TH 13/101 TH 13/101 Design-Build Project Design-Build Project S.P. 7001-103 S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING PROJECT INFORMATIONAL MEETING

TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Embed Size (px)

Citation preview

Page 1: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

TH 13/101TH 13/101Design-Build ProjectDesign-Build Project

S.P. 7001-103S.P. 7001-103

October 30, 2009

Michael Beer, P.E.Mn/DOT Project Manager

PROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETING

Page 2: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

DESIGN-BUILD INFORMATIONDESIGN-BUILD INFORMATION

Amber Blanchard, Mn/DOT Central OfficeAmber Blanchard, Mn/DOT Central Office

Design-Build Program ManagerDesign-Build Program Manager

Economic Stimulus Program (ARRA Funds)Economic Stimulus Program (ARRA Funds)

Page 3: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Design-Build Low BidDesign-Build Low Bid

Request for Qualifications (RFQ)Request for Qualifications (RFQ) Low Bid – Streamline processLow Bid – Streamline process High Quality TeamsHigh Quality Teams

Short-listingShort-listing StipendsStipends

Request for Proposals (RFP)Request for Proposals (RFP) Technical ProposalTechnical Proposal

Alternate Technical ConceptsAlternate Technical Concepts Price/DBE ProposalPrice/DBE Proposal

Page 4: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Conflict of InterestConflict of Interest

Approach Posted on Website:Approach Posted on Website:

www.dot.state.mn.us/designbuild/www.dot.state.mn.us/designbuild/

Page 5: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

PROJECT INFORMATIONPROJECT INFORMATION

Michael Beer, Mn/DOT Metro DistrictMichael Beer, Mn/DOT Metro District

Project ManagerProject Manager

Page 6: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

DISCLAIMERDISCLAIMER

What is discussed today is informational only; it is What is discussed today is informational only; it is meant to assist interested teams in the pursuit of this meant to assist interested teams in the pursuit of this project.project.

The ultimate contract requirements will be included in The ultimate contract requirements will be included in the Request for Proposals (RFP). the Request for Proposals (RFP).

There may be changes between now and the time the There may be changes between now and the time the RFP is issued.RFP is issued.

Page 7: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Project PartnersProject Partners

City of SavageCity of Savage

Scott CountyScott County

Federal Highway AdministrationFederal Highway Administration

Department of Natural ResourcesDepartment of Natural Resources

Design-Build ProposersDesign-Build Proposers

HNTB – Design-Build Contract DevelopmentHNTB – Design-Build Contract Development

Page 8: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Project InformationProject Information

http://www.dot.state.mn.us/designbuild/TH13-CR101/index.html

http://www.dot.state.mn.us/metro/projects/hwy13savage/index.html

Page 9: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Project DescriptionProject Description

General LayoutGeneral Layout RoadwayRoadway

LimitsLimits

ProfilesProfiles

Pedestrian crossingPedestrian crossing DrainageDrainage

Flood plainFlood plain Right of WayRight of Way

No additional R/WNo additional R/W BridgeBridge

VibrationsVibrations

Page 10: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Bridge LayoutBridge Layout

Page 11: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Project DescriptionProject DescriptionUtilitiesUtilities

NoiseNoise

Visual QualityVisual Quality

BoringsBorings

EnvironmentalEnvironmental Savage FenSavage Fen WetlandsWetlands Trout Stream – Eagle CreekTrout Stream – Eagle Creek

GeotechnicalGeotechnical Artesian ConditionsArtesian Conditions MuckMuck

Page 12: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Design-Build Design-Build General Discussion PointsGeneral Discussion Points

Co-Housing – not requiredCo-Housing – not required May require a design/construction office within 3 May require a design/construction office within 3

miles of the project. miles of the project. Key personnel onlyKey personnel only

DBEDBE Goal will be determined at RFPGoal will be determined at RFP Outreach MeetingOutreach Meeting

Page 13: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

ARRA Funded ScheduleARRA Funded ScheduleTentative – Subject to ChangeTentative – Subject to Change

ACTIVITY ACTIVITY Due DateDue Date

Issue RFQ Issue RFQ Mid-NovemberMid-November

SOQ Due Date SOQ Due Date Mid-DecemberMid-December

Determine Short List Determine Short List Early January, Early January, 20102010

Issue RFP Issue RFP Late JanuaryLate January

Technical Proposals Due Technical Proposals Due Mid-MarchMid-March

First Notice to ProceedFirst Notice to Proceed Mid-AprilMid-April

Project CompletionProject Completion December, 2010December, 2010

Page 14: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

TIGER Funded ScheduleTIGER Funded ScheduleTentative – Subject to ChangeTentative – Subject to Change

ACTIVITY ACTIVITY Due DateDue Date

Issue RFQ Issue RFQ Mid-NovemberMid-November

SOQ Due Date SOQ Due Date Mid-DecemberMid-December

Determine Short List Determine Short List Early January, Early January, 20102010

Issue RFP Issue RFP Mid-MarchMid-March

Technical Proposals Due Technical Proposals Due Late AprilLate April

First Notice to ProceedFirst Notice to Proceed Late MayLate May

Project CompletionProject Completion December, 2010December, 2010

Page 15: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Project GoalsProject Goals

Environmental ComplianceEnvironmental Compliance Minimize environmental impactsMinimize environmental impacts Protect the Savage Fen and WetlandsProtect the Savage Fen and Wetlands

QualityQualitySchedule & BudgetSchedule & BudgetStakeholder SatisfactionStakeholder Satisfaction

Maintenance of TrafficMaintenance of Traffic Business and Residential impactsBusiness and Residential impacts

SafetySafetyEmployment OpportunitiesEmployment Opportunities

Page 16: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Request for QualificationsRequest for Qualifications

Mn/DOT Single Point of ContactMn/DOT Single Point of Contact [email protected]@state.mn.us

Page 17: TH 13/101 Design-Build Project S.P. 7001-103 October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING

Questions ?Questions ?