    3/31/2013 1

    TESTING INSTRUMENT

    TRANSFORMERS

    CT Testing

    Primary Insulation

    Resistance

    Dielectric Withstand Secondary Insulation

    Resistance

    Secondary Burden

    Saturation Ratio and Polarity

    Primary Ins. Resistance Test

    For Bar and Primary wound

    CTs

    DC voltage test at the ratedcrest voltage on the primary

    winding

    Secondary grounded

    1 minute test

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    2/27

    3/31/2013 2

    TESTING INSTRUMENT

    TRANSFORMERSCT Insulation Resistance: Bar Type and Primary Wound

    DC Voltage test

    Isolate Primary

    Isolate & Gnd Secondary

    Connect HV lead to H1/H2

    Connect LV to Gnd /

    2ndary

    Test for 1 minute Record test value

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    3/27

    3/31/2013 3

    TESTING INSTRUMENT

    TRANSFORMERS

    CT Testing

    Primary Insulation

    Resistance

    Dielectric Withstand Secondary Insulation

    Resistance

    Secondary Burden

    Saturation Ratio and Polarity

    Dielectric Withstand Test

    For Bar and Primary wound

    CTs

    AC voltage test at the 75%factory test voltage

    Secondary grounded

    1 minute test

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    4/27

    3/31/2013 4

    TESTING INSTRUMENT

    TRANSFORMERSCT Dielectric Withstand: Bar Type and Primary Wound

    AC Voltage test

    Isolate & Gnd Secondary

    Connect HV lead to H1/H2

    Connect LV to Gnd /

    2ndary

    Test for 1 minute

    Record test value

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    5/27

    3/31/2013 5

    TESTING INSTRUMENT

    TRANSFORMERS

    CT Testing

    Primary Insulation

    Resistance

    Dielectric Withstand Secondary Insulation

    Resistance

    Secondary Burden

    Saturation Ratio and Polarity

    2ndary Ins. Resistance Test

    Test for secondary wiring

    Secondary wiring isolated

    and ungrounded 1000 VDC

    1 minute test

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    6/27

    3/31/2013 6

    TESTING INSTRUMENT

    TRANSFORMERSCT Secondary Circuit Insulation Test

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    7/27

    3/31/2013 7

    TESTING INSTRUMENT

    TRANSFORMERS

    CT Testing

    Primary Insulation

    Resistance

    Dielectric Withstand Secondary Insulation

    Resistance

    Secondary Burden

    Saturation Ratio and Polarity

    2ndary Burden Test

    Conducted in 2 parts

    Part 1, 1A current injection

    Measure circuit burden Part 2, four-wire resistance

    measurement

    Measure secondary

    winding resistance Burden = part 1 + part 2

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    8/27

    3/31/2013 8

    TESTING INSTRUMENT

    TRANSFORMERSPart 1: CT Secondary Circuit Burden Measurement

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    9/27

    3/31/2013 9

    TESTING INSTRUMENT

    TRANSFORMERSPart 2: CT Secondary Winding Resistance Measurement

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    10/27

    3/31/2013 10

    TESTING INSTRUMENT

    TRANSFORMERS

    Total burden calculation

    ZT = RCT + (RL + ZB)

    WhereZT = Total burden ()

    RCT = DC Winding resistance ()

    RL = Lead resistance ()ZB = Device impedance ()

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    11/27

    3/31/2013 11

    TESTING INSTRUMENT

    TRANSFORMERS

    CT Testing

    Primary Insulation

    Resistance

    Dielectric Withstand Secondary Insulation

    Resistance

    Secondary Burden

    Saturation Ratio and Polarity

    Saturation Test

    Secondary winding excitation

    test

    Primary open circuited Step voltage increase,

    current proportional

    Test for knee-point voltage

    Rapid rise is I-excitation 10% V = 50% I

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    12/27

    3/31/2013 12

    TESTING INSTRUMENT

    TRANSFORMERSCT Saturation test

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    13/27

    3/31/2013 13

    TESTING INSTRUMENT

    TRANSFORMERS

    CT Testing

    Primary Insulation

    Resistance

    Dielectric Withstand Secondary Insulation

    Resistance

    Secondary Burden

    Saturation Ratio and Polarity

    Ratio and Polarity test

    Secondary winding excited at

    1V per turn

    Primary open circuited H1-H2 compared to X1-X2

    Phase measured, ratio

    calculated

    Phase difference 0 meanspolarity correct

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    14/27

    3/31/2013 14

    TESTING INSTRUMENT

    TRANSFORMERSCT Ratio and Polarity Test

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    15/27

    3/31/2013 15

    TESTING INSTRUMENT

    TRANSFORMERS

    CT Testing

    Primary Insulation

    Resistance

    Dielectric Withstand Secondary Insulation

    Resistance

    Secondary Burden

    Saturation Ratio and Polarity

    Ratio and Polarity test (ALT)

    Use individual meters, phase

    angle and voltmeter

    Secondary winding excited at1V per turn

    Primary open circuited

    H1-H2 compared to X1-X2

    Phase measured, ratiocalculated

    Phase difference 0 means

    polarity correct

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    16/27

    3/31/2013 16

    TESTING INSTRUMENT

    TRANSFORMERSCT Ratio and Polarity Test (alternate connections)

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    17/27

    3/31/2013 17

    TESTING INSTRUMENT

    TRANSFORMERS

    VT Testing

    Insulation Resistance

    Dielectric Withstand

    Ratio and Polarity

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    18/27

    3/31/2013 18

    TESTING INSTRUMENT

    TRANSFORMERS

    VT Testing

    Insulation Resistance

    Dielectric Withstand

    Ratio and Polarity

    Insulation Resistance Test

    DC voltage test at the rated

    crest voltage

    3 tests HV to Gnd

    HV to LV

    LV to Gnd

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    19/27

    3/31/2013 19

    TESTING INSTRUMENT

    TRANSFORMERSVT Insulation Resistance Tests

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    20/27

    3/31/2013 20

    TESTING INSTRUMENT

    TRANSFORMERS

    VT Testing

    Insulation Resistance

    Dielectric Withstand

    Ratio and Polarity

    Dielectric Withstand Test

    AC voltage test at the 75%

    factory test voltage

    Secondary grounded 1 minute test

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    21/27

    3/31/2013 21

    TESTING INSTRUMENT

    TRANSFORMERSVT Dielectric Withstand Tests

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    22/27

    3/31/2013 22

    TESTING INSTRUMENT

    TRANSFORMERS

    VT Testing

    Insulation Resistance

    Dielectric Withstand

    Ratio and Polarity

    Ratio and Polarity test

    Primary winding excited at

    1V per turns ratio

    Secondary open circuited X1-X2 compared to H1-H2

    Phase measured, ratio

    calculated

    Phase difference 0 meanspolarity correct

    Compare ratio with

    nameplate

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    23/27

    3/31/2013 23

    NETA STANDARD

    5. NETA Acceptance Testing Procedure

    5.1 Visual and Mechanical Inspection

    5.2 Electrical Test 5.2.1 Current Transformer

    5.2.2 Voltage Transformer

    5.3 Test Value Analysis 5.3.1 Visual and Mechanical

    5.3.2 CT Electrical Test

    5.3.3 VT Electrical Test

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    24/27

    3/31/2013 24

    TEST SET MANUAL

    Module 3:

    CT Tester

    Module 2:

    15 KV Insulation Resistance Test set

    AC High Potential Test set

    DC High Potential Test set

    Digital Low Resistance Test set

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    25/27

    3/31/2013 25

    TEST FORMS

    Current Transformer Test Form

    Voltage Transformer Test Form

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    26/27

    3/31/2013 26

  • 7/28/2019 Testing and Commissioning Instrument-Transformers

    27/27

    3/31/2013 27