HANDOVER DOCUMENT TASNEE UPGRADE – ODC – PP From Madhavan Krishnamoorthy to Shivanand 09/04/2008 Module: PRODUCTION PLANNING Document Details Project Name TASNEE Customer TASNEE Current Version 4.7 Handed over By Handed Over to Name Signature Name Signature Madhavan Krishnamoorthy Signed Shivanand Signed Prepared by/Date Reviewed by/Date Approved by/Date Madhavan Krishnamoorthy 09/04/2008 PP - Handover Document Page 1 of 9

TASNEE Handover Document

Embed Size (px)

Citation preview

Page 1: TASNEE Handover Document

HANDOVER DOCUMENT TASNEE UPGRADE – ODC – PP From Madhavan Krishnamoorthy to Shivanand 09/04/2008 Module: PRODUCTION PLANNING

Document Details

Project Name TASNEE

Customer TASNEE

Current Version 4.7

Handed over By Handed Over to

Name Signature Name Signature

Madhavan Krishnamoorthy

Signed Shivanand Signed

Prepared by/Date Reviewed by/Date Approved by/Date

Madhavan Krishnamoorthy 09/04/2008

PP - Handover Document Page 1 of 8

Page 2: TASNEE Handover Document

HANDOVER DOCUMENT TASNEE UPGRADE – ODC – PP From Madhavan Krishnamoorthy to Shivanand 09/04/2008 Module: PRODUCTION PLANNING

Table of contents

1 OBJECTIVE 3

2 ISSUES (PENDING ISSUES) 4

3 DOCUMENTS HANDEDOVER 5

4 USER ID WITH PASSWORDS 6

5 Conclusion 7

PP - Handover Document Page 2 of 8

Page 3: TASNEE Handover Document

HANDOVER DOCUMENT TASNEE UPGRADE – ODC – PP From Madhavan Krishnamoorthy to Shivanand 09/04/2008 Module: PRODUCTION PLANNING

1 Objective

To successfully handover the roles and responsibilities of Madhavan Krishnamoorthy to Mr. Shivanand

The following activities were carried out as part of the handover and KT:

1. Unit Testing and Integration Testing documents were gone through by Mr.Shivanand; this was followed up with testing of the same in Tasnee SAP server for better understanding.

2. Delta training document was read through with reference to SAP transactions.3. All BPP documents were glanced through to ensure that all transactions were

covered.4. All the user id and passwords for SAP access to Tasnee servers were handed over.

PP - Handover Document Page 3 of 8

Page 4: TASNEE Handover Document

HANDOVER DOCUMENT TASNEE UPGRADE – ODC – PP From Madhavan Krishnamoorthy to Shivanand 09/04/2008 Module: PRODUCTION PLANNING

PP - Handover Document Page 4 of 8

Page 5: TASNEE Handover Document

HANDOVER DOCUMENT TASNEE UPGRADE – ODC – PP From Madhavan Krishnamoorthy to Shivanand 09/04/2008 Module: PRODUCTION PLANNING

2 Issues (pending Issues)

Nil

PP - Handover Document Page 5 of 8

Page 6: TASNEE Handover Document

HANDOVER DOCUMENT TASNEE UPGRADE – ODC – PP From Madhavan Krishnamoorthy to Shivanand 09/04/2008 Module: PRODUCTION PLANNING

3 Documents handed over

The soft copies of the following documents have been handed over to him with explanation to them all (these are the deliverables expected from the functional consultant for Tasnee project from the on-site Project Manager):

1. Completed Unit Testing documents for PP module2. Completed Integration Testing documents for PP module3. Delta Training document for PP module4. BPP (Business Process Procedure) documents for all transactions for PP module.

PP - Handover Document Page 6 of 8

Page 7: TASNEE Handover Document

HANDOVER DOCUMENT TASNEE UPGRADE – ODC – PP From Madhavan Krishnamoorthy to Shivanand 09/04/2008 Module: PRODUCTION PLANNING

4 User id with passwords

Client login information

TASNEE

TASNEE – 4.7(no more available) Client 400 username – ppsupport password – Tasnee@1TASNEE – Development ECC 6.0 Client 400 username – joshiv password – Tasnee@1TASNEE - Quality ECC 6.0 Client400 username – joshiv password – Tasnee@1

PP - Handover Document Page 7 of 8

Page 8: TASNEE Handover Document

HANDOVER DOCUMENT TASNEE UPGRADE – ODC – PP From Madhavan Krishnamoorthy to Shivanand 09/04/2008 Module: PRODUCTION PLANNING

5 Conclusion

As of date, all the necessary deliverables for Tasnee project have been submitted to the Project Manager and he has approved all of them and there is no pending from PP side as of now.

This KT and handing over procedure ensures that the succeeding person can carry on with roles and responsibilities of PP module comfortably.