P.O. Box 85298 • San Diego, CA 92186-5298 • (858) 535-0505 • FAX (858) 535-0757 6795 Flanders Drive • San Diego, CA 92121-2903
P1-101 Sludge Dewatering & Odor Control
At Plant No. 1 Orange County Sanitation District
HEI Project No. 181301
HEI Submittal #16080-03-00 OCSD Submittal #16080-003A
Submittal Data Regarding:
SPECIFICATION SECTION 16080-1.4.D/3.3
NETA Test Forms (Tests Performed by Testing Organization)
It is hereby certified that the equipment/material shown and Helix Electric, Inc. marked in this submittal is that proposed to be incorporated Project No. 181301 into the project. It is in compliance with the contract drawings April 13, 2016
and specifications and can be installed in the allocated spaces. Revision 0
Barrett Robinson – Project Manager
P.O. Box 85298 • San Diego, CA 92186-5298 • (858) 535-0505 • FAX (858) 535-0757 6795 Flanders Drive • San Diego, CA 92121-2903
April 13, 2016 Mike Munden W.M. Lyles Co. 42142 Roick Drive Temecula, CA 92590
RE: Sludge Dewatering and Odor Control at Plant 1 (OCSD P1-101) SUBJECT: Helix Submittal 16080-03-00: NETA Test Plan (Tests performed by Testing Organization)
Dear Mike, Attached are the example NETA Test Forms, per Spec Section 16080-1.4.D as applicable to Spec Section 16080-3.3 “TESTS REQUIRED TO BE PERFORMED BY TESTING ORGANIZATION”. The following notes are related to the Specification Review: Note 1: This testing plan includes an estimated schedule/duration and sequencing of the testing, as previously reviewed with OCSD. As discussed in the 4/7/16 pre-submittal review meeting with OCSD, tests performed by the Contractor, including Circuit and Cable Testing (600V and below) and Low-Voltage Motor Testing will be submitted separately. Note 2: As discussed in the 4/7/16 pre-submittal review meeting with OCSD, the VFD’s, UPS System, and Motors (above 20HP) will be submitted separately, as there is overlap between the Vendor Startup procedures and the steps outlined in the NETA Standards. Please contact me at 310-318-4063 if any questions arise during the review of this submittal. Sincerely,
Barrett Robinson Project Manager
Sludge Dewatering and Odor Control at Plant 1 ELECTRICAL TESTING Project No. P1-101 CONFORMED 16080-1
Section 16080 ELECTRICAL TESTING
PART 1 - GENERAL
1.1 THE REQUIREMENT
A. This Specification defines electrical equipment testing responsibilities for the CONTRACTOR.
B. The CONTRACTOR shall provide an independent, third-party InterNational Electrical Testing Association (NETA) testing organization to perform electrical testing described herein based on the 2009 Edition of the InterNational Electrical Testing Association Standard for Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems.
C. The CONTRACTOR is responsible for performing all tests listed herein that does not require the use of the testing organization.
D. The CONTRACTOR shall furnish all tools, equipment, material, and supplies and perform all labor required to perform electrical tests as indicated on the Contact Documents and specified herein.
E. The CONTRACTOR shall include electrical testing in the construction schedule.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. The requirements of the following sections and divisions apply to the Work of this section. Other sections and divisions, not referenced below, shall also apply to the extent required for proper performance of this Work.
1. Section 01300, Contractor’s Construction Schedule and Reports
2. Section 01810, Commissioning
3. Division 11, Equipment, applicable sections
4. Division 16, Electrical, applicable sections
5. Division 17, Instrumentation and Control, applicable sections
1.3 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. All Work specified herein shall conform to or exceed the applicable requirements of the referenced portions of the following publications to the extent that the provisions thereof are not in conflict with other provisions of these Specifications.
B. Comply with the applicable editions of the following codes, regulations, and standards:
1. Codes and Standards:
29 CFR 1910 Code of Federal Regulations, Title 29, Part 1910, U.S. Occupational Safety and Health Standards (OSHA)
CCR California Code of Regulations, Title 8, Div. 1, Chap. 4, Subchap. 5, Electrical Safety Orders
NFPA 70 National Electrical Code (NEC)
NFPA 70E Standard for Electrical Safety In the Workplace
ELECTRICAL TESTING Sludge Dewatering and Odor Control at Plant 1 Project No. P1-101 16080-2 CONFORMED
2. Industry Standards:
IEEE 43 Recommended Practice for Testing Insulation Resistance of Rotating Machinery
NETA Standard for Certification of Electrical Testing Technicians
NETA Standard for Acceptance Testing Specifications
3. Other Standards:
ANSI American National Standards Institute
IEEE Institute of Electrical and Electronics Engineers
NEMA National Electrical Manufacturers Association
NETA InterNational Electrical Testing Association
NFPA National Fire Protection Association
NIST National Institute of Standards and Technology
C. Comply with the applicable reference Specifications as directed in the General Requirements and Additional General Requirements.
1.4 SUBMITTALS
A. Submittals shall be made in accordance with the General Requirements, Additional General Requirements and as specified herein.
B. Testing Organization Qualifications
C. The CONTRACTOR shall submit for ENGINEER’s acceptance the qualifications of the testing organization and testing personnel to demonstrate that they comply with the requirements as described above.
D. Testing Plan:
1. The CONTRACTOR shall submit for ENGINEER’s acceptance a testing plan for each electrical item. Equipment tested by the testing organization and equipment tested by the CONTRACTOR’s testing personnel shall be included in Testing Plan.
2. The testing plan shall detail the type, schedule and duration of each test. The testing plan shall, as a minimum, include a description of test, identify tools required, construction power required, the state of installation of the equipment to be tested, and any safety issues.
E. Test Reports:
1. Three bound copies of the certified test reports shall be submitted to the ENGINEER at the completion each test. The final report shall be signed and shall include the following information:
a. Summary of the project
b. Description of equipment tested and OCSD Tag Number
c. Visual inspection report
d. Description of tests
e. Test results
f. Conclusions and recommendations
g. Appendix including appropriate test forms
Sludge Dewatering and Odor Control at Plant 1 ELECTRICAL TESTING Project No. P1-101 CONFORMED 16080-3
h. Identification of test equipment used
i. Device setting values
j. Tester’s name and date of test
F. Protective Device Setpoint and Arc Flash Request:
1. The CONTRACTOR shall request from the ENGINEER the adjustable/programmable protective device settings and available arc flash hazard information after all applicable electrical equipment submittals have been accepted.
2. The submittal shall request all adjustable/programmable settings for each piece of equipment including settings for time, current, voltage, frequency, power factor, ground detection, transformer tap, etc.
3. The submittal shall be in each respective equipment manufacturer’s format and each set point shall be included.
1.5 QUALITY ASSURANCE
A. General:
1. Comply with the requirements specified herein and the applicable reference Specifications of the General Requirements and Additional General Requirements.
B. Test Instrumentation:
1. The testing organization and CONTRACTOR shall have a calibration program that ensures that all applicable test instruments are maintained within rated accuracy. The accuracy shall be directly traceable to NIST Standards. Dated calibration labels shall be visible on all test equipment, and up to date records and calibration instructions shall be maintained for each test instrument. The calibrating standard shall be of a higher accuracy than that of the instrument tested.
2. All testing shall be done using the proper test equipment. Megohmmeters, ohmmeters, and dc high-potential test sets from such manufacturers as Biddle, Associated Research, Hipotronics, and AEMC, Or Equal shall be acceptable for use in performing insulation resistance and high-potential tests.
C. Testing Organization:
1. The testing organization shall be an independent, third party entity which shall function as an unbiased testing authority, professionally independent of the manufacturers, suppliers, and installers of equipment or systems being evaluated.
2. The testing organization shall be regularly engaged in testing of electrical equipment devices, installations, and systems.
3. The testing organization shall use technicians who are NETA-certified and regularly employed for testing services.
4. The testing organization shall be a current NETA-accredited company.
5. Technicians performing electrical tests and inspections shall be trained and experienced concerning the apparatus and systems being evaluated.
6. Technicians shall be certified in accordance with NETA Standard for Certification of Electrical Testing Technicians. Each on-site crew leader shall hold a current certification, Level III or higher in electrical testing.
PART 2 - PRODUCTS (NOT USED)
ELECTRICAL TESTING Sludge Dewatering and Odor Control at Plant 1 Project No. P1-101 16080-4 CONFORMED
PART 3 - EXECUTION
3.1 GENERAL
A. Prior to testing equipment including cable, the equipment shall be installed and secured per the manufacturer’s recommendations, the Contract Documents. A minimum of ten days in advance, the CONTRACTOR shall provide a notice to the ENGINEER for inspection of installation. ENGINEER's acceptance of installation shall be obtained prior to the commencement of any testing.
B. The CONTRACTOR shall update the testing schedule showing daily work projected a minimum of three weeks into the future.
C. The CONTRACTOR shall provide a minimum of seven days notice to the ENGINEER for the scheduling of any testing.
D. The CONTRACTOR shall provide the testing organization-approved manufacturers’ documentation of all equipment.
E. The CONTRACTOR, in the event a retest is required due to failure of equipment, adverse testing conditions, or method of installation, shall schedule the retest. Any impact to schedule shall be borne by the CONTRACTOR.
F. All tests that are required to be performed, whether done by the CONTRACTOR or by the testing organization shall be in accordance with NETA Standard for Acceptance Testing Specifications.
G. High-potential tests shall not be repeated without authorization by the ENGINEER.
H. Test and inspection records shall be submitted to the ENGINEER no later than thirty days after completion of the individual test and prior to energizing of equipment.
I. All tests shall be performed with the equipment or material de-energized, except where otherwise specifically required by the nature of the test.
J. All items not in conformance with the requirements of this Specification shall be noted on an Electrical Punchlist Record for correction by the CONTRACTOR.
K. The ENGINEER may, during start-up and check-out of electrical equipment, perform additional testing functions, wiring check-out, operational compliance certification, etc. to satisfy that the equipment meets the Contract requirements. The CONTRACTOR shall be responsible for correcting deficiencies revealed by the testing.
3.2 TESTS NOT REQUIRED TO BE PERFORMED BY THE TESTING ORGANIZATION
A. Tests listed herein are to be performed by the testing organization or the CONTRACTOR’s staff. The tests are not substitutions for tests required to be performed by the testing organization but are additional or complimentary tests.
B. Upon completion of various phases of the project, electrical equipment and wiring and cabling systems shall be inspected and tested in accordance with this Specification. All testing shall be in accordance with the applicable ANSI, IEEE, NETA, NEMA, or other national standard, and in accordance with the specific manufacturer's instruction bulletins or other literature supplied with the equipment to be tested, and the test equipment manufacturer's operating instructions.
Sludge Dewatering and Odor Control at Plant 1 ELECTRICAL TESTING Project No. P1-101 CONFORMED 16080-5
C. The CONTRACTOR shall check all equipment for proper mechanical adjustment and freedom of operation. All electrical equipment, both pre-wired and field-wired shall be field-tested for functional operation, including all intended modes and sequences of operation. This shall include switches, relays, non-adjustable circuit breakers, contactors, etc., including control interlock and sequence circuits. All necessary adjustments shall be made on apparatus in accordance with the manufacturer's instructions and design requirements. Alarm systems and circuits shall be tested by manually operating the initiating devices. Relays and control components that may prove to be functioning incorrectly or otherwise appear to be unreliable shall be repaired or replaced as necessary. An electrical system will not be accepted until it is tested in its entirety and the results reported to and accepted by the ENGINEER.
D. Circuit and Cable Testing:
1. Power, Control and Lighting Circuits - 600 V and Below. The CONTRACTOR shall perform continuity checks of all power, control and lighting cables and wires, including each conductor of multiconductor and multipair cables. Continuity checks shall be done prior to termination of cables and any testing organization tests.
a. The CONTRACTOR shall visually check all wire and cable connections, verify wire numbers, and verify that the actual wiring conforms to the Drawings.
b. Each power cable shall be tested to ensure proper phase identification.
c. The conductor ends shall be cleaned and guarded for personnel safety during testing. Circuits in the immediate vicinity that are not under test shall be grounded.
d. Prior to performing insulation resistance tests on cables, the CONTRACTOR shall verify that they are not connected to any solid state devices, transformers, or capacitors.
e. The CONTRACTOR shall perform insulation resistance tests on all 600 V power and control cables. Each conductor in a multiconductor or multipair cable or conduit shall be tested against ground with the conduit and/or all others conductors connected to ground. Motor feeder circuits shall be tested with motors disconnected and the controller open. Motor control circuits shall be tested with control stations and overcurrent devices connected. Lighting panelboard main feeder circuits, including lighting panelboard and transformer, shall be tested with the branch circuit breakers open. Testing shall be for one minute using 1000 V dc. Values of insulation resistance less than 50 megohms shall not be acceptable.
f. Branch lighting circuits containing lamp holders and receptacles do not require an insulation resistance test. Lighting branch circuits require only functional tests; any insulation problems should be revealed by this test.
g. The CONTRACTOR shall check all ac and dc control circuits for short circuits and extraneous grounds.
h. The CONTRACTOR shall perform functional tests of all power, control and lighting circuits. Alarm conditions shall be simulated for each alarm and control point, and alarm indicators shall be checked for proper operation. All control circuits shall function as intended by the Contract Documents. Metering and indication lights for motors shall be checked for proper operation. All lighting panels, circuits and fixtures, power panels, circuits, and receptacles shall be tested for proper operation.
i. The ENGINEER shall be notified if minimum insulation resistance values are not obtained.
ELECTRICAL TESTING Sludge Dewatering and Odor Control at Plant 1 Project No. P1-101 16080-6 CONFORMED
2. Instrumentation, Signal and Alarm Circuits - 300 V and Below:
a. The CONTRACTOR shall perform continuity checks of all instrumentation, signal and alarm cables and wires, including each conductor of multiconductor and multipair cables. Continuity checks shall be done prior to termination of cables.
b. The CONTRACTOR shall visually check all wire and cable connections, verify wire numbers, and verify that actual wiring conforms to the Drawings.
c. Prior to performing insulation resistance tests on cables, verify that they are not connected to any solid-state devices.
d. The CONTRACTOR shall perform insulation resistance tests on all instrumentation, signaling and alarm cables. Each conductor in a multiconductor or multipair cable or conduit shall be tested against ground with the conduit, shield and/or all other conductors connected to ground. Testing shall be for one minute using 500 V dc. Values of insulation resistance less than 50 megohms shall not be acceptable.
e. Alarm conditions shall be simulated for each alarm and control point, and alarm indicators checked for proper operation.
f. The CONTRACTOR shall check all ac and dc instrumentation, signaling and alarm circuits for short circuits and extraneous grounds.
g. The ENGINEER shall be notified if minimum insulation resistance values are not obtained.
h. The CONTRACTOR shall perform a functional test of all electrical signaling and alarm systems.
E. Low-Voltage Motor Testing:
1. Motor Tests Prior to Energization:
a. The following tests shall be conducted prior to starting motors for all motors 3 horsepower and larger but smaller than 20 horsepower:
1) Compare equipment nameplate with the Contract Documents.
2) Inspect physical and mechanical condition.
3) Inspect anchorage, alignment, and grounding.
4) Perform insulation resistance tests in accordance with IEEE 43 of all motor windings before connecting power cables to motors. Test duration shall be one minute. Insulation resistance shall be a minimum of 50 megohms at 20 degrees C at test voltage of 1000 V dc.
5) Inspect bolted electrical connections for high-resistance using the calibrated torque-wrench method in accordance with manufacturer’s published data.
6) Check all bearings to see if they are properly filled with oil or grease.
7) Check coupling alignment and shaft end play.
8) Rotate the motor shaft by hand or bar to ensure it is free to rotate.
Sludge Dewatering and Odor Control at Plant 1 ELECTRICAL TESTING Project No. P1-101 CONFORMED 16080-7
2. Uncoupled Run Tests:
a. In addition to the NETA motor tests described in this Specification, the CONTRACTOR shall conduct the following test on all motors 20 horsepower and larger:
1) All motors shall be run uncoupled for a minimum period of 2 (two) hours for motors above 100 horsepower and 30 minutes for motors 100 horsepower and below before the driven equipment is placed in service. While running, motors shall be observed for any unusual conditions, such as vibration, noise, and excessive winding or bearing temperature rise.
2) During or immediately after starting motors, the following shall be checked:
a) Shaft rotation (care shall be taken to ensure proper rotation on all equipment).
b) Bearing lubrication and temperature.
c) Excessive vibration. Vibration shall be checked with a vibrometer before mechanical connection to the driven machine. One reading shall be taken on the motor drive end shaft adjacent to the bearing housing or on the bearing housing. Vibration displacement in mils (peak-to-peak) and velocity in inches per second shall be measured and recorded. Maximum velocity shall not exceed those shown in NETA and deflection shall not exceed the readings shown in the following table:
Speed (RPM)
3600 1800 1200 900 600 300 Deflection (Mils) 1.0 1.5 2.0 2.5 3.0 3.5
3.3 TESTS REQUIRED TO BE PERFORMED BY TESTING ORGANIZATION
A. Prior to testing equipment including cable, the equipment shall be installed and secured per the manufacturer’s recommendations and the Contract Documents. All terminations required for NETA testing shall be complete. A minimum of ten days in advance, the CONTRACTOR shall provide a notice to the ENGINEER for inspection of installation. ENGINEER’s acceptance of installation shall be obtained prior to the commencement of any testing.
B. Subsequent to acceptance of installation by the ENGINEER, the CONTRACTOR shall provide a minimum of ten days notice of third party testing. Energizing of tested equipment is at the discretion of the “OCSD” (ENGINEER) and will not take place until passed and documented by the testing organization and reviewed by the ENGINEER. The entire electrical system shall be tested before energization. If functional testing requires power, the CONTRACTOR shall provide temporary power for that purpose. All testing shall be completed prior to equipment start up.
C. All references to NETA in this Specification section are referring to NETA Standard for Acceptance Testing Specifications.
D. The following tests shall be performed by the testing organization and witnessed by the ENGINEER:
1. Switchgear and Switchboard Assemblies: Perform all inspection and tests, including all optional tests, listed in Section 7.1 of NETA on all Medium-Voltage Switchgear, and Low-Voltage Switchgear
ELECTRICAL TESTING Sludge Dewatering and Odor Control at Plant 1 Project No. P1-101 16080-8 CONFORMED
2. Transformers, Dry-Type, Air-Cooled: Perform all inspection and tests, including all optional tests, listed in applicable Sections 7.2.1.1 or 7.2.1.2 of NETA on all dry type transformers.
3. Transformers, Liquid-Filled: Perform all inspection and tests, including all optional tests, listed in Section 7.2.2 of NETA on all liquid-filled transformers.
4. Cables, Medium-Voltage: Perform all inspection and tests, not including optional tests, listed in Section 7.3.3 of NETA on all medium-voltage cable including cable bus.
5. Circuit Breakers, Air, Insulated-Case/Molded-Case: Perform all inspection and tests, including all optional tests, listed in Section 7.6.1.1 of NETA on all insulated-case/molded-case circuit breakers 100 A frame and higher.
6. Circuit Breakers, Air, Low-Voltage Power: Perform all inspection and tests, including all optional tests, listed in Section 7.6.1.2 of NETA on all low-voltage power circuit breakers.
7. Circuit Breakers, Vacuum, Medium-Voltage: Perform all inspection and tests, including all optional tests, listed in Section 7.6.3 of NETA on all medium-voltage circuit breakers.
8. Protective Relays, Electromechanical and Solid-State: Perform all inspection and tests, including all optional tests, listed in Section 7.9.1 of NETA on all electromechanical and solid-state protective relays.
9. Protective Relays, Microprocessor-Based: Perform all inspection and tests listed in Section 7.9.2 of NETA on all microprocessor-based protective relays.
10. Instrument Transformer: Perform all inspection and tests, including all optional tests, listed in Section 7.10 of NETA on all instrument transformers (CTs, CPTs and PTs).
11. Metering Devices, Microprocessor-Based: Perform all inspection and tests listed in Section 7.11 of NETA on all metering devises including power monitors.
12. Grounding Systems: Perform all inspection and tests listed in Section 7.13 of NETA on grounding system.
13. Ground-Fault Protection Systems, Low-Voltage: Perform all inspection and tests listed in Section 7.14 of NETA on all ground fault protection systems.
14. Rotating Machinery, ac Induction Motors and Generators: Perform all inspection and tests, including all optional tests, listed in Section 7.15.1 of NETA on all low-voltage ac motors 20 HP and larger.
15. Motor Control, Motor Starters, Low-Voltage: Perform all inspection and tests, including all optional tests, listed in Section 7.16.1.1 of NETA on all motor starters. For item 7.16.1.1.6 “Perform operational tests by initiating control devices,” the starter control devices (selector switches, pushbuttons, relays, pilot lights, etc.) and motor control wiring shall be tested by simulating field device controls or signals at starter terminal blocks to simulate actual control functionality. Control functionality is again checked during ORT testing as described in Section 01810, Commissioning, utilizing actual field devices.
16. Motor Control, Motor Control Centers, Low-Voltage: Perform all inspection and tests, including all optional tests, listed in Section 7.16.2.1 of NETA on all MCCs.
Sludge Dewatering and Odor Control at Plant 1 ELECTRICAL TESTING Project No. P1-101 CONFORMED 16080-9
17. Adjustable Speed Drives: Perform all inspection and tests, including all optional tests, listed in Section 7.17 of NETA on all Variable Frequency Drives except for Section 7.17.2.7 which shall be performed by the manufacturer. For item 7.17.2.8 “Perform operational tests by initiating control devices, the VFD control devices (selector switches, pushbuttons, relays, pilot lights, etc.) and motor control wiring shall be tested by simulating field device controls or signals at starter terminal blocks to simulate actual control functionality.” Control functionality is again checked during ORT testing as described in Section 01810, Commissioning, utilizing actual field devices.
18. Direct Current Systems, Batteries: Perform all inspection and tests, listed in applicable subsection of Section 7.18.1.1 of NETA on all batteries for UPS systems, Engine-generators and switchgear systems.
19. Direct Current Systems, Battery Chargers: Perform all inspection and tests, including all optional tests, listed in Section 7.18.2 of NETA on all battery chargers UPS systems, and switchgear systems.
20. Surge Arrestors, Low-Voltage: Perform all inspection and tests listed in Section 7.19.1 of NETA on all low-voltage surge protection devices.]
21. Surge Arrestors, Medium-Voltage: Perform all inspection and tests listed in Section 7.19.2 of NETA on all medium-voltage surge protection devices.
22. Emergency Systems, Uninterruptible Power Systems: Perform all inspection and tests listed in Section 7.22.2 of NETA on all UPSs.
23. Emergency Systems, Automatic Transfer Switches: Perform all inspection and tests listed in Section 7.22.3 of NETA on all ATS’s and Manual Bypass Switches.
3.4 SETTING and TESTING OF ADJUSTABLE/PROGRAMMABLE PROTECTIVE DEVICES
A. The ENGINEER will provide settings within thirty days after CONTRACTOR’s “Protective Device Setpoint and Arc Flash Request” and all protective device data/manual submittal.
B. The testing organization shall set/program and test the adjustable/programmable protective devices in the field according to applicable NETA and manufacturer’s requirements.
C. CONTRACTOR shall provide all software and hardware required to set or program devices.
D. The protective devices shall be tested for operation after setting and programming.
3.5 ARC FLASH
A. The ENGINEER will provide arc flash levels within thirty days after CONTRACTOR’s “Protective Device Setpoint and Arc Flash Request” submittal.
B. The CONTRACTOR shall provide and install labels on the project electrical equipment for personnel protective clothing requirements to comply with arc flash hazard sign installation requirements as specified in NEC Article 110.16 “Flash Protection’ and NFPA 70E.
C. Arc flash labels shall be installed at all the locations specified below:
1. One on the front near the main equipment nameplate.
2. One at the back in the middle section of the lineup (if rear is accessible)
3. One at each end of the equipment lineup (if the ends are accessible).
ELECTRICAL TESTING Sludge Dewatering and Odor Control at Plant 1 Project No. P1-101 16080-10 CONFORMED
3.6 ATTACHMENTS
Attachment A- Arc Flash Label Template.
* * * * * *
Equip Group Equipment Description Single Line Duration
Group 1 (Silos) MCC‐SHH (and equipment fed) (Tested in 2 phases) E6‐6001/6002 3 days
12KV Electrical Service Center Breaker 110B* E0‐6001 1 Day
12KV SWGR CT's Installation & Test (A side)* E0‐6001 1 Day
12KV SWGR CT's Installation & Test (B side)* E0‐6001 1 Day
HI‐POT 12KV FEEDERS H15L901/A* E5‐6001 1 Day
HI‐POT 12KV FEEDERS H15L903 & H15L907 E5‐6001 1 Day
HI‐POT 12KV FEEDERS H15L902/A* E5‐6002 1 Day
HI‐POT 12KV FEEDERS H15L904 & H15L908 E5‐6002 1 Day
12KV SWGR QA (Breakers, Relays, Meters) E5‐6001 2 Days
12KV SWGR QB (Breakers, Relays, Meters) E5‐6002 2 Days
125VDC Battery System E5‐6028 1 day
TFR‐Q01, TFR‐Q51 E5‐6003/6004 1 Day
TFR‐Q02, TFR‐Q52 E5‐6005/6006 1 Day
12KV
Energization**Energize 12KV SWGR w/ Feeder Breakers LOTO E5‐6001‐6002 1 Day
480V SWGR QA‐A/B (Breakers, Relays, Meters) E5‐6003/6004 3 Days
480V SWGR QC‐A/B (Breakers, Relays, Meters) E5‐6005/6006 3 days
Energization &
EPSET** 480V SWGR Energization & EPSET E5‐6003‐6006 5 days
UPS System (including vendor startup) E5‐6027 4 days
Thickening Centrifuge Main/Scroll Drives E5‐6007 1 day
Dewatering Centrifuge Main/Scroll Drives E5‐6008 1 day
MCC‐SHA (and equipment fed) E5‐6011/6012 3 days
MCC‐SHB (and equipment fed) E5‐6013/6014 3 days
MCC‐SHC (and equipment fed) E5‐6015 3 days
MCC‐SHD (and equipment fed) E5‐6016/6017 3 days
MCC‐SHE (and equipment fed) E5‐6018/6019 3 days
MCC‐SHF (and equipment fed) E5‐6020 3 days
MCC‐SHG (and equipment fed, including ATS's) E5‐6021/6022 4 days
Switchgear F Modifications* E11‐6001 1 day
MCC‐SDD Modifications (SDD‐435/436)* E3‐6001 1 Day
MCC‐SDE Modifications (SDE‐423/424/425/426)* E3‐6002 1 Day
MCC‐SDB Modifications (SDB‐427/428)* E4‐6001 1 Day
MCC‐FA Modifications* E11‐6005 1 day
MCC‐NB Modifications* E11‐6006 1 day
MCC‐QB Modifications* E14‐6002 1 day
Group 2
(12KV & DC
Control)
Group 5
(MCC's &
associated
equipment)***
Group 6
(Existing 480V
MCC/SWGR
Mods)***
P1‐101 NETA TESTING SEQUENCE
*Coordinated shutdown required
**Energization following Approval of NETA Testing and Relay Settings of upstream equipment.
Downstream equipment to remain LOTO.
***UPS, VFD's & MCC's to be energized following approval of NETA Testing on case‐by‐case basis.
Group 3
(480V SWGR)
Group 4
(UPS & Drives)
***
UL NUMBER SHOP/JOB NUMBER PHASE WIRE
SECTION CURRENT
AF AS NOTE 1
CONDITION
A PHASE B PHASE C PHASE
A-GROUND B-GROUND C-GROUND A-B B-C C-A
A PHASE B PHASE C PHASE
COMPLETE
SWITCHGEAR DESIGNATION TEST EQUIPMENT CALIBRATION DATES1kV Megger 8/5/2015
MANUFACTURER CATALOG NUMBER STYLENAME PLATE DATA
CLIENT TESTING SPECIFICATIONS EPS JOB NUMBER
LOCATION ENGINEER(S) DATE
VOLTAGE L-L VOLTAGE L-N SUPPLY CURRENT NEUTRAL CURRENT
NETA SECTION 7.1 SWITCHGEAR AND SWITCHBOARD ASSEMBLIES INSPECTION
SHORT CIRCUIT INTERRUPTING CURRENT RATINGSSWITCHBOARD MAIN PROTECTIVE DEVICE MINIMUM PROTECTIVE DEVICE
INSPECTION CHECK LIST
MAIN PROTECTIVE DEVICE CURRENT RATINGS MAXIMUM AVAILABLE FAULT CURRENT
A = ACCEPTABLE R = NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT C = CORRECTED N/A = NOT APPLICABLE
SWITCHBOARD INSPECTION REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
1. FAULT CURRENT CALCULATED USING THE FOLLOWING FORMULA:
FIELD DATA
DUCTOR (MILLIOHMS)
INSULATION RESISTANCE (1 MIN)
NOTES
VERIFY APPROPRIATE LUBRICATION ON MOVING CURRENT-CARRYING PARTS AND ON MOVING AND SLIDING SURFACES
INSPECT INSULATORS FOR EVIDENCE OF PHYSICAL DAMAGE OR CONTAMINATED SURFACES
PERFORM SYSTEM FUNCTION TESTS IAW SECTION 8
VERIFY OPERATION OF CUBICLE SWITCHGEAR / SWITCHBOARD SPACE HEATERS
PERFORM PHASING CHECKS ON DOUBLE-ENDED OR DUAL-SOURCE SWGR TO INSURE CORRECT PHASING FROM EACH SOURCE
NOTES:
DIELECTRIC WITHSTAND FOR 1 MIN AT 2300 VDC
NOTES: ALL PHASES NOT UNDER TEST WERE GROUNDED
FUNCTIONAL TESTING
PERFORM SECONDARY INJECTION TESTING AT 1 AMP AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUIT
VERIFY THAT CURRENT AND VOLTAGE TRASFORMER RATIOS CORRESPOND TO DRAWINGS
VERIFY THAT WIRING CONNECTIONS ARE TIGHT AND WIRING IS SECURE TO PREVENT DAMAGE DURING ROUTINE OPERATION OF MOVING PARTS
INSPECT BOLTED ELECTRICAL CONNECTIONS BY DUCTOR, TORQUE WRENCH OR THERMAL INSPECTION
VERIFY OPERATION AND SEQUENCING OF INTERLOCKING SYSTEMS
PERFORM PRIMARY INJECTION TESTING AT 1 AMP SECONDARY AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUIT
PERFORM VISUAL AND MECHANICAL INSPECTION OF SURGE ARRESTERS IAW SECTION 7.19
INSPECT CPT'S FOR PHYSICAL DAMAGE, CRACKED INSULATION, BROKEN LEADS TIGHTNESS OF CONNECTIONS, DEFECTIVE WIRING AND OVERALL GENERAL CONDITION
VERIFY CPT PRIMARY AND SECONDARY FUSE OR CIRCUIT BREAKER RATINGS MATCH DRAWINGS
VERIFY CORRECT FUNCTIONING OF CPT DRAWOUT DISCONNECTING CONTACTS, GROUNDING CONTACTS AND INTERLOCKS
VERIFY CORRECT BARRIER AND SHUTTER INSTALLATION AND OPERATION
EXERCISE ALL ACTIVE COMPONENTS
INSPECT MECHANICAL INDIDCATING DEVICES FOR CORRECT OPERATION
VERIFY THAT FILTERS ARE IN PLACE AND VENTS ARE CLEAR
PERFORM VISUAL AND MECHANICAL INSPECTION OF INST XFMR'S IAW SECTION 7.10
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
INSPECT PHYSICAL AND MECHANICAL CONDITION
INSPECT ANCHORAGE, ALIGNMENT, GROUNDING AND REQUIRED AREA CLEARANCES
VERIFY THE UNIT IS CLEAN AND ALL SHIPPING BRACING, LOOSE PARTS AND DOCUMENTATION SHIPPED INSIDE CUBICLES HAVE BEEN REMOVEDVERIFY THAT FUSE AND CIRCUIT BREAKER SIZES AND TYPES CORRESPOND TO DRAWINGS AND COORDINATION STUDY AS WELL AS CIRCUIT BREAKER COMM PACKAGES
TRANSFORMER FULL LOADCURRENTTRANSFORMER IMPEDANCE
INDOOROUTDOOR
Acceptance Maintenance
ASYMSYMASYMSYM ASYMSYM
MEGOHMS
GIGOHMS1000 VDC500 VDC
CONDITION NOTES
A-GROUND B-GROUND C-GROUND
A-GROUND B-GROUND C-GROUND
A-GROUND B-GROUND C-GROUND A-B B-C C-A
VALUES IN MICROHMS
DUCTOR READING FOR GROUND CONNECTIONS
HIPOT NOTES:
MCOV RATING STROKE COUNTER READING
44 KV (P = PASS, F = FAIL)
INSPECT PHYSICAL AND MECHANICAL CONDITION
INSPECT ANCHORAGE, ALIGNMENT, GROUNDING AND CLEARANCES
VERIFY THE ARRESTERS ARE CLEAN
VERIFY THE GROUND LEAD ON EACH DEVICE IS INDIVIDUALLY ATTACHED TO A GND BUS / GND ELECTRODE
VERIFY THE STROKE COUNTER IS CORRECTLY MOUNTED AND ELECTRICALLY CONNECTED
INSPECTION CHECK LISTCHECK POINT
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
FIELD DATA
LOCATION ENGINEER(S)
SWITCHGEAR DESIGNATION TEST EQUIPMENT CALIBRATION DATES
DATE
5000 VDC
INSULATION RESISTANCE
A = ACCEPTABLE R = NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT C = CORRECTED N/A = NOT APPLICABLE
NOTES:
NAME PLATE DATAMANUFACTURER SERIAL NUMBER CATALOG NUMBER
SURGE ARRESTER REPORT7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
EPS JOB NUMBERCLIENT
VOLTAGE RATING MANUFACTURE DATE
MEGOHMS
GIGOHMS
SOFTWARE REVISION:SERIAL NUMBER:
CONDITION
COMPLETED
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
MODEL NUMBER:
SWITCHGEAR DESIGNATION TEST EQUIPMENT CALIBRATION DATES1kV Megger 8/5/2015
RELAY NAME:
INSULATION RESISTANCE (1 MIN)
NOTES
NETA SECTION 7.9.2.1 VISUAL AND MECHANICAL INSPECTION
CHECK OPERATION OF ALL ACTIVE DIGITAL INPUTS
CHECK ALL OUTPUT CONTACTS RO SCR'S, PREFERABLY BY OPERATING THE CONTROLLED DEVICE SUCH AS CB, AUX RELAY OR ALARM
FUNCTIONAL TESTING
APPLY VOLTAGE OR CURRENT TO ALL ANALOG INPUTS AND VERIFY CORRECT REGISTRATION OF THE RELAY METER FUNCTIONS
CHECK FUNCTIONAL OPERATION OF EACH ELEMENT USED IN THE PROTECTION SCHEME
CLEAN THE FRONT PANEL AND REMOVE FOREIGN MATERIAL FROM THE CASECHECK TIGHTNESS OF CONNECTIONS
RECORD MODEL NUMBER, STYLE NUMBER, SERIAL NUMBER FIRMWARE REVISION, SOFTWARE REVISION AND RATED CONTROL VOLTAGEVERIFY OPERATION OF LIGHT-EMITTING DIODES, DISPLAY AND TARGETS
A = ACCEPTABLE R = NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT C = CORRECTED N/A = NOT APPLICABLE
VERIFY THAT THE FRAME IS GROUNDED IAW MANUFACTURER'S INSTRUCTIONSSET THE RELAY IAW THE COORDINATION STUDYDOWNLOAD SETTINGS FROM THE RELAY AND COMPARE TO THOSE SPECIFIED IN THE COORDINATAION STUDY OR SITE DOCUMENTATIONCONNECT BACKUP BATTERYSET CLOCK IF NOT CONTROLLED EXTERNALLY
AFTER THE EQUIPMNET IS INITIALLY ENERGIZED, MEASURE MAGNITUDE AND PHASE ANGLE OF ALL INPUTS AND COMPARE TO EXPECTED VALUES
UPON COMPLETION OF TESTIN, RESET ALL MIN/MAX RECORDERS, COMMUNICATIONS STATISTICS, FAULT COUNTERS, SEQUENCE OF EVENTS RECORDER AND ALL EVENT RECORDS
NAMEPLATE DATA
CHECK ALL INTERNAL LOGIC FUNCTIONS USED IN THE PROTECTION SCHEME
FOR PILOT SCHEMES, PERFORM A LOP-BACK TEST TO CHECK THE RECEIVE AND TRANSMIT COMMUNICATION CIRCUITS
FOR PILOT SCHEMES, PERFORM SATELLITE SYNCHRONIZED END-TO-END TESTS
FOR PILOT SCHEMES WITH DTT, PERFORM TRANSMET AND RECEIVED DTT AT EACH TERMINAL
RATED CONTROL VOLTAGE:STYLE NUMBER:
CURRENT CIRCUIT VOLTAGE CIRCUIT
NETA SECTION 7.9.2.2 ELECTRICAL TESTS
MICROPROCESSOR RELAY INSPECTION REPORT
RELAY FUNTION:FIRMWARE REVISION:
CLIENT TESTING SPECIFICATIONS EPS JOB NUMBER
LOCATION ENGINEER(S) DATEAcceptance Maintenance
MEGOHMS
GIGOHMS1000 VDC500 VDC
UL NUMBER SHOP/JOB NUMBER PHASE WIRE
SECTION CURRENT
AF AS NOTE 1
CONDITION
A PHASE B PHASE C PHASE
A-GROUND B-GROUND C-GROUND A-B B-C C-A
A PHASE B PHASE C PHASE
COMPLETE
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
INSPECT PHYSICAL AND MECHANICAL CONDITION
INSPECT ANCHORAGE, ALIGNMENT, GROUNDING AND REQUIRED AREA CLEARANCES
VERIFY THE UNIT IS CLEAN AND ALL SHIPPING BRACING, LOOSE PARTS AND DOCUMENTATION SHIPPED INSIDE CUBICLES HAVE BEEN REMOVEDVERIFY THAT FUSE AND CIRCUIT BREAKER SIZES AND TYPES CORRESPOND TO DRAWINGS AND COORDINATION STUDY AS WELL AS CIRCUIT BREAKER COMM PACKAGES
VERIFY CORRECT BARRIER AND SHUTTER INSTALLATION AND OPERATION
EXERCISE ALL ACTIVE COMPONENTS
INSPECT MECHANICAL INDIDCATING DEVICES FOR CORRECT OPERATION
VERIFY THAT FILTERS ARE IN PLACE AND VENTS ARE CLEAR
PERFORM VISUAL AND MECHANICAL INSPECTION OF INST XFMR'S IAW SECTION 7.10
PERFORM PRIMARY INJECTION TESTING AT 1 AMP SECONDARY AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUIT
PERFORM VISUAL AND MECHANICAL INSPECTION OF SURGE ARRESTERS IAW SECTION 7.19
INSPECT CPT'S FOR PHYSICAL DAMAGE, CRACKED INSULATION, BROKEN LEADS TIGHTNESS OF CONNECTIONS, DEFECTIVE WIRING AND OVERALL GENERAL CONDITION
VERIFY CPT PRIMARY AND SECONDARY FUSE OR CIRCUIT BREAKER RATINGS MATCH DRAWINGS
VERIFY CORRECT FUNCTIONING OF CPT DRAWOUT DISCONNECTING CONTACTS, GROUNDING CONTACTS AND INTERLOCKS
PANELBOARD INSPECTION REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
1. FAULT CURRENT CALCULATED USING THE FOLLOWING FORMULA:
FIELD DATA
DUCTOR (MILLIOHMS)
INSULATION RESISTANCE (1 MIN)
NOTES
VERIFY APPROPRIATE LUBRICATION ON MOVING CURRENT-CARRYING PARTS AND ON MOVING AND SLIDING SURFACES
INSPECT INSULATORS FOR EVIDENCE OF PHYSICAL DAMAGE OR CONTAMINATED SURFACES
PERFORM SYSTEM FUNCTION TESTS IAW SECTION 8
VERIFY OPERATION OF CUBICLE SWITCHGEAR / SWITCHBOARD SPACE HEATERS
PERFORM PHASING CHECKS ON DOUBLE-ENDED OR DUAL-SOURCE SWGR TO INSURE CORRECT PHASING FROM EACH SOURCE
NOTES:
INSPECTION CHECK LIST
MAIN PROTECTIVE DEVICE CURRENT RATINGS MAXIMUM AVAILABLE FAULT CURRENT
A = ACCEPTABLE R = NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT C = CORRECTED N/A = NOT APPLICABLE
DIELECTRIC WITHSTAND FOR 1 MIN AT 2300 VDC
NOTES: ALL PHASES NOT UNDER TEST WERE GROUNDED
FUNCTIONAL TESTING
PERFORM SECONDARY INJECTION TESTING AT 1 AMP AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUIT
VERIFY THAT CURRENT AND VOLTAGE TRASFORMER RATIOS CORRESPOND TO DRAWINGS
VERIFY THAT WIRING CONNECTIONS ARE TIGHT AND WIRING IS SECURE TO PREVENT DAMAGE DURING ROUTINE OPERATION OF MOVING PARTS
INSPECT BOLTED ELECTRICAL CONNECTIONS BY DUCTOR, TORQUE WRENCH OR THERMAL INSPECTION
VERIFY OPERATION AND SEQUENCING OF INTERLOCKING SYSTEMS
NETA SECTION 7.1 SWITCHGEAR AND SWITCHBOARD ASSEMBLIES INSPECTION
SHORT CIRCUIT INTERRUPTING CURRENT RATINGSSWITCHBOARD MAIN PROTECTIVE DEVICE MINIMUM PROTECTIVE DEVICE
VOLTAGE L-L VOLTAGE L-N SUPPLY CURRENT NEUTRAL CURRENT
MANUFACTURER CATALOG NUMBER STYLENAME PLATE DATA
CLIENT TESTING SPECIFICATIONS EPS JOB NUMBER
LOCATION ENGINEER(S) DATE
SWITCHGEAR DESIGNATION TEST EQUIPMENT CALIBRATION DATES1kV Megger 8/5/2015
TRANSFORMER FULL LOADCURRENTTRANSFORMER IMPEDANCE
INDOOROUTDOOR
Acceptance Maintenance
ASYMSYMASYMSYM ASYMSYM
MEGOHMS
GIGOHMS1000 VDC500 VDC
MEDIUM VOLTAGE VACUUM BREAKER TEST REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6433
JOB #:TESTED BY:JOB LOCATION:
DATE:CUSTOMER:
NAMEPLATE DATATEST EQUIPMENT: CALIBRATION DATE:
EQUIPMENT LOCATION SWITCHGEAR DESIGNATION
A - ACCEPTABLE N - NEEDS REPAIR C - CORRECTED NA - NOT APPLICABLE NS - NOT IN SCOPE
NOTES:
A - BB - CC - A
A - GNDB - GND
C - C
C - GNDA - AB - B
INSULATION RESISTANCE AT 1000V WITH THE BREAKER CLOSED (GIGOHMS)
INSULATION RESISTANCE AT 1000V WITH THE BREAKER OPEN (GIGOHMS)
FEEDER DESIGNATION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONSINSPECT PHYSICAL AND MECHANICAL CONDITIONINSPECT ANCHORAGE, ALIGNMENT AND GROUNDINGVERIFY THE UNIT IS CLEANPERFORM ALL MECHANICAL OPERATION TESTS ON THE OPERATIN MECHANISM IAW MANUFACTURER'S PUBLISHED DATAMEASURE CRITICAL DISTANCES SUCH AS CONTACT GAP AS RECOMMENDED BY MANUFACTURERINSPECT BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
PERFORM TIME-TRAVEL ANALYSISRECORD AS-FOUND AND AS-LEFT OPERATION COUNTER READINGS
TYPEMANUFACTURER
VOLTAGE RATING (kV)
OPERATIONS COUNTER (AF/AL)
CURRENT RATING (AMPS)
SERIAL NUMBER
NETA SECTION 7.6.3.1 VISUAL AND MECHANICAL INSPECTION
CONTACT EROSIONA PHASEB PHASEC PHASE
B PHASEC PHASE
A PHASEVACUUM BOTTLE TEST AT ____kV
INTERRUPT RATING (KA)
VERIFY APPROPRIATE LUBRICATION ON MOVING, CURRENT-CARRYING PARTS AND ON MOVING AND SLIDING SURFACES
VERIFY CELL FIT AND ELEMENT ALIGNMENTVERIFY RACKING MECHANISM OPERATION
NETA SECTION 7.6.3.2 ELECTRICAL TESTS
CONTACT RESISTANCE (MICROHMS)
A PHASEB PHASEC PHASE
MINIMUM PICKUP VOLTAGE ON CLOSE COIL
COMPLETEDFUNCTION TESTS
VAC
CONTROL WIRING INSULATION RESISTANCE AT 1000 VDC (GIGOHMS)
TEST INSTRUMENT TRANSFORMERS IAW SECTION 7.10
TRIP CIRCUIT BREAKER BY OPERATION OF EACH PROTECTIVE DEVICE. RESET ALL TRIP LOGS AND INDICATORS
VERIFY OPERATION OF HEATERS
PERFORM POWER-FACTOR OR DISSIPATION-FACTOR TESTS ON EACH BUSHING EQUIPPED WITH A POWER-FACTOR CAPACITANCE TAP. IN THE ABSENCE OF A POWER-FACTOR CAPACITANCE TAP, PERFORM HOT-COLLAR TESTS. THESE SHALL BE IAW EQUIPMENT MANUFACTURER'S PUBLISHED DATA
PERFORM POWER-FACTOR OR DISSIPATION-FACTOR TESTS ON EACH POLE WITH THE BREAKER OPEN AND EACH PHASE WITH THE BREAKER CLOSED
VERIFY CORRECT OPERATION OF ANY AUXILIARY FEATURES SUCH AS ELECTRICAL CLOASE AND TRIP OPERATION, TRIKP-FREE, ANTI-PUMP FUNCTION
PERFORM DIELECTRIC WITHSTAND VOLTAGE TEST PER 7.6.3.2.11
VAC
VAC VAC VAC VAC
VAC VAC VAC
MINIMUM PICKUP VOLTAGE ON TRIP COIL VAC
A PHASE B PHASE C PHASE EXPECTED TIMEMIN MAX
CONROL POWER TRANSFORMER TEST COMPLETED
FUNCTIONAL CHECKS COMPLETED
TORQUE CHECKS COMPLETED (IF DUCTOR OR THERMAL SCAN NOT DONE)THERMAL SCAN COMPLETED (IF DUCTOR OR TORQUE CHECKS NOT DONE)
DUCTOR READINGS (MILLIOHMS) C PHASE CONTROL WIRE INSULATION RESISTANCE (GIGOHMS)
AMPS
OVERLOAD ELEMENT TRIP TEST @300% (SECONDS)
A PHASE B PHASE
FIELD DATA
INSULATION RESISTANCE (GIGOHMS) A - B
A - ACCEPTABLE C - CORRECTED N - NEEDS REPAIR NA - NOT APPLICABLE NS - NOT IN SCOPE
INSPECT BOLTED CONNECTIONS WITH DUCTOR, TORQUE WRENCH OR THERMAL IMAGERVERIFY APPROPRIATE LUBRICATION ON MOVING CURRENT-CARRYING AND SLIDING SURFACES
B - C C - A A - GND B - GND
PERFORM OPERATIONAL TEST BY INITIATING CONTROL DEVICES
NOTES:
C - GND A - A B - B C - CCONTACTOR OPENCONTACTOR CLOSED
INSPECT CONTACTORS GAP, WIPE, ALIGNMENT AND PRESSURE ARE IAW MANUFACTUER'S PUBLISHED DATAVERIFY OVERLOAD ELEMENT RATING IS CORRECT FOR ITS APPLICATIONVERIFY FUSE RATING IS ADEQUATE FOR MOTOR PROTECTION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONSINSPECT FOR PHYSICAL AND MECHANICAL CONDITIONINSPECT ANCHORAGE, ALIGNMENT AND GROUNDINGVERIFY THE UNIT IS CLEANINSPECT CONTACTORS MECHANICAL OPERATION
CONDITIONINSPECTION
TYPE / STYLE / CAT #
OL CATALOG NUMBERSTARTER SIZE
OL RATED AMPSMOTOR HORSEPOWER
DISCONNECT RATED AMPS MOTOR FULL LOAD AMPS HP
AMPS
NAMEPLATE DATA
EQUIPMENT DESIGNATIONEQUIPMENT LOCATION
MANUFACTURER
TEST EQUIPMENT:
AMPS
CALIBRATION DATE:
MOTOR STARTER TEST REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6433
JOB #:TESTED BY:JOB LOCATION:
DATE:CUSTOMER:
MOLDED CASE CIRCUIT BREAKER TEST REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6433
JOB #:TESTED BY:JOB LOCATION:
DATE:CUSTOMER:
TEST DATATEST EQUIPMENT: CALIBRATION DATE:
EQUIPMENT LOCATION SWITCHGEAR DESIGNATION
PERFORM ADJUSTMENTS FOR FINAL PROTECTIVE SETTINGS IAW THE COORDINATION STUDY
A PHASEMILLIVOLT DROP AT 300% FRAME CURRENT RATING
AMPS AMPS
AMPS AMPS
C PHASE
A - ACCEPTABLE N - NEEDS REPAIR C - CORRECTED NA - NOT APPLICABLE NS - NOT IN SCOPE
NOTES:
VAC VAC
SEC SECSEC SEC SEC SEC
VAC VACSEC SEC
SEC SEC SEC
AMPS
A - B
BREAKER IDENTIFICATION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONSINSPECT PHYSICAL AND MECHANICAL CONDITIONINSPECT ANCHORAGE AND ALIGNMENTVERIFY THE UNIT IS CLEANOPERATE THE BREAKER TO INSURE SMOOTH OPERATIONINSPECT BOLTED CONNECTIONS WITH DUCTOR, TORQUE WRENCH OR THERMAL INSPECT OPERATING MECHANISM, CONTACTS AND ARC CHUTES IN UNSEALED UNITS
A PHASEB PHASE
TRIP RATINGFRAME RATING
MANUFACTURERTYPE
INSTANTANEOUS TRIP CURRENT AMPS
AMPS AMPS
AMPS AMPS
VAC VAC
VAC VAC
AMPS
AMPS AMPS AMPS
B - CC - A
A - GNDB - GND
C - C
C - GNDA - AB - B
INSULATION RESISTANCE AT 1000V WITH THE BREAKER
CLOSED (GIGOHMS)
INSULATION RESISTANCE AT 1000V WITH THE BREAKER
OPEN (GIGOHMS)
CONTROL WIRING INSULATION RESISTANCE (GIGOHMS)
AMPS
VACA PHASEB PHASEC PHASE
SEC SEC SEC
SETTINGRANGE
VAC VAC VAC
AMPS
LONG TIME DELAY AT 300% RATED CURRENT SEC
VAC VACB PHASEC PHASE VAC
RANGE
AMPS AMPS AMPS AMPS
SR
°F
VOLTAGE RATING 15 KVKV 2/0LENGTH MFG DATE
MILS 700 NA
LINES: 54 KV LOAD: 54 KV
MODEL: PTS Series S/N: ASSET: SAN0002S/N: ASSET: SAN0003
OTHER EQUIP MODEL: S/N: ASSET: ` CALIBRATION:
KV KV 30
LINES: LOAD: LINES: LOAD:
LINE LOAD:
VOLTAGE: 5000 VDC A-GND B-GND C-GND A-B B-C C-A B C
VOLTS IN TIME IN TIME INKV A B C NOTES MINUTES A B C NOTES SECONDS A B C NOTES9 0.5
18 127 236 345 454 5
6789101112131415
MEDIUM VOLTAGE CABLE D.C. HIGH-POTENTIAL TEST REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
NOTES:
HIGH-POTENTIAL TEST DATASTEP VOLTAGE TEST ABSORPTION TEST VOLTAGE DECAY TEST
LEAKAGE CURRENT IN MICROAMPS LEAKAGE CURRENT IN MICROAMPS DECAY VOLTAGE IN KILOVOLTS
APRE-HIPOTENTIAL TESTS (GIG)POST-HIPOTENTIAL TESTS (GIG)
C-Clamp C-Clamp1 MINUTE MEGGER TEST DATA SHIELD CONTINUITY TEST DATA IN OHMS
NA NA NA NAGROUND PLANE SHIELDS GROUNDED SHIELD CONNECTIONS
54 9 SECONDSSPACE CHARGE CONTAINMENT CORONA SUPPRESSION
Fluke 87V 27080608 5/20/2015TEST PROCEDURE
MAXIMUM TEST VOLTAGE VOLTAGE INCREMENTS STABILIZATION TIME TEST POWER VOLTAGE SOURCE
HIPOT MFR: VLF Inst 1775 CALIBRATION: 8/5/2015MEGGER MODEL: Megger S1-1052/2 CALIBRATION: 8/5/2015
TERMINATION TYPES AND MAXIMUM RECOMMENDED TEST VOLTAGES NUMBER OF SPLICES200A Elastimold Elbow 200A Elastimold Elbow 0
TEST EQUIPMENT
INSULATION TYPE INSULATION THICKNESS INSULATION RATING INSTALLED INEPR 220 PVC Conduit
CABLE DATAMANUFACTURER OPERATING VOLTAGE CONDUCTOR SIZE & TYPE
General Cable 12 AWG
FEEDER IDENTIFICATION CABLE SOURCE POINT CABLE END POINT
LOCATION: HUMIDITY AMBIENT TEMPERATURE WITNESS35 76 NA
CLIENT: TESTING SPECIFICATIONS ENGINEER(S) DATE JOB NUMBER
INSPECT CABLE JACKET AND INSULATION CONDITION
NETA SECTION 7.3.3.1 VISUAL AND MECHANICAL INSPECTION CONDITION
INSPECT BOLTED ELECTRIC CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHY SURVEYINSPECT EXPOSED SECTIONS OF CABLES FOR PHYSICAL DAMAGECOMPARE CABLE DATA WITH DRAWINGS AND SPECIFICATIONS
INSPECT COMPRESSION-APPLIED CONNECTORS FOR CORRECT CABLE MATCH AND INDENTATIONINSPECT SHIELD GROUNDING, CABLE SUPPORTS AND TERMINATIONSINSPECT FIREPROOFING IN COMMON CABLE AREASIF CABLES ARE TERMINATED THROUGH WINDOW-TYPE CT'S, INSPECT TO VERIFY TTHAT NEUTRAL AND GROUND CONDUCTORS ARE CORRECTLY PLACED AND THAT SHIELDS ARE CORRECTLY TERMINATED FOR OPERATION OF PROTECTIVE DEVICESINSPECT FOR CORRECT IDENTIFICATION AND ARRANGEMENTS
0
0.2
0.4
0.6
0.8
1
1.2
Kilo
volts
Seconds
Voltage Decay Test
Ph A
Ph B
Ph C
0.00
0.20
0.40
0.60
0.80
1.00
1.20
9 18 27 36 45 54
Leak
age
in M
icro
amps
Voltage in KV
Step Voltage Test
Ph A
Ph B
Ph C
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0.5 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.011.012.013.014.015.0
Leak
age
in M
icro
amps
Minutes
Absorption Test
GROUND GRID GROUND ROD
UNSTABLE
GROUNDED UNGROUNDED
Acceptance Maintenance
100% 133%
STABLE
Normal AC Generator Inverter Other
YES NO
CU AL OTHER________
N/A
OTHER:
UL NUMBER SHOP/JOB NUMBER PHASE WIRE
SECTION CURRENT
CONDITION
CONDITION
A PHASE B PHASE C PHASE
A-GROUND B-GROUND C-GROUND A-B B-C C-A
A PHASE B PHASE C PHASE
COMPLETE
PERFORM PHASING CHECKS ON DOUBLE-ENDED OR DUAL-SOURCE SWGR TO INSURE CORRECT PHASING FROM EACH SOURCE
FUNCTIONAL TESTINGPERFORM SECONDARY INJECTION TESTING AT 1 AMP AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUITPERFORM PRIMARY INJECTION TESTING AT 1 AMP SECONDARY AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUIT
PERFORM SYSTEM FUNCTION TESTS IAW SECTION 8VERIFY OPERATION OF CUBICLE SWITCHGEAR / SWITCHBOARD SPACE HEATERS
PERFORM ELECTRICAL TESTS FOR CPT'S PER SECTION 7.1.2.8
HIPOT TEST AT 2.3 KV DCNOTES: HIPOT TESTS ARE PERFORMED PHASE TO GROUND WITH ALL PHASES NOT UNDER TEST GROUNDED.
NETA SECTION 7.1 FOR MOTOR CONTROL CENTER BUS
VERIFY OPERATION AND SEQUENCING OF INTERLOCKING SYSTEMSVERIFY APPROPRIATE LUBRICATION ON MOVING CURRENT-CARRYING PARTS AND ON MOVING AND SLIDING SURFACESINSPECT INSULATORS FOR EVIDENCE OF PHYSICAL DAMAGE OR CONTAMINATED SURFACESVERIFY CORRECT BARRIER AND SHUTTER INSTALLATION AND OPERATION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONSINSPECT PHYSICAL AND MECHANICAL CONDITIONINSPECT ANCHORAGE, ALIGNMENT, GROUNDING AND REQUIRED AREA CLEARANCESVERIFY UNIT IS CLEAN AND ALL SHIPPING BRACING, LOOSE PARTS, AND DOCUMENTATION SHIPPED INSIDE CUBICLES REMOVEDVERIFY FUSE AND CIRCUIT BREAKER SIZES AND TYPES AGREE WITH DRAWINGS, COORDINATION STUDY AND COMM SCHEMEVERIFY THAT CURRENT AND VOLTAGE TRANSFORMER RATIOS CORRESPOND TO DRAWINGSVERIFY WIRING CONNECTION ARE TIGHT AND SECURE TO PREVENT DAMAGE DURING ROUTINE OPERATION OF MOVING PARTS
INSPECT CPT'S FOR PHYSICAL DAMAGE, CRACKED INSULATION, BROKEN LEADS, CONNECTION TIGHTNESS, DEFECTIVE WIRING AND OVERALL GENERAL CONDITION
A - ACCEPTABLE N - NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT C - CORRECTED NA - NOT APPLICABLE NS - NOT IN SCOPE
MOTOR CONTROL CENTER INSPECTION REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
FIELD DATA (NETA SECTION 7.1 TESTS)
DUCTOR (MILLIOHMS)
INSULATION RESISTANCE
NOTES
INSULATION RESISTANCE OF CONTROL WIRING AT 1000 VOLTS
(GIGOHMS)
FOR CPT'S VERIFY PROPER OPERATION OF DRAWOUT DISCONNECTING CONTACTS, GROUNDING CONTACTS AND INTERLOCKS
PERFORM VISUAL AND MECHANICAL INSPECTION OF SURGE ARRESTORS IAW SECTION 7.19
VERIFY CPT'S PRIMARY AND SECONDARY FUSE / CIRCUIT BREAKER RATINGS MATCH DRAWINGS
INSPECT BOLTED CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC INSPECTION
PERFORM VISUAL AND MECHANICAL INSPECTION OF INSTRUMENT TRANSFORMERS IAW SECTION 7.10
INSPECT MECHANICAL INDICATING DEVICES FOR CORRECT OPERATION.VERIFY THAT FILTERS ARE IN PLACE AND VENTS ARE CLEAR
VOLTAGE L-N SUPPLY CURRENT NEUTRAL CURRENT
EXERCISE ALL ACTIVE COMPONENTS
INSPECTION CHECK LIST
SHORT CIRCUIT INTERRUPTING CURRENT RATINGSSWITCHBOARD MAIN PROTECTIVE DEVICE MINIMUM PROTECTIVE DEVICE
LOCATION ENGINEER(S) DATE
CLIENT TESTING SPECIFICATIONS EPS JOB NUMBER
VERIFY APPROPRIATE LUBRICATION ON MOVING CURRENT-CARRYING PARTS AND ON MOVING AND SLIDING SURFACES
TEST EQUIPMENTSWITCHGEAR DESIGNATION
NETA SECTION 7.5.1.2 FOR MOTOR CONTROL CENTER SWITCHESCOMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
MANUFACTURER CATALOG NUMBER STYLE
CALIBRATION DATES
NAME PLATE DATA
VOLTAGE L-L
VERIFY THAT EACH FUSE HAS ADEQUATE MECHANICAL SUPPORT AND CONTACT INTEGRITYINSPECT BOLTED CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC INSPECTIONVERIFY OPERATION AND SEQUENCING OF INTERLOCKING SYSTEMSVERIFY CORRECT PHASE BARRIER INSTALLATIONVERIFY CORRECT OPERATION OF ALL INDICATIING AND CONTROL DEVICES
INSPECT PHYSICAL AND MECHANICAL CONDITIONINSPECT ANCHORAGE, ALIGNMENT, GROUNDING AND REQUIRED CLEARANCESVERIFY THE UNIT IS CLEANVERIFY CORRECT BLADE ALIGNMENT, PENETRATION, TRAVEL STOPS AND MECHANICAL OPERATIONVERIFY THAT FUSE SIZES AND TYPES ARE IAW DRAWINGS, SHORT-CIRCUIT STUDIES AND THE COORDINATION STUDY
INDOOR
OUTDOOR
Acceptance Maintenance
ASYMSYMASYMSYM ASYMSYM
MEGOHMS
GIGOHMS1000 VDC500 VDC
MFR: JOB NO: SERIAL NO:
DATE MFD: STYLE:MVA: CLASS: PHASE: 3 VOLTAGE: HV: LV: TV: N/A
HERTZ: 60 %IMPEDANCE: @ DEGREES C
TAP POSITION:
H1 - H0 m H3 - H1 m X0 - X1 Y1-Y0 N/A H2 - H0 m H1 - H2 m X0 - X2 Y2-Y0 N/A H3 - H0 m H2 - H3 m X0 - X3 Y3-Y0 N/A
CALCULATED RATIOX0 - X1 Y0-Y1 X0 - X2 Y0-Y2 X0 - X3 Y0-Y3 POSITION VOLTAGE H-X H-Y
N/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/A
A PHASE B PHASE C PHASE 1 MIN 10 MIN PI
PASS FAIL
TRANSFORMER DATA
TRANSFORMER DESIGNATION TEST EQUIPMENT CALIBRATION DATES
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
LIQUID FILLED TRANSFORMER TEST REPORT
LOCATION ENGINEER(S) DATE
CLIENT TESTING SPECIFICATIONS EPS JOB NUMBER
WINDING CONFIGURATION
TEST DEW POINT OF TANK GASES
NOTEMP. RISE: OC
Oil Samples Drawn?
YES DGA # GALLONS OF OIL AS-FOUND TAP: AS-LEFT TAP:
CONDITIONNETA SECTION 7.2.2 TRANSFORMERS, LIQUID FILLEDCOMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONSINSPECT PHYSICAL AND MECHANICAL CONDITIONINSPECT IMPACT RECORDER PRIOR TO UNLOADING
CONDITIONLIQUID LEVEL VACUUM/ PRESSURE
NETA SECTION 7.2.2.2 ELECTRICAL TESTSREADING CONDITION READING
3PRIMARY SECONDARY TERTIARY
LIQUID TEMPERATURE PRESSURE RELIEF DEVICE WINDING TEMPERATURE
DUCTOR (HS/LS) (MICROHMS)
PRIMARY H3 - H1 H1 - H2 H2 - H3 TAP
DUCTOR AND INSULATION RESISTANCE
SECONDARY
NOTES: TRANSFORMER STATUS
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDINGVERIFY THE PRESENCE OF PCB CONTENT LABELINGVERIFY REMOVAL OF ANY SHIPPING BRACING AFTER PLACEMENTVERIFY THE BUSHINGS ARE CLEANVERIFY THAT ALARM, CONTROL AND TRIP SETTINGS ON TEMPERATURE AND LEVEL INDICATORS ARE AS SPECIFIEDVERIFY OPERATION OF ALARM, CONTROL AND TRIP CIRCUITS FROM TEMPERATURE AND LEVEL INDICATORS, PRESURE RELIEF DEVICE, GAS ACCUMULATOR AND FAULT PRESSURE RELAY, IF APPLICABLE
VERIFY THAT COOLING FANS AND PUMPS OPERATE CORRECTLY AND HAVE APPROPRIATE OVERCURRENT PROTECTION
INSPECT BOLTED ELECTRICAL CONNECTIONS BY DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEYVERIFY CORRECT LIQUID LEVEL IN TANKS AND BUSHINGSVERIFY THAT POSITIVE PRESSURE IS MAINTAINED ON GAS-BLANKETED TRANSFORMERS
INSULATION RESISTANCE OF CORE GROUND STRAP AT 500 VDC, IF ACCESSIBLE (GIGOHMS)MEASURE THE PERCENTAGE OF OXYGEN IN THE GAS BLANKET (PERCENT)MEASURE THE DEW POINT OF TANK GASES
NA
PERFORM INSPECTIONS AND MECHANICAL TESTS AS RECOMMENDED BY THE MANUFACTURER
VERIFY DE-ENERGIZED TAP-CHANGER POSISTION IS LEFT AS SPECIFIEDVERIFY PRESENCE OF TRANSFORMER SURGE ARRESTERSTEST LOAD TAP-CHANGER IAW NETA SECTION 7.12.3
HIGH TO LOW AT 1000 VDC (GIGOHMS)LOW TO HIGH AND GND
AT 1000 VDC (GIGOHMS)
HIGH TO LOW AND GND
AT 1000 VDC (GIGOHMS)
MINERAL OIL OTHER:_________ASKERAL
Acceptance Maintenance
KA @ VOLTSTRIP UNIT/SENSOR RATING LETTER ID PLUG RATING LETTER ID THICKNESS:
NUMBER PER PHASE: SQUARE INCHES
LETTER ID VALUE LOW HI OTHER I^2T A B C A C
CURRENT SETTING
LONG TIME PICKUP Ir x In
LONG TIME DELAY It @ 6 Ir
SHORT TIME PICKUP Isd x Ir
SHORT TIME DELAY tsd
INSTANTANEOUS PICKUP Ii x In
GROUND FAULT PICKUP Ig
GROUND FAULT DELAY tg
CHARGECLOSETRIP
NOTES
TRIP FUNCTION SETTING TEST AMPS A B C A B CCONTACT RESISTANCE Max
LONG TIME PICKUP -
LONG TIME DELAY -
SHORT TIME PICKUP -
SHORT TIME DELAY -
INSTANTANEOUS PICKUP -
GROUND FAULT PICKUP - NA
GROUND FAULT DELAY -SHUNT TRIP PICKUP:
N/A DROPOUT VOLTAGE N/A
TEST VOLTAGE B-GROUND C-GROUND A-B B-C C-A A C
UNITS OF MEASURE >2 >2 >2 >2 >2 >2 >2NOTES: PASS FAIL
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
LOW VOLTAGE CIRCUIT BREAKER TEST REPORT
>2 >2LOW VOLTAGE CIRCUIT BREAKER STATUS
G.F. SENSOR POLARITY
MEGGER TEST BREAKER CLOSED BREAKER OPEN
A-GROUND B
INSPECT BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
PERFORM ADJUSTMENTS FOR FINAL PROTECTIVE DEVICE SETTINGS IAW THE COORDINATION STUDYINSPECT OPERATING MECHANISM, CONTACTS AND ARC CHUTES IN UNSEALED UNITS
A - ACCEPTABLE C - CORRECTED R - NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT N/A - NOT APPLICABLE
NETA SECTION 7.6.1.1.2 ELECTRICAL TESTSCONTACT RESISTANCE VALUES ARE MEASURED IN MILLIVOLTS
ALL DELAY VALUES ARE MEASURED IN SECONDS INITIAL TEST FINAL TEST NETA SPEC MIN/MAX
VERIFY OPERATION OF CHARGING MECHANISMVERIFY TRIP UNIT BATTERY CONDITION
MINIMUM PICKUP TESTS (VDC)
NOTES:
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONSINSPECT PHYSICAL AND MECHANICAL CONDITIONINSPECT ANCHORAGE AND ALIGNMENTVERIFY THE UNIT IS CLEANOPERATE THE CIRCUIT BREAKER TO INSURE SMOOTH OPERATION
TRIP UNIT TYPE CONDUCTOR INFO: WIDTH:
CALCULATED AREA:
AS LEFTB
TRIP UNIT FUNCTIONSCURRENT MULTIPLIERS AVAILABLE RANGES
SETTINGS PROVIDED BY:AS FOUND
FEEDER IDENTIFICATION TEST EQUIPMENT CALIBRATION DUE DATES
MANUFACTURER TYPE CATALOG NUMBER FRAME SIZE IN AMPS INTERRUPTING RATING
CLIENT: TESTING SPECIFICATIONS EPS JOB NUMBER
CIRCUIT BREAKER DATA
LOCATION: ENGINEER(S) DATE
SWITCHGEAR DESIGNATION:
CONDITIONNETA SECTION 7.6.1.1.1 VISUAL AND MECHANICAL INSPECTION
SECTION
VERIFY CORRECT OPERATION OF LED / FLAG INDICATORS, ZONE INTERLOCKING, ELECTRICAL CLOSE AND TRIP OPERATION AND ANTI-PUMP
N/AUNDERVOLTAGE PICKUP:
% AF/AS/AP
OTHER
Correct Incorrect Corrected N/A
CU AL
VAC VDCVAC VDC
MEGOHMSGIGOHMS
AS FOUND EPS CLIENT
1000 VDC 500 VDC
Acceptance Maintenance
CLIENT:
7925 Dunbrook Rd
Suite G
San Diego, CA 92126
(858)566‐6317
INSTRUMENT
POTENTIAL TRANSFORMER
TEST REPORT
NAMEPLATE DATA
SWITCHGEAR DESIGNATION: MANUFACTURER:
DATE:
ENGINEER:
CALIBRATION DATE:
JOB #:
TEST EQUIPMENT:
LOCATION:
TYPE/CLASS
VA
INSTRUMENT TRANSFORMER DESIGNATION:
MANUFACTURER
RATIO
NETA SECTION 7.10.1 VISUAL AND MECHANICAL INSPECTION CONDITION CONDITION CONDITION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
KV RATING
BURDEN CLASS
VERIFY THAT ADEQUATE CLEARANCES EXIST BETWEEN PRI AND SEC CIRCUIT WIRING
VERIFY THE UNIT IS CLEAN
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY CORRECT CONNECTION OF TRANSFORMERS WITH SYSTEM REQUIREMENTS
VERIFY CORRECT OPERATION OF TRANSFORMER WITHDRAWAL MECHANISM AND GROUNDING OPERATION
VERIFY CORRECT PRIMARY AND SECONDARY FUSE SIZES FOR VOLTAGE TRANSFORMERS
INSPECT BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
VERIFY ALL REQUIRED GROUNDING AND SHORTING CONNECTIONS PROVIDE CONTACT
VERIFY APPROPRIATE LUBRICAITON ON MOVING CURRENT‐CARRYING PARTS AND ON MOVING AND SLIDING
SURFACES
VOLTAGE TRANSFORMER TESTS
HI ‐ LOW
HI ‐ GND
LOW ‐ GND
INSULATION RESISTANCE
(GIGOHMS)
H1 ‐ H4 : X1 ‐ X2
POLARITY
H1 ‐ H4 : X1 ‐ X4
TURNS‐RATIO
H1 ‐ H4 : X3 ‐ X4
PERFORM DIELECTRIC WITHSTAND ON PRIMAY WINDINGS AT 2300 VDC (1 MIN)PERFORM POWER FACTOR OR DISSIPATION FACTOR TEST IAW MANUFACTURER'S
PUBLISHED DATA
VOLTAGE CIRCUIT BURDEN AT TRANSFORMER TERMINALS (VAC)
NOTES:
TEST SINGLE POINT OF GROUND (GIGOHMS)
7925 Dunbrook Rd
Suite G
San Diego, CA 92126
(858)566‐6317
INSTRUMENT
CURRENT TRANSFORMER
TEST REPORT
NAMEPLATE DATA
SWITCHGEAR DESIGNATION: MANUFACTURER:
DATE:
ENGINEER:
CALIBRATION DATE:
JOB #:
TEST EQUIPMENT:
LOCATION:
VA
INSTRUMENT TRANSFORMER DESIGNATION:
MANUFACTURER
CLIENT:
NETA SECTION 7.10.1 VISUAL AND MECHANICAL INSPECTION CONDITION CONDITION CONDITION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
KV RATING
BURDEN CLASS
RATIO
TYPE/CLASS
VERIFY THAT ADEQUATE CLEARANCES EXIST BETWEEN PRI AND SEC CIRCUIT WIRING
VERIFY THE UNIT IS CLEAN
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY CORRECT CONNECTION OF TRANSFORMERS WITH SYSTEM REQUIREMENTS
VERIFY CORRECT OPERATION OF TRANSFORMER WITHDRAWAL MECHANISM AND GROUNDING OPERATION
VERIFY CORRECT PRIMARY AND SECONDARY FUSE SIZES FOR VOLTAGE TRANSFORMERS
INSPECT BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
VERIFY ALL REQUIRED GROUNDING AND SHORTING CONNECTIONS PROVIDE CONTACT
VERIFY APPROPRIATE LUBRICAITON ON MOVING CURRENT‐CARRYING PARTS AND ON MOVING AND SLIDING
SURFACES
CURRENT TRANSFORMER TESTS
INSULATION RESISTANCE SEC TO GND AT 1000 VDC (GIGOHMS)
PERFORM POLARITY TEST
PERFORM RATIO‐VERIFICATION TEST USING VOLTAGE OR CURRENT METHOD
PERFORM EXCITATION TEST
PERFORM DIELECTRIC WITHSTAND TEST ON PRI WINDING W/SEC GROUNDED
(2300 VDC)
MEASURE CIRCUIT BURDENS (VAC)
WHEN APPLICABLE, PERFORM INSULATION RESISTANCE TESTS ON THE PRIMARY
WINDING W/SEC GROUNDED
NOTES:
VERIFY THE SINGLE POINT OF GROUND IS LOCATED IAW DRAWINGS AND SPECS
PERFORM POWER‐FACTOR DISSIPATION‐FACTOR TESTS IAW MANUFACTURER'S
PUBLISHED DATAVERIFY THAT CURRENT TRANSFORMER SEC CIRCUITS ARE GROUNDED AND HAVE
ONLY ONE GROUNDING POINT
CONDITION
TAP ____ TAP ____ TAP ____ TAP ____ TAP ____
MEGOHMS
COMPLETED
SYSTEM VOLTAGE (L-N)
VERIFY SECONDARY CONNECTIONS CONNECTED PROPERLY
VERIFY EQUIPMENT GROUNDING
RATED TIMETYPE/STYLE/CAT #:
PRIMARY CONDUCTOR RATED VOLTAGE (V)
RATED OHMS
TYPE/STYLE/CAT #: CT RATED VOLTAGE (V)PRIMARY CONDUCTOR SIZERATED AMPS
GROUNDING RESISTOR TEST REPORT
BIL (KV)CT RATIO
CLIENT TESTING SPECIFICATIONS EPS JOB NUMBER
LOCATION ENGINEER(S) DATE
NAMEPLATE DATA
ELECTRICAL TESTS
A = ACCEPTABLE R = NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT C = CORRECTED N/A = NOT APPLICABLE
VERIFY ALL BUSHINGS AND INSULATORS CLEAN AND IN GOOD CONDITION
VERIFY ALL RESISTOR LINK CONNECTIONS
VERIFY PROPER CT INSTALLATION
VERIFY PROPER INSTALLATION AND OPERATION OF ISOLATION SWITCH
NOTES:
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY ALL BARRIERS AND COVERS ARE INSTALLED
OVERALLRESISTANCE (OHMS)
FUNCTIONAL TESTING
VERIFY ALL CONTROLS FUNCTION PROPERLY
VERIFY ALL LIGHTS AND INDICATORS FUNCTION PROPERLY
VERIFY CLEANLINESS OF UNIT
VERIFY BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
INSULATION RESISTANCE @ 1000 VDC OVER POTENTIAL @2300 VDC
TEMPERATURE (°F) HUMIDITY
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
MANUFACTURER:
EQUIPMENT DESIGNATION TEST EQUIPMENT CALIBRATION DATES1kV Megger 8/5/2015
EQUIPMENT LOCATION
VISUAL AND MECHANICAL INSPECTION
Acceptance Maintenance
SERIAL #S CAL DATES:
CURRENT RATING
CATALOG NUMBER PICKUP RANGE
PICKUP CURRENT TIME PICKUP
CURRENT TIME
Manufacturer VACONDITION
Primary Voltage Secondary Voltage
PRIMARY CURRENT AMPERE-TURNS PERCENT PICKUP TOTAL TIME REACTION
TIME RELAY TIME MFR. TOLERANCE
#DIV/0!#DIV/0!#DIV/0!
GROUND FAULT SYSTEM STATUS PASS FAILNOTES:
SERVICE ENTRANCE CONDUCTORS MAIN BONDING JUMPER GROUNDING ELECTRODE CONDUCTOR
PICKUP CURRENT TEST ADDITIONAL PICKUP CURRENT TEST(S) PICKUP CURRENT MINUS 25% =
NEUTRAL - GROUNDING LOCATIONS CONTROL POWER TRANSFORMER
GROUND FAULT SYSTEM TEST REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
TIME-CURRENT CALIBRATION TESTS
VERIFY THAT GROUNDING CONDUCTORS DO N OT PASS THROUGH THE ZERO SEQUENCE SENSORSVERIFY THAT THE GROUNDED CONDUCTOR IS SOLIDLY GROUNDED
ELECTRICAL TESTSGROUND FAULT SENSOR POLARITY SYSTEM NEUTRAL INSULATION RESISTANCE TO GROUND
VERIFY THE UNIT IS CLEANINSPECT BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEYVERIFY CORRECT OPERATION OF ALL FUNCTIONS OF THE SELF0TEST PANEL, IF APPLICABLE
NETA SECTION 7.14.1 VISUAL AND MECHANICAL INSPECTIONCOMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONSVERIFY THAT GROUND CONNECTION IS MADE ON THE SOURCE SIDE OF THE NEUTRAL DISCONNECT LINK AND ON THE SOURCE SIDE OF ANY GROUND GAULT SENSORVERIFY THAT THE NEUTRAL SENSORS ARE CONNECTED WITH CORRECT POLARITY ON BOTH PRIMARY AND SECONDARYVERIFY THAT ALL PHASE CONDUCTORS AND THE NEUTRAL PASS THROUGH THE SENSOR IN THE SAME DIRECTION FOR ZERO SEQUENCE SYSTEMS
INSPECTION
MODEL TIME RANGE SENSOR / CT
AS FOUND SETTINGS
AS LEFT SETTINGS
SETTINGS PROVIDED BY
MODEL / CATALOG NUMBER SYSTEM VOLTAGE VOLTAGE RATING
GROUND FAULT SYSTEM MANUFACTURER
SWITCHBOARD MANUFACTURER SHOP ORDER / DRAWING NUMBER UL NUMBERFIELD DATA
MAIN OVERCURRENT DEVICE MANUFACTURER TYPE
SWITCHGEAR DESIGNATION
CLIENT TESTING SPECIFICATIONS EPS JOB NUMBER
LOCATION ENGINEER(S) DATE
CONTROL WIRING INSULATION RESISTANCE AT 500 VDC (GIGOHMS)
VERIFY THAT THE CONTROL POWER TRANSFORMER HAS ADEQUATE CAPACITY FOR THE SYSTEMSET PICKUP AND TIME-DELAY SETTINGS IAW THE SETTINGS PROVIDED IN THE OWNER'S SPECIFICATIONS
CONTROL POWER TRANSFORMER REDUCED VOLTAGE TEST (55% RATED VOLTAGE)
CIRCUIT BREAKER / SWITCH REACTION TIME MONITOR TEST PANEL OPERATION
Zero Sequence
Correct
AL
Neutral Ground Strap
CU
Corrected by ContractorIncorrect
Seconds Cycles
Trip (Correct) No Trip (Incorrect)
Trip (Incorrect) No Trip (Correct)
Residual
AL CU AL CU
N/A
N/A
Correct Incorrect Corrected N/A
Circuit Breaker Fused Switch
Acceptance Maintenance
GIGOHMSMEGOHMSCorrect Incorrect Corrected N/A
MFR: JOB NO: SERIAL NO:
DATE MFD: STYLE:
KVA/ MVA: CLASS: PHASE: 3 VOLTAGE: HV: LV: TV: N/A
AF TAP: AL TAP: HERTZ: 60 %IMPEDANCE: @ DEGREES C
TAP POSITION:
H1 - H0 N/A m H3 - H1 m X0 - X1 Y1-Y0 N/A
H2 - H0 N/A m H1 - H2 m X0 - X2 Y2-Y0 N/A H3 - H0 N/A m H2 - H3 m X0 - X3 Y3-Y0 N/A
X0 - X1 Y0-Y1 X0 - X2 Y0-Y2 X0 - X3 Y0-Y3 POSITION VOLTAGE H-X H-YN/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/AN/A N/A N/A N/A
A PHASE B PHASE C PHASE 1 MIN 10 MIN PI
PASS FAIL
CLIENT TESTING SPECIFICATIONS EPS JOB NUMBER
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
DRY TYPE TRANSFORMER TEST REPORT
WINDING CONFIG.:
LOCATION ENGINEER(S) DATE
TRANSFORMER DESIGNATION TEST EQUIPMENT CALIBRATION DATES
TRANSFORMER DATA
VERIFY THAT RESILIENT MOUNTS ARE FREE AND THAT ANY SHIPPING BRACKETS HAVE BEEN REMOVED
TEMP. RISE: OC
CONDITIONNETA SECTION 7.2.2 TRANSFORMERS, LIQUID FILLEDCOMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
INSPECT PHYSICAL AND MECHANICAL CONDITION
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
DUCTOR (HS/LS) (MICROHMS)
PRIMARY H3 - H1 H1 - H2 H2 - H3 TAP
DUCTOR AND INSULATION RESISTANCE
SECONDARYCALCULATED RATIO
HIGH TO LOW AT 1000 VDC (GIGOHMS)
VERIFY THE PRESENCE OF SURGE ARRESTERS
PRIMARY SECONDARY TERTIARY
NETA SECTION 7.2.2.2 ELECTRICAL TESTS
INSPECT BOLTED ELECTRICAL CONNECTIONS BY DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
PERFORM SPECIFIC INSPECTIONS AND MECHANICAL TESTS AS RECOMMENDED BY THE MANUFACTURER
VERIFY THAT AS-LEFT TAP CONNECTIONS ARE AS SPECIFIED
VERIFY THE UNIT IS CLEAN
VERIFY THAT CONTROL AND ALARM SETTINGS ON TEMPERATURE INDICATORS ARE AS SPECIFIED
VERIFY THAT COOLING FANS OPERATE AND THAT FAN MOTORS HAVE CORRECT OVERCURRENT PROTECTION
A - ACCEPTABLE N - NEEDS REPAIR C - CORRECTED NA - NOT APPLICABLE NS - NOT IN SCOPE
NOTES: TRANSFORMER STATUS
LOW TO HIGH AND GND
AT 1000 VDC (GIGOHMS)
HIGH TO LOW AND GND
AT 1000 VDC (GIGOHMS)
Acceptance Maintenance
VERIFY FLOAT AND EQUALIZE AND HIGH VOLTAGE SETTINGS
PERFORM FULL-LOAD TESTING OF CHARGER
COMPLETEDFUNCTIONAL TESTS
VERIFY CURRENT LIMITVERIFY CORRECT LOAD SHARING (PARALLEL CHARGERS)VERIFY CALIBRATION OF METERS IAW SECTION 7.11VERIFY OPERATION OF ALARMS
BATTERY CHARGER TEST REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6433
JOB #:TESTED BY:JOB LOCATION:
DATE:CUSTOMER:
NAMEPLATE DATA
EQUIPMENT DESIGNATIONEQUIPMENT LOCATION
MANUFACTURER
CALIBRATION DATE:TEST EQUIPMENT:
CONDITIONNETA SECTION7.18.2.1 VISUAL AND MECHANICAL INSPECTIONTYPE / STYLE / CAT #
VDCVDC
AmpsAmps
RATED OUTPUT VOLTAGE:RATED INPUT VOLTAGE:
RATED INPUT CURRENT:RATED OUTPUT CURRENT:
INSPECT FILTER AND TANK CAPACITORSVERIFY OPERATION OF COLLING FANS AND PRESENCE OF FILTERS
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONSINSPECT FOR PHYSICAL AND MECHANICAL CONDITIONINSPECT ANCHORAGE, ALIGNMENT AND GROUNDINGVERIFY THE UNIT IS CLEANINSPECT BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR
A - ACCEPTABLE C - CORRECTED N - NEEDS REPAIR NA - NOT APPLICABLE NS - NOT IN SCOPE
AS LEFT
EQUALIZE VOLTAGEFLOAT VOLTAGE
SETTINGS
DC OUTPUT CURRENT LIMIT
AS LEFTAS FOUNDHIGH VOLTAGE ALARMHIGH VOLTAGE SHUTDOWNLOW VOLTAGE ALARMLOW VOLTAGE SHUTDOWN
INITIAL CHARGE VOLTAGE
AS FOUND
AC RIPPLE VOLTAGE IMPOSED ON THE BATTERY:AC RIPPLE CURRENT IMPOSED ON THE BATTERY:
VACAmps
NETA SECTION7.18.2.2 ELECTRICAL TESTSVACINPUT VOLTAGE:
INPUT CURRENT: AmpsVACAmps
OUTPUT VOLTAGE:OUTPUT CURRENT:
NOTES:
53 - 5657 - 60
VERIFY ALL CHARGER FUNCTIONS AND ALARMSBATTERY VOLTAGE READINGS NOTES
VDC
VDC
VDCEQUALIZE VOLTSFLOAT VOLTS
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6433
BATTERY TEST REPORT
JOB #:LOCATION:
DATE:
TESTED BY:NETA SECTION 7.18.1.1 VISUAL AND MECHANICAL INSPECTION CONDITION
VERIFY BATTERIES ARE ADEQUATELY LOCATED VERIFY ELECTROLYTE LEVELVERIFY VENTILATION SYSTEM IS OPERABLE VERIFY FLAME ARRESTERS PRESENT
CUSTOMER:
TEST EQUIPMENT USED:
BATTERY MANUFACTURER:
CALIBRATION DATE:
AhrBATTERY CAPACITY:
NEG - GNDPOS - GND VDC
CELL DESIGNATION
1 - 45 - 89 -12
INDIVIDUAL CELL VOLTAGE (VOLTS) SPECIFIC GRAVITY
33 - 3637 - 4041 - 4445 - 4849 - 52
13 - 1617 - 2021 - 24
EYEWASH STATION VERIFY THE UNITS ARE CLEANCOMPARE WITH NAMEPLATE / DRAWINGS / SPECS INSPECT SPILL CONTAINMENT INSTALLATIONINSPECT PHYSICAL / MECHANICAL CONDITION VERIFY OXIDE INHIBITOR ON TERMINAL CONNECTIONSINSPECT SUPPORT RACKS / MOUNTING / CLEARANCES INSPECT BOLTED CONNECTION VIA DUCTOR, TORQUE
WRENCH OR THEROGRAPHIC SURVEYVERIFY ANCHORAGE / ALIGNMENT / GROUNDINGA - ACCEPTABLE C - CORRECTED N - NEEDS REPAIR NA - NOT APPLICABLE NS - NOT IN SCOPE
NETA SECTION 7.18.1.1.2 ELECTRICAL TESTS
COMPLETEDFUNCTIONAL TESTS
INTERCONNECT RESISTANCE (MICROHMS)
INTERNAL RESISTANCE (MICROHMS)
25 - 2829 - 32
TRANSFER SWITCH DATAMFG.:TYPE:
CHECK POINT: CHECK POINT:
SETTINGS RESULTS
TIME DELAY TO TRANSFERTIME DELAY TO RETRANSFEROVERIDE MOMENTARY OUTAGESGENERATOR START TIMEGENERATOR COOL DOWN TIME
A-G B-G C-G A-B B-C C-A
NOTES:
CONDITIONFUNCTIONAL CHECKSVERIFY PHASE ROTATION, PHASING AND SYNCHRONIZED OPERATION AS REQUIRED BY THE APPLICATION NOTE 1
NOTE 1NOTE 1
PERFORM AUTOMATIC TRANSFER TESTS PER NETA 7.22.3.7.1-4VERIFY CORRECT OPERATION AND TIMING OF FUNCTIONS PER NETA 7.22.3.8.1-8
AUTOMATIC TRANSFER SWITCH TEST DATA SHEET
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
CLIENT:
Insulating barriersInterlock operation.Indicating lights.Physical damaage.
NORMAL TO LOAD
AS LEFT:
A PHASE: B PHASE: C PHASE:SWITCH CLOSED:CONTACT RESISTANCE
FUNCTIONS:
Perform Manual Transfer Operation
AS FOUND:AS FOUND: AS LEFT:
Contact alignment.
Manual Transfer warning visible.Verify connection tightness.
Verify cleanliness.
NORMAL TO EMERGENCY
EMERGENCY TO LOAD
SWITCH CLOSED: @ VDC (in Gigohms) NORMAL TO LOAD
INSULATION RESISTANCE
Condition Condition
CONTROL WIRING
Compare with drawings and specs.Inspect physical condition.Inspect anchoring and alignment.Inspect grounding.
Verify proper lubrication.
TIMING TEST DATA
LOCATION:
SUBSTATION:FEEDER :
CONTROL WIRING INSULATION RESISTANCE@ VDC (in Megohms)
MECHANICAL INSPECTION
JOB NO.:
DATE:
TEST ENGR.:
SERIAL NO.:
VOLTAGE:AMPS:CATALOG NO.:
NOTE 1: TO BE COMPLETED BY CONTRACTOR
N
CONDITION
C2 DIST. (FT) P2 DIST. (FT)
1
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
*DIRECT INDICATES TWO TERMINAL METHOD, F. O. P. INDICATES THREE TERMINAL "FALL OF POTENTIAL" METHOD
GROUND SYSTEM LAYOUT
TEST DATA
LAYOUT NO. MEASURED RESISTANCEF. O. P.
TEST METHOD
DEPTHSIZEEQUIPMENT GROUND DESIGNATION
NOTES:
TEST EQUIPMENT DATAMFGR: MODEL: SERIAL NO.:AMEC 4610 167899 DL DV
GROUND RESISTANCE TEST REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 (858) 566-6317
CLIENT: JOB NUMBER:
LOCATION: DATE:
SWITCHGEAR DESIGNATION: ENGINEER: ASSET NO.: CALIBRATION DATE:GROUND GRID 8/5/2015
TEST CONDITIONS
NETA SECTION 7.13.1 VISUAL INSPECTIONVERIFY GROUND SYSTEM IS IN COMPLIANCE WITH DRAWINGS, SPECIFICATIONS, AND NFPA 70INSPECT PHYSICAL AND MECHANICAL CONDITIONINSPECT BOLTED ELECTRICAL CONNECTION VIA DUCTOR OR TORQUE WRENCH METHODINSPECT ANCHORAGE
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0 0.5 1 1.5
OH
MS
FEET
GROUNDING RESISTANCE
Series1
RAIN FALL WITHIN LAST 24 HOURS RAIN FALL WITHIN LAST WEEK
RAIN FALL WITHIN LAST 48 HOURS NO PREVIOUS APPRECIABLE RAIN FALL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
TEST DATA
TEST EQUIPMENT DATAMFGR: MODEL: SERIAL NO.:MEGGER DET4TCR2 101337615
EQUIPMENT GROUND DESIGNATIONLAYOUT NO.
TEST METHOD
MEASURED RESISTANCELEAD RESISTANCE
DIRECT
REFERENCE
GROUND RESISTANCE TEST REPORT
7925 Dunbrook Road, Suite G San Diego, CA 92126 858-566-6317
CLIENT: JOB NUMBER:
LOCATION: DATE:
SWITCHGEAR DESIGNATION: ENGINEER: ASSET NO.: CALIBRATION DUE DATE:SAN0017 8/5/2016
TEST CONDITIONS
INVESTIGATE POINT TO POINT VALUES THAT EXCEED 0.5 OHMS.NOTES:
RAIN FALL WITHIN LAST 24 HOURS RAIN FALL WITHIN LAST WEEK
RAIN FALL WITHIN LAST 48 HOURS NO PREVIOUS APPRECIABLE RAIN FALL