Update: March 2018
This project, part of the Atlantic branch of Priority Project 3 (High speed railway line Paris-Madrid) covered the section between Arrazua/Ubarrundia and Mondragón in the Basque Country in Spain. It supported the construction of the following high speed railway lines in the provinces of Álava and Guipúzcoa:
• Arrazua/Ubarrundia-Legutiano • Legutiano-Eskoriatza • Eskoriatza-Aramaio • Aramaio-Mondragón
Due to the mountainous landscape of this region, the works included the construction of a series of viaducts and tunnels. The total length of the section was of 24.1 km - of which 4.5 km were viaducts and 9.8 km are tunnels. This project had to help improving the competitiveness of rail transport between Madrid and the cities located along the corridor (Valladolid, Burgos, Vitoria, Bilbao and San Sebastián). It also aimed to substantially reduce travel time along this line. The action is closed.
TEN-T Multi-Annual Programme
Member States involved: Spain Implementation schedule Start date: January 2007 End date: December 2015
EU contribution: €25,430,509
Additional information:
Coordinator’s Report of the Priority Project: http://ec.europa.eu/transport/themes/infrastructure/ten-t-policy/priority-projects/european-coordinators_en.htm European Commission, DG MOVE http://ec.europa.eu/transport Innovation and Networks Executive Agency (INEA) https://ec.europa.eu/inea Beneficiary & implementing body: Administrador de Infraestructuras Ferroviarias Alta Velocidad (ADIF Alta Velocidad) www.adifaltavelocidad.es
High Speed Railway Line Paris-Madrid: Section Arrazua/Ubarrundia-Mondragón
2007-ES-03150-P
Part of Priority Project 3