1
Update: March 2018 This project, part of the Atlantic branch of Priority Project 3 (High speed railway line Paris-Madrid) covered the section between Arrazua/Ubarrundia and Mondragón in the Basque Country in Spain. It supported the construction of the following high speed railway lines in the provinces of Álava and Guipúzcoa: Arrazua/Ubarrundia-Legutiano Legutiano-Eskoriatza Eskoriatza-Aramaio Aramaio-Mondragón Due to the mountainous landscape of this region, the works included the construction of a series of viaducts and tunnels. The total length of the section was of 24.1 km - of which 4.5 km were viaducts and 9.8 km are tunnels. This project had to help improving the competitiveness of rail transport between Madrid and the cities located along the corridor (Valladolid, Burgos, Vitoria, Bilbao and San Sebastián). It also aimed to substantially reduce travel time along this line. The action is closed. TEN-T Multi-Annual Programme Member States involved: Spain Implementation schedule Start date: January 2007 End date: December 2015 EU contribution: €25,430,509 Additional information: Coordinator’s Report of the Priority Project: http://ec.europa.eu/transport/themes/ infrastructure/ten-t-policy/priority- projects/european- coordinators_en.htm European Commission, DG MOVE http://ec.europa.eu/transport Innovation and Networks Executive Agency (INEA) https://ec.europa.eu/inea Beneficiary & implementing body: Administrador de Infraestructuras Ferroviarias Alta Velocidad (ADIF Alta Velocidad) www.adifaltavelocidad.es High Speed Railway Line Paris-Madrid: Section Arrazua/Ubarrundia-Mondragón 2007-ES-03150-P Part of Priority Project 3

TEN-T Multi-Annual Programme High Speed Railway Line ......Mondragón in the Basque Country in Spain. It supported the construction of the following high speed railway lines in the

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TEN-T Multi-Annual Programme High Speed Railway Line ......Mondragón in the Basque Country in Spain. It supported the construction of the following high speed railway lines in the

Update: March 2018

This project, part of the Atlantic branch of Priority Project 3 (High speed railway line Paris-Madrid) covered the section between Arrazua/Ubarrundia and Mondragón in the Basque Country in Spain. It supported the construction of the following high speed railway lines in the provinces of Álava and Guipúzcoa:

• Arrazua/Ubarrundia-Legutiano • Legutiano-Eskoriatza • Eskoriatza-Aramaio • Aramaio-Mondragón

Due to the mountainous landscape of this region, the works included the construction of a series of viaducts and tunnels. The total length of the section was of 24.1 km - of which 4.5 km were viaducts and 9.8 km are tunnels. This project had to help improving the competitiveness of rail transport between Madrid and the cities located along the corridor (Valladolid, Burgos, Vitoria, Bilbao and San Sebastián). It also aimed to substantially reduce travel time along this line. The action is closed.

TEN-T Multi-Annual Programme

Member States involved: Spain Implementation schedule Start date: January 2007 End date: December 2015

EU contribution: €25,430,509

Additional information:

Coordinator’s Report of the Priority Project: http://ec.europa.eu/transport/themes/infrastructure/ten-t-policy/priority-projects/european-coordinators_en.htm European Commission, DG MOVE http://ec.europa.eu/transport Innovation and Networks Executive Agency (INEA) https://ec.europa.eu/inea Beneficiary & implementing body: Administrador de Infraestructuras Ferroviarias Alta Velocidad (ADIF Alta Velocidad) www.adifaltavelocidad.es

High Speed Railway Line Paris-Madrid: Section Arrazua/Ubarrundia-Mondragón

2007-ES-03150-P

Part of Priority Project 3