Based Rates (Section 1252)• Demand Response (Section 1252)• Electric Transmission and Distribution Programs (Section 925)• Daylight Savings Time Change (Section 110)• Technology Advancement Collaborative (Section 127)• Consumer Education Programs (Section 132)

Page 24: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 26

California – Does this model apply in other markets? June 2002: The CPUC issued its Order Instituting Rulemaking (OIR) on advanced

metering, demand response, and dynamic pricing (all combined = AMI). > Goal of OIR is to determine whether the use of AMR and Demand Response can help the

state avoid another energy crisis. A Statewide Pricing Pilot (SPP) was implemented by the three IOUs (SCE, SDG&E,

and PG&E) in the summers of 2003 - 2005. The pilot consisted of 2500 electric meters statewide, divided into 25 groups of differing customer “treatments”, 100 customers per group. > PG&E piloted 1000 points, SCE tested 1000 points and SDG&E 500 customers. The various

treatments included Load Profile (LP) information only, LP info and TOU rates, LP info and Critical Peak Pricing (CPP) rates, LP info with load control and CPP rates, etc.

> For the most part, the SPP proved that a decent level of customer price elasticity exists. The debate continues about the magnitude and sustainability of the load reductions elicited, and the value ($/kW).

December 15, 2004: “Preliminary” AMI business cases from each of the three IOUs were filed. > Seventeen different business case “scenarios” (ranging from total saturated AMR, to

surgical/partial deployments, to load control only) were evaluated and submitted by each utility. The state’s AMI requirement is for hourly interval data on mass mkt, and 15-min interval data on C&I customers.

March, 2005: Official AMI business cases (aka “applications”) were filed by each of the utilities. > PG&E’s and SDG&E’s recommending full deployment, while SCE’s recommended

development of new Advanced Integrated Meter (AIM for AMI). The AMI applications of the utilities have since been separated into three different regulatory proceedings, each with unique schedules.

Page 25: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 27

Ontario – A “Culture of Conservation” Not enough Energy Supply:

> Have not built a power plant since early 1980s> Theoretical generating capacity of 26,000 megawatts> Practical generating capacity of 21,000 megawatts > Summer peak 26,000 megawatts, winter peak 25,000 megawatts

Election spring of 2008:> Rolling brownouts summer of 2005, very close to blackout

• If they have BO during the election period they will not be re-elected Bill 100 & Bill 21:

> Introduction of Flexible TOU pricing> Targeted reduction in Energy Consumption by 2007> Commitment to Install 800,000 in 2007 and in every home by 2010 (5M)

Page 26: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 28

So Just What is Being Done Today? Views of Energy Bill vary significantly by region depending on:

> Generation and delivery capacity relative to demand> Reliability of regional transmission grid

Approaches vary by state> New York: embraces advanced metering for Time Differentiated Rates

• ordered Time Of Use (“TOU”) rates to “largest” C&I at each utility> New Jersey: emphasizes load control through addressable thermostats

State Commissioners and Staff are devoting time and energy to implementing the new rulings

> Texas: PUC commission hosted a workshop on Sept. 16 for developing a rule on advanced metering and demand response, in accordance with recent state law regarding advanced metering

> Oregon: Holding a series of presentations about AMI technology and the demand response capabilities of smart meter

> New York: Calling for “Automation Plans” in the next 6 months

Page 27: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 29

Many States Already Pursuing Demand Response Nearly half of all U.S. states are implementing or piloting

technology for demand response and advanced metering

%Load Change

NY Capital Region = -3.2%

Results in -20.1% LMP

Page 28: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 30

Key Questions What is/should be your generation/supply approach?

> Wholesale Market Design?> Retail Mass Market Reality?

To what extent will functionality and technology be defined and compensated by the Regulator?> Low Cost: Driven by Operations Savings> High Function: “Smart” meter / preparing for the future

Will Time Based Rates and Demand Response be:> Mandated / Opt Out?> Voluntary / Opt In?

• Anticipated penetration rates? What is / will be your approach to reliability and asset

management?> Where do you see constraints / challenges around delivery congestion> To what extent do you subscribe to the concept of an intelligent / smart

distribution grid?

Page 29: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc.

Key Concepts & Summarization

In closing

Page 30: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 32

Key Concepts The cost of traditional AMR solutions continues to come down while

functionality continues to incrementally improve The delta between mobile and fixed solutions continues to close

> The cost reduction of FN is accelerating faster then the more mature mobile solutions

Likely two distinct markets going forward (AMR/AMI)> Sometimes they may exist within the same utility

AMI depends on operational savings for much of its economics, just like AMR. > Additional cost for AMI has to be justified by added benefits like demand

response and remote connect/disconnect. AMI is a public policy issue

> That means we must partner with our customers to command mindshare and formulate aligned concepts

Page 31: The following content applies to this page only Presenter Name: 12pt Arial Bold, black

© 2005, Itron Inc. 33

To know more, start here: www.itron.com

Thank You.