Crosses the channel at the straight of Dover, the narrowest point of the channel
Goes from Folkestone, UK to Coquelles, France
31.4 mile train tunnel carrying people vehicles and freight via 2 single trackelectric rail sets
23.5 miles of the tunnel is under water making it the longest submerged tunnel
in the world At the lowest depth the tunnel is 250 feet below sea level
7/29/2019 The Chunnel Tunnel Case
3/8
Travel time underwater is about 20 minutes
Much faster and easier than ferry to cross thechannel
Construction took from 1988 to 1994 and the tunnel
was opened for passenger service on November 4,1994. At the time it was the largest project everconceived at about 21 billion US dollars.
Owned by Eurotunnel and operated by Eurotunnel,
Eurostar, DB Schenker Rail and SNCF In 2008 16.1 million tickets were sold for travel
across the chunnel through Eurotunnel andEurostar.
7/29/2019 The Chunnel Tunnel Case
4/8
Built in the chalk marl layer Chalk marl is chalk that has formed in shallower seas closer to land
where clay washout from rivers and streams sunk to the bottom anddeposited in the forming rock
Over time the land eroded back and the marl formation works away fromland and strictly white chalk forms
Chalk Marl is almost always found below the white or grey chalk as itforms first
http://upload.wikimedia.org/wikipedia/commons/thumb/5/59/Channel_Tunnel_geological_profile_1.svg/800px-Channel_Tunnel_geological_profile_1.svg.png
7/29/2019 The Chunnel Tunnel Case
5/8
Due to the fine clay content in the marl it is virtually impervious towater
Clay content makes it softer than the higher levels making it easierand faster to tunnel, as it is easier on the cutting machinery.
http://www.whitecliffscountryside.org.uk/site_img/articles/82.jpg
Local chalk deposits White chalk cliffs at Dover (more clay content at lower levels)
http://upload.wikimedia.org/wikipedia/commons/7/7e/White_cliffs_of_dover_09_2004.jpg
7/29/2019 The Chunnel Tunnel Case
6/8
Convincing People such a long tunnel was safe. Todo this there was an escape tunnel construction inaddition to the 2 rail traffic tunnels.
Station on the English side has to be made on
Castle Hill Landslide and in order to overcome thisthey buttressed the station with drainage adits,which are gravity powered pathways for water toescape.
Needed a piston relief duct connecting the tunnels
to regulate the pressure for moving trains. Trains got too hot so they needed to run cool water
through pipes to keep the air at appropriatetemperatures.
7/29/2019 The Chunnel Tunnel Case
7/8
The spoil from the construction of the chunnelwas placed in Samphire hoe.
This area was then opened to the public as a
park.
samphire.ukfossils.co.uk
7/29/2019 The Chunnel Tunnel Case
8/8
http://www.pbs.org/wgbh/buildingbig/wonder/structure/channel.html
http://www.whitecliffscountryside.org.uk/in
dex3.php?id_img=81&id_sec=2&id_sub=2