Upload
asta
View
47
Download
1
Embed Size (px)
DESCRIPTION
The East Sicily Node Facilities. WG discussion on Mediterranean Sites. Giorgio Riccobene INFN-LNS, Catania [email protected]. All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN. East-Sicily: KM3NeT and ESONET/EMSO. Three sites of common interest for the - PowerPoint PPT Presentation
Citation preview
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
The East Sicily Node Facilities
Giorgio RiccobeneINFN-LNS, Catania
WG discussion on Mediterranean Sites
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: KM3NeT and ESONET/EMSO
Three sites of common interest for theKM3NeT and ESONET / EMSO Consortia
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: Catania and Capo Passero
Infrastructures realised by INFN within the NEMO Project aiming at the construction of a deep sea underwater neutrino telescope.Fundings also by EU, Regione Sicilia, MIUR
Catania Test Site: 25 km East offshore the port of Catania, 2000 m depthCapo Passero Site:85 km South East offshore Capo Passero, 3500 m depth
Infrastructures realised by INFN within the NEMO Project aiming at the construction of a deep sea underwater neutrino telescope.Fundings also by EU, Regione Sicilia, MIUR
Catania Test Site: 25 km East offshore the port of Catania, 2000 m depthCapo Passero Site:85 km South East offshore Capo Passero, 3500 m depth
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: Catania Test Site infrastructure
LNS Test Site Laboratoryat the port of Catania
LNS-INFN Catania
Internet Radio Link
NEMO JBTest Site South
5 km
Installation at 2000 m depth
20 km
INGV
Test Site North
5 km
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: Catania TS shore facilities
The Catania Test Site shore laboratory has:
Large structures construction hallData acquisition hallPower suppliers (under UPS) Electronics workshopsConference room20’’ pressure test chamber (400 bar)32 Mbps radio link to LNS-INFN.
The port of Catania is the logistic base of Elettra-Tlc, member of MECMA and owner of the Teliri and Certamen C/L vessels.
LNS is one of the four laboratories of INFN.
LNS is connected (now at 1 Gbps) to the Italian Internet Infrastructure for Scientific Research (GARR)
LNS hosts the main Storage Unitsand Servers (e.g. For LIDO-DM) and it is a node of the European GRID
The Catania Test Site shore laboratory has:
Large structures construction hallData acquisition hallPower suppliers (under UPS) Electronics workshopsConference room20’’ pressure test chamber (400 bar)32 Mbps radio link to LNS-INFN.
The port of Catania is the logistic base of Elettra-Tlc, member of MECMA and owner of the Teliri and Certamen C/L vessels.
LNS is one of the four laboratories of INFN.
LNS is connected (now at 1 Gbps) to the Italian Internet Infrastructure for Scientific Research (GARR)
LNS hosts the main Storage Unitsand Servers (e.g. For LIDO-DM) and it is a node of the European GRID
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: TS cable and terminations
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: Catania TS North
SN-1 (2005-2008) Sensors3-component seismometer; Hydrophone (geophysics);Gravity meter; Scalar magnetometer; 3-axes current meter; CTD
SN-1 (2005-2008) Sensors3-component seismometer; Hydrophone (geophysics);Gravity meter; Scalar magnetometer; 3-axes current meter; CTD
2005 TSN Frame and SN-1 Installation2008 SN-1 recovery for refurbishment2010 LIDO East Sicily Installation (TSN)
SN-1 connection
SN1- recovery
Frame deployment
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: Catania TS South
2005 TSS Frame and ODE installation2006 Junction Box and NEMO Phase 1 deployment2007 Junction Box recovery for maintenance2008 JB re-deployment. ODE recovery for refurbishment2010 LIDO East Sicily Installation (TSS)
2005 TSS Frame and ODE installation2006 Junction Box and NEMO Phase 1 deployment2007 Junction Box recovery for maintenance2008 JB re-deployment. ODE recovery for refurbishment2010 LIDO East Sicily Installation (TSS)
Experiments SensorsODE 4 hydrophones
(bioacoustics, environmental monitoring)NEMO Phase 1 16 optical modules, CTD, ADCP
(neutrino telescope demonstrator)
Experiments SensorsODE 4 hydrophones
(bioacoustics, environmental monitoring)NEMO Phase 1 16 optical modules, CTD, ADCP
(neutrino telescope demonstrator)
Framewith ODE
Junction Box
NEMO Phase-1tower
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: Catania TS South
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: the JB at Catania TS South700 VAC (3-phase) 10 kVA power supply is installed on-shore700 VAC (3-phase) 10 kVA power supply is installed on-shore
Two output e.o. ROV mateable connectors available
Power load per outup connector: 1.5 kVA - 380 VAC (3-phase)
Optical fibre link: DWDM (optional CWDM)
Two output e.o. ROV mateable connectors available
Power load per outup connector: 1.5 kVA - 380 VAC (3-phase)
Optical fibre link: DWDM (optional CWDM)
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: LIDO at the Catania Test Site
LNS Test Site Laboratoryat the port of Catania:shore data acquisition system; local storage unit
LNS-INFN Catania:main storage unit; servers;1 Gbps connection to internet
Radio Link (32 Mbps)
NEMO JBTest Site South
Test Site North
5 km
5 km
Installation at 2000 m depth
20 km
LIDO TS North
New ! CREEPof UCL
LIDO TS South
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: CREEP undersea deformation lab
Study of accelerations preceeding crustal failureStudy of accelerations preceeding crustal failure
10-6 10-9 10-22 10-25
CREEP
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
Shore Laboratory in Capo Passero Harbour
East-Sicily: Capo Passero infrastructure
Capo Passero is an infrastructure suitable for km3-scale neutrino telescope installation (KM3NeT)
Shore laboratoryPower supplier 10 kV - 50 kWConstruction HallData Acquisition RoomOptical fiber to LNS (requested)
Submarine cable100 km - 20 fibres, DC-sea return
Submarine InfrastrctureDC/DC Converter 10 kV-375 V
Neptune’s-like design ROV connectors to end users
The site selected for the km3 detector lies on a flat and wide plateau
CP Site
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: Capo Passero infrastructure
The cable: 20 fibres, 1 conductor 100 kW (tested upto 80 kW), sea return Deployed on July 2007 by the Elettra Tlc – Certamen C/L.
The cable fibres were continuoisly monitored from shore during the installation. Monitoring continues.
The cable is suitable for the km3 telescope
The cable: 20 fibres, 1 conductor 100 kW (tested upto 80 kW), sea return Deployed on July 2007 by the Elettra Tlc – Certamen C/L.
The cable fibres were continuoisly monitored from shore during the installation. Monitoring continues.
The cable is suitable for the km3 telescope
Capo Passero village
Capo Passero Site
Cable route
INFN has also applied to GARR, within the new GARR-X network, for an optical fibre connection (land) from the Capo Passero shore lab to the LNS.
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
Alcatel shore power supply (50 kW, 10 kV max)
and line power converter
installed in the Capo Passero shore Lab
East-Sicily: the CP power supply system
Antares Mini Line(2009)
KM3NeT Tower Prototype(2010)
futurekm3 Towers
100 km cable
Medium Voltage Converter
Cable Termination Assembly
1.5 m
Deployment foreseen in the end of 2009 Deployment foreseen in the end of 2009
Underwater Frame
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: the CP power supply system
The Medium Voltage Converter: fully tested and ready for deployment
10 kV-DC from shore (10 kW at full work load) to 375 VDC 6 MVC required for the km3
Max output current 25 A, Operational with no load, Output Voltage ripple 1.5 V
Voltage Overshoot and Undershoot on boot/stop: 8%
Safety switch off at 100 A output for t > 30 µs
The Medium Voltage Converter: fully tested and ready for deployment
10 kV-DC from shore (10 kW at full work load) to 375 VDC 6 MVC required for the km3
Max output current 25 A, Operational with no load, Output Voltage ripple 1.5 V
Voltage Overshoot and Undershoot on boot/stop: 8%
Safety switch off at 100 A output for t > 30 µs
48 sub converters: 200Vin - 50Vout divided in to 6 stacks each with a control unit.
The 48 sub converters have: Inputs in series Outputs in series/parallel matrix
Large number of Sub Converters can fail without loss of output current, (50%).
Cooling system in Fluorinert.
Topology by JPL NASA, designed for NEPTUNE
48 sub converters: 200Vin - 50Vout divided in to 6 stacks each with a control unit.
The 48 sub converters have: Inputs in series Outputs in series/parallel matrix
Large number of Sub Converters can fail without loss of output current, (50%).
Cooling system in Fluorinert.
Topology by JPL NASA, designed for NEPTUNE
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: the PEGASO ROV - DSS
Cougar Seaeye ROV upgraded to 4000 m The ROV moves horizontally (200 m tether cable) The DSS holds ROV garage or heavy structures
Cougar Seaeye ROV upgraded to 4000 m The ROV moves horizontally (200 m tether cable) The DSS holds ROV garage or heavy structures
INGV
4000 m 30 Tons
200m
3500 m dive test at the end of 2009 3500 m dive test at the end of 2009
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: Summary
The Catania Test Site at 2000 m depth is a ready-to-use infrastructure:•electro-optical wet-mateable connections, through junction box (380 VAC – 3 kW) or directly from shore•fully equipped shore lab•connection to LNS-INFN
The Capo Passero Site infrastructure at 3500 m depth is going to be completed this year:•to be used within KM3NeT ... ESONET / EMSO
The PEGASO ROV – DSS will carry out deployment / connect ion / recovery operations of underwater structures, in deep sea sites, densely instrumented
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: Summary
All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN
East-Sicily: MVC tests @ Alcatel