All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania [email protected]. it WG discussion on Mediterranean Sites All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

The East Sicily Node Facilities

  • Upload
    asta

  • View
    47

  • Download
    1

Embed Size (px)

DESCRIPTION

The East Sicily Node Facilities. WG discussion on Mediterranean Sites. Giorgio Riccobene INFN-LNS, Catania [email protected]. All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN. East-Sicily: KM3NeT and ESONET/EMSO. Three sites of common interest for the - PowerPoint PPT Presentation

Citation preview

Page 1: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

The East Sicily Node Facilities

Giorgio RiccobeneINFN-LNS, Catania

[email protected]

WG discussion on Mediterranean Sites

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

Page 2: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: KM3NeT and ESONET/EMSO

Three sites of common interest for theKM3NeT and ESONET / EMSO Consortia

Page 3: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: Catania and Capo Passero

Infrastructures realised by INFN within the NEMO Project aiming at the construction of a deep sea underwater neutrino telescope.Fundings also by EU, Regione Sicilia, MIUR

Catania Test Site: 25 km East offshore the port of Catania, 2000 m depthCapo Passero Site:85 km South East offshore Capo Passero, 3500 m depth

Infrastructures realised by INFN within the NEMO Project aiming at the construction of a deep sea underwater neutrino telescope.Fundings also by EU, Regione Sicilia, MIUR

Catania Test Site: 25 km East offshore the port of Catania, 2000 m depthCapo Passero Site:85 km South East offshore Capo Passero, 3500 m depth

Page 4: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: Catania Test Site infrastructure

LNS Test Site Laboratoryat the port of Catania

LNS-INFN Catania

Internet Radio Link

NEMO JBTest Site South

5 km

Installation at 2000 m depth

20 km

INGV

Test Site North

5 km

Page 5: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: Catania TS shore facilities

The Catania Test Site shore laboratory has:

Large structures construction hallData acquisition hallPower suppliers (under UPS) Electronics workshopsConference room20’’ pressure test chamber (400 bar)32 Mbps radio link to LNS-INFN.

The port of Catania is the logistic base of Elettra-Tlc, member of MECMA and owner of the Teliri and Certamen C/L vessels.

LNS is one of the four laboratories of INFN.

LNS is connected (now at 1 Gbps) to the Italian Internet Infrastructure for Scientific Research (GARR)

LNS hosts the main Storage Unitsand Servers (e.g. For LIDO-DM) and it is a node of the European GRID

The Catania Test Site shore laboratory has:

Large structures construction hallData acquisition hallPower suppliers (under UPS) Electronics workshopsConference room20’’ pressure test chamber (400 bar)32 Mbps radio link to LNS-INFN.

The port of Catania is the logistic base of Elettra-Tlc, member of MECMA and owner of the Teliri and Certamen C/L vessels.

LNS is one of the four laboratories of INFN.

LNS is connected (now at 1 Gbps) to the Italian Internet Infrastructure for Scientific Research (GARR)

LNS hosts the main Storage Unitsand Servers (e.g. For LIDO-DM) and it is a node of the European GRID

Page 6: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: TS cable and terminations

Page 7: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: Catania TS North

SN-1 (2005-2008) Sensors3-component seismometer; Hydrophone (geophysics);Gravity meter; Scalar magnetometer; 3-axes current meter; CTD

SN-1 (2005-2008) Sensors3-component seismometer; Hydrophone (geophysics);Gravity meter; Scalar magnetometer; 3-axes current meter; CTD

2005 TSN Frame and SN-1 Installation2008 SN-1 recovery for refurbishment2010 LIDO East Sicily Installation (TSN)

SN-1 connection

SN1- recovery

Frame deployment

Page 8: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: Catania TS South

2005 TSS Frame and ODE installation2006 Junction Box and NEMO Phase 1 deployment2007 Junction Box recovery for maintenance2008 JB re-deployment. ODE recovery for refurbishment2010 LIDO East Sicily Installation (TSS)

2005 TSS Frame and ODE installation2006 Junction Box and NEMO Phase 1 deployment2007 Junction Box recovery for maintenance2008 JB re-deployment. ODE recovery for refurbishment2010 LIDO East Sicily Installation (TSS)

Experiments SensorsODE 4 hydrophones

(bioacoustics, environmental monitoring)NEMO Phase 1 16 optical modules, CTD, ADCP

(neutrino telescope demonstrator)

Experiments SensorsODE 4 hydrophones

(bioacoustics, environmental monitoring)NEMO Phase 1 16 optical modules, CTD, ADCP

(neutrino telescope demonstrator)

Framewith ODE

Junction Box

NEMO Phase-1tower

Page 9: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: Catania TS South

Page 10: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: the JB at Catania TS South700 VAC (3-phase) 10 kVA power supply is installed on-shore700 VAC (3-phase) 10 kVA power supply is installed on-shore

Two output e.o. ROV mateable connectors available

Power load per outup connector: 1.5 kVA - 380 VAC (3-phase)

Optical fibre link: DWDM (optional CWDM)

Two output e.o. ROV mateable connectors available

Power load per outup connector: 1.5 kVA - 380 VAC (3-phase)

Optical fibre link: DWDM (optional CWDM)

Page 11: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: LIDO at the Catania Test Site

LNS Test Site Laboratoryat the port of Catania:shore data acquisition system; local storage unit

LNS-INFN Catania:main storage unit; servers;1 Gbps connection to internet

Radio Link (32 Mbps)

NEMO JBTest Site South

Test Site North

5 km

5 km

Installation at 2000 m depth

20 km

LIDO TS North

New ! CREEPof UCL

LIDO TS South

Page 12: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: CREEP undersea deformation lab

Study of accelerations preceeding crustal failureStudy of accelerations preceeding crustal failure

10-6 10-9 10-22 10-25

CREEP

Page 13: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

Shore Laboratory in Capo Passero Harbour

East-Sicily: Capo Passero infrastructure

Capo Passero is an infrastructure suitable for km3-scale neutrino telescope installation (KM3NeT)

Shore laboratoryPower supplier 10 kV - 50 kWConstruction HallData Acquisition RoomOptical fiber to LNS (requested)

Submarine cable100 km - 20 fibres, DC-sea return

Submarine InfrastrctureDC/DC Converter 10 kV-375 V

Neptune’s-like design ROV connectors to end users

The site selected for the km3 detector lies on a flat and wide plateau

CP Site

Page 14: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: Capo Passero infrastructure

The cable: 20 fibres, 1 conductor 100 kW (tested upto 80 kW), sea return Deployed on July 2007 by the Elettra Tlc – Certamen C/L.

The cable fibres were continuoisly monitored from shore during the installation. Monitoring continues.

The cable is suitable for the km3 telescope

The cable: 20 fibres, 1 conductor 100 kW (tested upto 80 kW), sea return Deployed on July 2007 by the Elettra Tlc – Certamen C/L.

The cable fibres were continuoisly monitored from shore during the installation. Monitoring continues.

The cable is suitable for the km3 telescope

Capo Passero village

Capo Passero Site

Cable route

INFN has also applied to GARR, within the new GARR-X network, for an optical fibre connection (land) from the Capo Passero shore lab to the LNS.

Page 15: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

Alcatel shore power supply (50 kW, 10 kV max)

and line power converter

installed in the Capo Passero shore Lab

East-Sicily: the CP power supply system

Antares Mini Line(2009)

KM3NeT Tower Prototype(2010)

futurekm3 Towers

100 km cable

Medium Voltage Converter

Cable Termination Assembly

1.5 m

Deployment foreseen in the end of 2009 Deployment foreseen in the end of 2009

Underwater Frame

Page 16: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: the CP power supply system

The Medium Voltage Converter: fully tested and ready for deployment

10 kV-DC from shore (10 kW at full work load) to 375 VDC 6 MVC required for the km3

Max output current 25 A, Operational with no load, Output Voltage ripple 1.5 V

Voltage Overshoot and Undershoot on boot/stop: 8%

Safety switch off at 100 A output for t > 30 µs

The Medium Voltage Converter: fully tested and ready for deployment

10 kV-DC from shore (10 kW at full work load) to 375 VDC 6 MVC required for the km3

Max output current 25 A, Operational with no load, Output Voltage ripple 1.5 V

Voltage Overshoot and Undershoot on boot/stop: 8%

Safety switch off at 100 A output for t > 30 µs

48 sub converters: 200Vin - 50Vout divided in to 6 stacks each with a control unit.

The 48 sub converters have: Inputs in series Outputs in series/parallel matrix

Large number of Sub Converters can fail without loss of output current, (50%).

Cooling system in Fluorinert.

Topology by JPL NASA, designed for NEPTUNE

48 sub converters: 200Vin - 50Vout divided in to 6 stacks each with a control unit.

The 48 sub converters have: Inputs in series Outputs in series/parallel matrix

Large number of Sub Converters can fail without loss of output current, (50%).

Cooling system in Fluorinert.

Topology by JPL NASA, designed for NEPTUNE

Page 17: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: the PEGASO ROV - DSS

Cougar Seaeye ROV upgraded to 4000 m The ROV moves horizontally (200 m tether cable) The DSS holds ROV garage or heavy structures

Cougar Seaeye ROV upgraded to 4000 m The ROV moves horizontally (200 m tether cable) The DSS holds ROV garage or heavy structures

INGV

4000 m 30 Tons

200m

3500 m dive test at the end of 2009 3500 m dive test at the end of 2009

Page 18: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: Summary

The Catania Test Site at 2000 m depth is a ready-to-use infrastructure:•electro-optical wet-mateable connections, through junction box (380 VAC – 3 kW) or directly from shore•fully equipped shore lab•connection to LNS-INFN

The Capo Passero Site infrastructure at 3500 m depth is going to be completed this year:•to be used within KM3NeT ... ESONET / EMSO

The PEGASO ROV – DSS will carry out deployment / connect ion / recovery operations of underwater structures, in deep sea sites, densely instrumented

Page 19: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: Summary

Page 20: The East Sicily Node Facilities

All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN

East-Sicily: MVC tests @ Alcatel