1.0 SCOPE OF SUPPLY / WORKS / SERVICES.
1.1 This specification covers replacement of existing analogue automatic voltage regulators
(AVR) panels of excitation system with new voltage regulators for Emergency Diesel
Generators. It includes inspection, testing, and packing, transportation, delivery at site,
erection, commissioning, and performance of functional test.
1.2 It is not the intent to specify completely herein, all details of design and construction of
the equipment. However, the equipment shall conform in all respects to high standards
of engineering, design and workmanship and be capable of performing continuous
commercial operation up to the CONTRACTOR'S guarantees in a manner acceptable
to the PURCHASER, who will interpret the meaning of drawings and specifications
and shall be entitled to reject any work or material which, in his judgement, is not in
full accordance therewith.
1.3 The scope includes but not limited to the following items / services described herein
and elsewhere in the tender package. CONTRACTOR will offer digital (with computer
based system) AVR suitable to existing system. Technical requirements of from new
AVR and additional requirements of digital AVR is supplied are brought out in this
specification.
1.3.1 New AVR should be compatible with existing excitation system with respect to
following:
i. Functional Requirements of AVR
ii. AVR Wiring Diagram
iii. Details of external cabling to other panels
iv. Auxiliary power supply arrangement
v. GA Drawing of AVR Panel for space availability for new panel
vi. Remote Control / Protection Alarm/Indication in MCR / SCADA
vii. Specification and ratings of CTs and PTs
These details are given in Annexure –I
New AVR, equipped with computer based systems (CBS), shall be complete with all
necessary digital control cards, interface card, communication card etc. and associated
switching, protection, control, alarm and indication circuits.
1.3.2 AVR comes under seismic category 1 and complete panel shall be seismically qualified
preferably by testing. If not possible, than by analysis or testing and analysis. In case
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
any anchor bolts are required to be used during installation, the same shall be
seismically qualified anchor fasteners of NPCIL approved make.
1.3.3 AVR panels along with associated equipments, if provided with commercially pre
developed system (C-PDS) is required to undergo internal Independent Verification and
Validation program (IV&V) for both hardware and software portions. Details are given
in Annexure-V. Functional testing of AVR shall be carried out at factory and actual
testing at site as per IV & V requirements.
1.3.4 Since the AVR is for emergency diesel generator its electrical safety class will be class-
EA (For Computer Based Systems used, safety class- IB) as per AERB SG-D-1. This
aspect is to be considered for IV&V purpose.
1.3.5 Engineering deliverables by supplier shall include following:
i. All engineering drawings and documents for AVR
ii. Terminal List (TL)
iii. Factory and Site testing Procedure and Reports
iv. IV &V Related documents
v. Commissioning/test procedures
vi. AVR setting sheets
vii. All history documents as mentioned in clause no.12.3
1.3.6 CONTRACTOR shall visit the site to understand the nature of job, existing panel
configuration and modifications required for the replacement of old AVR panel.
Expected visit for execution of the all task activities is two.
1.3.7 Engineering, manufacturing, inspection and testing, packing, delivery to site, new
AVR panels, associated power supply modules, protection, control and metering,
software and new components such as pulse transformers, cables or any other devices
of excitation system required for replacement and handing over of the equipment as
detailed in the subsequent sections. The dimension of new AVR panels shall match
with the existing AVR panels
1.3.8 A micro-terminal shall be provided for local control and communication with the AVR
controller during operation. Parameters and measured variables shall be recalled and
indicated through a Liquid Crystal Display of the terminal.
1.3.9 Dismantling the old AVR panel, shifting to station stores and erection, testing and
commissioning of new panels at site.
1.3.10 Supply, laying and termination of additional cables required for inter connection
between panels.
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
1.3.11 Spares as indicated in clause 4 of this specification shall be supplied by the
CONTRACTOR
1.3.12 Maintenance tools and tackles as described in clause 10 of this specification shall be
supplied by the CONTRACTOR.
1.3.13 Hardware and associated software tools (as applicable) for control, protection and
field setting of various protective devices and limiters, indications and remote
signalling shall be included in the scope of supply. Necessary port and connectivity
cables for connecting to transient recorders, with computer or laptop shall be supplied
along with the equipment.
1.4 Training of PURCHASER's personnel at manufacturer's works on various design,
testing and maintenance aspects and also at PURCHASER's site on installation,
maintenance, carrying out adjustments etc. are included in the CONTRACTOR‟s scope
of supply.
1.5 Whether called for specifically or not, all accessories required for normal operation of
equipment are deemed to be considered as a part of the CONTRACTOR'S scope of
supply.
1.6 The CONTRACTOR shall be provided with available of the existing Diesel Generator
and brushless excitation system (M/s.BHEL Make) to match with technical
requirements of the new AVR offered.
1.7 Based on generator details, the CONTRACTOR shall work out the settings for AVR
and do all necessary adjustment at site required for the optimum performance of the
AVR. CONTRACTOR shall also furnish the settings to be adopted for the limiters and
carry out tests for tuning controllers and limiters, wherever applicable.
1.8 The CONTRACTOR shall note that the availability of work front shall be given
progressively by PURCHASER and it is the intent that the successful CONTRACTOR
takes up and plans work accordingly, following all precautions and safety requirements
1.9 The available drawings and details for the existing system where required would be
furnished to the successful CONTRACTOR for detailed engineering.
1.10 On award of PO, CONTRACTOR shall furnish the schematics, general arrangement
drawings, cable schedules, interconnection schedules, panel wiring diagrams etc for
PURCHASER‟s approval. CONTRACTOR shall also furnish the recommended
relay/limiter settings to be adopted.
1.11 The CONTRACTOR shall submit erection and commissioning procedure and drawings
after placement of order. Among other details this procedure shall also contain detailed
requirement for handling, checklist for assembly and erection, special instructions,
precautions erection drawings, log sheets etc
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
2.0 CONTENT
3.0 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS
3.1 The list of applicable codes and standards are given below.
CODE TITLE
IS-5 : Colors for ready mixed paints and enamels
IS: 513 : Cold rolled low carbon steel Sheets and strips
IS: 613 : Copper rods and bars for electrical purposes.
IS: 1248 : Direct acting indicating analogue electrical measuring instruments
and their accessories
IS: 1271 : Thermal evaluation and classification of electrical insulation.
IS: 1554 : PVC insulated electric cables
IS: 1897 : Copper strips for electrical purposes.
IS: 2062 : Steel for general structural purposes
IS: 2551 : Danger Notice Plates.
IS: 2705 : Current Transformers.
IS: 3156 : Voltage transformers
IS: 4007 : Terminals for electronic equipment.
Title Clause
Applicable codes, standards and specifications 3
Specification of main equipment and accessories 4
Design and construction details 5
Exclusions 6
Inspection and testing 7
Quality surveillance 8
Installation, testing and commissioning 9
Special tools & tackles for erection and maintenance 10
Warrantee and guarantee 11
Drawings and documents to be submitted 12
Schedule for submission of drawings and test reports 13
Existing AVR Drawings ANNEXURE – I
Load Restoration Sequence ANNEXURE – II
Station Data ANNEXURE – III
Bill of Material ANNEXURE – IV
Guide lines/Scope of IV&V activities for
C-PDS/ COTS CBS ANNEXURE – V
Guaranteed Technical Particulars to be submitted by
CONTRACTOR ANNEXURE – VI
Delivery Schedule And Terms of The Payment ANNEXURE – VII
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
IS: 5082 : Wrought aluminium and aluminium alloy bars, rods, tubes and
sections, plates and sheets for electrical applications.
IS: 5921 : Metal clad base materials for printed circuits for use in electronic and
telecommunication equipment.
IS: 6005 : Code of Practice for phosphate coatings of iron and steel.
IS: 6297 : Transformers and inductors (Power, audio, pulse and switching) for
electronic equipment)
IS: 6553 : Environmental requirements for semiconductor devices and
integrated circuits.
IS: 6619 : Safety code for semi-conductor rectifier equipment.
IS: 9000 : Basic environmental testing procedures for electronic and electrical
items.
Other International/ National Standards/Codes/ Rules :
IEC:60034 : Rotating Electrical Machines
IEC: 60068 : Basic environmental testing procedure for electrical and electronic
items
IEEE: 344 : Recommended practice for seismic qualification of equipment for
Nuclear Power Generating stations.
IEEE: 387 : Standard Criteria for diesel generator units applied to as stand-by
power supplies for nuclear power generating stations
IEC 61000 : Electromagnetic interference testing of electronic components
IEC 60601 : Radio frequency interference testing of electronic components
IPC : Standards for Printed circuit boards.
IEEE
Std 7-4.3.2
: IEEE Standard Criteria for Digital Computers in Safety Systems of
Nuclear Power Generating Stations
IEEE 421.2 IEEE Guide for Identification, Testing, and Evaluation of the
Dynamic Performance of Excitation Control Systems
Indian Electricity Rules
PP-P-1819 NPCIL reference document for seismic qualification
AERB/NPP
PHWR/SG/
D-1
Safety Classification And Seismic Categorisation For Structures,
Systems And Components of Pressurised Heavy Water Reactors,
January 2003.
AERB/NPP
PHWR/SG/
D-25
CBS of Pressurized Heavy Water Reactors, January 2010.
ED-PROC-
62
Engineering Directorate Procedure for deployment of Pre-developed
Digital I&C System
The design, material, manufacture, assembly, inspection, testing and performance of
relays, panels and other associated equipments shall comply with latest editions
(including amendments thereto) of all currently applicable statutes, regulations and
safety codes in the locality where the equipment will be installed. The equipment shall
also conform to the latest applicable standards. Nothing in this specification shall be
construed to relieve the CONTRACTOR of his responsibility.
Other national standards are acceptable if they are established to be equal to or superior
to the listed standards. In all such cases, however, copies of English translation of such
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
national standards shall be attached to the tender. The tenders not complying with this
requirement are liable for rejection.
3.2 APPLICABLE DRAWINGS
Given in Annexure-I.
4.0 SPECIFICATION FOR MAIN EQUIPMENT AND ACCESSORIES
This section covers existing systems details, specific requirements for new AVR and
essential spares to be supplied. Based on the existing system details the
CONTRACTOR has to select and size the AVR and its components.
SL.
NO.
DESCRIPTION PARAMETER VALUE
1.0 Technical Data of Diesel Generator
1.1 Make of Engine DLW, model-ALCO251-16,
Cylinder configuration V-type,
3600BHP, 1000RPM.
1.2 Make of Alternator BHEL. Bhopal
1.3 Maximum continuous MW rating 2.4 MW
1.4 Maximum continuous MVA rating 3.0 MVA
1.5 Rated terminal voltage 6600 Volts
1.6 Rated frequency 50Hz
1.7 Rated Power factor 0.8 LAG
1.8 No. of phases 3 Phase
2.0 Technical Data of Existing Brushless
Excitation System
2.1 Make BHEL
2.2 Main Exciter
2.3 Rated armature current/field current 265 A/ 3.5 A
2.4 Rated armature voltage/field voltage 115 V/ 40 V
2.5 No. of phases 3
2.6 Frequency /No. of poles 150 Hz, 18 poles
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
SL.
NO.
DESCRIPTION PARAMETER VALUE
2.7 Make and rating of diodes EUPEC, 350 A, 1800 V PIV
2.8 Permanent Magnet Generator Not Applicable
2.8.1 Make and Type BHEL , Brushless
2.8.2 Rated armature current 265A
2.8.3 Rated armature voltage 115V
2.9 Technical Data of Automatic Voltage
Regulator
2.10
Make and type of AVR BHEL, VXB-22M
2.11 Response time of AVR. < 25 mili sec.
2.12 Dead band of AVR No DB
2.13 Burden of AVR on purchaser‟s PT 20 VA
2.14 AVR provision to limit
generator voltage in case of PT signal
failure
AVR shifts to manual mode
of control (field control
regulator) with generator
not experiencing any jerk
(bumpless transfer)
2.15 AVR provision for limiting the reactive
power sharing when parallel operation
Yes, this is ensured by
compounding circuit in the AVR
2.16 Response time of excitation system < 25 mili sec.
2.17 Response ratio of excitation system. 0.8
3.0 Power and Control Cables
3.1 Conductor Copper
3.2 Insulation HR PVC
3.3 Inner/ Outer sheath FRLS PVC
3.4 Armouring steel
3.5 Applicable standard IS-1554
3.6 Panel wiring PVC
3.7 i) All circuits except CT and power
circuit PVC
3.8 ii) CT circuits PVC
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
Technical Requirements For New AVR System
SL.
NO.
DESCRIPTION PARAMETER VALUE
1.0 Type digital voltage regulator four
redundant channels with two auto
and two manual modes
1.1 Input / Output requirement
1.1.1 Input rated current CONTRACTOR to indicate
1.1.2 Input rated voltage CONTRACTOR to indicate
1.1.3 Analogue and digital output As required by CONTRACTOR
1.2 Performance Requirements
1.2.1 Steady State Accuracy 1% of rated voltage
1.2.2 Voltage Setting Range ± 10% of rated voltage
1.2.3 Response time of AVR <1 sec on load sequence
1.2.4 Steady State Voltage Regulation +1%
1.2.5 Response time of the generator, voltage regulator & excitation system Maximum time interval to recover the generator voltage to +/-5% value for a step rejection of rated load at rated power factor.
Less than 1.0 sec.
1.2.6 Response time of the generator, voltage regulator & excitation system Maximum time interval to recover the generator voltage to +/-5% value for a maximum step load of 400kW at 0.2 pf with base load of 2 MW.
Less than 1.0 sec
1.2.7 Response time of the generator, voltage regulator & excitation system Maximum time interval to recover the generator voltage to +/-5% value at any time during automatic sequential load restoration as per Annexure.
Less than 1.0 sec
1.2.8 Voltage drop during starting of largest motor (400 kW) when D.G set is operating at 2000 kW, or at any point during the specified sequential load restoration as per Annexure.
< 15% (at generator terminals)
2.0 Enclosure of AVR panel
2.1 Material Cold rolled sheet steel
2.2 Thickness of sheet steel 2.5 mm for frames, 2 mm for load
bearing covers / doors
1.6 mm for non-load bearing
covers
2.3 Gland plates 3.0 mm CRCA
2.4 Degree of protection provided by the IP-52
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
enclosure
2.5 Painting Aircraft grey shade 631 (as per-
IS-5) on outside. Glossy white
inside or RAL-7032 on both
inside & outside. Thickness 110-
130mm.
2.6 Cable entry Bottom Entry
2.7 Meters As required
2.9 Preferred panel dimensions ≤ 800 X 800 X 2310 MM
4.1 List of Mandatory (Essential) Spares: Quantity Detailed in Annexure-IV
Sl.
No.
Item Description
1) 1 Set of all PCBs with controller loaded with approved
software used in one AVR panel. (1 set is all PCB with
controller used in one AVR panel)
2) 3 Set of each type of aux. relay, meter, control switch, timer,
protective relay used consisting of one of each type.( 1 set is
relay, switch, timer, meter used in one AVR panel)
3) 4 Power electronic components (1 set is the power electronic
component used in one AVR panel)
4) 5 HRC fuses for all power electronic components used in the
AVR. (1 set is the HRC fuses for all power electronic
components used in one AVR panel)
5) 6 Control HRC fuses/ MCBs (1 set is the Control HRC fuses
and MCB used in one AVR panel)
6) 7 Ventilation units (As per design of supplied AVR panel)
NOTE:
4.2 The CONTRACTOR shall also include such additional items in the spares offered
which are not covered in the list above but which are necessary for the satisfactory
operation and maintenance of the AVR panel. The details of such additional spares
included together with details of quantities and unit rates shall be given as
“Recommended Spares”.
4.3 In case CONTRACTOR feels that the quantities of spares indicated in the list of spares
needs to be increased, details of the same including quantities of each item actually
used and quantities of corresponding spares recommended shall be given separately.
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
5.0 DESIGN AND CONSTRUCTION DETAILS
This section covers equipment design and construction, functional requirements of new
AVR system.
5.1 The voltage regulator will be microcontroller/computer based systems (CBS). The voltage
regulator shall have two completely independent Auto (regulating and control)
channels (Auto-1 and Auto-2) and independent Manual channels (Manual-1 and
Manual-2). The Auto channels shall be completely equivalent so that any one channel
can be freely selected as the active channel and the other channel acting as standby.
Similarly manual channels shall be completely equivalent so that any one manual
channel can be freely selected as the active channel and the other channels as standby
channels. Automatic follow up shall ensure that inactive channels always generate same
control variables as the active channel so that a smooth switchover shall be achieved
between active channel to inactive channels during malfunction of the operating
channels or selection of channel (Auto-1/Auto-2/Manual-1/Manual-2/vice versa).
Annunciation during this changeover shall be provided in DGLCP OR AVR panel.
5.2 Functional Requirements:
5.2.1 The AVR shall have following features:
i. Over fluxing Protection
ii. Loss of PT signal protection
iii. Power factor control/MVAR control, reactive current droop for parallel
operation
iv. Soft start function
v. Under voltage detection and external current boosting during short circuit at
generator terminal
vi. Monitoring and alarm of rotating diodes
vii. Alarm & trip functions
5.2.2 In AUTO mode, the generator voltage shall be regulated so that a constant voltage is
produced at the generator terminals and in MANUAL mode, the generator excitation
shall be controlled by the manual reference value.
5.2.3 The voltage regulator shall be capable of supplying excitation current in the event of a
three phase short circuit at the Generator terminals to facilitate operation of the
protective devices and excitation requirements under all specified conditions of motor
starting.
5.2.4 Loss of PT signal due to tripping of MCB/fuse in PT circuit or any other cause shall
not cause over shooting of voltage. Voltage shall be clamped to the nominal value in
this condition
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
5.2.5 A quadrature droop circuit shall be provided to limit the reactive kVA supplied by the
machine during parallel operation. The droop settings shall be adjustable at site and shall
have adequate range to meet all operating conditions expected. When the DG set is
connected for parallel operation with the grid, the quadrature droop circuit shall
automatically come in the AVR scheme and control the reactive VAR shared by the
Diesel Generator. Failure of this circuit shall be appropriately annunciated.
5.2.6 All the existing control, indications, monitoring and protection shall be implemented in
the newly installed system.
5.3 Security Requirement:
5.3.1 The electronic modules shall have in-built self diagnostic check facility. Appropriate
control actions shall be taken immediately after the appearance of fault defective cards
shall be indicated by LEDs so that trouble shooting is easier. Monitoring of pulse
output and monitoring of output voltage of all power supplies shall be performed
5.3.2 For AVR with computer based system,
i. programming unit or laptop with required licensed software, communication cable
and hardware lock are in the CONTRACTOR‟s scope of supply.
ii. programming unit or laptop used for software diagnostic test, password verification,
and software communication shall be tested during commissioning and IV&V
5.3.3 The CONTRACTOR shall include diagnostic kit along with its instruction manual for
trouble shooting of PCBs used in AVR panel.
5.4 Grounding and Shielding
The type of Grounding and Shielding provided for electronic equipment shall be
indicated in the technical bid. CONTRACTOR shall also provide any special
requirements/provisions with regard to the type of grounding mat arrangement.
5.5 Environmental Requirements:
AVR shall be of proven design. It shall be designed and manufactured to suit the power
plant environment and conditions expected. It should have been qualified to withstand
and operate after experiencing the expected environmental conditions and
electromagnetic, electro static and radio frequency interferences and voltage surges.
The RF and EM emissions from the AVR shall not interfere with other equipment in
the vicinity. Severity levels to which the AVR proposed is qualified shall be indicated
in the offer and detailed type test certificates shall be submitted after the placement of
order. Details of the tests to be carried out are given in Clause 7.3.
5.6 Printed Circuit Boards
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
5.7.1 All critical PCBs used in the AVR panel shall confirm to class-3 (High Reliability)
grade as per Inter Connecting and Packaging Electronics Standards.(IPC Standards).
Non critical PCBs (i,e those PCBs whose failure does not affect the operation of AVR
system) shall confirm to class-2 requirement of IPC standard.
5.7.2 The material for the PCB laminate shall be glass woven fabric and epoxy resin based,
flame retardant and confirming to type FR-4 or better.
5.7.3 The quality assurance and acceptance norms for PCBs shall be applicable to specified
class of PCBs as per IPC standards.
5.7.4 All critical PCBs shall be provided with interface for connecting external diagnostic
tools which it shall be possible to monitor the healthiness of PCBs and also as a fault
diagnostic facility for identifying defective components.
5.7.5 After completion of all factory tests, PCBs shall be provided with conformal coating
of approved type to protect them from power plant atmosphere encountered at site.
5.7 AVR Panel Requirements
i. AVR Panel shall be completely metal enclosed, free standing, floor mounting,
dust, moisture and vermin proof and identical to the existing panels.
ii. Degree of protection should be IP52
iii. Panels shall be fabricated of CRCA sheet steel of thickness not less than 2 mm
for front, rear and load bearing members and 1.6 mm for sides, top and bottom
portions. Gland plates of all panel shall be 3 mm (thick), non magnetic
iv. The panels shall be free from dents and flaws and sufficiently reinforced to
provide level surfaces resistance to vibration, transportation and installation.
v. The make and type of paints used for primary and final coatings shall conform
to applicable Indian Standards and shall be subjected to the approval of the
PURCHASER. Use aircraft grey shade 631 (as per-IS-5) on outside and glossy
white inside or RAL-7032 on both inside & outside. The total dry film
thickness on the items shall be within 110 to 130 microns. Painted surfaces
shall be tested for adhesion, peel resistance and salt fog test, as per applicable
standards.
5.8 An earthing bus of GI strip shall be provided and extended outside the panel for
connection to the earth. The minimum size of earth bus bar shall be 30*5sq.mm GI
strip. The earth bus shall have provision for connecting to PURCHASER‟s external
earthing connection.
5.9 Reliability Requirements:
The CONTRACTOR shall furnish the average mean time between failures for AVR.
The value of MTBF should not be less than 20000 hrs. The CONTRACTOR shall also
indicate the method by which MTBF value has been arrived at and the first component
which is expected to fail. Calculation for MTBF shall be submitted to review and
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
approval of PURCHASER. The CONTRACTOR shall also specify the mean time to
repair for AVR.
Failure mode and effect analysis (FMEA) shall be submitted for the AVR.
6.0 EXCLUSIONS
Supply of Permanent Magnet Generator, Complete exciter rotor with diode wheels are
excluded from the scope of work.
7.0 INSPECTION AND TESTING
7.1 Tests at works in accordance with the appropriate clauses of relevant codes and
standards and in addition any test called for by the PURCHASER or his representative
to ensure that the plant being supplied fulfills the requirements of the specification. The
CONTRACTOR shall carry out all the shop tests and inspections specified in the
following clauses in addition to those normally carried out by him
7.2 A detailed document covering procedures for various tests to be conducted on AVR
system shall be prepared by the successful bidder and subjected to the approval of the
PURCHASER. Such a document shall indicate details of test setup, measurements to be
made, acceptance norms, and calculations to be made etc.
7.3 CONTRACTOR shall furnish following type test reports on electronic modules of
excitation system. Modules/ components used in type tests shall not be supplied to the
PURCHASER. However the components/ structures not having vibration related
failures mechanism may be accepted after inspection and due justification. If type test
certificates are not available type tests shall be conducted without any additional cost to
the PURCHASER.
7.3.1 Environmental Tests:
1. Dry heat tests: Temperature at 55º C ± 2 for 4 hrs
2. Damp heat cyclic tests: Temperature 40ºC and 95% relative humidity for
12+12 hours. 2 number of cycles. Total duration 48 hours.
3. Cold test: 5± 2ºC for 2 hours
4. Temperature cycling test: Temperature 5± 3ºC and 70± 2ºC, Dwell time
60min at each temperature. Change over time 02 minutes. Number of cycles 5.
Total duration 10 hours.
7.3.2 EMI/ EMC and RF Tests
1. Electromagnetic compatibility tests.
2. Electrostatic discharge test as per IEC 61000-4-2
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
3. Radiated Radio frequency Electromagnetic field as per IEC 61000-4-3
4. Electrical fast transient burst immunity test as per IEC 61000-4-4
5. Surge immunity tests as per IEC 61000-4-5
6. Conducted disturbance induced by radio frequency fields as per IEC 61000-
4-6
7. Voltage dips, short interruptions and voltage variations immunity as per IEC
61000-4-11
8. Oscillatory test wave as per IEC 61000-4-12
7.3.3 Hardware reliability analysis needs to be carried out for the base values of MTBF,
MTTR and availability given.
7.3.4 Seismic Qualification Requirement
AVR Panel shall meet the requirement of safe shutdown earthquake (SSE) and five
operation basis earthquake (OBE). Exact seismic spectra shall be given to the
successful bidder. The qualification shall be as per PP-P-1819. AVR panel shall be
considered for acceptance if the stress levels observed during the seismic qualification
testing are demonstrated to be less than permissible limits for the materials used.
7.4 Routine tests at works/ factory
1. Visual
2. Wiring as per drawings
3. Insulation resistance
4. High voltage test
5. Continuity test/Regulation signal flow
6. Power supply check
7. Functional tests at rated and reduced voltage
8. Operation Interlocks & Protections
9. Performance during switchover between channels
7.5 IV&V Requirement
In case of digital AVR, microcontroller/ computer based system used shall be
subjected to Independent Verification and Validation (IV & V) process by
PURCHASER. All documents covered in Annexure-V shall be prepared and
submitted. All required tests at factory and site for IV & V purpose shall be
conducted.
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
8.0 QUALITY SURVEILLANCE
8.1 General
The general requirements regarding quality assurance, organizational set up for quality surveillance, qualification and experience details of personnel of
quality Assurance department, QA Manual, Mock up test procedures etc. are covered in GCC.
8.2 Quality control plan
This indicates the requirements expected from the CONTRACTOR/manufacturer of the excitation system. Subsequent to the placement of Purchase
Order CONTRACTOR/manufacturer shall submit” for PURCHASER‟s approval a quality assurance plan in line with this document incorporating
specific document numbers for “format of records”, “acceptance norms” and “reference documents
8.3 Abbreviations:
V Verified by
P Performed by
W Witnessed by (After lapse of due notice to NPCIL, manufacturer may proceed with manufacture)
H Hold (Unless a written clearance is obtained from NPCIL, manufacturer shall not proceed to next stage)
1 NPCIL QS
2 Prime Supplier/CONTRACTOR
3 Approved External Laboratory or Sub CONTRACTOR QC (if CONTRACTOR QC / facility not available.)
AD- PC Approved Document such as Tender Document, Purchase order, Drawings & Test Procedures
TR- Test Report
PS- Plant Standard
CHP - Customer Hold Point (Customer is NPCIL)
IS - Indian Standards
IEC - International Electrotechnical Commission standards
IEEE - Institute of Electronics and Electrical Engineers standards
Notes:
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
Wherever V & W are both indicated , NPCIL QS to witness test or review test report
TRs not more than five year old from date of opening of Part-I of tender shall be reviewed for acceptance. Otherwise test shall be carried out.
Minor: The characteristic of a component, process or operation whose failure neither materially reduce the usability of the product in operation, nor
does it affect the aesthetic aspects.
Major: The characteristic of a component, process or operation whose failure may cause operation failure which cannot be readily corrected
at site or cause substandard performance, increased erection and maintenance cost, reduced life or seriously affect aesthetics or ergonomics.
Critical: The characteristics of a component, process or operation failure of which will surely cause operating failure or intermittent troubles
which is difficult to rectify at site or render the unit unfit for use or safety hazards.
„„Failure “ of a characteristic means failure to meet the „acceptance norms „.
Sampling: Generally in accordance with IS:2500. Sampling will be used as under:-
If 100% “witness” is carried out by “Prime CONTRACTOR”, NPCIL will witness on sample basis, or if 100% “witness” of tests is carried out by
“sub- CONTRACTOR”, “Prime CONTRACTOR” will witness on sample basis.
Any deviation to this QAP shall be brought out by CONTRACTOR in his offer failing which this QAP shall be complied with fully
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
SAMPLE QUALITY ASSURANCE PLAN FOR DVR PANEL
SL
NO
COMPONENT AND
OPERATION
CHARACTERSTICS CATEGORY TYPE
OF
CHECK
QUANT
UM OF
CHECK
REFERENC
E
DOCUMEN
T
ACCEPTANC
E NORMS
FORMAT
OF
RECORD
AGENCY REMARKS
P W R
1
Material check of
mechanical items
like
aluminium, steel
sheet ,
copper bus bars,
lugs,
gaskets etc.
Dimensional
Chemical
composition
Appearance
Measurement etc
Major
Review
of
Certific
ates/
complia
nce
report
Sampli
ng
Material
Test
Certificate
P.S
I.S
Inspection
Report
3
2
2,1
2
Material check of
electrical items
like
cables, meters,
MCBs
relays, shunts,
heaters
transformers etc.
Dimensional,
Electrical,
Functional test as
applicable
Major
Review
of
Certific
ates/
complia
nce
report
Sampli
ng
Material
Test
Certificate
P.S
I.S
Inspection
Report
3
2
2,1
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
3
Material check of
electronic items
like
thyristor, resistor,
ICs, inductors,
capacitors,
diodes, transistors
etc.
Dimensional and
Functional test as
applicable
Major
Review
of
Certific
ates /
complia
nce
report
Sampli
ng
Material
Test
Certificate
P.S
I.S
Inspection
Report
3
2
2,1
4
Fabrication of
panels, doors,
side cover, base
frame etc
Visual
Dimensions
Degree of
protection
Major
Visual
Dimens
ions
100%
Sample
P.S
Drawing
Test report
P.S
Drawing
Test report
Inspection
Report
3
2
2,1
5 Painting Paint shade,
coating thickness,
appearance
Major Visual
&
Measur
ement
100% P.S P.S Inspection
Report
3 2 2,1
6
Electronic/Power
module
manufacturing
Appearance,
component
mounting,
HV test,
Functional
Major/
Critical
Review
of
Certific
ates
100%
P.S
I.S
P.S
I.S
Inspection
Report
3
2
2,1
7 AVR Environmental
tests: Dry heat,
Damp Heat and
Temperature
cycle tests, EMI
and RFI tests
Major Testing Sample IEC IEC Test
Report
3
2
2,1
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
Temperature Rise
Test
Major Testing Sample AD AD Test
Report
3
2
2,1
Functional tests
to demonstrate
AVR capability
to meet all
conditions of
loading of
generator
Major Testing 100% PS PS Test
Report
3
2
2,1
8
Assembly, testing
of racks with
connectors
etc.
Identification of
component
Electrical
continuity, HV
test, pull test etc.
Critical
Physica
l
100%
except
pull test
P.S
I.S
P.S
I.S
Inspection
Report
3
2
2,1
9
Cubicle assembly
Visual,
dimensional
Major
Dimens
ions
100%
P.S
drawing
P.S
drawing
Inspection
Report
3
2
2,1
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
10
System testing
Visual
Wiring
Insulation
resistance
High voltage test
Continuity
Regulation
Signal flow
Power Supply
check
Functional tests
at rated and
reduced voltage
Operation of
limiters,
Interlocks &
Protections
Performance
during
switchover
between channels
Critical
Tests
Approved
Procedure
Approved
Procedure
Inspection
Report
3
2
2,1
CHP
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
Technical Specification
11 Assembled AVR
panel
IV&V Critical Testing 100% Approved
Procedure
Approved
Procedure
3 2 1 CHP
This is
applicable
if for
CBS is
used in
AVR.
Complete
IV&V
documenta
tion shall
be
completed
before
factory or
site
acceptance
test
11 Packing and
despatch
visual Major Visual 100% P.S P.S Inspection
Report
3 2 2,1
Note: 1. PS - Supplier plant standard
2. IS - Indian standard
3. CHP - Customer(NPCIL) Hold Point
4. TC - Test Certificate
5. Type test certificate for all items / modules shall be submitted
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
9.0 INSTALLATION, TESTING AND COMMISSIONIG
9.1 The scope of this section covers the details for receipt, storage, erection, commissioning
checks and tests to be done at site
9.2 In may please be noted that being operating plant, up gradation work for all units may
not be possible at a time in one stretch and may have to match with plant shut down.
9.3 As the scope includes disconnection and removal of the existing regulating cubicles all
the necessary tools, tackles and handling facility required for the same shall be brought
by the CONTRACTOR.
9.4 After removing the existing cubicles and sent to stores / designated / identified location,
the new cubicles shall be safely brought to its location, erected and fixed neatly.
9.5 Commissioning checks indicated below are indicative only. However the
CONTRACTOR shall carry out actual commissioning checks on all the equipments
covered in this specification as per manufacturer‟s recommendation and
PURCHASER‟s instructions. The Original Equipment Manufacturer's engineer shall be
present during performance of tests at site and manufacturer's concurrence taken before
completion.
9.6 Preliminary Checks
(a) Check name plate details of every associated equipment according to this
specification.
(b) Check for any physical damage.
(c) Check for level, verticality of panels, tightness of all bolts, clamps and
connecting terminals.
(d) Check cleanliness.
(e) Check earthing.
(f) Check space heaters, lighting receptacles provided.
(g) Check mounting as per approved drawings.
(h) Check for proper termination of all external power and control cables.
9.7 Commissioning Checks
(a) Each wire shall be traced by continuity tests and it should be made sure that
the wiring is as per relevant drawings. All interconnection between
panels/equipment shall be similarly checked.
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
(b) IR and HV test
(c) Settings of relays, other alarms tripping devices and interlocks as per scheme.
(d) Checking for settings of various limits, checking of calibration of relays and
transducers, ware validation.
(e) Functional checking of all control circuit e.g. closing, tripping, interlock and
alarm circuits including proper functioning of the component/equipment.
(f) Software diagnostic tests, password verification, software communications (if
applicable).
(g) Measurement of output voltage waveform distortion (both SHD and THD)
(h) Synchronization of DG set with the Class-IV and loading
(i) Performance during switch over between channels /modes
(j) Sequential restoration of loads and measuring of voltage drop at generator
terminal and response time of AVR to recover voltage to +/- 5 % value.
(k) Checking of largest motor load of 400 kW starting with base load of 2000 kW
and measuring of voltage drop at generator terminal and response time of
AVR to recover voltage to +/- 5 % value in less than 1 sec
(l) Functional tests on control circuitry including various interlocks and
operation of its protections, alarms and controls.
(m) Functional performance of AVR when DG is connected to grid and run up to
110% load.
(n) Load Rejection Test: On load rejection of 110% , voltage variation should not
be more than +/- 10% in less than 1 sec
10.0 SPECIAL TOOLS AND TACKLES FOR ERECTION & MAINTENANCE
10.1 All Special tools and tackles required for successful erection, site testing &
commissioning of Generator and Excitation system shall be supplied by the
CONTRACTOR and a list of such items shall be submitted along with the data sheet.
11.0 WARRANTEE AND GUARANTEE
Warrantee and guarantee shall be as stated in General Condition of the Contract
attached with the tender
12.0 DRAWINGS AND DOCUMENTS TO BE SUBMITTED
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
12.1 As part of the bid the CONTRACTOR shall furnish the following
a) General arrangement and scheme drawing for AVR
b) Detailed literature/catalogues all equipment being offered.
f) Any other drawings necessary for the correct and complete understanding of the
proposal.
12.2 On award of contract, three sets of all drawings and all documents shall be sent to
PURCHASER for review and on PURCHASER‟s approval 2 sets shall be sent
incorporating PURCHASER‟s comments, along with soft copy
12.3 Three (3) copies of history docket covering NPCIL purchase order, approved QA Plan,
drawings, inspection and test reports, manuals containing storage, erection,
commissioning and maintenance instructions, recommended spare parts, detailed
catalogues of various components, shipping releases, etc shall be submitted to
PURCHASER in the bound form along with three soft copies in CDs/ Pen drives. No
additional payment will be done for any document supply.
13.0 SCHEDULE FOR SUBMISSION OF DRAWINGS, MANUALS, TEST
REPORTS, ETC
Sr.No Item Duration
(No LD applicable)
1.1 Engineering schedule indicating a list of all drawings,
documents, data, test certificates, manuals, quality
assurance plan, level-2 plan as per supplieretc.
One month of PO
1.2 Quality assurance plan and type test reports Two months of PO
1.3 Drawings - Schematic, General Arrangement, Bill of
material and wiring diagram
Three months of PO
1.4 History document Within one month
dispatch of equipment
14. Delivery Schedule which is applicable of LD and terms of the payment :
See Annexure -VII
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
ANNEXURE – I
Existing AVR Drawings
Following Drawings/ Information
1. Functional Requirements of AVR
The Automatic voltage regulator ensures stable operation of the synchronous
generators in the entire load range. It ensures very fast recovery of generator voltage
following changes in load demand. The protective features ensure safe operation of
the generator. The equipment automatically regulates the output voltage of a
synchronous generator by providing it with a controlled field supply via an exciter
generator. The equipment is active over the entire load range with negligible dead
band.
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
2. Existing AVR Diagram and
details:
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
3. Details of external cabling to other panels:
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
4. Existing Auxiliary power supply arrangement:
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
5. GA Drawing of AVR Panel for space availability for new panel
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
6. Remote Control /Alarm/Indication in MCR / SCADA
As given in inter panel wiring diagram
7. Specification and ratings of CTs and PTs
PT supply 110V, 3φ, 15VA
CT supply 1A, 1φ, 15VA
Short Circuit CT: 300/2 A
Droop/AVR CT: 300/1 A,10 VA
PT mounted on generator : 3.810 KV/415V
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
ANNEXURE – II
Load Restoration Sequence
Load Description USI No KW
Load start permissive when
restoration is by DG set
Time (Sec.)
Active HPPW Pump 7133-PM-1001 180 KW 25
APW Cooling Pump 7125-PM-1003 200 KW 27
APW Cooling Pump 7125-PM-1004 200 KW 29
Active HPPW Pump 7133-PM-1002 180 KW 31
Primary Feed Pump 3331-PM-1 400 KW 33
Moderator Circulating
Pump
3211-PM-1 200 KW 37
Air Compressor 7510-CP-1002 140 KW 40
ABF Pump 4321-PM-1006 132 KW 44
Air Compressor 7510-CP-1001 140 KW 47
ECCS Pump 3335-PM-1 132 KW 51
ECCS Pump 3335-PM-2 132 KW 55
Ex. Fan SFB, RAB, RB Sy.
Cont.
7343-FM-1003 132 KW 59
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
ANNEXURE – III
Station Data
1.1 1
.
1
Purchaser Nuclear Power Corporation of India Ltd. (NPCIL)
1.2 Project Title Rajasthan Atomic Power Station Unit 5,6
1.3 Location Rawatbhata, right bank of Chambal river about 6.4 Km
upstream of Ranapratap Sagar Dam (60 Km by road from
Kota).
1.4 Elevation above mean
Sea Level
384 meters above sea level
1.5 Nearest Railway
Station
Railway siding-Kota Jn. on Western Railway, about 60 Km
by road from RAPP-5 to 8 Site
1.6 Nearest Airport Jaipur
1.7 Ambient Air
Temperatures
Maximum 46.5 Deg. C
Minimum 6.7 Deg. C
1.8 Relative humidity 90% max
1.9 Rainfall / year 799 mm
1.10 Climatic conditions
for which equipment
should be designed
The climate is tropical with less rainfall.
1.11 Tropicalisation Required
1.12 Wind Velocity for
which equipment shall
be designed
130 km/hr
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
1.13 Transport Rail/Road
1.14 Seismology Floor response spectra will be furnished to successful bidder
for analyzing and testing.
1.15 Auxiliary Power Supply : Auxiliary electrical equipment to be
supplied against this specification
shall be suitable for operation on the
following supply systems with
variations as given below.
1.15.1 For AC motors above 200kW : 6600V, 3-phase, 3wire,50Hz
Non-effectively earthed
1.15.2 For AC motors below 200kW : 415V, 3 phase, 3 wire, 50Hz
effectively earthed
1.15.3 Construction power supply : 415V, 3 phase, 4 wire, 50Hz,AC
supply effectively earthed
1.15.4 Panel lighting fixtures/sockets, : 240V, 1 phase, 2 wire,50Hz
space heaters AC supply with neutral lead
earthed.
1.15.5 Instrumentation, controls and annciation : 48V DC supply
1.15.6 Supply variations of AC systems
i) Variation of supply voltage : +10%
ii) Variation in supply frequency : +5%
iii) Combined voltage and : 10%
frequency variation
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
ANNEXURE – IV
List of Mandatory (Essential) Spares
Sl.
No.
Item Description Quantity
1) 1 Set of all PCBs with controller loaded with approved
software used in one AVR panel. (1 set is all PCB with
controller used in one AVR panel)
4 Set
2) 3 Set of each type of aux. relay, meter, control switch, timer,
protective relay used consisting of one of each type.( 1 set is
relay, switch, timer, meter used in one AVR panel)
2 Set
3) 4 Power electronic components (1 set is the all power
electronic components used in one AVR panel)
2 set
4) 5 HRC fuses for all power electronic components used in the
AVR. (1 set is the HRC fuses for all power electronic
components used in one AVR panel)
2 Set
5) 6 Control HRC fuses/ MCBs (1 set is the Control HRC fuses
and MCB used in one AVR panel)
2 Set
6) 7 Ventilation units (As per design of supplied AVR panel) 2 Nos.
NOTE:
The CONTRACTOR shall also include such additional items in the spares offered
which are not covered in the list above but which are necessary for the satisfactory
operation and maintenance of the AVR panel. The details of such additional spares
included together with details of quantities and unit rates shall be given as
“Recommended Spares”.
In case CONTRACTOR feels that the quantities of spares indicated in the list of
spares needs to be increased, details of the same including quantities of each item
actually used and quantities of corresponding spares recommended shall be given
separately.
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
ANNEXURE – V
Guide lines/Scope of IV&V activities for C-PDS/COTS-CBS
1.0 Independent verification & validation (IV & V) activity shall cover the review,
verification and validation of Commercial- Pre Developed computer based Systems
(C-PDS) or Commercial off the Shelf computer based Systems (COTS-CBS) in phase
of procurement, development/manufacturing, installation, testing and commissioning
phases.
2.0 The IV& V process for C-PDS shall be carried out in the following stages:
2.1 Review of design and manufacture‟s documents
2.2 Audit of the previous design & development documents
2.3 Validation of standalone system at factory
2.4 Validation of integrated system with plant systems at site
2.5 Preparation of the applicable reports
3.0 Under the review/verification of design document stage: CONTRACTOR shall map
with existing manufacture‟s documents with required documents or prepare the
documents and submit to NPCIL as per Annexure-A for IV & V review process. The
IV & V team shall review all these design/manufacturer‟s documents for their
correctness, consistency & completeness in line of the System Requirements (NPCIL
document) and submit the verification/review report on each document.
5.0 Under the audit of previous design/development document stage: CONTRACTOR
shall offer (not submission) these documents or equivalent documents with mapping
as per Annexure-B at CONTRACTOR/NPCIL premises for IV & V audit only. The
IV & V team shall audit all previous design & development documents for their
correctness, consistency & completeness and submit the audit report on these
documents.
7.0 Validation of standalone system at factory stage: IV & V-team shall carry out the
system verification and validation tests on standalone equipment/system panel(s) at
factory at CONTRACTOR‟S premises (factory) as per the approved system validation
procedure (SVP) and submit System Validation Report (SVR-F). It is to be noted that
these validation tests shall be carried out after completion of the QA tests, but before
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
shipment of the equipment. This activity shall be included in the QAP with hold point.
The final Shipping Release shall be issued after completion of the validation tests at
factory.
8.0 Validation of integrated system at plant/project stage: IV&V-team shall carry out the
system verification and validation tests on integrated equipment/system panel(s) with
plant systems at plant/project site (NPCIL‟S site) as per the approved system
validation procedure (SVP) and submit System Validation Report (SVR-S). It is to be
noted that these tests shall be carried out after completion of the commissioning of the
system but before actual deployment or operation of the system
9.0 System Validation procedure (SVP) document can be a common document for factory
and site if there are no vast differences in the test cases, test set up and test execution
procedure in the expected environment.
10.0 CONTRACTOR shall ensure availability of all the tools, expert manpower and
resources while conducting the validation tests at factory as well as at plant site.
11.0 IV&V-team shall ensure the proposed system is built as per the system requirements,
standalone tested at factory, functionally tested at project/plant site after integration
with plant systems, the fail-safe operation of the system for safety of the equipment
and the safety of the plant and finally fulfill all the regulatory requirements.
12.0 CONTRACTOR shall submit the document submission schedule for review process
and validation test schedule for validation tests after placement of the purchase order
and ensure that each document is correct, consistence and complete with required
information about the proposed system.
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
Annexure-A
List of the documents for Comm.-PDS for submission for review
Sr.
No.
List of required design
documents
Equivalent
documents with
mapping
Responsible Agency
1. System requirements (SR) or
Technical specifications (TS) as
part of the Tender
Tender documents NPCIL
2. Product Specification
Compliance (PSC)
OEM/CONTRACTOR/system
integrator
3. Fitness for purpose (FFP). This
should includes
Organization level Quality
Assurance Plan
Product suitability and
quality report
Operating experience report
OEM/CONTRACTOR/system
integrator
4. Configuration Management
Plan-Manufacturer/Developer
(CMP-M)
OEM/CONTRACTOR/system
integrator
5. Verification Plan -Application
Software (VP-ASW)
OEM/CONTRACTOR/system
integrator
6. System Verification and
Validation Plan (SVVP)
Not applicable NPCIL
7. System Architecture Design
(SAD)
OEM/CONTRACTOR/system
integrator
8. Application Programming
Requirements (APR) and
Application Program (AP)
OEM/CONTRACTOR/system
integrator
9. System Build (SB) OEM/CONTRACTOR/system
integrator
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
10. User Documentations (UD) OEM/CONTRACTOR/system
integrator
11. System Validation Procedure
(SVP)
OEM/CONTRACTOR/system
integrator
12. System Safety Analysis Report
(SSAR) to includes
System safety analysis for
implementation of safety
functions
Single Failure Analysis
Process
Common Cause Failure
Analysis Process
OEM/CONTRACTOR/system
integrator
13. Hardware Reliability Analysis OEM/CONTRACTOR/system
integrator
14. Configuration Management
Plan/procedure during operation
and maintenance phase (CMP-
O&M)
Not applicable NPCIL
Note:-If the details to be covered in some of the above documents are available /covered in a
single document of the manufacturer, then the same would also be considered for acceptance
after review by IV&V team.
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
Annexure-B
List of previous design and development documents for Audit only not for submission to
NPCIL
SR.
No.
Name of the required
documents
Name of the equivalent
manufacture’s documents
with mapping
Responsible Agency
1. Hardware Quality Assurance
Plan (HQAP)
OEM or
CONTRACTOR/system
integrator
2. Software Quality Assurance
Plan (SQAP)
3. Hardware Requirement
Specifications (HRS)
4. Hardware Design Description
(HDD)
5. Software Requirement
Specifications (SRS)
6. Software Design Description
(SDD)
7. System Integration and Test
Plan (SysITP)
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
8. System Integration and Test
Report (SysITR)
9. Verification Reports on SRS,
HRS, SDD, HDD
10. Verification Report on
Code/program
11. System Validation Report
(SVR)
12. Certifications/Reports on
Generic design criteria, safety
criteria and quality policy
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
ANNEXURE – VI
GUARENTEED TECHNICAL PARTICULARS
The CONTRACTOR along with his offer shall furnish following data for the equipments
covered in this specification:
S.No Particulars Value
1.0. Automatic Voltage Regulator
1.1. Type
1.2. Make
1.3. Rated current
1.4. Rated voltage
1.5. Burden of AVR on Purchaser‟s PT
1.6. Response time of AVR
1.7. Accuracy
1.8. Range of voltage Setting
1.8.1 In Auto mode
1.8.2 In manual mode
1.9. Response ratio
1.10. Response time of the generator, voltage regulator & excitation system Maximum time interval to recover the generator voltage to +/-5% value for a step rejection of rated load at rated power factor.
1.11. Response time of the generator, voltage regulator & excitation system Maximum time interval to recover the generator voltage to +/-5% value for a maximum step load of 400kW at 0.2 pf with base load of 2MW.
1.12. Response time of the generator, voltage regulator & excitation system Maximum time interval to recover the generator voltage to +/-5% value at any time during automatic sequential load restoration as per Annexure II
1.13. Voltage drop during starting of largest motor (400 kW) when D.G set is operating at 2000 kW, or at any point during the specified sequential load restoration as per Annexure II
2.0. Functions of AVR
2.1. Reactive current compensation
2.2. PT fuse failure
2.3. Watch dog
2.4. Firing pulse supervision and amplification
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
S.No Particulars Value
2.5. Field current regulation
2.6. Voltage regulation from no load to full load
3.0. Degree of Protection for AVR Panels
3.1. Provisions for remote control, Monitoring, metering,
alarm annunciations are provided?
3.2. Whether all provisions for local control, monitoring,
metering, alarm annunciations as specified are
provided?
3.3. Over all dimensions
3.4. Total weight
4.0. Environmental /EMC/EMI tests performed on
electronic modules
4.1. Severity levels for climatic tests on modules
4.1.1. Dry heat
4.1.2. Cold
4.1.3. Damp heat
4.1.4. Temperature cycling
4.1.5. Vibration
4.2.0. Severity levels for EMC /EMI tests on system
4.2.1. Electrostatic discharge test as per IEC 61000-4-2
4.2.2. Radiated Radio frequency Electromagnetic field as
per IEC 61000-4-3
4.2.3. Electrical fast transient burst immunity test as per
IEC 61000-4-4
4.2.4. Surge immunity tests as per IEC 61000-4-5
4.2.5. Conducted disturbance induced by radio frequency
fields as per IEC 61000-4-6
4.2.6. Voltage dips, short interruptions and voltage
variations immunity as per IEC 61000-4-11
4.2.7. Oscillatory test wave as per IEC 61000-4- 12
4.2.8. Insulation test level
4.2.9. Dielectric test level as per IEC 60255-5
4.2.10. Impulse Voltage test level as per IEC 60255-5
5.0. Whether all software and hardware required for
carrying out logic, setting changes and fault
diagnosis are included in the scope of supply?
5.1. Whether carrying out all settings and submission of
relevant documents as per specification included in
the scope of supply?
5.2. Whether training of PURCHASER‟s personnel
included in the scope of supply?
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
S.No Particulars Value
6.0. Control /Signal Cables
6.1. Voltage Grade
6.2. Conductor material for each type of control cable
6.3. Conductor Size for each sizes and no. Of cores
provided
6.4. Insulation material
6.5. For prefabricated pulse cables
6.6. For control cable
6.7. Reference Standard
7.0. Constructional details of cubicles
7.1. Thickness of sheet steel provided for frames, load
bearing members and doors
7.2. Covers, partitions and other non-load bearing
members.
7.3. Painting and pre treatment process adopted
7.4. Minimum thickness of phosphate provided
7.5. Minimum thickness of painting
8.0. General information
8.1. Whether panels are designed to qualify for the
seismic accelerations given in spectra?
8.2. Whether the tenderer has supplied similar equipment
to any plant located in an area subjected to the
seismic events of the same magnitude or higher and
equipment have performed satisfactorily during such
events.
8.3. Whether the tenderer has carried out seismic tests on
similar equipment to prove their seismic withstand
capability.
8.4. Whether the tenderer has carried out seismic
analysis to determine seismic withstand capability.
8.5. Mean Time Between Failure (MTBF), Mean Time
to Repair (MTTR)
8.6. Recommended Test Frequency
8.7. Impact of ageing on equipment performance
8.8. Life in terms of
(1) Number of cycles of operation
(2) Years of operation.
8.9. Recommended calibration frequency of relays,
meters
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
Annexure-VII
DELIVERY SCHEDULE AND TERMS OF THE PAYMENT
Delivery schedule:
The time schedule given below is indicative. The actual schedule shall be drawn up by the
contractor at the time of bidding, which should be less than or equal to mentioned in delivery
schedule: (LD would be applicable for if bidder fail to supply within Expected Milestone Activity
Delivery schedule)
Sl.
No.
Particulars Expected Milestone Activity
Delivery schedule
Supplier’s
compliance in Y/N
or Months
1 Supply of all AVR at
RAPS site (All the supply
items as per purchase
order)
18 months from placement of PO
including IV&V at factory, type
test and seismic test for this tender.
2 Erection &
commissioning with
IV&V at site of new
AVRs along with removal
of old AVR.
A. To be completed within 24
months from date of
placement of PO
B. Erection and all
commissioning related to
any one AVR is be
completed within 5 days
(120 hrs) of front given by
NPCIL (providing work
permit)
Terms of the payment:
1. For Supply item:
i. 70% payment on material received and accepted at site.
ii. 20% on submission of completion certificate for respective AVR
commissioning at site.
iii. Remaining 10 % on completion of complete PO.
2. For testing (Seismic ,Type test, IV &V at factory) : On Successful completion of the testing and submission of the report to EIC,
Completion certification for the item will be issued by EIC. 100% payment
will be done as per PO on submission of Completion certification.
NUCLEAR POWER CORPORATION OF INDIA LTD.
TECHNICAL SPECIFICATION FOR
REPLACEMENT OF AVR FOR EMERGENCY DIESEL GENERATOR
TECHNICAL SPECIFICATION
3. For Task Activities: (Item No. 2)
i. 90% payment on submission of completion certificate for respective
AVR.
ii. Remaining 10 % on completion of complete PO.
WARRANTY:
18 months from material supply (From date of receipt of last lot) or 12 month from
date of completion of PO in all respect.
LIQUIDATED DAMAGES:
1. In case of the delay in supply of new AVR, LD will be levied as per
Purchase order value for the supply item including testing‟s (Type test , IV&V at
factory and seismic test).
2. In case of delay in completion of task activities (including
erection/commissioning) as per scope of the work, LD would be levied on
Purchase order value for same job.