28
Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME Walter Freitag - ME Jason Zion - ME Luis Garcia - EE IE ME EE

Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Embed Size (px)

DESCRIPTION

Team Valeo. Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME Walter Freitag - ME Jason Zion - ME Luis Garcia - EE. Hydraulic Fan Motors. Who uses them? Why are they used? How are they built?. Needs Assessment. QPH (9) - PowerPoint PPT Presentation

Citation preview

Page 1: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Team MembersStefan Enjem – ISE

Joe Van Hofwegen - ISEYoung Lee - ISEJoe Pecht - ME

Walter Freitag - MEJason Zion - MELuis Garcia - EE

IEIE

MEMEEEEE

Page 2: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Hydraulic Fan Motors

Who uses them? Why are they used? How are they built?

Page 3: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Needs Assessment

QPH (9)4 to 6% Increase in Production2 year paybackSafety and Quality

Page 4: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Organization

Scope and Resource DistributionWork Breakdown Structure

SchedulingGantt Chart

CommunicationYahoo Web Group

Page 5: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Deliverables

Standardized Procedures

Preventative Maintenance

Set Production Guidelines

Fix Problematic Stations

End of Line Tester Efficiency

Identify improved system configurations

Page 6: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Organizational Structure

Project ManagerStefan Enjem

ProceduresJason Zion

Problem Stations

Joe Pecht

EOLTWalter Freitag

Simulation Joe VH

Data AnalysisYoung Lee

ControlsLuis Garcia

Page 7: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Data Collection and Analysis

Data Collection

Motor Counters

EOLT Data Sheets

Cycle Time

Historical Data

Page 8: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Bottleneck Identification Histogram shows major sources of backup

0

10

20

30

40

50

60

90 100

110A

110B

120A

120B 13

0

140A

140B

150A

150B 16

0

170A

170B 18

0

190

200A

200B 20

5

210

230A

230B

EO

L

Station

Cy

cle

Tim

e (

se

co

nd

s)

Direction of Assembly

Manual

Automated

Page 9: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Micro-stop

Micro stop = Downtime of less than 5 minutes

0

50

100

150

200

250

300

350

400

450

Station 210 Station 140 Station 230 Station 200 Station 170

Station

Freq

uenc

y of

Mic

rost

op

(app

rox

6 w

eeks

)

Cumulative Sum

Page 10: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Industrial Standards

Clean RoomCertified Class 100,000

QS 9000Quality standard TS 16949

Valeo Union Standard423 minutes per shift

Ergonomic Guidelines

Page 11: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Detailed ProceduresStandard Procedures

Worker Rotation Failure Response Plan

Page 12: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Manual Stations

Current Problems

Concept for Improvements

Expected Improvements

Station 90 Station 160

Page 13: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Preventative Maintenance

Creation of a Preventative Maintenance Schedule

Page 14: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Station 210

• Current ProblemsCamera for Optical Test

Leak Test Connectors

Page 15: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

•Concepts for Improvement–Mirror

–PM on Rubber Connectors

•Expected Improvements–Reduction in Downtime

Rubber Connectors

Station 210

Page 16: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

End of Line Tester

Function Current Problems Feasibility of

Concepts

Page 17: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Mounting Concept

Linear Slide Mount

Page 18: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Mating Concept

Modified Assembly Cell Balancer

Page 19: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Technical Analysis

FEA Air Cylinder Sizing Expected

Improvements

Page 20: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Arena Simulation – Our Test Plan

Analyze system as a whole Identify optimal system configuration and

alternatives Using pallets, conveyor speed, queue sizes

Justify Improvements

Qualifier Improvement Winner Improvement4% 8%

Page 21: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Cost Analysis of Total System

Improvement Cost OT Saved (After 2yrs)Total 61,347.00$ 157,831.80$

• Estimated Cost Analysis

Interest Rate 5%

Total Cost ($61,347.00)Return After 1 Year 78,915.90$ Return After 2 Years 157,831.80$

Net Present Value $81,323.85

• Net Present Value

Page 22: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Future of Project Engineering Models Head start

Simulation Stations

Detailed Design Meet the Goal

Page 23: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Backup - Bill of Materials Bill of Materials*

Station Part # Quantity Unit Description Production

Board 518936 1 Each 3' by 5" Dry erase Board

1 Each 1foot of stock aluminum 2 Each Machined steel block to hold marker cap Station 160 3 Each Bracket Hardware to support cap holder

INRD-50 1 Each DVT Doal light source, 50mm

INOO-S12 1 Each DVT Doal light source Power Supply Station 210 1 Each Rubber connector

- - Required Mounting Hardware

EOLT FO-501.500 4 Each Bimba Pnuematic Air Cylinder 2 Each Custom Motor Mounting Plate 2 Each Custom 1/2" Motor Mounting Bracket 2 Each Custom 3/4" Motor Mounting Bracket 2 Each Custom 1" Motor Mounting Bracket

MM-C

6498K266 6 Each Spring-Return Pivot-Mount Cylinder --------- 2 Each Press Fit Connector Assembly 2 Each Custom Connector Base Plate 2 Each Custom Connector Plate - - Required Hydraulic/Pneumatic Plumbing - - Require Mounting Hardware

5 Each EDI Digital counters Timer

5 Each EDI Mounting brackets for timer * Tentative Bill of Material Station 90: Cavalry Automation Systems has been awarded the contract to implement The improvements being made to this system at a cost of $6,910.

Page 24: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Backup - RegressionManpower vs. Motors Out

y = -10.49x2 + 107.09x + 35.586R2 = 0.4265

0

50

100

150

200

250

300

350

400

450

500

1 2 3 4 5 6 7 8

Manpower

Mo

tors

Ou

t

Manpower vs. QPH y = 1.8564x2 - 30.104x + 160.97

R2 = 0.5938

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

160.00

180.00

200.00

0 1 2 3 4 5 6 7 8

Manpower

QP

H

Page 25: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Backup – Bottleneck RankBottleneck Ranks

Rank Station Avg Cycle Time

1 EOL 44.07

2 90 36.93

3 160 35.48

4 100 22.18

5 170A 21.17

6 140A 20.85

7 200B 20.80

8 110B 20.50

9 120B 19.66

10 210 17.71

11 140B 17.20

12 180 16.85

13 205 16.69

14 120A 15.86

15 150B 15.07

16 190 15.01

17 200A 14.94

18 110A 14.88

19 150A 12.95

20 170B 11.65

21 230B 11.48

22 230A 10.78

23 130 6.29

Page 26: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Backup - WBS

Page 27: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Backup –Gantt Chart

Page 28: Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME

Backup – Counter DataMotor Count Log

Date Shift Motors

Out

Motors Back

In Total Manpower QPPH

1/26/03 B 54 4 50 2 3.55 1/27/03 A 237 0 237 7 4.80 1/27/03 B 246 1 245 2 17.38 1/28/03 A 280 2 278 7 5.63 1/28/03 B No Info No Info 1/29/03 A 172 3 169 6 4.00 1/29/03 B 210 2 208 2 14.75 1/30/03 A 310 3 307 5 8.71 1/30/04 B 234 1 233 2 16.52 1/31/04 A 121 1 120 4 4.26 2/1/04 A 94 1 93 4 3.30 2/1/04 B No Info No Info 2/2/04 A 245 3 242 7 4.90 2/2/04 B 90 2 88 1 12.48 2/3/04 A 322 5 317 7 6.42 2/3/04 B 138 5 133 2 9.43 2/4/04 A 400 4 396 7 8.02 2/4/04 B 163 3 160 2 11.35 2/5/04 A 432 3 429 7 8.69 2/5/04 B 151 5 146 2 10.35

Average 216.61 2.67 213.94 4.22 8.59