What is CWMS?
2
A USACE-developed decision support systemcapable of real-time:• Data acquisition• Data visualization• Hydrological forecasting
CAVI = Control and Visualization Interface
2/13/2015
David Ford Consulting Engineers, Inc. 2
Where has CWMS been deployed?
• Big push in 2009 as a result of ARRA.• Current push with funding coming from the
USACE Modeling, Mapping, and Consequences (MMC) center.
3
2009 CWMS deployment sites
Is CWMS available for non-USACE users?
• No, but a similar package is available: • Hydrologic Engineering Center Real-Time
Simulation Program (HEC-RTS)
4
2/13/2015
David Ford Consulting Engineers, Inc. 3
What is CWMS?
3 overarching capabilities:• Data acquisition• Data visualization• Hydrological forecasting
5
Data acquisition
6
CWMSCAVI
CWMS server
Database
Decoding
Transformation & Validation
2/13/2015
David Ford Consulting Engineers, Inc. 4
CAVI data acquisition module
7
Time series icons
Data quality color bars
8
2/13/2015
David Ford Consulting Engineers, Inc. 5
Data status summary report
9
Can modify list to include only critical data
What is CWMS?
3 overarching capabilities:• Data acquisition• Data visualization• Hydrological forecasting
10
2/13/2015
David Ford Consulting Engineers, Inc. 6
CAVI data visualization module
11
Real-time plots can be generated for each icon
12
2/13/2015
David Ford Consulting Engineers, Inc. 7
Can also view gridded data
13
NEXRAD rainfall data
What is CWMS?
3 overarching capabilities:• Data acquisition• Data visualization• Hydrological forecasting
14
2/13/2015
David Ford Consulting Engineers, Inc. 8
The big idea…
15
Want to predict stage/flow here
ReservoirFirst need runoff hydrographs!
Simulation window
16
Lookback period
Forecastperiod
2/13/2015
David Ford Consulting Engineers, Inc. 9
Forecasting workflow
17
CWMS utilizes familiar and widely used modeling software
Step 1: Meteorological forecast preprocessor (MFP)
• Need to start by specifying meteorology• Lookback period: NEXRAD data• Forecast period: User specified or NWS
quantitative precipitation forecasts (QPFs)
18
2/13/2015
David Ford Consulting Engineers, Inc. 10
Step 2: Hydrologic modeling system (HEC-HMS)
19
• Given precipitation, compute runoff
Precipitation inputs from MFP
Flows computed by HEC-HMS
Step 3: Reservoir simulation (HEC-ResSim)• Given runoff (incl. reservoir inflows), compute
reservoir releases
20
Reservoir inflows computed by HEC-HMS
Reservoir releases computed by HEC-ResSim
Simulated reservoir pool elevations
2/13/2015
David Ford Consulting Engineers, Inc. 11
Step 4: Channel simulation (HEC-RAS)
21
• Given reservoir releases, compute downstream:• Stage/flow.• Inundation.
Reservoir releases from HEC-ResSim
Intervening local flows from HEC-HMS
Stages and flows at all cross sections from HEC-ResSim
Step 4: Channel simulation (HEC-RAS)
22
Output available for all cross sections
2/13/2015
David Ford Consulting Engineers, Inc. 12
Step 4: Channel simulation (HEC-RAS)
23
Sample inundation map
Step 5: Consequences (HEC-FIA)
24
• Given stages/inundation, compute impacts and required response
2/13/2015
David Ford Consulting Engineers, Inc. 13
Viewing forecast results
25
In Summary, CWMS:
• Is easily adaptable• Can do as little or as much as you want it to do• Allows users to access lots of information and
data from a single interface• Improves operational decision making
26
2/13/2015
David Ford Consulting Engineers, Inc. 14
Contributors
• Ben Zoeller, AMEC Nashville• USACE Norfolk District
27
28
2/13/2015
David Ford Consulting Engineers, Inc. 15
Real-time forecasting
29
Step 5: Consequences (HEC-FIA)