THIS SUBMISSION IS DECLARED TO BE STRICTLY IN
ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT
PROJECT DRAWING NUMBER
PH10-1C-10-15-P002
CLIENT NAME
STAMP:
QATAR TRANSMISSION SYSTEM EXPANSION – PHASE 10SUBSTATIONS PACKAGE S5 & S8
CONSULTANT NAME
SUBSTATION NAME / CIRCUIT NAME
COMMON
B 02 Oct, 13 ISSUED FOR CONSTRUCTION T.G. PARK S.T.M S.Y.SUNG
A B 16 June, 13 ISSUED FOR CONSTRUCTION T.G. PARK S.T.M S.Y.SUNG
0 B 24 APR, 13 ISSUED FOR COMMENTS T.G. PARK S.T.M S.Y.SUNG
REV. STAT. DATE DESCRIPTION DRAWN CHECK. APPRO.
CONTRACTOR NAME
MANUFACTUTRE NAME
NA
MANUFACTUTRE DRAWING NUMBER
NA
DRAWING / DOCUMENT TITLE
SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
SUBSTATIONS: 220/66/11kV 220/66/11kV New Doha-B Super S/S, 220/66/11kV Abu Hamur Super S/S,220/66/11kV Ain Khalid Super S/S, Lusail Development super 3 S/S, 66/11KV Ain Khalid North S/S,
66/11KV Al Wadi West S/S
SCALE N/A SIZE A4 REV. PROJECT DRAWING NUMBER
PH10-1C-10-15-P002SHEET 1 OF 105 SHEETS B
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 2 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
LIST OF CONTENTS
SL. NO. DESCRIPTION PAGE NO.
1 Visual and Dimension check 6
2Power Frequency Withstand Voltage Test
2.1.Insulation Resistance Measurement2.2.High Voltage AC Test
8
3 Measurement of Insulation Resistance for Auxiliary circuit 104 Vacuum Circuit Breaker Test
4.1 Insulation Resistance Measurement4.2 Coil Resistance Measurement4.3 Contact Resistance Measurement4.4 Closing Coil And Tripping Coil Pickup(Operation) Test4.5 Breaker Timing Test4.6 Electrical & Mechanical Operation checks
10
5 Measurement of Contact Resistance for Main Circuit 146 Current Transformer Test
6.1. Incomer Feeder6.1.1 General Checks6.1.2 Insulation Resistance Measurement6.1.3 Polarity Test6.1.4 Winding Resistance Measurement6.1.5 Knee Point Voltage Measurement6.1.6 Ratio Test
6.2.Bus-Section6.2.1 General Checks6.2.2 Insulation Resistance Measurement6.2.3 Polarity Test6.2.4 Winding Resistance Measurement6.2.5 Knee Point Voltage Measurement6.2.6 Ratio Test
6.3.Outgoing Feeder6.3.1 General Checks6.3.2 Insulation Resistance Measurement6.3.3 Polarity Test6.3.4 Winding Resistance Measurement6.3.5 Knee Point Voltage Measurement6.3.6 Ratio Test
6.4.Station Transformer Feeder6.4.1 General Checks6.4.2 Insulation Resistance Measurement6.4.3 Polarity Test6.4.4 Winding Resistance Measurement6.4.5 Knee Point Voltage Measurement
16
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 3 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.4.6 Ratio Test
7
Voltage Transformer Test7.1.Incomer Feeder
7.1.1. General Check7.1.2. Insulation Resistance Measurement7.1.3. Polarity Test7.1.4. Winding Resistance Measurement7.1.5. Ratio Test
7.2.Bus VT & Outgoing Feeders7.2.1. General Check7.2.2. Insulation Resistance Measurement7.2.3. Polarity Test7.2.4. Winding Resistance Measurement7.2.5. Ratio Test
44
8Meter Calibration test
8.1. Ammeter Calibration Test8.2. Voltmeter Calibration Test
54
9 CT Secondary Injection Test 56
10 VT Secondary Injection Test 80
11 CT Primary Injection Test 105
Reference Drawings:
S.NO Description Doc.No Approval Status
1 Schematic for 11kV SWGR Incomer feeder PH10-1C-10-15-3-001 A
2 Schematic for 11kV SWGR Bus section PH10-1C-10-15-3-012 A
3 Schematic for 11kV SWGR Cable feeder PH10-1C-10-15-3-008 A
4 Schematic for 11kV SWGR Aux transformer feeder PH10-1C-10-15-3-007 A
5 Schematic for 11kV SWGR Capacitor feeder PH10-1C-10-15-3-009 A
6 Schematic for 11kV SWGR Interlock Diagram PH10-1C-10-15-3-010 I
7 Schematic for 11kv SWGR SYNCRO check PH10-1C-10-15-3-011 B
8 Schematic for 11kv SWGR Bus1 CT Diagram PH10-1C-10-15-3-002 I
9 Schematic for 11kv SWGR Bus2 CT Diagram PH10-1C-10-15-3-006 I
10 Schematic for 11kv SWGR Bus Bar VT Diagram PH10-1C-10-15-3-003 B
11 11KV SWGR General Arrangement Diagram PH10-1C-10-15-2-002 B
12 11KV SWGR Name Plate Diagram PH10-1C-10-15-5-001 I
13 11KV SWGR Outline & Foundation Diagram PH10-1C-10-15-2-001 I
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 4 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
LIST OF TEST INSTRUMENTS
S.NO EQUIPMENT MAKE/TYPE SERIALNUMBER
CALIBRATIONDATE
CALIBRATION DUEDATE
1
2
3
Note: Calibration Certificates will be produced along with the Testing equipments at site during testing activities.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 5 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
1. VISUAL CHECK
Equipment information
DESCRIPTION INCOMER BUS SECTION OUT GOING
Make SCHNEIDER
Type
Installation INDOOR
Serial no
Rated current 2500 A 3150 A 630A
Rated frequency 50 Hz 50 Hz 50 Hz
Rated voltage 12 kV 12 kV 12 kV
Short time withstand rating 40 KA for 3Sec 40 KA for 3 Sec 40 KA for 3 Sec
Control voltage 110 VDC 110 VDC 110 VDC
Auxiliary voltage 240 VAC 240 VAC 240 VAC
Year of manufacture
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 6 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Sl.No. DESCRIPTION RESULTS
1 Name Plate InspectionCheck each nameplate according to drawing
2
Space Heater
Check and breaking of wires of heater of HV and LV compartment
Check setting of thermostat
3
Others
3.1. Check doors closing completely
3.2. Check earthing state of doors and frame
3.3. Check all indication lamps of local panel
3.4. Check wiring condition
3.5. Check any joint in middle of wire
3.6. Check terminal block cover
3.7. Check the door limit switches
3.8. Check phase marks
3.10. Check construction and inspection of operating mechanism
4After self test and official test check interlock lever’s set-up and it’s smoothoperation
5 Check cable number tag at cables
6 Check the proper dressing at wire duct
7 Check the cable proper glanding at the panel
8 Check insulation cover on CT&AC/DC supply terminals
9 Conformity of power/control cable connection and identification labels.
10 Check the power/control cable connection and tightness.
11 Check of component pad lock facilities.
12 All TB are numbered at both sides.
2. POWER FREQUENCY WITHSTAND VOLTAGE TEST
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 7 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Test procedure:1. Carry out Insulation Resistance Test (Before HV).2. Carry out HV Test.3. Carry out Insulation Resistance Test (After HV).
Pre-conditions:1. Check and confirm the CT circuits should be shorted and earthed.2. Check and confirm Bus and line VT are isolated.3. Check and confirm Switchboard is earthed.4. Check all VT Fuse Removed.5. CVD contact shorted at front of Display terminals in each phase of HV test.
(Note: CVD indications to be tested at 6KV AC during the HV test.)Safety Procedures:(i)During the HV test 11kv SWGR Room all the access points are should be closed and locked, No-onenot permitted to remain with in the 11KV SWGR room during testing.(ii) All the energize component will be barricaded off with rigid safety fencing.(iii) 11KV SWGR room and basement as well as all access points are shall be locked.
2.1. IR value measurement:Measure insulation resistance at 5000V DC before and after HV test.
R – YBE in GΩ Y-RBE in GΩ B-RYE in GΩ
Before HV Test
After HV Test
2.2. HVAC test.
This test is to be carried out on each of the phases with respect to earth. AC voltage at 50Hz equal to80% FAT value i.e 22.4kV since this test was carried out at Factory 2.5 times of the line voltage i.e 28 kVfor 1 minute was applied to the conductor with respect to ground. The leakage current is recorded andnoted as mentioned in the below table.(Note: Since this test is carried out in factory. 80% of the 28kV i.e. 22.4 kV shall be applied in sitetest.)
Test Result:HV Test @ 22.4 kV AC for 1 Minutes
Leakage current in mA
0 Sec 30 Sec 1 min
R–YBE
Y-RBE
B-RYE
Criteria: Shall be withstood.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 8 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
2.2. PARTIAL DISCHARGE TEST DURING HV TEST
(i) All secondary circuit of CT’s must be shorted.(ii) Ground the other two phases through the bus bar at cable chamber and also at the CVD display on the
chamber.(iii) For the selected phases apply 1.1 x E/1.732 Voltage (7.6KV)(iv) Note down the PD value for each panel at the applied voltage.(v) Repeat same procedure for all phases and all the feeders.
S.NO BAY NO Test voltage (kV)Measured values
ResultR-PH Y-PH B-PH
1 A190 6.9KV
2 A170 6.9KV
3 A150 6.9KV
4 A130 6.9KV
Criteria: Should be less than 15 db
2.3. VT RATIO TEST AT RATED VOLTAGE:For Incomer:
Test Results
VT Designation Phase TerminalApplied Primary
Voltage in (V)
CalcSec. Voltage in
(V)
MeasuredSec. Voltage in
(V)% Error
R
1r - 1nr
2r - 2nr
3r - 3nr
Y
1y - 1ny
2y - 2ny
3y - 3ny
B
1b - 1nb
2b - 2nb
3b - 3nb
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 9 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
For Bus VT & Outgoing Feeders:
VTDesignation Phase Terminal
Applied PrimaryVoltage in (V)
CalcSec. Voltage in
(V)
MeasuredSec.Voltage in
(V)% Error
R 1r - 1nr
Y 1y - 1ny
B 1b - 1nb
2.4.CVD INDICATOR TEST:
CVD Indicator test have been tested with 6 kv single phase, check the all condition with individualPhases.
CVD indications tested at 6KV AC VOLTAGE : OK/NOT OK
Remarks:
3. MEASUREMENT OF INSULATION RESISTANCE FOR AUXILIARY CIRCUIT
Insulation Resistance MeasurementThe insulation resistance between Auxiliary circuit and earth shall be measured with 1kV Megger.
Contents Measured value of Insulation Resistance Result Remarks
Between the Auxiliary Circuit and Earth
Criteria: >2MΩ
Remarks:
4. VACUUM CIRCUIT BREAKER TEST
Name Plate Details
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 10 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Description INCOMER BUS SECTION OUT GOING
Make SCHNEIDER
TypeHVX 12-40-31-E HVX 12-40-31-E HVX 12-40-31-E
Installation INDOOR
Serial no
Rated current 2500 A 3150 A 800A
Rated frequency 50 Hz 50 Hz 50 Hz
Rated voltage 12 kV 12 kV 12 kV
Breaking rating 40 kA 40 kA 40 kA
Control voltage 110 VDC 110 VDC 110 VDC
Auxiliary voltage 240 VAC 240 VAC 240 VAC
Breaker operating sequence O–0.3S-CO–3M-CO O–0.3S-CO–3M-CO O–0.3S-CO–3M-CO
Year of manufacture
4.1. Insulation Resistance Measurement:
Applied Voltage R-PH(GΩ) Y-PH(GΩ) B-PH(GΩ)
5KVPole – Earth(Close)
Pole – Pole(Open)
Criteria: 500MΩ4.2. Coil Resistance Measurement:
Coil Resistance in Ω
Trip Coil
Close Coil
Criteria: 1.Closing Coil : 35.3 to 39.0 Ω2. Opening Coil : 35.3 to 39.0 Ω
4.3. CB Closing & Opening check at reduced control voltage:
CB C .Voltage (110V) A .Volt [Vdc] Time (ms) Result
Close (85%) 93.5V
Open (70%) 77V
Temperature : ºC
4.4. Breaker Timing Test:
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 11 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Operation R-PH (msec) Y-PH (msec) B-PH( (msec)
Open
Close
Close – Open
Criteria: 1. Closing time : 20 to 50ms2. Opening time: 15 to 35 ms
4.5. Contact Resistance Measurement:
Criteria: 1. For Incomer & Bus Section : < 20 µΩ2. For Outgoing feeder : <55 µΩ
Check List for Print out1.Breaker timing test report
4.6. Electrical & Mechanical Operational checks for Circuit Breaker
4.6.1 Electrical checks
Sl.No Description Remarks4.6.1.1 Rack In / Rack Out4.6.1.2 Spring charge indication4.6.1.3 Spring Charge Mechanism
1.Electrical Operation2.Mechanical operation
4.6.1.4 Current drawn by spring charge motor4.6.1.5 CB Spring Charge Time in Seconds4.6.1.6 Anti-pumping checked4.6.1.7 Open / Close Indication4.6.1.8 Auxiliary Contacts4.6.1.9 Operation of Counter4.6.1.10 Tripping & Closing Operation
Operation Electrical MechanicalTrip
Close
Phase Measured Value (in μΩ)
R-Phase
Y-Phase
B-Phase
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 12 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
4.6.2 Mechanical Operational ChecksSl.No Description Remarks
4.6.2.1
Check the correct closing/opening of the doorsa. Make to VCB at TEST positionb. Un-latch or latch the door latchc. Lift up the door handle to opening the doord. Push down the handle to closing the door
4.6.2.2 Circuit breaker in test and closed condition should not be possible to rack IN.
4.6.2.3 Circuit breaker in service and closed condition should not be possible to rack OUT.
4.6.2.4Circuit breaker in between service and test position should not be possible toClose.
4.6.2.5 Circuit breaker in test position should be possible to close or trip.
4.6.2.6 Circuit breaker in service position should be possible to close or trip.
4.6.2.7 All safety interlocks.
4.6.2.8 Smooth rack in and rack out for the circuit breaker.
4.6.2.9 Mechanical Interlock with Earth Switch
4.6.2.10 Earthing switch cannot be closed when the circuit breaker is in service position.
4.6.2.11 Circuit breaker cannot be Rack IN when the Earthing switch is Closed
4.6.2.12 Circuit breaker interchangeability test
4.6.2.13 Check the CB racking IN/OUT handle inserted properly
The positions of the Withdraw able part are described as,
State Operations possible Operations not possibleWithdraw able truck in serviceposition, switching device ‘ON’
1. Switching device shall be switchedOFF from Local/Remote.2. Switching device shall be switchedOFF from emergency Push button.
1.Removal of the Withdraw abletruck
2.Opening of the door3.Pulling of the LV plug
Withdraw able truck in serviceposition, switching device‘OFF’
1. Removal of the withdraw able truck.2. Switching device shall be switched
OFF from Local/Remote.
1. Opening of the door2. Pulling of the LV plug
Withdraw able truck locatedbetween the service and testpositions
Transfer of the Withdraw able truckto service or Test position
1. Closing of the switching device2. Opening of the door3. Pulling of the LV plug
Withdraw able truck in testposition, switching device ‘ON’
1. Switching device shall be switchedOFF from Local/Remote.
Transfer of the Withdraw abletruck to service position
Withdraw able truck indisconnected position LV plugpulled off, switching device‘OFF’, door open
--
Closing of the door transfer of theWithdraw able truck to serviceposition
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 13 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
5. CONTACT RESISTANCE MEASUREMENT TEST
5.1. Bus Bar Contact ResistanceMake : SCHNEIDER
DC Current Injected : 100 A DCPre-conditions for the measurement of BUSBAR contact resistance:
1. All the breakers are to be kept in service position.2. Close the breakers in the bays through which current injected. And all other should be in open.3. Ensure all the earth switches are in open position.
11KV SWITCHGEAR Ambt Temperature : C
SL.NOBay -1
IdentificationBay -2
IdentificationBay -3
IdentificationR-Ph in
µΩY-Ph in
µΩB-Ph in
µΩ1 A210 A190 ---2 A190 A170 ---3 A170 A150 ---4 A150 A130 ---5 A130 A110 ---6 A110 A18- I/C -1 ---7 A18- I/C -1 A90 ---8 A90 A70 ---9 A70 A50 ---
10 A50 A30 ---11 A30 A10 ---12 A10 A12 – Bus section A2013 A20 A40 ---14 A40 A60 ---15 A60 A80 ---16 A80 A100 ---17 A100 A28 – I/C -2 ---18 A28 – I/C -2 A120 ---19 A120 A140 ---20 A140 A160 ---21 A160 A180 ---22 A180 A200 ---23 A200 A220 ---24 A220 A32 – Bus Section A29025 A290 A31026 A310 A33027 A330 A35028 A350 A3829 A38 A37030 A370 A39031 A390 A41032 A410 A43033 A430 A45034 A450 A470
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 14 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Note: For the all other test the value is for two breakers & bus.For the test Sl.No 12 the value is for three breakers & bus.
Remarks:
5.2. Earth Switch Contact Resistance MeasurementMake : SCHNEIDER
DC Current Injected : 100 A DCPre-conditions for the measurement of EARTH SWITCH contact resistance:
1. All the breakers are to be kept in test position.2. Close the earth switches in the bay through which current injected, and all other should be in open.
Earth Switch Ambt Temperature : CSL.NO Bay Identification R-Ph in µΩ Y-Ph in µΩ B-Ph in µΩ
1 A210
2 A190
3 A170
4 A150
5 A130
6 A110
7 A18
8 A90
9 A70
10 A50
11 A30
12 A10
13 A12
14 A20
15 A40
16 A60
17 A80
18 A100
19 A28
20 A120
21 A140
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 15 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
22 A160
23 A180
24 A200
25 A220
26 A32
27 A290
28 A310
29 A330
30 A350
31 A38
32 A370
33 A390
34 A410
35 A430
36 A450
37 A470
Remarks:
6. CURRENT TRANSFORMER TEST
6.1. Incomer Feeder
Name Plate Details
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 16 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Description CT1 (CORE-1) CT1 (CORE-2) CT2 (CORE-1)
Make SCHNEIDER
Type RING
Installation INDOOR
Highest system voltage 12 kV
Short time rating 40 kA for 3Sec
Ratio 2500/1A 2500/1A 3200/1A
Class PX 5P20/1.0 PX
Rated burden(VA) - 15VA -
CT sec. resistance (Rct) at 75cin Ω 8.75≤ 8.75≤ 18≤
Knee point voltage (Vk) in V 230 - 563
I mag at VK/2 in mA ≤30≤ - 18≤
Mfg.Year/Sl.No
R ph
Y ph
B ph
CT SecTerminals
R ph 1S1-1S2 2S1-2S2 S1-S2
Y ph 1S1-1S2 2S1-2S2 S1-S2
B ph 1S1-1S2 2S1-2S2 S1-S2
FunctionMAIN TRF DIFF(87T) +
REFDIR OC+BF
+BCU+METERINGBUS BAR PROTN
(87B/50BF)
6.1.1. General Checks1.General visual inspection :2.Name plate details :3.HV Terminal Marking :4.LV Terminal Marking :
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 17 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
5.Check for tightness of all CT terminals :6.Neutral earthing / Single point earthing :7.Position of P1-towards BUS/FEEDER :8.Check CT Connection with ring type Lugs :9.Check CT wire as per the Schematic diagrams and tightness :
6.1.2 Insulation Resistance Measurement:Minimum Value: 1M/KV Ambt Temperature : ºC
Test Procedure Check the Core to be measured Say Typical X – Y(X is value to be checked, Y is against which value to be checked). Connect X to - Ve Terminal of Megger Connect Y to + Ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values
Test Results
DescriptionApplied Voltage (DC)
in VR-PH(GΩ) Y-PH(GΩ) B-PH(GΩ)
Primary –Earth 5000 V
Primary- Secondary 1 5000 V
Primary- Secondary 2 5000 V
Secondary 1-Earth 500 V
Secondary 2-Earth 500 V
Secondary 1- Secondary 2 500 V
6.1.3. Polarity Test
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 18 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
(P1 towards (+) ve & P2 towards (-) ve
Test ResultsCT
DesignationCore No Terminal R-PH Y-PH B-PH
CT1 CORE-1 1S1-1S2
CORE-2 2S1-2S2CT2 CORE-1 1S1-1S2
6.1.4. CT Winding Resistance
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button,
the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance
Test Results
CT Core No Terminal Measured Resistance ( in ohms)
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 19 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Designation R-Ph Y-Ph B-Ph
At ambT At 75 C At ambT At 75 C At ambT At 75 C
CT1CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
Ambt Temperature : ºC Temperature at 75 C = Rt (1+0.00393(75-t)Where, 75 : Resistance at 75°C (Ω)
Rt : Resistance at ambient temperature (Ω)t : Ambient temperature (°C)
Criteria: Resistance shall be less than specified CT specification.
6.1.5. Knee Point Voltage measurement
Test Procedure Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores.
Ambt Temperature : ºC
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 20 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Test Results
CTDesignation
Core No TerminalR-Ph Y-Ph B-Ph
Vk(V)
Imag(mA)
Vk(V)
Imag(mA)
Vk(V)
Imag( mA)
CT1 CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
Criteria: Accordance with CT specification.
6.1.6. Ratio Test
Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current values and pressing the start button, the test cord
displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases.Test Results:
R-Phase
CTDesignation Core No Terminal
Injected PrimaryCurrent (A)
Expected Sec.Current (A)
Measured Sec.Current (A) % Error
CT1 CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 21 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Y-Phase
CTDesignation
Core No TerminalInjected Primary
Current (A)Expected Sec.Current (A)
Measured Sec.Current (A)
% Error
CT1 CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
B-Phase
CTDesignation
Core No TerminalInjected Primary
Current (A)Expected Sec.Current (A)
Measured Sec.Current (A)
% Error
CT1 CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
Criteria: Accordance with CT specification.
Check List for Print out1.CT Ratio and Polarity Test (For all Cores and Taps) :2.Knee point test ( for all cores and taps) :3.Winding resistance test (for all core & taps) :
Remark :
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 22 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.2. BUS SECTION6.2.1. Name Plate Details
Description CT 1 – CORE-1 CT 2 – CORE-1 CT 2 – CORE-2
Make SCHNEIDER SCHNEIDER
Type RING RING
Installation INDOOR INDOOR
Highest System Voltage 12 kV 12 kV
Short Time Rating 40 kA for 3Sec 40 kA for 3Sec
Mfg.Year/Sl.No:
R ph
Y ph
B ph
Ratio 3200/1A 3200/1A 3200/1A
Class PX 5P20/1.0 PX
Rated burden(VA) - 15 VA -
CT sec.resistance (Rct) at75c in Ω 18Ω 18Ω 18Ω
Knee point voltage (Vk) inV
563V - 563V
I mag at VK/2 in mA 8.8mA - 8.8mA
Mfg.Year/Sl.No
R ph
Y ph
B ph
CT SecTerminals
R ph 1S1-1S2 1S1-1S2 2S1-2S2
Y ph 1S1-1S2 1S1-1S2 2S1-2S2
B ph 1S1-1S2 1S1-1S2 2S1-2S2
Function B/B PROT (87B) OC/EF+BCU+MET B/B PROT (87B)
6.2.1. General Checks
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 23 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
1. General visual inspection :2. Name plate details :3. HV Terminal Marking :4. LV Terminal Marking :5. Check for tightness of all CT terminals :6. Neutral earthing / Single point earthing :7. Position of P1-Towards BUS/FEEDER :8. Check CT Connection with ring type Lugs :9. Check CT wire as per the Schematic diagrams and tightness :
6.2.2. Insulation Resistance Measurement:Minimum Value: 1M/kV
Test Procedure Check the Core to be measured Say Typical X – Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values
Test Results- CT 1
CTDesignation
Description Applied Voltage(DC) in V
R-PH(GΩ) Y-PH(GΩ) B-PH(GΩ)
CT 1
Primary –Earth 5000 V
Primary-Secondary(Core.1) 5000 V
Secondary (Core.1)- Earth 500 V
Test Results -CT 2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 24 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
CTDesignation Description
AppliedVoltage
(DC) in VR-PH(GΩ) Y-PH(GΩ) B-PH(GΩ)
CT 2
Primary –Earth 5000 V
Primary- Secondary (Core.1) 5000 V
Primary- Secondary (Core.2) 5000 V
Secondary (Core.1) -Earth 500 V
Secondary (Core.2)-Earth 500 V
Secondary(Core.1) &Secondary(Core.2)
500 V
6.2.3. Polarity Test(P1 towards (+) ve & P2 towards (-) ve
Test Procedure Isolate primary/ secondary / Neutral earth. Connect S1 to +ve and S2 to –ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter.
Test Results
CT Designation Core No Terminal R-PH Y-PH B-PH
CT1-1 CORE-1 1S1-1S2
CT2-1 CORE-1 1S1-1S2
CT2-2 CORE-2 2S1-2S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 25 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.2.4. CT Winding Resistance
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button,
the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance
Test Results
CTDesignation
Core No Terminal
Measured Resistance ( in ohms)
R-Ph Y-Ph B-Ph
At ambT At 75 C At ambT At 75 C At ambT At 75 C
CT1-1 CORE-1 1S1-1S2
CT2-1 CORE-1 1S1-1S2
CT2-2 CORE-2 2S1-2S2
Ambt Temperature : ºC Temperature at 75 C = Rt (1+0.00393(75-t))Where, 75: Resistance at 75°C (Ω)
Rt : Resistance at ambient temperature (Ω)t : Ambient temperature (°C)
Criteria: Resistance shall be less than specified CT specification.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 26 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.2.5. Knee Point Voltage measurementAmbt Temperature : ºC
Test Procedure Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores.
Test Results
CTDesignation
Core No TerminalR-Ph Y-Ph B-Ph
Vk(V)
Imag(mA)
Vk(V)
Imag(mA)
Vk(V)
Imag( mA)
CT1-1 CORE-1 1S1-1S2
CT2-1 CORE-1 1S1-1S2
CT2-2 CORE-2 2S1-2S2
Criteria: Accordance with CT specification.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 27 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.2.6. Ratio Test
Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases.Test Results
R-Phase
CT Designation Core No TerminalInjected Primary
Current (A)Expected Sec.Current (A)
Measured Sec.Current (A)
% Error
CT1-1 CORE-1 1S1-1S2
CT2-1 CORE-1 1S1-1S2
CT2-2 CORE-2 2S1-2S2
Y-Phase
CT Designation Core No TerminalInjected Primary
Current (A)Expected Sec.Current (A)
Measured Sec.Current (A)
% Error
CT1-1 CORE-1 1S1-1S2
CT2-1 CORE-1 1S1-1S2
CT2-2 CORE-2 2S1-2S2
B-Phase
CT Designation Core No TerminalInjected Primary
Current (A)Expected Sec.Current (A)
Measured Sec.Current (A)
% Error
CT1-1 CORE-1 1S1-1S2
CT2-1 CORE-1 1S1-1S2
CT2-2 CORE-2 2S1-2S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 28 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Criteria: Accordance with CT specification.
Check List for Print out1. CT Ratio and Polarity Test ( For all Cores and Taps ) :2. Knee point test ( for all cores and taps) :3. Winding resistance test (for all core & taps) :
Remark
6.3. Outgoing FeedersName Plate DetailsDescription (CT1) Core 1 (CT1) Core 2 (CT2) Core 1
Make SCHNEIDER
Type RING
Installation INDOOR
Highest System Voltage 12 kV
Short Time Rating 40 kA for 3Sec
Ratio 400 – 300 /1A 400 – 300 /1A 3200/1A
Class 5P20/1.0 PX PX
Rated burden(VA) 15 - 11.5 VA - -
CT sec. resistance (Rct) at75c in Ω 2 - 1.5Ω 1.4 1.05Ω 18Ω
Knee point voltage (Vk)in V
- 425 - 320 563V
I mag at VK/2 in mA - ≤50-70mA 8.8mA
Mfg.Year/Sl.No:
R ph
Y ph
B ph
CT SecTerminals
R ph 1S1-1S3 2S1-2S3 1S1-1S2
Y ph 1S1-1S3 2S1-2S3 1S1-1S2
B ph 1S1-1S3 2S1-2S3 1S1-1S2
Function OC/EF+BCU PILOT WIRE PRTN B/B PROTN (87B)
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 29 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.3.1. General Checks1. General visual inspection :2. Name plate details :3. HV Terminal Marking :4. LV Terminal Marking :5. Check for tightness of all CT terminals :6. Neutral earthing / Single point earthing :7. Position of P1-Towards BUS/FEEDER :8. Check CT Connection with ring type Lugs :9. Check CT wire as per the Schematic diagrams and tightness :
6.3.2. Insulation Resistance Measurement:Minimum Value: 1M/KV
Test Procedure Check the Core to be measured Say Typical X – Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values
Test Results
Description Applied Voltage(DC) in V
R-PH(GΩ) Y-PH(GΩ) B-PH(GΩ)
Primary –Earth 5000 V
Primary- Secondary 1 5000 V
Primary- Secondary 2 5000 V
Secondary 1-Earth 500 V
Secondary 2-Earth 500 V
Secondary 1- Secondary 2 500 V
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 30 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.3.3. Polarity Test
(P1 towards (+) ve & P2 towards (-) ve
Test Procedure Isolate primary/ secondary / Neutral earth. Connect S1 to +ve and S2 to –ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter.
Test ResultsCT
DesignationCore No Terminal R-PH Y-PH B-PH
CT1
CORE-1 1S1-1S2
1S1-1S3
CORE-22S1-2S2
2S1-2S3
CT2 CORE-1 S1-S2
6.3.4. CT Winding Resistance
Test Procedure
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 31 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button,
the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance
Test Results
CTDesignation
Core No Terminal
Measured Resistance ( in ohms)
R-Ph Y-Ph B-Ph
At ambT At 75 C At ambT At 75 C At ambT At 75 C
CT1
CORE-11S1-1S2
1S1-1S3
CORE-22S1-2S2
2S1-2S3
CT2 CORE-1 1S1-1S2
Ambt Temperature : ºC Temperature at 75 C = Rt (1+0.00393(75-t))Where, 75: Resistance at 75°C (Ω)
Rt : Resistance at ambient temperature (Ω)t : Ambient temperature (°C)
Criteria: Resistance shall be less than specified CT specification.
6.3.5. Knee Point Voltage measurementAmbt Temperature : ºC
Test Procedure
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 32 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores.
Test Results
CT Designation Core No TerminalR-Ph Y-Ph B-Ph
Vk(V)
Imag(mA)
Vk(V)
Imag(mA)
Vk(V)
Imag( mA)
CT1
CORE-11S1-1S2
1S1-1S3
CORE-22S1-2S2
2S1-2S3
CT2 CORE-1 1S1-1S2
Criteria: Accordance with CT specification.6.3.6. Ratio Test
Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 33 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Test Results
R-Phase
CT Designation Core TerminalInjected Primary
Current in (A)
ExpectedSec.Current in
(A)
MeasuredSec.Current in
(A)% Error
CT1
CORE-11S1-1S2
1S1-1S3
CORE-22S1-2S2
2S1-2S3
CT2 CORE-1 1S1-1S2
Y-Phase
CT Designation Core TerminalInjected Primary
Current in (A)Expected Sec.Current in (A)
Measured Sec.Current in (A)
% Error
CT1
CORE-11S1-1S2
1S1-1S3
CORE-22S1-2S2
2S1-2S3
CT2 CORE-1 1S1-1S2
B-Phase
CT Designation Core TerminalInjected Primary
Current in (A)Expected Sec.Current in (A)
Measured Sec.Current in (A)
% Error
CT1
CORE-11S1-1S2
1S1-1S3
CORE-22S1-2S2
2S1-2S3
CT2 CORE-1 1S1-1S2
Criteria: Accordance with CT specification.
Check List for Print out1. CT Ratio and Polarity Test(For All Cores and Taps) :2. Knee point test ( for all cores and taps) :3. Winding resistance test (for all core & taps) :
Remarks
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 34 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.4. Station Transformer FeedersName Plate Details
Description (CT1) CORE-1 (CT1) CORE-2 (CT2) CORE-1
Make SCHNEIDER
Type RING
Installation INDOOR
Highest System Voltage 12 kV
Short Time Rating 40kA for 3Sec
Ratio 150/1A 150/1A 3200/1A
Class 5P20/1.0 5P20/1.0 PX
Rated burden(VA) 15VA 15VA -
CT sec. resistance (Rct) at75c in Ω 3Ω 3Ω 18Ω
Knee point voltage (Vk) inV
- - 563
I mag at VK/2 in mA - - 8.8mA
Mfg.Year/Sl.No:
R ph
Y ph
B ph
CT SecTerminals
R ph 1S1-1S2 2S1-2S2 S1-S2
Y ph 1S1-1S2 2S1-2S2 S1-S2
B ph 1S1-1S2 2S1-2S2 S1-S2
Function OC+E/F BCU+ METERING B/B PROT (87B)
6.4.1. General Checks1. General visual inspection :2. Name plate details :3. HV Terminal Marking :4. LV Terminal Marking :5. Check for tightness of all CT terminals :6. Neutral earthing / Single point earthing :7. Position of P1-Towards BUS/FEEDER :8. Check CT Connection with ring type Lugs :9. Check CT wire as per the Schematic diagrams and tightness :
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 35 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.4.2. Insulation Resistance Measurement:Minimum Value: 1M/KV Ambt Temperature : ºC
Test Procedure Check the Core to be measured Say Typical X – Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values
Test Results
DescriptionApplied Voltage
(DC) in VR-PH(GΩ) Y-PH(GΩ) B-PH(GΩ)
Primary –Earth 5000 V
Primary- Secondary 1 5000 V
Primary- Secondary 2 5000 V
Secondary 1-Earth 500 V
Secondary 2-Earth 500 V
Secondary 1- Secondary 2 500 V
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 36 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.4.3. Polarity Test
(P1 towards (+) ve & P2 towards (-) ve
Test Procedure Isolate primary/ secondary / Neutral earth. Connect S1 to +ve and S2 to –ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter.
Test ResultsCT
DesignationCore No Terminal R-PH Y-PH B-PH
CT1 CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 37 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.4.4. CT Winding Resistance
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button,
the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance
Test Results
CTDesignation
Core No Terminal
Measured Resistance ( in ohms)
R-Ph Y-Ph B-Ph
At ambT At 75 C At ambT At 75 C At ambT At 75 C
CT1CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
Ambt Temperature : ºC Temperature at 75 C = Rt (1+0.00393(75-t))Where, 75: Resistance at 75°C (Ω)
Rt : Resistance at ambient temperature (Ω)t : Ambient temperature (°C)
Criteria: Resistance shall be less than specified CT specification.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 38 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.4.5. Knee Point Voltage measurementAmbt Temperature : ºC
Test Procedure Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores.
Test Results
CT Designation Core No TerminalR-Ph Y-Ph B-Ph
Vk(V)
Imag(mA)
Vk(V)
Imag(mA)
Vk(V)
Imag( mA)
CT1CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
Criteria: Accordance with CT specification.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 39 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
6.4.6. Ratio Test
Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases.Test Results
R-Phase
CT Designation Core TerminalInjected Primary
Current in (A)Expected Sec.Current in (A)
Measured Sec.Current in (A) % Error
CT1CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
Y-Phase
CT Designation Core TerminalInjected Primary
Current in (A)Expected Sec.Current in (A)
Measured Sec.Current in (A) % Error
CT1CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 40 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
B-Phase
CT Designation Core TerminalInjected Primary
Current in (A)Expected Sec.Current in (A)
Measured Sec.Current in (A)
% Error
CT1CORE-1 1S1-1S2
CORE-2 2S1-2S2
CT2 CORE-1 1S1-1S2
Criteria: Accordance with CT specification.
Check List for Print out1. CT Ratio and Polarity Test(For All Cores and Taps) :2. Knee point test ( for all cores and taps) :3. Winding resistance test (for all core & taps) :
Remarks :
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 41 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
7. VOLTAGE TRANSFORMER TEST
7.1. Incomer FeederName Plate Details
Description CORE 1
Make SCHNEIDER
Type VBF12
Installation INDOOR
Highest System Voltage 12 kV
Insulation Level
Ratio11kV/√3 :110V/√3
Class 3P/1.0
Burden(VA) 50 VA
Mfg.Year/Sl.No:
R ph
Y ph
B ph
Function BCU + AVR + MET. + SYNC
7.1.1. General Checks1. General visual inspection :2. Name plate details :3. HV Terminal Marking :4. LV Terminal Marking :5. Check for tightness of all VT terminals :6. VT Primary and Secondary neutral earth check :7. Fuse rating :8. MCB rating :
9. Equipment Grounding System :
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 42 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
7.1.2. Insulation Resistance Measurement:Minimum Value: 1M/kV Ambt Temperature : ºC
Test Procedure Check the Core to be measured Say Typical X – Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values
Test Results
DescriptionApplied Voltage
(DC)in VR-PH(GΩ) Y-PH(GΩ) B-PH(GΩ)
Primary –Earth 5000 V
Primary- Secondary 1 5000 V
Secondary 1-Earth 500 V
7.1.3. Polarity Test
Test Procedure Isolate primary/ secondary / Neutral earth. Connect ‘a’ to +ve and ‘n’ to –ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. If the deflection is not enough to confirm, reverse the connection (meter shall be connected to
Primary side and DC voltage shall be applied on secondary side) and try again.Test Results
VT Designation Core No Terminal R-Ph Y-Ph B-Ph
VT CORE-1 1r* - 1nr*
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 43 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
*Denotes respective phase .i.e (1r-1nr), (1y-1ny), (1b-1nb)
7.1.4. VT Winding Resistance
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the voltage transformer page As per instructions given by manual enter the test current and Pressing the start button, the test card
displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance
Test Results
VTDesignation
Core Terminal
Measured Resistance ( in ohms)
R-PH Y-PH B-PH
At ambT At 75 C At ambT At 75 C At ambT At 75 C
HV R* - N*
LV
1r* - 1nr*
2r* - 2nr*
3r* - 3nr*
*Denotes respective phase.i.e (R-N), (Y-N), (B-N), (1r-1nr), (1y-1ny),(1b-1nb) (2r-2nr),(2y-2ny),(2b-2nb) & (3r-3nr),(3y-3ny),(3b-3nb)
Ambt Temperature: C Temperature at 75 C = Rt (1+0.00393(75-t))Where, 75: Resistance at 75°C (Ω)
Rt: Resistance at ambient temperature (Ω)t: Ambient temperature (°C)
Criteria: Resistance shall be less than specified CT specification.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 44 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
7.1.5. Ratio Test
Test Procedure Do the connection as shown fig. Switch on the kit. Select the voltage transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary voltage and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases.
Test Results
VT Designation Phase TerminalApplied Primary
Voltage in (V)
CalcSec. Voltage in
(V)
MeasuredSec. Voltage in
(V)% Error
VT
R 1r - 1nr
Y 1y - 1ny
B 1b - 1nb
Criteria: Accordance with VT specification.
Check List for Print out1.VT ratio and polarity test :2. VT secondary winding resistance :
Remarks:
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 45 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
7.2. Capacitor, Station Transformer, Outgoing FeedersName Plate Details
Description Core 1
Make SCHNEIDER
Type VBF12
Installation INDOOR
Highest System Voltage 12 kV
Insulation Level
Mfg. Year/Sl.No:
R ph
Y ph
B ph
Ratio 11kV/√3 : 110V/√3
Class 3P/1.0
Burden(VA) 50 VA
Function BCU + MET. + SYNC.
7.3. Bus VTDescription Core 1
Make SCHNEITER
Type VBF12
Installation INDOOR
Highest System Voltage 12 kV
Insulation Level
Mfg.Year/Sl.No:
R ph
Y ph
B ph
Ratio 11kV/√3 : 110V/√3
Class 3P/1.0
Burden(VA) 50 VA
Function BCU + MET. + SYNC.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 46 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
7.2.1. General Checks1.General visual inspection :2.Name plate details :3.HV Terminal Marking :4.LV Terminal Marking :5.Check for tightness of all VT terminals :6.Fuse rating :7.MCB rating :8.Equipment Grounding System :9.VT Primary and Secondary neutral earth check :10. VT truck rack IN/OUT check :
7.2.2. Insulation Resistance Measurement:Minimum Value: 1M/kV Ambt Temperature : ºC
Test Procedure Check the Core to be measured Say Typical X – Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values
Test Results
DescriptionApplied Voltage
(DC) in V R-PH(GΩ) Y-PH(GΩ) B-PH(GΩ)
Primary –Earth 5000 V
Primary- Secondary 5000 V
Secondary -Earth 500 V
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 47 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
7.2.3. Polarity Test
Test Procedure Isolate primary/ secondary / Neutral earth. Connect ‘a’ to +ve and ‘n’ to –ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. If the deflection is not enough to confirm, reverse the connection (meter shall be connected to
Primary side and DC voltage shall be applied on secondary side) and try again.
Test ResultsVT Designation Core No Terminal R-Ph Y-Ph B-Ph
VT CORE -1 1r* - 1nr*
*Denotes respective phase .i.e (1r-1nr),(1y-1ny),(1b-1nb)
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 48 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
7.2.4. VT Winding Resistance
Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the voltage transformer page As per instructions given by manual enter the test current and Pressing the start button, the test card
displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance
Test Results
VT Designation Core Terminal
Measured Resistance ( in ohms)
R-PH Y-PH B-PH
At ambT At 75 C At ambT At 75 C At ambT At 75 C
VT 1 1r* - 1nr*
*Denotes respective phase .i.e (1r-1nr),(1y-1ny),(1b-1nb)
Ambient Temperature: C Temperature at 75 C = Rt (1+0.00393(75-t))Where, 75 : Resistance at 75°C (Ω)
Rt : Resistance at ambient temperature (Ω)t : Ambient temperature (°C)
Criteria: Resistance shall be less than specified CT specification.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 49 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
7.2.5. Ratio Test
Test Procedure Do the connection as shown fig. Switch on the kit. Select the voltage transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary voltage and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases.
Test Results
VTDesignation
Phase TerminalApplied Primary
Voltage in (V)
CalculatedSec. Voltage in
(V)
MeasuredSec. Voltage in
(V)% Error
R 1r - 1nr
Y 1y - 1ny
B 1b - 1nb
Criteria: Accordance with VT specification.
Check List for Print out1. VT ratio and polarity test :2. VT secondary winding resistance :
Remarks
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 50 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
8. METER CALIBRATION TEST
8.1. Ammeter with Selector Switch8.1.1. Name Plate Details
Device Ref :Make :Sl. No. :Full Scale Reading :CT Ratio :Accuracy Class :
8.1.2. Secondary Injection Test
Injected Secondary Currentin (A)
Measured Current in (A) Expected Current in (A) % Error
Allowable Error Range: As per the Ammeter Class
Ammeter Found Healthy : YES / NO
Selector switch function checked : YES / NO
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 51 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
8.2. Volt Meter with Selector Switch:
8.2.1. Name Plate DetailsDevice Ref :Make :Sl. No. :Full Scale Reading :CT Ratio :Accuracy Class :
8.2.2. Secondary Injection TestInjected Secondary
voltage in VMeasured Voltmeter Reading
in (kV)Expected Voltmeter Reading
in (kV)% Error
Allowable Error Range: As per the Voltmeter Class
Volt meter Found Healthy : YES / NOSelector switch function checked : YES / NO
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 52 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.11kV CT SECONDARY INJECTION TEST
9.1. Incomer Feeder9.1.1 Name Plate Details:
Description (CT1) CORE-1 (CT1) CORE-2 (CT2) CORE-1
Make SCHNEIDER
Type RING
Installation INDOOR
Highest system voltage 12 kV
Short time rating 40 kA for 3Sec
Ratio 2500/1A 2500/1A 3200/1A
Class PX 5P20/1.0 PX
Rated burden(VA) - 15VA -
CT sec. resistance (Rct) at 75cin Ω <8.75 <14 <18
Knee point voltage (Vk) in V ≥230 - 563
I mag at VK/2 in mA ≤30 - 8.8mA
Mfg. Year/Sl.No
R ph
Y ph
B ph
CT SecTerminals
R ph 1S1-1S2 2S1-2S2 S1-S2
Y ph 1S1-1S2 2S1-2S2 S1-S2
B ph 1S1-1S2 2S1-2S2 S1-S2
FunctionMAIN TRF DIFF(87T) +
REFDirectional O/C Protection
+BCU+AVR+ AmmeterBus Bar Protection
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 53 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.1.2. A18 CT1- Core-1, Diff Protection (87T) + REF (87NI).
Ratio : 2500/1A
Inject R- PH – 0.6 A, Y- PH – 0. 8A, B- PH – 1.0A at A, SWGR Terminals X11-612, 615, 618 & 613 andmeasure the Current in the following terminals.
Secondary Current In mA measured at
SWGR Panel A18TB Terminal X11
Relay Panel +B11 RPCT Terminal X650
Relay Panel +B11 .RPTest Block –S871.B Test Position
R Y B N R Y B N R Y B N
612 615 618 613 1 3 5 7 21 23 25 27
Relay Panel +B11 .RPTest Block –S871.B Test Position
Relay Panel +B11 .RPTest Block –S871.B Service Position
Relay Panel +B11 RP Relay 87TMain - 7UT613
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 R1 R3 R5 -
Relay Panel +B11 RPDisplay Pri. Current at Relay87T Main-
7UT613
Relay Panel +B11 RPDisplay Sec. Current at Relay87T Main-
7UT613
Relay Panel +B11 .RPTest Block –S871.B Test Position
R Y B N R Y B N R Y B N
IL1 IL2 IL3 - IL1 IL2 IL3 - 2 4 6 8
Relay Panel +B11 .RPTest Block –S871.B Test Position
Relay Panel +B11 .RPTest Block –S871.B Service Position
Relay Panel +B11 .RPTB Terminal X650
R Y B N R Y B N R Y B N
1 3 5 7 1 3 5 7 10 11 12 13
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 54 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel +A18 .RPTB Terminal X610
Relay Panel +A18 .RP Test Block –S871 Test Position
Relay Panel +A18 .RP Test Block–S871 Test Position
R Y B N R Y B N R Y B N
5 6 7 8 21 23 25 27 22 24 26 28
Relay Panel+A18 .RP Test Block –S871 Service Position
Relay Panel+A18 .RP-Relay (87NL/51) P141
Relay Panel +A18 .RP- DisplayPri. Current at Relay (87NL/51) P141
R Y B N R Y B N R Y B N
22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8 IL1 IL2 IL3 3I0
Relay Panel+A18 .RP-Display Sec. Current At Relay
(87NL/51) P141
Relay Panel+A18 .RP-B1 Metrosil
Relay Panel+A18 .RP-R102 Resistor
Relay Panel+A18 .RP –
S871Test Position
Relay Panel+A18
.RP –S871Test
Position
R Y B N N N N N N N N N
IL1 IL2 IL3 3I0 1 2 1 2 1 3 2 4
Relay Panel+A18 .RP TestBlock –S871
Service Position
Relay Panel +A18.RP-Relay 87NL P141
Relay Panel +A18 .RP-Display Pri. at
RELAY 87NL P141
Relay Panel+18A .RP- DisplaySec. at Relay 87NL P141
N N N3I0 3I0
2 4 Q7/Q8
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 55 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.1.3. A18 CT1- CORE-2, AVR+DIR OC+BCU+AMMETERRatio : 2500/1A
Inject R- PH – 0.6 A, Y- PH – 0.8A, B- PH – 1.0A at A SWGR Terminals X11 – 622, 625, 628 & 623and measure the current in the following terminals.
Secondary current in mA measured at
SWGR Panel +A18 TB Terminal -X11Relay Panel+A18 .RP TB Terminal–
X620
Relay Panel+A18.RP TB
Terminal–X620
AVR Panel TBTerminal –X620
R Y B N R Y B N B B B B
622 625 628 623 1 3 5 7 10 13 1 4
AVR Panel -A1TAPCON 260
Relay Terminal-M1
AVR Panel -A1TAPCON 260
Relay Display Pri
AVR Panel -A1TAPCON 260
Relay Display Sec-
Relay Panel+A18 .RP –Test Block –S671.A Test Position
B B B B B B - - R Y B N
5 9 I I - - 21 23 25 27
- -
Relay Panel+A18 .RP –Test Block –S671.A Test Position
Relay Panel+A18 .RP –Test Block –S671.A Service Position
Relay panel +A18 .RP –Relay (67/67N/51/50BF) P141
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay panel +A18 .RP –Relay Display Pri at (67/67N/51/50BF)
P141
Relay panel +A18 .RP –Relay Display Sec at (67/67N/51/50BF)
P141
Relay Panel+A18 .RP –Test Block –S671.A Test Position
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE IL1 IL2 IL3 IE 2 4 6 8
Relay Panel+A18 .RP –Test Block –S671.A Test Position
Relay Panel+A18 .RP –Test Block –S671.A Service Position
Relay Panel+A18 .RPTest Block –S201 Test Position
R Y B N R Y B N R Y B N
1 3 5 7 1 3 5 7 21 23 25 27
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 56 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel+A18 .RPTest Block –S201 Test Position
Relay Panel+A18 .RPTest Block –S201 Service Position
Relay Panel+A18 .RP A201BCU 7SJ647
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel+A18 .RP - Display Pri. atBCU 7SJ647
Relay Panel+A18 .RP - Display Sec. atBCU 7SJ647
Relay Panel +A18 .RP TBTerminal –X620
IL1 IL2 IL3 IE IL1 IL2 IL3 IER Y B N
10 11 12 13
SWGR Panel+A18TB Terminal- X11
SWGR Panel+A18Selector Switch (-S401)
SWGR Panel +A18Ammeter (-P401)
R Y B N R Y B N R-ph Y-ph B-ph -
661 663 665 667 2 6 10 1-
9.1.4. A CT2- CORE-1, BB PROTN.Ratio: 3200/1A
Inject R- PH – 0.6 A, Y- PH – 0.8A, B- PH – 1.0A at A SWGR Terminals X11 – 634, 637, 640 &633 and measure the current in the following terminals.
Secondary current in mA measured at
SWGR Panel A18TB Terminal – X11
Bb Relay Panel +BB .RP1TB Terminal-X610
BB Relay Panel +BB .RP1R103,R104,R105(Resistor)
R Y B N R Y B N R Y B N
634 637 640 633 52 53 54 2 1,2 1,2 1,2 --
--
BB Relay Panel +BB .RP1 –Test Block –S87Z1 Test Position
BB Relay Panel +BB .RP1 –Test Block –S87Z1 Test Position
BB Relay Panel +BB .RP1 –Test Block –S87Z1 Service Position
R Y B N R Y B N R Y B N
21 23 25 27 22 24 26 28 22 24 26 28
BB Relay Panel +BB .RP-Relay F87Z1 BBP 7SJ611
BB Relay Panel +BB .RP-Relay Display Pri.F87Z1 BBP 7SJ611
BB Relay Panel +BB .RP-RelayDisplay Sec.F87Z1 BBP 7SJ611
R Y B N R Y B N R Y B N
Q7/Q8 Q7/Q8 Q7/Q8 -- 3I0 3I0 3I0 - 3I0 3I0 3I0 -
--
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 57 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.1.5. Burden Measurement Test
Inject 1A at each core and each phase. Measure the voltage at terminal.LOCATION CORE NO PHASE TERMINAL VOLTAGE BURDEN
11KV SWGR
CT1-Core 1
R X11– 612 & 613
Y X11– 615 & 616
B X11– 618 & 619
CT1-Core 2
R X11 –622 & 623
Y X11– 625 & 626
B X11– 628 & 629
CT2-Core 1
R X11 – 633 & 634
Y X11 – 636 & 637
B X11 – 639 & 640
CT Star Point Conformation:
Note:
1. Confirmation of connection of CT as per drawing :2. Confirmation of isolating links and shorting links as per drawing :3. Confirmation of earthing of star at single point :4. CT Terminal tightness :5. CORE identification checks :
Remarks:
Description CT Core (CT1) Core-1 (CT1) Core-2 (CT2) Core-1
Star Point
Conformation
S1/S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 58 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.2. Bus Section
9.2.1. Name Plate Details:
Description CT1 - Core 1 CT2 - Core 1 CT2 - Core 2
Ratio 3200/1A 3200/1A 3200/1A
Class PX 5P20/1.0 PX
Rated Output(VA) - 15 VA -
CT Sec. Resistance (Rct)@75C
≤18Ω ≤18Ω ≤18Ω
Knee Point Voltage (Vk) ≥563V - ≥563V
I mag At VK/2 ≤8.8mA - ≤8.8mA
Purpose B/B PRTN(87B/50BF)O/C + E/F-
50/51N+BCU+METERINGB/B PRTN(87B/50BF)
9.2.2. A CT1, CORE-1 (87B/50BF)Ratio: 3200/1A
Inject R-PH– 0.6A, Y-PH- 0.8A, B-PH-1.0A at A SWGR Terminals X11: 605, 609, 613&603 andmeasure the current in the following terminals.
Secondary current in mA measured at
SWGR Panel +A18TB Terminal-X11
BB Relay Panel +BB .RP1TB Terminal– X610
BB Relay Panel +BB .RP1 –B103,B104,B105-(Metrosil)
R Y B N R Y B N R Y B N
605 609 613 603 2 4 6 5 1,2 1,2 1,2 --
--
BB Relay Panel +BB .RP1 –R103,R104,R105- Resistor
BB Relay Panel +BB .RP1 Test Block –S871Z1 Test Position
BB Relay Panel +BB .RP1 Test Block –S871Z1 Test Position
R Y B N R Y B N R Y B N
1,2 1,2 1,2 -- 21 23 25 27 22 24 26 28
--
BB Relay Panel +BB .RP1 Test Block–S871Z1 Service Position
BB Relay Panel +BB .RP1-Relay 87BB1 BBP 7SJ611
BB Relay Panel +BB .RP1-Relay Display Pri-87BB1 BBP 7SJ611
R Y B N R Y B N3I0 3I0 3I0 --
22 24 26 28 Q7/Q8 Q7/Q8 Q7/Q8 --
-- --
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 59 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
BB Relay Panel +BB .RP1-Relay Display Sec-87BB1 BBP 7SJ611
---------- -------
3I0 3I0 3I0 -- --- --- --- --- --- --- --- ---
--- --- --- --- --- --- --- ---
9.2.3. A CT2, CORE-1 O/C + E/F +BCU+METERING Ratio: 3200/1AInject R-PH– 0.6A, Y-PH- 0.8A, B-PH-1.0A at A SWGR Terminals X11: 612, 615, 618&613 andmeasure the current in the following terminals.
Secondary current in mA measured at
Relay Panel +ATB Terminal X11
Relay Panel +A .RPTB Terminal –X610
Relay Panel +A .RPTest Block –S511 Test Position
R Y B N R Y B N R Y B N
612 615 618 613 1 3 5 7 21 23 25 27
Relay Panel +A .RPTest Block –S511 Test Position
Relay Panel +A .RPTest Block –S511 Service Position
Relay Panel +A .RP Relay (51/50BF)7SJ621
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel +A .RP Relay DisplayPri- (51/50BF) 7SJ621
Relay Panel +A .RP Relay DisplaySec - (51/50BF) 7SJ621
Relay Panel +A .RPTest Block –S511 Test Position
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE IL1 IL2 IL3 IE 2 4 6 8
Relay Panel +A .RPTest Block –S511 Test Position
Relay Panel +A .RPTest Block –S511 Service Position
Relay Panel +A .RPTest Block –S201 Test Position
R Y B N R Y B N R Y B N
1 3 5 7 1 3 5 7 21 23 25 27
Relay Panel +A .RPTest Block –S201 Test Position
Relay Panel +A .RPTest Block –S201 Service Position
Relay Panel +A .RP -A201 BCU(7SJ647)
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel +A .RP Relay DisplayPri -A201 BCU (7SJ647)
Relay Panel +A .RP Relay DisplaySec -A201 BCU (7SJ647)
Relay Panel +A .RPTB Terminal -X610
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE IL1 IL2 IL3 IE 10 11 12 13
SWGR Panel BUS CT2TB Terminal -X11
SWGR Panel +ATB Terminal -X11
SWGR Panel +ASelector Switch (S401)
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 60 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
R Y B N R Y B N R Y B N
651 652 653 654 621 623 625 627 2 6 10 1
+A Ammeter Display R - Ph ,Y - Ph ,B – Ph (P401)
- -
R Y B N - - - - -
- - - - - -
- - - - - -
9.2.4. A CT2, CORE-2 87BB2 PROTNRatio: 3200/1A
Inject R-PH– 0.6A, Y-PH- 0.8A, B-PH-1.0A at +A SWGR Terminals X11:612,615,618 & 613 andmeasure the current in the following terminals.
Secondary current in mA measured at
SWGR Panel +ATB Terminal X11
BB Relay Panel +BB .RP1TB Terminal– X610
BB Relay Panel +BB .RP1 –B103,B104,B105 -(Metrosil)
R Y B N R Y B N R Y B N
612 615 618 613 1 17 33 49 1,2 1,2 1,2 --
--
BB Relay Panel +BB .RP1 –R103,R104,R105- (Resistor)
BB Relay Panel +BB .RP1 Test Block –S87Z1 Test Position
BB Relay Panel +BB .RP1 Test Block –S87Z1 Test Position
R Y B N R Y B N R Y B N
1,2 1,2 1,2 -- 21 23 25 27 22 24 26 28
--
BB Relay Panel +BB .RP1 Test Block–S87Z1 Service Position
BB Relay Panel +BB .RP1-Relay 87BB2 BBP 7SJ611
BB Relay Panel +BB .RP1-Relay Display Pri-87BB2 BBP 7SJ611
R Y B N R Y B N3I0 3I0 3I0 --
22 24 26 28 Q7/Q8 Q7/Q8 Q7/Q8 --
---
BB Relay Panel +BB .RP1-Relay Display Sec-87BB2 BBP
7SJ611----- -----
3I0 3I0 3I0 -- --- --- --- --- --- --- --- ---
--- --- --- --- --- --- --- ---
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 61 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.2.5. Burden Measurement Test:
Inject 1A at each core and each phase, Measure the voltage at terminal.Location Core No Phase Terminal Voltage Burden
11KV SWGR
CT1-Core 1
R X11 – 612 & 613
Y X11 – 615 & 616
B X11 – 618 & 619
CT2-Core 1
R X11 – 612 & 613
Y X11 – 615 & 616
B X11 – 618 & 619
CT2-Core 2
R X11 – 622 & 623
Y X11 – 625 & 626
B X11 – 628 & 629
CT Star Point Conformation:
DescriptionCT Core S1/S2
Star Point
Conformation
CT1-Core-1
CT2-Core-1
CT2-Core-2
Note:1. Confirmation of connection of CT as per drawing :2. Confirmation of isolating links and shorting links as per drawing :3. Confirmation of earthing of star at single point :4. CT terminal tightness :5. CORE identification checks :
Remarks:
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 62 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.3. Bay Ref: A Cable Feeder9.3.1. Name Plate Details:
9.3.2. A CT1-CORE-1, OC/EF+BCU+METRatio: 400 - 300/1A
Inject R- PH – 0.6 A, Y- PH – 0.8A, B- PH – 1.0 A at A SWGR Terminals X11 – 602, 606, 610 & 604and measure the current in the following terminals.
Secondary current in mA measured at
SWGR PanelTB Terminals - X11
Relay Panel +A .RP- TB TerminalX610.A
Relay Panel +A .RP –S502.A Test Position
R Y B N R Y B N R Y B N
602 606 610 604 1 3 5 7 21 23 25 27
Relay Panel +A .RP –S502.A Test Position
Relay Panel +A .RP –S502.A Service Position
Relay Panel +A .RP- Relay(50/50N/51/51N) 7SJ802
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 F1/F2 F3/F4 F5/F6 F7/F8
Description (CT1) CORE 1 (CT1) CORE 2 (CT2) CORE 1
Ratio 400 - 300/1A 400 - 300/1A 3200/1A
Class 5P20/1.0 PX PX
Rated Output(VA) 15-11.5 VA - -
CT Sec. Resistance (Rct) @75C <2 – 1.5Ω <1.4 – 1.05Ω <18Ω
Knee Point Voltage (Vk) - ≥425-320V ≥563V
I mag at VK/2 - ≤ 50-70mA ≤8.8mA
PurposeOC/EF+BCU+MET
50/50N/51/51N/49C
PILOT WIRE 87PA(7SG11+7PG211)
BBP 87BB1(7SJ611)
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 63 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel +A .RP- Display Pri.Relay (50/50N/51/51N) 7SJ802
Relay Panel +A .RP- Display Sec.Relay (50/50N/51/51N) 7SJ802
Relay Panel +A .RP –S502.A Test Position
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE IL1 IL2 IL3 IE 2 4 6 8
Relay Panel +A .RP – Test BlockS502.A Test Position
Relay Panel +A .RP – Test BlockS502.A Service Position
Relay Panel +A .RP –Test Block –S201.A Test Position
R Y B N R Y B N R Y B N
1 3 5 7 1 3 5 7 21 23 25 27
Relay Panel +A .RP –Test Block –S201.A Test Position
Relay Panel +A .RP –Test Block –S201.A Service Position
Relay Panel +A .RP – A201.A BCU7SJ632
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel +A .RP Display Pri –A201.A BCU 7SJ632
Relay Panel +A .RP Display Sec –A201.A BCU 7SJ632
Relay Panel +A .RP –TB TerminalX610A
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE IL1 IL2 IL3 IE 10 11 12 13
SWGR Panel +A .SWGR –TB Terminal –X11
SWGR Panel +A .SWGR –S401Ammeter selector switch (AS)
SWGR Panel +A SWGR- AmmeterDisplay
R Y B N R Y B N R Y B N
651 652 653 654 2 6 10 1 - - - -
9.3.3. A CT1- CORE-2, Pilot Wire Diff PRTNRatio : 400 - 300/1A
Inject R- PH – 0.6 A, Y- PH – 0.8A, B- PH – 1.0A at A SWGR Terminals X11 – 622, 626, 630 & 624and measure the current in the following terminals.
Secondary current in mA measured at
SWGR Panel +ATB Terminal X11
Relay Panel +A .RP- TBTerminal X620.A
Relay Panel +A .RP –TEST Block –S501.A Test Position
R Y B N R Y B N R Y B N
622 626 630 624 1 3 5 7 21 23 25 27
Relay Panel +A .RP –Test Block –S501.A Test Position
Relay Panel +A .RP –Test Block –S501.A Service Position
Relay Panel +A .RP- Relay –F501.A(50GR) 7SG111
R Y B N R Y B N R Y B N
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 64 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
22 24 26 28 22 24 26 28 27/28 25/26 23/24 21/22
Relay Panel +A .RP- Relay DisplayPri. F501.A (50GR) 7SG111
Relay Panel +A .RP- Relay DisplaySec. F501.A (50GR) 7SG111
Relay Panel +A .RP –Test Block –S501.A Test Position
R Y B N R Y B N
1AIA 1AIB 1AIC 5AIA 1AIA 1AIB 1AIC 5AIA 1 3 5 7
Relay Panel +A .RP –Test Block –S501.A Test Position
Relay Panel +A .RP –Test Block –S501.A Service Position
Relay Panel +A .RP- TB Terminal -X620.A
R Y B N R Y B N R Y B N
2 4 6 8 2 4 6 8 10 12 14 16
Relay Panel +A .RP –Relay 87P (7PG211)
--
R Y B N - - - - - - - -
23 25 27 24 - - - - - - - -
- - - - - - - -
9.3.4. A CT2-CORE-1, BUSBAR PRTNRatio: 3200/1A
Inject R- PH – 0.6 A, Y- PH – 0.8A, B- PH – 1.0A at A SWGR Terminals X11 – 644, 647,650 &643and measure the current in the following terminals.
Secondary current in mA measured at
SWGR Panel +ATB Terminal X11
Relay Panel +BB .RP1 –TB Terminal –X610
Relay Panel +BB .RP1 –R103,R104,R105(Resistor)
R Y B N R Y B N R Y B N
644 647 650 643 3 23 39 69 R(1,2) Y(1,2) B(1,2) --
--
Relay Panel +BB .RP1 –Test Block –S87Z1 Test Position
Relay Panel +BB .RP1 –Test Block –S87Z1 Test Position
Relay Panel +BB .RP1 –Test Block –S87Z1 Service Position
R Y B N R Y B N R Y B N
21 23 25 27 22 24 26 28 22 24 26 28
Relay Panel +A .RP - Relay -F87Z1BBP 7SJ611
Relay Panel +A .RP - Relay DisplayPri -F87Z1 BBP 7SJ611
Relay Panel +A .RP - Relay DisplaySec -F87Z1 BBP 7SJ611
R Y B N R Y B N R Y B N
Q7/Q8 Q7/Q8 Q7/Q8 -- 3I0 3I0 3I0 - 3I0 3I0 3I0 -
--
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 65 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.3.5. Burden Measurement TestInject 1A at each core and each phase. Measure the voltage at terminal.
Location Core No Phase Terminal Voltage Burden
11KV SWGR
CT1-Core 1
R X11 – 602 & 604
Y X11 – 606 & 608
B X11 – 610 & 612
CT1-Core 2
R X11 – 624 & 622
Y X11– 626 & 628
B X11 – 630 & 632
CT2-Core 1
R X11 – 644 & 643
Y X11 – 646 & 647
B X11 – 650 & 649
CT Star Point Conformation:
Note:1. Confirmation of connection of CT as per drawing :2. Confirmation of isolating links and shorting links as per drawing :3. Confirmation of earthing of star at single point :4. CT terminal tightness :5. CORE identification checks :
Remarks:
Description CT Core (CT1) Core-1 (CT1) Core-2 (CT2) Core-1
Star Point Conformation S1/S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 66 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.4. Bay Ref : A Auxiliary Transformer Feeder
9.4.1. Name Plate Details:
Description (CT1) Core 1 (CT1) Core 2 (CT2) Core 1
Ratio 150/1A 150/1A 3200/1A
Class 5P20/1.0 5P20/1.0 PX
Rated Output(Va) 15 VA 15 VA -
CT Sec. Resistance (R ct)@75C
<3.0Ω <3.0Ω <18Ω
Knee Point Voltage (Vk) - - ≥563V
I mag At VK/2 - - ≤ 8.8mA
Purpose OC/EF PROTNBCU+
AMMETERBUSBAR PROTN.
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 67 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.4.2. A CT1- CORE-1, OC/EF PROTNRatio : 150/1A
Inject R- PH – 0.6 A, Y- PH – 0.8A, B- PH – 1.0A at A SWGR Terminals X11– 602, 605, 608 & 603and measure the current in the following terminals.
Secondary current in mA measured at
SWGR Panel +A10TB terminal –X11
Relay Panel +A10 .RP- TBterminal X610
Relay Panel +A10 .RP–Test Block –S511 Test Position
R Y B N R Y B N R Y B N
602 605 608 603 1 3 5 7 21 23 25 27
Relay Panel +A10 .RP–Test Block –S511 Test Position
Relay Panel +A10 .RP–Test Block –S511 Service Position
Relay Panel +A10 .RP- Relay50/50N/51/51N (7SJ611)
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel +A10 .RP- Relay DisplayPri-50/50N/51/51N (7SJ611)
Relay Panel +A10 .RP- Relay DisplaySec -50/50N/51/51N (7SJ611)
----
R Y B N R Y B N --- --- --- ---
IL1 IL2 IL3 IE IL1 IL2 IL3 IE --- --- --- ---
--- --- --- ---
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 68 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.4.3. A CT1- CORE-2, BCU+METERINGRatio : 150/1A,
Inject R- PH – 0.6 A, Y- PH – 0.8A, B- PH – 1.0A at A SWGR Terminals X11 – 622, 625, 628 & 623and measure the current in the following terminals.
Secondary current in mA measured at
SWGR Panel +ATB terminal –X11
Relay Panel +A .RP-TB terminal X620
Relay Panel +A .RP-Test Block –S201 Test Position
R Y B N R Y B N R Y B N
622 625 628 623 1 3 5 7 21 23 25 27
Relay Panel +A .RP-Test Block –S201 Test Position
Relay Panel +A .RP-Test Block –S201 Service Position
Relay Panel +A .RP - A201BCU 7SJ647
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
Relay Panel +A .RP - A201RelayDisplay Pri-BCU 7SJ647
Relay Panel +A .RP - A201RelayDisplay Sec-BCU 7SJ647
Relay Panel +A .RP-Test Block –S201 Test Position
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE IL1 IL2 IL3 IE 2 4 6 8
Relay Panel +A .RP-Test Block –S201 Test Position
Relay Panel +A .RP-Test Block –S201 Service Position
Relay Panel +A .RP-TB terminal -X620
R Y B N R Y B N R Y B N
1 3 5 7 1 3 5 7 10 11 12 13
SWGR Panel +ATB terminal –X11
SWGR Panel +A Ammeter SelectorSwitch (S401)
SWGR Panel +A Ammeter Display
R Y B N R Y B N R Y B N
661 663 665 667 2 6 10 1
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 69 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.4.4. A CT2-CORE-1, BUSBAR PROTN.Ratio: 3200/1A
Inject R- PH – 0.6 A, Y- PH – 0.8A, B- PH – 1.0A at A SWGR Terminals X11 – 644, 647, 650 & 643and measure the current in the following terminals.
Secondary current in mA measured at
SWGR Panel ATB Terminal –X11
Relay Panel +A .RP-TB Terminal –X610
Relay Panel +A .RP-B103,B104,B105 -Metrosil
R Y B N R Y B N R Y B N
644 647 650 643 3 19 35 55 R(1,2) Y(1,2) B(1,2) --
+ Relay Panel+A .RP-R103,R104,R105 (Resistor)
Relay Panel+A .RP-Test Block –S87Z1 Test Position
Relay Panel +A .RP-Test Block –S87Z1 Test Position
R Y B N R Y B N R Y B N
R(1,2) Y(1,2) B(1,2) -- 21 23 25 27 22 24 26 28
Relay Panel +A .RP-Test Block –S87Z1 Test Position
Relay Panel+A .RP-Relay 87BB1 BBP 7SJ611
Relay Panel +A .RP-Relay Display Pri-87BB1 BBP 7SJ611
R Y B N R Y B N R Y B N
22 24 26 28 Q7/Q8 Q7/Q8 Q7/Q8 -- 3I0 3I0 3I0 --
Relay Panel +A .RP-Relay Display Sec-87BB1 BBP 7SJ611
-------------
3I0 3I0 3I0 -- -- -- -- -- -- -- -- --
-- -- -- -- -- -- -- -- --
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 70 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
9.4.5. Burden Measurement Test :Inject 1A at each core and each phase. Measure the voltage at terminal
Location Core No Phase Terminal Voltage Burden
11KV SWGR
(CT1) Core 1
R X11 – 602 & 603
Y X11 – 603 & 606
B X11 – 608 & 609
(CT1) Core 2
R X11 – 622 & 623
Y X11 – 625 & 626
B X11 – 628 & 629
(CT2) Core 1
R X11 – 644 & 643
Y X11 – 647 & 646
B X11 – 650 & 649
CT Star Point Conformation:
Note:1. Confirmation of connection of CT as per drawing :2. Confirmation of isolating links and shorting links as per drawing :3. Confirmation of earthing of star at single point :4. CT terminal tightness :5. CORE identification checks :
Remarks:
Description CT Core (CT1) Core-1 (CT1) Core-2 (CT2) Core-1
Star Point Conformation S1/S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 71 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
10. VT SECONDARY INJECTION TEST
10.1. Bay Ref : A Incomer Feeder10.1.1. Name Plate Details:
Core No. VT-WDG-1
Class 3P/1.0
Ratio (Volt) 11kV/√3 :110V/√3
Burden(VA) 50
Purpose67PROTN+SYNC. +BCU+VOLT METER
10.1.2. Core-1 VT secondary injection:
VT core and function : CORE1, 67PTN+BCU+SYNC +VOLT METERRatio : 11kV/√3 / 110V/√3
Injected voltage: R-N: 60 Y-N: 50 B-N: 40 at X11- 671,672, 673 & 674 Terminals measure the voltagewith respect to Earth in the following terminals
Voltage in volts measured at
SWGR Panel +A TB Terminal –X11SWGR Panel +A MCB (F404)
OFF PositionSWGR Panel +A MCB (F404)
OFF Position
R Y B N R Y B N R Y B N
671 672 673 674 1 3 5 7 2 4 6 8
SWGR Panel +A MCB (F404)ON Position
SWGR Panel +A TB Terminal –X1+ SWGR Panel +A
Selector Switch (S404)
R Y B N R Y B N R Y B N
2 4 6 8 511 512 513 514 10 6 2 12
SWGR Panel +AVolt Meter Display
SWGR Panel +A TB Terminal –X1SWGR Panel +A -K101,K102,
K103- U/V Relay
R-Y Y-B B-R -- R Y B N R Y B --
--511.A 512.A 513.A 514.A 2,10 2,10 2,10 --
--
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 72 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
SWGR Panel +A -K101.1,K102.1,K103.1- U/V Relay
SWGR Panel +A TB Terminal –X4SWGR Panel +A
Fuse Failure Relay (F304)
R Y B -- R Y B N R Y B -
2,10 2,10 2,10 -- 511.B 512.B 513.B 514.B L1 L2 L3 -
-- -
SWGR Panel +A TB Terminal –X4 SWGR Panel +A Sync Switch S25 - ONSWGR Panel +A Sync Switch
S25 - ON
R Y B N R Y - - R Y - -
511.A 512.A 513.A 514.A 1 3 - - 2 4 - -
- - - -
SWGR Panel +A18 TB Terminal –X4 SWGR Panel +A10 TB Terminal –X4 SWGR Panel +A12 TB Terminal –X4
R Y - - R Y - - R Y - -
661 663 - - 661 663 - - 661 663 - -
- - - - - -
Relay Panel+A12 .RPTB Terminal –X710
Relay Panel +A12 .RP Test Block –S251Test Position
Relay Panel +A12 .RP Test Block –S251 Test Position
R Y - - R Y - - R Y - -
14 15 - - 9 11 - - 10 12 - -
- - - - - -
Relay Panel+A12 .RP-A251 (7SJ640)
Relay Panel+A12 .RP Relay Display Pri-A251 (7SJ640)
Relay Panel+A12 .RP Relay DisplaySec-A251 (7SJ640)
R Y - - RY - - RY - - -
R13 R14 - - V4 - - V4 - - -
- - - - - - -
SWGR Panel +A18 TB Terminal –X4Relay Panel+A18 .RP
TB Terminal –X710
Relay Panel +A18.RP VT Terminal -
X710
RTCC1Panel.AVR. TB- X710
R Y B N R Y B N R Y R Y
511 512 513 514 1 3 5 7 14 15 1 (R) 2(Y)
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 73 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
RTCC1 Panel.AVR Volt Meter
Terminal
RTCC1 Panel .AVRVolt Meter Display
RTCC1 Panel .AVR-U/V Relay (K501)
RTCC1 Panel.AVR Fail Relay
(K97)
RTCC1 Panel.AVR.
Raise/LowerRELAY(K502)
RTCC1 Panel.AVR Relay-A1TAPCON260
R Y R-Y R Y R Y R Y R Y R Y MI MI
1(R) 2(Y) R ph-Y ph A1(R) A2(Y) 21 22 31 32 13 14 43 44 1 2
RTCC1 Panel.AVR Relay-A1TAPCON260
-Relay Panel +A18 .RP
TB Terminal - X710
Relay Panel +A .RPTest Block-S671.B Test Position
R-Y - - R Y B N R Y B N
U - - 10 11 12 13 1 3 5 7
- -
Relay Panel +A .RPTest Block-S671.B Test Position
Relay Panel +A .RPTest Block-S671.B Service Position
Relay Panel +A .RP Relay –F671(67/67N/51/50BF) 7SJ621
R Y B N R Y B N R Y B N
2 4 6 8 E13 E33 E53 E73 R14 R15 R17 R16
Relay Panel +A .RP Relay Display Pri–F671 (67/67N/51/50BF) 7SJ621
Relay Panel +A .RP Relay Display Sec–F671 (67/67N/51/50BF) 7SJ621
Relay Panel +A .RPTest Block-S201 Test Position
R Y B - R Y B - R Y B N
V1 V2 V3 - V1 V2 V3 - 1 3 5 7
Relay Panel +A .RPTest Block-S201 Test Position
Relay Panel +A .RPTest Block-S201 Test Position
Relay Panel +A .RPRelay –A201 BCU (7SJ647)
R Y B N R Y B N R Y B N
2 4 6 8 2 4 6 8 R15 R17 R18 R16
Relay Panel +A .RPRelay Display Pri –A201 BCU (7SJ647)
Relay Panel +A .RPRelay Display Sec –A201 BCU (7SJ647) -
R Y B N R Y B N - - - -
VL1 VL2 VL3 - VL1 VL2 VL3 - - - - -
- - - - - -
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 74 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
10.1.3. Burden Measurement:Core-1
Phase Voltage applied in Volts Current measured in mA Calculated Burden in VA
R 63.5
Y 63.5
B 63.5
Note:1. Confirmation of isolating links and shorting links as per drawing :2. Confirmation of Earthing of STAR at single point :3. Terminal tightness checked :
Remarks:
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 75 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
10.2. Bay Ref : A12 Bus Section :Name Plate Details:
10.2.1. A166 VT secondary injection:Core and Function: A166 - BCU + Voltmeter + LOAD SHEDDING
Ratio: 11kV/√3:110V/√3Injected voltage: R-N: 60V Y-N: 50V B-N: 40V at X4:651, 652, 653 & 654 Terminals measure thevoltage with respect to Earth in the following terminals.
Voltage in volts measured at
SWGR Panel +A16 TB Terminal –X4SWGR Panel +A16 VT MCB (F404)
OFF PositionSWGR Panel +A16 VT MCB (F404)
OFF Position
R Y B N R Y B N R Y B N
651 652 653 654 1 3 5 7 2 4 6 8
SWGR Panel +A16 VT MCB (F404)ON Position
SWGR Panel +A16 TB Terminal –X1 SWGR Panel +A16 TB Terminal –X1
R Y B N R Y B N R Y B N
2 4 6 8 511 512 513 514 511.A 512.A 513.A 514.A
SWGR Panel +A16 Fuse FailureRelay(F304)
SWGR Panel +A16 U/V Relay–K101,K102,K103
SWGR Panel +A16 TB Terminal –X1
R Y B N R Y B - R Y B N
L1 L2 L3 - 2,10 2,10 2,10 - 511.B 512.B 513.B 514.B
-
SWGR Panel +A16 Selector Switch(S404)
SWGR Panel +A16 Ammeter Display(P404)
SWGR Panel +A16 TB Terminal –X4
R Y B N RY YB BR - R Y B N
10 6 2 12 - 511.A 512.A 513.A 514.A
-
Core No. A166 VT-WDG A266 VT-WDG
Class 3P/1.0 3P/1.0
Ratio (Volt) 11kV/√3 :110V/√3 11kV/√3 :110V/√3
Burden(VA) 5050
Purpose BCU + VOLTMETER + LOADSHEDDING
BCU + VOLTMETER + LOADSHEDDING
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 76 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
SWGR Panel +A12 TB Terminal –X4 SWGR Panel +A10 TB Terminal –X4SWGR Panel +A10 Sync Selector
Switch -25 OFF
R Y B N R Y B N R Y B N
668 670 672 674 669 671 673 675 5 7 9 11
SWGR Panel +A10 Sync Selector Switch-25 OFF
SWGR Panel +A10 Sync SelectorSwitch -25 ON
SWGR Panel +A10 TB Terminal –X4
R Y B N R Y B N R Y B N
6 8 10 12 6 8 10 12 653 655 657 659
SWGR Panel +A12 TB Terminal –X4Relay Panel +A12 .RP TB Terminal
–X710Relay Panel +A12 .RP Test Block –
S251 Test Position
R Y B N R Y B N R Y B N
653 655 657 659 10 11 12 13 1 3 5 7
Relay Panel +A12 .RP Test Block –S251Test Position
Relay Panel +A12 .RP Test Block–S251 Service Position
Relay Panel +A12 .RP Relay –A251(7SJ640)
R Y B N R Y B N R Y B N
2 4 6 8 2 4 6 8 R15 R17 R18 R16
Relay Panel +A12 .RP Relay Display–A251 (7SJ640)
SWGR Panel +A210 TB Terminal –X4 SWGR Panel +A210 Sync SelectorSwitch -25 OFF
R Y B N R Y B N R Y B N
VL1 VL2 VL3 - 669 671 673 675 5 7 9 11
SWGR Panel +A210 Sync SelectorSwitch -25 OFF
SWGR Panel +A210 Sync SelectorSwitch -25 ON
SWGR Panel +A12 TB Terminal –X4
R Y B N R Y B N R Y B N
6 8 10 12 6 8 10 12 676 678 680 684
Relay Panel +A12 .RP TB Terminal–X720
Relay Panel +A12 .RP Test Block –S252 Test Position
Relay Panel +A12 .RP Test Block –S252 Test Position
R Y B N R Y B N R Y B N
10 11 12 - 1 5 3 - 2 6 4 -
Relay Panel +A12 .RP Test Block –S252Service Position
Relay Panel +A12 .RP Relay –A252(7SJ804)
Relay Panel +A12 .RP Relay –A252(7SJ804)
R Y B N R Y B N R Y B N
2 6 4 - E9 E12 E11 - VL1 VL2 VL3 -
SWGR Panel +A16 TB Terminal –X4 Relay Panel +A12 TB Terminal –X710 Relay Panel +A12 TB Terminal –X231
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 77 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
R Y B N R Y B N R Y B N
511 512 513 514 1 3 5 7 2 5 8 11
Relay Panel +A10 TB Terminal –X231.ARelay Panel +A10 .RP Test Block –
S201 Test PositionRelay Panel +A10 .RP Test Block –
S201 Test Position
R Y - - R Y - - R Y - -
1 3 - - 11 13 - - 12 14 - -
- - - - - -
Relay Panel +A10 .RP Test Block –S201Service Position
Relay Panel +A10 .RP Relay –A201(7SJ647)
Relay Panel +A10 .RP Relay Display–A201 (7SJ647)
R Y - - R Y - - R-Y - -
12 14 - - R13 R14 - - V4 - -
- - - - - -
Relay Panel +A18 TB Terminal –X231.ARelay Panel +A18 .RP Test Block –
S201 Test PositionRelay Panel +A18 .RP Test Block –
S201 Test Position
R Y - - R Y - - R Y - -
1 13 - - 9 11 - - 10 12 - -
- - - - - -
Relay Panel +A18 .RP Test Block –S201Service Position
Relay Panel +A18 .RP Relay –A201(7SJ647)
Relay Panel +A18 .RP Relay Display–A201 (7SJ647)
R Y - - R Y - - R-Y - -
10 12 - - R13 R14 - - V4 - -
- - - - - -
Relay Panel +LSP TB Terminal –X231Relay Panel +LSP Selector Switch
–S66 OFFRelay Panel +LSP Selector Switch
–S66 OFF
R Y B N R Y B N R Y B N
9 10 11 12 1 3 5 7 2 4 6 8
Relay Panel +LSP Selector Switch–S66 ON
Relay Panel +LSP .RP Test Block–S811 Test Position
Relay Panel +LSP .RP Test Block–S811 Test Position
R Y B N R Y B N R Y B N
2 4 6 8 1 3 5 7 1 3 5 7
Relay Panel +LSP .RP Test Block–S811 Test Position
Relay Panel +LSP .RP Relay –F811(7SJ621)
Relay Panel +LSP .RP Relay Display–F811 (7SJ621)
R Y B N R Y B N R Y B -
2 4 6 8 R14 R15 R17 R16 V1 V2 V3 -
-
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 78 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel +A12 .RP Test Block–S201 Test Position
Relay Panel +A12 .RP Test Block–S201 Test Position
Relay Panel +A12 .RP Test Block–S201 Service Position
R Y B N R Y B N R Y B N
3 5 7 9 4 6 8 10 4 6 8 10
-
Relay Panel +A12 .RP Relay –A201(7SJ647)
Relay Panel +A12 .RP Relay DisplayPri –A201 (7SJ647)
Relay Panel +A12 .RP Relay DisplaySec –A201 (7SJ647)
R Y B N R Y B - R Y B -
R15 R17 R18 R16 VL1 VL2 VL3 - VL1 VL2 VL3 -
-
Relay Panel +A12 .RP Test Block–S253 Test Position
Relay Panel +A12 .RP Test Block–S253 Test Position
Relay Panel +A12 .RP Test Block–S253 Service Position
R Y B - R Y B - R Y B -
1 3 5 - 2 4 6 - 2 4 6 -
-
Relay Panel +A12 .RP Relay–A253 (7SJ804)
Relay Panel +A12 .RP Relay Display–A253 (7SJ804)
R Y B - R Y B - -
E9 E12 E11 - VL1 VL2 VL3 - -
-
10.2.2. A266 VT secondary injection :VT core and function : BCU + Voltmeter + LOAD SHEDDING Ratio: 11kV/√3 / 110V/√3
Injected voltage : R-N: 60V Y-N: 50V B-N: 40V at A X4: 651, 652, 653 & 654Terminals measure the voltage with respect to Earth in the following terminals.
Voltage in volts measured at
SWGR Panel +A26 TB Terminal –X4SWGR Panel +A26 VT MCB (F404)
OFF PositionSWGR Panel +A26 VT MCB (F404)
OFF Position
R Y B N R Y B N R Y B N
651 652 653 654 1 3 5 7 2 4 6 8
SWGR Panel +A26 VT MCB (F404)ON Position
SWGR Panel +A26 TB Terminal –X1 SWGR Panel +A26 TB Terminal –X1
R Y B N R Y B N R Y B N
2 4 6 8 511 512 513 514 511.A 512.A 513.A 514.A
SWGR Panel +A26 Fuse FailureRelay(F304)
SWGR Panel +A26 U/V Relay–K101,K102,K103
SWGR Panel +A26 TB Terminal –X1
R Y B N R Y B - R Y B N
L1 L2 L3 - 2,10 2,10 2,10 - 511.B 512.B 513.B 514.B
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 79 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
-
SWGR Panel +A26 Selector Switch(-S404)
SWGR Panel +A26 Ammeter Display(P404)
SWGR Panel +A26 TB Terminal –X4
R Y B N RY YB BR - R Y B N
10 6 2 12 - 511.A 512.A 513.A 514.A
-
SWGR Panel +A12 TB Terminal –X4 SWGR Panel +A20 TB Terminal –X4 SWGR Panel +A32 TB Terminal –X4
R Y - - R Y B N R Y B N
672 673 - - 668 670 672 674 668 669 670 671
- -
SWGR Panel +A32 Sync Selector Switch–S25 OFF
SWGR Panel +A32 Sync SelectorSwitch –S25 OFF
SWGR Panel +A32 Sync SelectorSwitch –S25 ON
R Y B N R Y B N R Y B N
1 3 5 7 2 4 6 8 2 4 6 8
SWGR Panel +A26 TB Terminal –X4Relay Panel +A12 .RP TB Terminal
–X720Relay Panel +A12 .RP TB Terminal
–X231
R Y B N R Y B N R Y B N
511 512 513 514 1 3 5 7 13 15 17 19
Relay Panel +LSP .RP TB Terminal–X231
Relay Panel +LSP .RP Selector Switch–S66 OFF
Relay Panel +LSP .RP Selector Switch–S66 OFF
R Y B N R Y B N R Y B N
1 3 5 7 9 11 13 15 10 12 14 16
Relay Panel +LSP .RP Selector Switch –S66 ON
Relay Panel +LSP .RP Test Block–S811 Test Position
Relay Panel +LSP .RP Test Block–S811 Test Position
R Y B N R Y B N R Y B N
10 12 14 16 1 3 5 7 2 4 6 8
Relay Panel +LSP .RP Test Block–S811 Service Position
Relay Panel +LSP .RP Relay –F811(7SJ621)
Relay Panel +LSP .RP Relay Display–F811 (7SJ621)
R Y B N R Y B N R Y B -
2 4 6 8 R14 R15 R17 R16 V1 V2 V3 -
Relay Panel +A20 TB Terminal –X231.ARelay Panel +A20 .RP Test Block –
S201 Test PositionRelay Panel +A20 .RP Test Block –
S201 Test Position
R Y - - R Y - - R Y - -
1 3 - - 11 13 - - 12 14 - -
- - - - - -
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 80 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel +A20 .RP Test Block –S201Service Position
Relay Panel +A20 .RP Relay –A201(7SJ647)
Relay Panel +A20 .RP Relay Display–A201 (7SJ647)
R Y - - R Y - - R-Y - -
12 14 - - R13 R14 - - V4 - -
- - - - - -
Relay Panel +A28 TB Terminal –X231.ARelay Panel +A28 .RP Test Block –
S201 Test PositionRelay Panel +A28 .RP Test Block –
S201 Test Position
R Y - - R Y - - R Y - -
1 13 - - 9 11 - - 10 12 - -
- - - - - -
Relay Panel +A28 .RP Test Block –S201Service Position
Relay Panel +A28 .RP Relay –A201(7SJ647)
Relay Panel +A28 .RP Relay Display–A201 (7SJ647)
R Y - - R Y - - R-Y - -
10 12 - - R13 R14 - - V4 - -
- - - - - -
Relay Panel +A12 TB Terminal –X231Relay Panel +A12 .RP Test Block –
S201 Test Position
Relay Panel +A12 .RP Test Block –S201 Test Position
R Y - - R Y - - R Y - -
14 16 - - 11 13 - - 12 14 - -
- - - - - -
Relay Panel +A12 .RP Relay –A201(7SJ647)
Relay Panel +A12 .RP Relay Display–A201 (7SJ647)
Relay Panel +A12 .RP TB Terminal-X231
R Y - - R-Y - - R Y B N
R13 R14 - - V4 - - 13 15 17 19
- - - -
Relay Panel +A12 .RP Test Block–S511 Test Position
Relay Panel +A12 .RP Test Block–S511 Test Position
Relay Panel +A12 .RP Test Block–S511 Service Position
R Y B N R Y B N R Y B N
9 11 13 15 10 12 14 16 10 12 14 16
Relay Panel +A12 .RP Relay –A511(51/50BF) 7SJ621
Relay Panel +A12 .RP Relay Display–A511(51/50BF) 7SJ621
-
R Y B N R Y B N - - - -
R14 R15 R17 R18 V1 V2 V3 - - - - -
10.2.3. Burden Measurement:
A166 VT:
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 81 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
A266 VT
Note:1. Confirmation of isolating links and shorting links as per drawing :2. Confirmation of Earthing of STAR at single point :3. Terminal tightness checked :
Remarks:
11.0 Bay Ref : A32 Bus Section :Name Plate Details:
Phase Voltage applied in Volts Current measured in mA Calculated Burden in VA
R 63.5Y 63.5B 63.5
Phase Voltage applied in Volts Current measured in mA Calculated Burden in VA
R 63.5Y 63.5B 63.5
Core No. A566 VT-WDG
Class 3P/1.0
Ratio (Volt) 11kV/√3 :110V/√3
Burden(VA) 50
Purpose BCU + VOLTMETER + LOAD SHEDDING
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 82 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
11.1A566 VT secondary injection :VT core and function : BCU + Voltmeter + LOAD SHEDDING Ratio: 11kV/√3 / 110V/√3
Injected voltage : R-N: 60V Y-N: 50V B-N: 40V at A X4:651, 652, 653 & 654Terminals measure the voltage with respect to Earth in the following terminals.
Voltage in volts measured at
SWGR Panel +A56 TB Terminal –X4SWGR Panel +A56 VT MCB (F404)
OFF PositionSWGR Panel +A56 VT MCB (F404)
OFF Position
R Y B N R Y B N R Y B N
651 652 653 654 1 3 5 7 2 4 6 8
SWGR Panel +A56 VT MCB (F404)ON Position
SWGR Panel +A56 TB Terminal –X1 SWGR Panel +A56 TB Terminal –X1
R Y B N R Y B N R Y B N
2 4 6 8 511 512 513 514 511.A 512.A 513.A 514.A
SWGR Panel +A56 Fuse FailureRelay(F304)
SWGR Panel +A56 U/V Relay–K101,K102,K103
SWGR Panel +A56 TB Terminal –X1
R Y B N R Y B - R Y B N
L1 L2 L3 - 2,10 2,10 2,10 - 511.B 512.B 513.B 514.B
-
SWGR Panel +A56 Selector Switch(-S404)
SWGR Panel +A56 Ammeter Display(P404)
SWGR Panel +A56 TB Terminal –X4
R Y B N RY YB BR - R Y - -
10 6 2 12 - 511 512 - -
- - -
SWGR Panel +A32 TB Terminal –X4SWGR Panel +A470 TB Terminal
–X4
SWGR Panel +A470 Sync SelectorSwitch –S25 OFF
R Y - - R Y B N R Y B N
672 673 - - 668 670 672 674 5 7 9 11
- -
SWGR Panel +A470 Sync SelectorSwitch –S25 OFF
SWGR Panel +A470 Sync SelectorSwitch –S25 ON
SWGR Panel +A12 TB Terminal–X4
R Y B N R Y B N R Y B N
6 8 10 12 6 8 10 12 676 678 680 684
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 83 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel +A12 .RP TB Terminal–X720
Relay Panel +A12 .RP Test Block –S252 Test Position
Relay Panel +A12 .RP Test Block –S252 Test Position
R Y B N R Y B N R Y B N
10 11 12 - 1 5 3 - 2 6 4 -
Relay Panel +A12 .RP Test Block –S252Service Position
Relay Panel +A12 .RP Relay –A252(7SJ804)
Relay Panel +A12 .RP Relay –A252(7SJ804)
R Y B N R Y B N R Y B N
2 6 4 - E9 E12 E11 - VL1 VL2 VL3 -
Relay Panel +A32 .RP TB Terminal–X720
Relay Panel +LSP .RP TB Terminal–X231
Relay Panel +LSP .RP Selector Switch–S66 OFF
R Y B N R Y B N R Y B N
2 5 8 11 17 18 19 20 21 23 25 27
Relay Panel +LSP .RP Selector Switch–S66 OFF
Relay Panel +LSP .RP Selector Switch–S66 ON
Relay Panel +LSP .RP Test Block–S811 Test Position
R Y B N R Y B N R Y B N
22 24 26 28 22 24 26 28 1 3 5 7
Relay Panel +LSP .RP Test Block–S811 Test Position
Relay Panel +LSP .RP Test Block–S811 Service Position
Relay Panel +LSP .RP Relay –F811(7SJ621)
R Y B N R Y B N R Y B N
2 4 6 8 2 4 6 8 R14 R15 R17 R16
Relay Panel +LSP .RP Relay Display–F811 (7SJ621)
Relay Panel +A38 TB Terminal –X720Relay Panel +A38 TB Terminal –
X231.A
R Y B - R Y B N R Y - -
V1 V2 V3 - 3 6 9 12 1 13 - -
- -
Relay Panel +A38 .RP Test Block –S201Test Position
Relay Panel +A38 .RP Test Block –S201 Test Position
Relay Panel +A38 .RP Test Block –S201 Service Position
R Y - - R Y - - R Y - -
9 11 - - 10 12 - - 10 12 - -
- - - - - -
Relay Panel +A38 .RP Relay –A201(7SJ647)
Relay Panel +A38 .RP Relay Display–A201 (7SJ647)
Relay Panel +A32 TB Terminal –X231
R Y - - R-Y - - R Y B N
R13 R14 - - V4 - - 1 3 5 7
- - - -
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 84 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel +A32 .RP Test Block –S201Test Position
Relay Panel +A32 .RP Test Block–S201 Test Position
Relay Panel +A32 .RP Test Block–S201 Service Position
R Y B N R Y B N R Y B N
3 5 7 9 4 6 8 10 4 6 8 10
-
Relay Panel +A32 .RP Relay –A201(7SJ647)
Relay Panel +A32 .RP Relay Display–A201 (7SJ647)
Relay Panel +A32 .RP Test Block–S255 Test Position
R Y B N R Y B N R Y B N
R15 R17 R18 R16 VL1 VL2 VL3 - 1 3 5 -
- -
Relay Panel +A32 .RP Test Block–S255 Test Position
Relay Panel +A32 .RP Test Block–S255 Service Position
Relay Panel +A32 .RP Relay –A255(7SJ804)
R Y B N R Y B N R Y B N
2 4 6 - 2 4 6 - E9 E10 E12 -
-
Relay Panel +A32 .RP Relay Display–A255 (7SJ804)
Relay Panel +A32 TB Terminal –X231Relay Panel +A32 .RP Test Block
–S511 Test Position
R Y B N R Y B N R Y B N
VL1 VL2 VL3 - 2 4 6 8 9 11 13 15
Relay Panel +A32 .RP Test Block–S511 Test Position
Relay Panel +A32 .RP Test Block–S511 Service Position
Relay Panel +A32 .RP Relay –A511(51/5BF) (7SJ621)
R Y B N R Y B N R Y B N
10 12 14 16 10 12 14 16 R14 R15 R17 R18
Relay Panel +A32 .RP Relay Display–A511(51/5BF) (7SJ621)
R Y B N
V1 V2 V3 -
10.3. Bay Ref : A30 Cable Feeder10.3.1. Name Plate Details:
Core No. VT-WINDING
Class 1.0/3P
Ratio (Volt) 11kV/√3:110V/√3
Burden(VA) 50
Purpose BCU + Synch Check Relay
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 85 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
10.3.2. VT core and function : BCU+SYNCRatio : 11kV/√3:110V/√3
Injected voltage: R-N: 60 Y-N: 50 B-N: 40 at VT X511: 1,2,3,4 Terminals measure the voltagewith respect to Earth in the following terminal
Voltage in volts measured at
SWGR Panel +A30 TB Terminal –X511SWGR Panel +A30 VT MCB (F404)
OFF PositionSWGR Panel +A30 VT MCB (F404)
OFF Position
R Y B N R Y B N R Y B N
1 2 3 4 1 3 5 7 2 4 6 8
SWGR Panel +A30 VT MCB (F404)ON Position
SWGR Panel +A30 TB Terminal –X1 SWGR Panel +A30 TB Terminal –X1
R Y B N R Y B N R Y B N
2 4 6 8 511 512 513 514 511.A 512.A 513.A 514.A
SWGR Panel +A30 Fuse FailureRelay(F304)
SWGR Panel +A30 U/V Relay–K101,K102,K103
SWGR Panel +A30 TB Terminal –X4
R Y B N R Y B - R Y B N
L1 L2 L3 - 2,10 2,10 2,10 - 511.A 512.A 513.A 514.A
-
SWGR Panel +A30 Synch SelectorSwitch -S25 OFF
SWGR Panel +A30 Synch SelectorSwitch -S25 OFF
SWGR Panel +A30 Synch SelectorSwitch -S25 ON
R Y - - R Y - - R Y - -
1 3 - - 2 4 - - 2 4 - -
- - - - - -
SWGR Panel +A30 TB Terminal –X4 SWGR Panel +A12 TB Terminal –X4Relay Panel +A12 TB Terminal
–X720
R Y - - R Y - - R Y - -
661 663 - - 684 686 - - 13 14 - -
- - - - - -
Relay Panel +A12 .RP Test Block –S252Test Position
Relay Panel +A12 .RP Test Block–S252 Test Position
Relay Panel +A12 .RP Test Block–S252 Service Position
R Y - - R Y - - R Y - -
7 9 - - 8 10 - - 8 10 - -
- - - - - -
Relay Panel +A12 .RP Relay –A252(7SJ804)
Relay Panel +A12 .RP Relay Display–A252 (7SJ804)
SWGR Panel +A30 TB Terminal –X4
R Y - - R-Y - - R Y B N
E13 E14 - - VL3 - - 511 512 513 514
- - - -
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 86 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel +A30 TB Terminal–X710.A
Relay Panel +A30 .RP Test Block–S201.A Test Position
Relay Panel +A30 .RP Test Block–S201.A Test Position
R Y B N R Y B N R Y B N
1 2 3 4 1 3 5 7 2 4 6 8
Relay Panel +A30 .RP Test Block–S201.A Test Position
Relay Panel +A30 .RP Relay –A201BCU (7SJ632)
Relay Panel +A30 .RP Relay Display–A201 BCU (7SJ632)
R Y B N R Y B N R Y B N
2 4 6 8 R14 R15 R17 R18 VL1 VL2 VL3 -
Relay Panel +A30 .RP Relay –A201.AO/P Contact
Relay Panel +A30 .RP Relay –A201.AO/P Contact
Relay Panel +A30 TB Terminal–X231
R Y - - R Y - - R Y - -
R1 R5 - - R4 R6 - - 2 4 - -
- - - - - -
Relay Panel +A12 TB Terminal–X231
Relay Panel +A12 .RP Test Block–S253 Test Position
Relay Panel +A12 .RP Test Block–S253 Test Position
R Y - - R Y - - R Y - -
21 22 - - 7 9 - - 8 10 - -
- - - - - -
Relay Panel +A12 .RP Test Block–S253 Service Position
Relay Panel +A12 .RP Relay –A253(7SJ804)
Relay Panel +A12 .RP Relay –A253(7SJ804)
R Y - - R Y - - R-Y - -
8 10 - - E13 E14 - - VL3 - -
- - - - - -
10.3.3. Burden Measurement:
Note:1. Confirmation of isolating links and shorting links as per drawing :2. Confirmation of Earthing of STAR at single point :3. Terminal tightness checked :
Remarks:
Phase Voltage applied in Volts Current measured in mA Calculated Burden in VA
R 63.5
Y 63.5
B 63.5
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 87 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
10.4. Bay Ref: A10 Aux.TR. Feeder10.4.1. Name Plate Details:
Core No. VT-WINDING
Class 1.0/3P
Ratio (Volt) 11kV/√3:110V/√3
Burden(VA) 50 VA
Purpose BCU+SYNC.
10.4.2. VT core and function : BCU+SYNC.Ratio : 11kV/√3 / 110V/√3
Injected voltage : R-N: 60 Y-N: 50 B-N: 40 at VT X511: 1, 2, 3 & 4 terminals measure the voltage withrespect to Earth in the following terminal
Voltage in volts measured at
SWGR Panel +A10 TB Terminal –X511SWGR Panel +A10 VT MCB (F404)
OFF PositionSWGR Panel +A10 VT MCB (F404)
OFF Position
R Y B N R Y B N R Y B N
1 2 3 4 1 3 5 7 2 4 6 8
SWGR Panel +A10 VT MCB (F404)ON Position
SWGR Panel +A10 TB Terminal –X1 SWGR Panel +A10 TB Terminal –X1
R Y B N R Y B N R Y B N
2 4 6 8 511 512 513 514 511.A 512.A 513.A 514.A
SWGR Panel +A10 Fuse FailureRelay(F304)
SWGR Panel +A10 U/V Relay–K101,K102,K103
SWGR Panel +A10 TB Terminal –X4
R Y B N R Y B - R Y B N
L1 L2 L3 - 2,10 2,10 2,10 - 511.A 512.A 513.A 514.A
-
SWGR Panel +A10 Synch SelectorSwitch -S25 OFF
SWGR Panel +A10 Synch SelectorSwitch -S25 OFF
SWGR Panel +A10 Synch SelectorSwitch -S25 ON
R Y - - R Y - - R Y - -
1 3 - - 2 4 - - 2 4 - -
- - - - - -
SWGR Panel +A10 TB Terminal –X4 SWGR Panel +A12 TB Terminal –X4Relay Panel +A12 TB Terminal
–X710
R Y - - R Y - - R Y - -
661 663 - - 661 663 - - 14 15 - -
- - - - - -
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 88 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel +A12 .RP Test Block –S251Test Position
Relay Panel +A12 .RP Test Block–S251 Test Position
Relay Panel +A12 .RP Test Block–S251 Service Position
R Y - - R Y - - R Y - -
9 11 - - 10 12 - - 10 12 - -
- - - - - -
Relay Panel +A12 .RP Relay –A251(7SJ804)
Relay Panel +A12 .RP Relay Display–A251 (7SJ804)
SWGR Panel +A10 TB Terminal –X4
R Y - - R-Y - - R Y B N
R13 R14 - - VL4 - - 511 512 513 514
- - - -
Relay Panel +A10 TB Terminal–X710
Relay Panel +A10 .RP Test Block–S201 Test Position
Relay Panel +A10 .RP Test Block–S201 Test Position
R Y B N R Y B N R Y B N
1 2 3 4 1 3 5 7 2 4 6 8
Relay Panel +A10 .RP Test Block–S201 Service Position
Relay Panel +A10 .RP Relay –A201BCU (7SJ647)
Relay Panel +A10 .RP Relay Display–A201 BCU (7SJ647)
R Y B N R Y B N R Y B N
2 4 6 8 R15 R17 R18 R16 VL1 VL2 VL3 -
10.4.3. Burden Measurement:
Phase Voltage applied in Volts Current measured in mA Calculated Burden in VA
R 63.5Y 63.5B 63.5
Note:1. Confirmation of isolating links and shorting links as per drawing :2. Confirmation of Earthing of STAR at single point :3. Terminal tightness checked :
Remarks:
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 89 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
11. CT PRIMARY INJECTION TEST
11.1. Bay Ref : A18 Incomer Feeder11.1.1. Name Plate Details:
Description (CT1) Core 1 (CT1) Core 2 (CT2) Core 1
Ratio 2500/1A 2500/1A 3200/1A
Class PX 5P20/1.0 PX
Rated Output(VA) - 15 VA -
CT Sec. Resistance(Rct) @75C <8.75Ω <14Ω <18Ω
Knee Point Voltage (VK) ≥230V - ≥563V
I mag at VK/2 ≤ 30mA - ≤30mA
PurposeMAIN PRTN
87T/REF (DIFF.)
Dir-OC/EF+BCU+
AMMETER
BB PRTN87BBP
Note:1. Temporary short for REF protection& Bus bar protection stabilizing resistor
11.1.2 CT Core And Function: A CT CORE-1, DIFF PRTN
Ratio : 2500/1AInjected Current : A
Inj.Phase
Secondary Current in mA Measured atSWGR Panel A18 CT Terminal
-X11Relay Panel +B11 .RP TB Terminal
X650Relay Panel +B11 .RP
Test Block –S871.B Service Position
R Y B N R Y B N R Y B N
612 615 618 613 1 3 5 7 21 23 25 27
R-E
R-Y
R-B
Relay Panel +B11 .RP TestBlock –S871.B Service Position
Relay Panel +B11 .RP Main Relay87T (7UT613)
Relay Panel +B11 .RPDisplay Pri. Current at Relay87T
Main 7UT613
R Y B N R Y B N R Y B N
22 24 26 28 R1//R2 R3/R4 R5/R6 -- IL1M2 IL2M2 IL3M2 -
R-E
R-Y
R-B --
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 90 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Inj.Phase
Relay Panel+B11 .RPDisplay Sec. Current at Relay 87T
Main 7UT613
Relay Panel +B11 .RPTest Block –S871.B Service Position
Relay Panel +B11 .RPTest Block –S871.B Service Position
IL1M2 IL2M2 IL3M2 -R Y B N R Y B N
2 4 6 8 1 3 5 7
R-E
R-Y
R-B -- --
Relay Panel +B11 .RP TBTerminal -X650
Relay Panel+A18 .RPTB Terminal -X610
Relay Panel+A18 .RPTest Block –S871 Service Position
R Y B N R Y B N R Y B N
10 11 12 13 5 6 7 8 21 23 25 27
R-E --
R-Y
R-B
Relay Panel+A18 .RPTest Block –S871 Serice Position
Relay Panel+A18 .RP-Relay 87NL/51 (7SJ611)
Relay Panel+A18 .RP- Display Pri.Current at Relay 87NL/51 (7SJ611)
R Y B N R Y B NIL1 IL2 IL3 3I0
22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 --
R-E --
R-Y
R-B
Relay Panel+A18 .RP- DisplaySec. Current At Relay 87NL/51
(7SJ611)
Relay Panel+A18 .RP-B1 Metrosil
Relay Panel+A18 .RP-
R102 Resistor
Relay Panel+A18 .RP –
Test Block –S871Service Position
Relay Panel+A18 .RP –Test Block –871Service
Position
IL1 IL2 IL3 3I0N N N N N N N N
1 2 1 2 1 3 2 4
R-E
R-Y
R-B
Relay Panel+A18 .RP-
Relay87NL/51(7SJ611)
Relay Panel+A18 .RP-Display Pri.Current at
Relay 87NL/51(7SJ611)
Relay Panel+A18 .RP-Display Sec.
Current atRelay 87NL/51(7SJ611)P141
------- --------- ----------
N3I0 3I0
- - - -
Q7/Q8 - - - -
R-E - - - -
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 91 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
R-Y - - - -
R-B - - - -
11.1.3. CT Core and Function: A18 CT1-CORE-2, OC/EF+BCU+AMMETERRatio : 2500/1AInjected Current : A
Inj.Phase
Secondary Current in mA Measured at
SWGR Panel A18 TBTerminal -X11
Relay Panel +A18 .RP TBTerminal -X620
Relay Panel +A18.RP TB Terminal
-X620
RTCC Panel .RPTB Terminal –X620
R Y B N R Y B N B B B B
622 625 628 623 1 3 5 7 10 13 1 4
R-E
R-Y
R-B
RTCC Panel–A1RelayTapcon260
MI
RTCC Panel –A1Relay Display
Tapcon260
Relay Panel+A18 .RP –Test Block –S671.A Service
Position
Relay Panel+A18 .RP –Test Block –S671.A Service Position
B B B R Y B N R Y B N
5 9 I 21 23 25 27 22 24 26 28
R-E
R-Y
R-B
Relay panel+A18 .RP –Relay 67/67N/51/50BF (7SJ621)
Relay panel+A18 .RP – RelayDisplay Pri -67/67N/51/50BF
(7SJ621)
Relay panel+A18 .RP – Relay DisplaySec -67/67N/51/50BF (7SJ621)
R Y B N R Y B N R Y B N
Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8 IL1 IL2 IL3 IE IL1 IL2 IL3 IE
R-E
R-Y
R-B
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 92 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Inj.Phase
Relay Panel+A18 .RP –Test Block –S671.A Service Position
Relay Panel+A18 .RP – TestBlock –S671.A Service Position
Relay Panel+A18 .RP –Test Block –S201 Service Position
R Y B N R Y B N R Y B N
2 4 6 8 1 3 5 7 21 23 25 27
R-E
R-Y
R-B
Relay Panel+A18 .RP –Test Block –S201 Service Position
Relay Panel+A18 .RP –A201BCU (7SJ647)
Relay Panel+A18 .RP RelayDisplay Pri–A201BCU (7SJ647)
R Y B N R Y B N R Y B N
22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8 IL1 IL2 IL3 IE
R-E
R-Y
R-B
Relay Panel+A18 .RP Relay DisplayPri–A201BCU (7SJ647)
Relay Panel+A18 TB Terminal–X620
SWGR Panel+A18TB Terminal- X11
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE 10 11 12 13 661 663 665 667
R-E
R-Y
R-B
SWGR Panel+A18 Selector Switch–S401
SWGR Panel+A18 AmmeterDisplay –P401
R Y B N R Y B N
2 6 10 1 9 10 11 12
R-E
R-Y
R-B
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 93 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
11.1.4. CT Core and Function : A18 CT2-CORE-1, BB PRTN.Ratio : 2500/1AInjected Current : A
Inj.Phase
Secondary Current in mA Measured at
SWGR Panel A18TB Terminal – X11
BB Relay Panel +RP1TB Terminal-X610
BB Relay Panel+A00 .RPR103,104,105(Resistor)
R Y B N R Y B N R Y B N
634 637 640 633 2 18 34 52 R(1,2) Y(1,2 B(1,2) -
R-E -
R-Y -
R-B -
BB Relay Panel +RP –Test Block –S87Z1 Service Position
BB Relay Panel +RP –Test Block –S87Z1 Service Position
BB Relay Panel +RP–F87Z1 (7SJ611)
R Y B N R Y B N R Y B N
21 23 25 27 22 24 26 28 Q7/Q8 Q7/Q8 Q7/Q8 --
R-E --
R-Y --
R-B --
11.1.7. CT Star Point Conformation:
Note:1. Confirmation of connection of CT as per drawing :2. Confirmation of isolating links and shorting links as per drawing :3. Confirmation of earthing of star at single point :4. CT terminal tightness :5. CORE identification checks :
Remarks:
Description CT Core Core-1 Core-2 Core-3 Core-4 Core-5
Star Point
Conformation
S1/S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 94 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
11.2. Bay Ref: A12 Bus Section Feeder
11.2.1. Name Plate Details:
Description CT1 - Core 1 CT2 - Core 1 CT2 - Core 2
Ratio 3200/1A 3200/1A 3200/1A
Class PX 5P20/1.0 PX
Rated Output (VA) - 15 VA -
CT Sec. Resistance (Rct)@75C
≤18Ω ≤18Ω ≤18Ω
Knee Point Voltage (VK) ≥563V - ≥563V
I mag at VK/2 ≤8.8mA - ≤8.8mA
Purpose B/B PRTN.-87B/50BFO/C + E/F-
50/51N+BCU+METERB/B PRTN.-87B/50BF.
Note:1. Temporary short for Bus bar protection stabilizing resistor
11.2.2. CT Core And Function : CT1, CORE-1 87BB1Ratio : 3200/1AInjected Current : A
Inj. Phase Secondary Current in mA Measured at
SWGR Panel A12TB Terminal-X11
BB Relay Panel +RP1 TBTerminal– X610
BB Relay Panel +RP1 –B103,B104,B105-(Metrosil)
R Y B N R Y B NR(1,2) Y(1,2) B(1,2) -
603 607 611 605 1 17 33 49
R – E -
R – Y -
R – B -
BB Relay Panel +RP1–R103,R104,R105- Resistor
BB Relay Panel +RP1 – TestBlock –S87Z1 Service Position
BB Relay Panel +RP1 – Test Block –S87Z1 Service Position
R(1,2) Y(1,2) B(1,2) -R Y B N R Y B N
1 3 5 7 2 4 6 8
R – E -
R – Y -
R – B -
BB Relay Panel +RP1- Relay 87BB1BBP (7SJ611)
BB Relay Panel +RP1- RelayDisplay Pri- 87BB1 BBP
(7SJ611)
BB Relay Panel +RP1- Relay DisplaySec- 87BB1 BBP (7SJ611)
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 95 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
R Y B N R Y B N R Y B N
Q7/Q8 Q7/Q8 Q7/Q8 -- 3I0 3I0 3I0 -- 3I0 3I0 3I0 --
R – E
R – Y
R – B
11.2.3. CT Core And Function : CT2 - CORE-1,51/51N+BCU+METERINGRatio : 3200/1AInjected Current : A
Inj Phase Secondary Current in mA Measured at
SWGR Panel BUS CT1TB Terminal X11
Relay Panel +A12 .RPTB Terminal –X610
Relay Panel+A12 .RP Test Block–S511 Service Position
R Y B N R Y B N R Y B N
612 615 618 613 1 3 5 7 21 23 25 27
R-E
R-Y
R-B
Relay Panel+A12 .RP TestBlock –S511 Service Position
Relay Panel +A12 .RP Relay (51/50BF )7SJ621
Relay Panel +A12 .RP RelayDisplay Pri-(51/50BF ) 7SJ621
R Y B N R Y B N R Y B N
22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8 IL1 IL2 IL3 IE
R – E
R – Y
R – B
Relay Panel +A12 .RP RelayDisplay Sec-(51/50BF )
7SJ621
Relay Panel+A12 .RP Test Block –S511Service Position
Relay Panel+A12 .RP Test Block–S511 Service Position
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE 2 4 6 8 1 3 5 7
R – E
R – Y
R – B
Relay Panel+A12 .RP TestBlock –S201 Service Position
Relay Panel+A12 .RP Test Block –S201 Service Position
Relay Panel+A12 .RP Relay –A201 (7SJ647)
R Y B N R Y B N R Y B N
21 23 25 27 22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
R – E
R – Y
R – B
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 96 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel+A12 .RP RelayDisplay Pri –A201 (7SJ647)
Relay Panel+A12 .RP Relay DisplaySec –A201 (7SJ647)
Relay Panel+A12 TB Terminal –X610
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE IL1 IL2 IL3 IE 10 11 12 13
R – E
R – Y
R – B
SWGR Panel+A12TB Terminal –X11
SWGR Panel+A12Selector Switch –S401
SWGR Panel+A12Ammeter –P401
R Y B N R Y B N R Y B N
623 626 629 630 2 6 10 1 - - - -
R – E
R – Y
R – B
11.2.4. CT Core And Function : CT2- CORE-2,87BB2Ratio : 3200/1AInjected Current : A
Inj Phase Secondary Current in mA Measured at
SWGR Panel BUS-CT1TB Terminal -X11
BB Relay Panel +RP1 TBTerminal –X610
BB Relay Panel + RP1 –B103,104,105-(Metrosil)
R Y B N R Y B NR(1,2) Y(1,2) B(1,2) -
623 626 629 622 2 19 36 55
R-E -
R-Y -
R-B -
BB Relay Panel +RP1 –R103,104,105- (Resistor)
BB Relay Panel + RP1 Test Blok-S87Z2 Service Position
BB Relay Panel + RP1 Test Blok-S87Z2 Service Position
R Y B N R Y B N R Y B N
R(1,2) Y(1,2) B(1,2) - 21 23 25 27 22 24 26 28
R – E -
R – Y -
R – B -
BB Relay Panel + RP1-Relay 87BB2 BBP 7SJ611
BB Relay Panel + RP1- DisplayPri. Current at Relay87BB2 BBP
7SJ611
BB Relay Panel + RP1- Display Sec.Current at Relay 87BB2 BBP
7SJ611
R Y B N R Y B N R Y B N
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 97 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Q7/Q8 Q7/Q8 Q7/Q8 -- 3I0 3I0 3I0 -- 3I0 3I0 3I0 --
R – E
R – Y
R – B
CT Star Point Conformation:
Note:
1. Confirmation of connection of CT as per drawing :2. Confirmation of isolating links and shorting links as per drawing :3. Confirmation of earthing of star at single point :4. CT terminal tightness :5. Core identification checks :
Remarks
Description CT Core CTI-Core-1 CT2-Core-1 CT2-Core-2
Star Point Conformation S1/S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 98 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
11.3. Bay Ref : A30 Cable Feeder :11.3.1. Name Plate Details:
Description CT1-Core 1 CT1-Core 2 CT2-Core 1
Ratio 400 - 300/1A 400 - 300/1A 2500/1A
Class 5P20/1.0 PX PX
Rated Output(VA) 15-11.5 VA - -
CT Sec. Resistance (Rct) @75C < 2 – 1.5Ω <1.4 – 1.05Ω <18Ω
Knee Point Voltage (VK) - ≥425-320V ≥ 563V
I mag at VK/2 -≤ 50-70mA ≤8.8 mA
PurposeOC/EF+BCU+METER
50/50N/51/51N/49CPILOT WIRE PRTN 87P BB PRTN 87BB1
Note:1. Temporary short for bus bar protection stabilizing resistor :
11.3.3. CT Core And Function : CT-CORE-1, OC/EF+BCU+METERINGRatio : 400 - 300/1AInjected Current : A
Injphase
Secondary Current in mA Measured at
SWGR PanelA30TB Terminals - X11
Relay Panel +A30 .RP- TBTerminal -X610.A
Relay Panel +A30 .RP –Test Block –S502.A -Service Position
R Y B N R Y B N R Y B N
602 606 610 604 1 3 5 7 21 23 25 27
R-E
R-Y
R-B
Relay Panel +A30 .RP Test Block–S502.A -Service Position
Relay Panel +A30 .RP- Relay50/50N/51/51N (7SJ802)
Relay Panel +A30 .RP- Display Pri.Current at Relay 50/50N/51/51N
(7SJ802)
R Y B N R Y B N R Y B N
22 24 26 28 F1/F2 F3/F4 F5/F6 F7/F8 IL1 IL2 IL3 IE
R-E
R-Y
R-B
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR
PAGE: 99 OF 105DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Relay Panel +A30 .RP- DisplayPri. Current at Relay 50/50N/51/51N
(7SJ802)
Relay Panel +A30 .RP Test Block–S502.A -Service Position
Relay Panel +A30 .RP Test Block–S502.A -Service Position
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE 2 4 6 8 1 3 5 7
R-E
R-Y
R-B
Relay Panel +A30 .RP –Test Block –S201.A Service Position
Relay Panel +A30 .RP –Test Block –S201.A Service Position
Relay Panel +A30 .RP -201.ABCU 7SJ632
R Y B N R Y B N R Y B N
21 23 25 27 22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8
R-E
R-Y
R-B
Relay Panel +A30 .RP-201.ADisplay Pri. Current- BCU 7SJ632
Relay Panel +A30 .RP-201.A DisplayPri. Current- BCU 7SJ632
Relay Panel +A30 .RP-TB Terminal X610.A
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE IL1 IL2 IL3 IE 8 9 10 11
R-E
R-Y
R-B
SWGR Panel A30TB Terminal -X11
SWGR Panel A30 Ammeterselector switch (-S401)
SWGR Panel A30Ammeter (-P401)
R Y B N R Y B N R Y B N
661 662 663 664 2 6 10 1 - - - -
R-E
R-Y
R-B
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010 TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGRPAGE: 100 OF105
DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
11.3.4. CT Core And Function : CT2-Core-2, PILOT WIRE PRTN 87PRatio : 400 - 300/1AInjected Current : A
Injphases
Secondary Current in mA Measured at
SWGR Panel A30TB Terminal –X11
Relay Panel +A30 TB Terminal–X620.A
Relay Panel +A30 .RP –Test Block –S501.A Service Position
R Y B N R Y B N R Y B N
622 626 630 624 1 3 5 7 21 23 25 27
R-E
R-Y
R-B
Relay Panel +A30 .RP –Test Block–S501.A Service Position
Relay Panel +A30 .RP- Relay 50GR(7SG111)
Relay Panel +A30 .RP –Test Block –S501.A Service Position
R Y B N R Y B N R Y B N
22 24 26 28 27/28 25/26 23/24 21/22 1 3 5 7
R-E
R-Y
R-B
Relay Panel +A30 .RP –Test Block –S501.A Service Position
Relay Panel +A30 .RP- TB Terminal-X620.A
Relay Panel +A30 .RPRelay 87P (7PG211)
R Y B N R Y B N R Y B N
2 4 6 8 10 12 14 16 23 25 27 24
R-E
R-Y
R-B
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010 TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGRPAGE: 101 OF105
DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
11.3.5. CT Core And Function : CT2-Core-1, BUSBAR PRTN(87B)Ratio : 3200/1AInjected Current : A
Injphases
Secondary Current in mA Measured at
SWGR Panel A30TB Terminal –X11
Relay Panel +A30 .RP –TB Terminal –X610
Relay Panel +BB .RP1 –R103,104,105(Resistor)
R Y B N R Y B NR Y B N
644 647 650 643 4 20 36 58
R-E
R-Y
R-B
Relay Panel +BB .RP1 –Test Block –S87Z1 Test Position
Relay Panel +BB .RP1 –Test Block –S87Z1 Test Position
Relay Panel +BB .RP1 - Relay87BB1 BBP (7SJ611)
R Y B N R Y B N R Y B N
21 23 25 27 22 24 26 28 Q7/Q8 Q7/Q8 Q7/Q8 -
R-E -
R-Y -
R-B -
Relay Panel +BB .RP - DisplayPri. Current at
Relay 87BB1 BBP (7SJ611)
Relay Panel +BB .RP - Display Sec.Current at
Relay 87BB1 BBP (7SJ611)------
R Y B N R Y B N - - - -
3I0 3I0 3I0 - 3I0 3I0 3I0 - - - - -
R-E - - - -
R-Y - - - -
R-B - - - -
CT Star Point Formation:
Description CT Core CT1- Core-1 CT1- Core-2 CT2- Core-1
Star Point
Conformation
S1/S2
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010 TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGRPAGE: 102 OF105
DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Note:1. Confirmation of connection of CT as per drawing :2. Confirmation of isolating links and shorting links as per drawing :3. Confirmation of earthing of star at single point :4. CT terminal tightness :5. CORE identification checks :
Remarks:
11.4. Bay Ref : A10 Station Transformer Feeder11.4.1 Name Plate Details:
Description CT1- Core 1 CT1- Core 2 CT2- Core 1
Ratio 150/1A 150/1A 3200/1A
Class 5P20 5P20/1.0 PX
Rated Output(VA) 15 VA 15 VA -
CT Sec. Resistance (Rct) @75C <3Ω <3Ω <18Ω
Knee Point Voltage (VK) - - ≥563V
I mag at VK/2 - - ≤ 8.8mA
Purpose OC/EF + METERING BCU+AMMETER BUSBAR PRTN.
Note:1. Temporary short for REF protection & Bus bar protection stabilizing resistor
11.4.2. CT Core and Function : CORE-1, OC/EF+METERINGRatio : 150/1AInjected Current : A
Injphases
Secondary Current in mA Measured at
SWGR Panel A10TB Terminal –X11
Relay Panel +A10 .RP-TB Terminal –X610
Relay Panel +A .RP–Test Block –S511 Service Position
R Y B N R Y B N R Y B N
602 605 608 603 1 3 5 7 21 23 25 27
R-E
R-Y
R-B
Relay Panel +A10 .RP– Relay Panel +A10 .RP- Relay Relay Panel +A10 .RP- Display
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010 TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGRPAGE: 103 OF105
DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
Test Block –S511 Service Position 50/51/50N (7SJ611) Pri. Current at Relay 50/51/50N(7SJ611)
R Y B N R Y B N R Y B N
22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8 IL1 IL2 IL3 IE
R-E
R-Y
R-B
Relay Panel +A10 .RP- DisplayPri. Current at Relay 50/51/50N
(7SJ611)--- ---
R Y B N --- --- --- --- --- --- --- ---
IL1 IL2 IL3 IE --- --- --- --- --- --- --- ---
R-E --- --- --- --- --- --- --- ---
R-Y --- --- --- --- --- --- --- ---
R-B --- --- --- --- --- --- --- ---
11.4.3. CT Core and Function : CT1-CORE-2, BCU + MeteringRatio : 150/1AInjected Current : A
Injphases
Secondary Current in mA Measured at
SWGR Panel A10TB Terminal –X11
Relay Panel +A10 .RP-TB Terminal –X620
Relay Panel +A10 .RP-Test Block –S201 Service Position
R Y B N R Y B N R Y B N
622 625 628 623 1 3 5 7 21 23 25 27
R-E
R-Y
R-B
Relay Panel +A10 .RP-Test Block –S201 Service Position
Relay Panel +A10 .RP- Relay –A201BCU 7SJ647
Relay Panel +A10 .RP- RelayDisplay Pri –A201 BCU 7SJ647
R Y B N R Y B N R Y B N
22 24 26 28 Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8 IL1 IL2 IL3 IE
R-E
R-Y
R-B
Relay Panel +A10 .RP- RelayDisplay Sec –A201 BCU 7SJ647
Relay Panel +A10 .RP-TB Terminal -X620
SWGR Panel +A10 .RPTB Terminal – X11
R Y B N R Y B N R Y B N
IL1 IL2 IL3 IE 10 11 12 13 661 663 665 667
R-E
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010 TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGRPAGE: 104 OF105
DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
R-Y
R-B
SWGR Panel+A10 AmmeterSelector Switch (-S401)
SWGR Panel +A10 AmmeterDisplay (-P401)
-
R Y B NR Y B N - - - -
2 6 10 1
R-E - - - -
R-Y
R-B - - - -
11.4.4. CT Core and Function : CT2-CORE-1, BUSBAR PRTNRatio : 3200/1AInjected Current : A
Injphases
Secondary Current in mA Measured at
SWGR Panel A10TB Terminal –X11
Relay Panel+A10 .RP-TB Terminal –X610
Relay Panel +BB .RP1-B103,B104,B105-Metrosil
R Y B N R Y B NR(1,2) Y(1,2) B(1,2) -
644 647 650 643 3 19 35 55
R-E -
R-Y -
R-B -
Relay Panel +BB .RP1-R103,R104,R105 Resistor
Relay Panel +BB .RP1- TestBlock –S87Z1 Service Position
Relay Panel +BB .RP1- Test Block –S87Z1 Service Position
R(1,2) Y(1,2) B(1,2) -R Y B N R Y B N
21 23 25 27 22 24 26 28
R-E -
R-Y -
R-B -
Relay Panel +BB .RP1-Relay 87BB1 BBP 7SJ611
Relay Panel +BB .RP1-Display Pri. Current at
Relay 87BB1 BBP 7SJ611
Relay Panel +BB .RP1-Display Sec. Current at
Relay 87BB1 BBP 7SJ611
R Y B N R Y B N R Y B N
Q7/Q8 Q7/Q8 Q7/Q8 -- 3I0 3I0 3I0 -- 3I0 3I0 3I0 --
R-E
R-Y
R-B
PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 – SUBSTATIONS PACKAGE S5 & S8
CONTRACT NO.: GTC/371C/2010 TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGRPAGE: 105 OF105
DOC. NO.: PH10-1C-10-15-P002 REV. B DATE:
HYOSUNG LAHMEYER INTERNATIONAL KAHRAMAA
Signature:Name:Date:
Signature:Name:Date:
Signature:Name:Date:
CT Star Point Conformation:
Note:
1. Confirmation of connection of CT as per drawing :2. Confirmation of isolating links and shorting links as per drawing :3. Confirmation of earthing of star at single point :4. CT terminal tightness :5. Core identification checks :
Remarks:
Test Kit Details :
S.NO EQUIPMENT MAKE/TYPE SERIALNUMBER
CALIBRATIONDATE
CALIBRATION DUEDATE
1
2
3
4
Description CT Core CT1-Core-1 CT1-Core-2 CT2-Core-1
Star Point Conformation S1/S2