1 2 3 4 5 6 7 8 9 10 11 12 13ANALISA BANGUNAN 1 1 1 1 1 1 1 1 1 1 1 1 1
No Bahan
Gal Pondasi Urugan Tanah Urugan Pasir Aanstamping Pas. Batu Kali 1:4 Pas.Batu Bata 1/2, 1:4 Plester Dinding 1:4 Acian Dinding Beton Sloof 15/20 Cat Dinding
VolumeKoef
M3Koef
M3Koef
Vol M3Koef
Vol M3Koef
Vol M3Koef
Vol M2Koef
Vol M2Koef
Vol M2Koef
M2Koef
Vol M2Koef
Vol M2
17.20 12.00 0.00 0.16 17.20 29.80 0.00 0.00 61.20 0.00 0.001 - 6.1/41 2 - 6.9e/101 3 - 6.11/113 4 - 6.9/221 5 - 6.2/181 8 - 6.9/598 9 - 6.4/745 10 - 6.27/852 11 - 6.35/455 34 - 6.54b/1371 35-6.14/2441
1 Batu Belah 0.00 0.00 0.00 1.20 0.19 1.20 20.64 0.00 0.00 0.00 0.00 0.00 0.00 20.83 M3
2 Pasir Pasang 0.00 0.00 0.00 0.00 0.52 8.94 0.043 1.28 0.024 0.00 0.00 0.018 1.10 0.018 0.00 0.00 11.33 M3
3 Kerikil Cor 2-3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.030 1.84 0.00 0.00 1.84 M3
4 Bata Merah 0.00 0.00 0.00 0.00 0.00 70.00 2,086 0 0.00 0.00 0.00 0.00 2,086.00 Bh
5 Semen PC 50 Kg 0.00 0.00 0.00 0.00 3.26 56.07 0.23 6.85 0.12 0.00 0.07 0.00 0.220 13.46 0.186 0.00 0.00 76.39 Zak
6 Besi Beton dia. 6 mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.140 8.57 0.00 0.00 8.57 Btg
7 Besi Beton dia. 10 mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.202 12.36 0.00 0.00 12.36 Btg
8 Kawat Bendrat 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.100 6.12 0.00 0.00 6.12 Kg
9 Paku 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.040 2.45 0.00 0.00 2.45 Kg
10 Papan Begisting 2/20-2 M 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.560 34.27 0.00 0.00 34.27 Lbr
11 Batu Alam 15 x 15 cm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 M2
12 Semen warna 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.94 0.00 0.00 0.00 Kg
13 Plamir Tembok 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.00 Kg
14 Cat Tembok 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 0.00 0.00 Kg
15 Kertas Gosok 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.00 Lbr
16
17 Pekerja 1.00 17.20 0.33 4.00 0.40 0.00 1.04 0.17 2.00 34.40 0.40 11.92 0.27 0.00 0.20 0.00 0.792 48.47 0.80 0.00 0.03 0.00 116.16 HOK
18 Tukang batu 0.00 0.00 0.00 0.00 0.00 0.00 0.52 0.08 0.80 13.76 0.13 3.97 0.20 0.00 0.13 0.00 0.088 5.39 0.00 0.00 0.08 0.00 23.20 HOK
19 Tukang kayu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.088 5.39 0.60 0.00 0.00 0.00 5.39 HOK
20 Tukang besi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.088 5.39 0.00 0.00 0.00 0.00 5.39 HOK
Batu Alam 15 x 15 warna
13 14 15 16 17 18 19 20 21 22 23 24 25 261 1 1 1 1 1 1 1 1 1 1 1 1
26 27 28 29 30 31 32 33 34 35 36 37 38 391 1 1 1 1 1 1 1 1 1 1 1 1
39 40 41 42 43 44 451 1 1 1 1 1
54 #REF!
#REF!
6
RENCANA ANGGARAN BIAYA
Propinsi : Jawa Timur No. RAB : 01Kabupaten : Banyuwangi Program : PNPM-Pariwisata 2009Kecamatan : Glagah Jenis Kegiatan : Pemb.Pintu GerbangDesa : KEMIREN Ukuran / dimensi :
UraianVolume
Satuan SWADAYATotal Swadaya
B A H A N
1 Batu Belah 34.4 0.0 34.4 M3 85,000 2,923,150 0 2 Pasir Pasang 25.9 0.0 25.9 M3 95,200 2,466,632 0 3 Kerikil Cor 2-3 1.4 0.0 1.4 M3 165,000 232,650 0 4 Bata Merah 10,486.0 0.0 10,486.0 Bh 370 3,879,820 0 5 Semen PC 50 Kg 165.7 0.0 165.7 Zak 52,500 8,699,775 0 6 Besi Beton dia. 6 mm 18.8 0.0 18.8 Btg 27,500 515,625 0 7 Besi Beton dia. 10 mm 18.8 0.0 18.8 Btg 65,000 1,218,750 0 8 Kawat Bendrat 4.7 0.0 4.7 Kg 20,000 93,800 0 9 Paku 1.9 0.0 1.9 Kg 14,000 26,320 0 10 Papan Begisting 2/20-2 M 46.9 0.0 46.9 Lbr 12,000 562,560 0 11 Batu Alam 15 x 15 cm 45.6 0.0 45.6 M2 79,875 3,642,300 0 12 Semen warna 0.0 0.0 0.0 Kg - 0 0 13 Plamir Tembok 7.6 0.0 7.6 Kg 7,000 53,060 0 14 Cat Tembok 27.2 0.0 27.2 Kg 15,000 408,300 0 15 Kertas Gosok 7.6 0.0 7.6 Lbr 2,500 18,900 0 16 Papan Proyek 1.0 0.0 1.0 Unit I.c 200,000 200,000 0 17 Prasasti 1.0 0.0 1.0 Unit I.c 300,000 300,000 0
Sub Total 1 25,241,642 0 UPAH
1 Pekerja 282.0 80.0 202.0 HOK 25,000 5,049,250 2,000,000 2 Tukang 121.3 70.0 51.3 HOK 35,000 1,795,850 2,450,000
Sub Total 2 6,845,100 4,450,000 KONSTUKSI 0
1 Kontruksi Reklame 10.0 10.0 M' 590,000 5,900,000 0 Sub Total 3 5,900,000 0
TOTAL 37,986,742 4,450,000
Sumber Dana
Dari PNPM - MP 37,986,742 Swadaya 4,450,000
Swadaya Uang 0 Total 42,436,742
JUMLAH DIBULATKAN 42,400,000
Kategori Biaya
Harga Satuan (Rp)
Jumlah (Rp)Dana
PNPM MP
HARGA SATUAN BAHAN-ALAT DAN UPAH KERJA
Propinsi : Jawa TimurKabupaten : BanyuwangiKecamatan : GlagahDesa : Kemiren
Uraian Satuan Harga Satuan (Rp)
B A H A N1 Batu Belah M3 85,000 2 Pasir Pasang M3 95,200 3 Kerikil Cor 2-3 M3 165,000 4 Bata Merah Bh 370 5 Semen PC 50 Kg Zak 52,500 6 Besi Beton dia. 6 mm Btg 27,500 7 Besi Beton dia. 10 mm Btg 65,000 8 Kawat Bendrat Kg 20,000 9 Paku Kg 14,000
10 Papan Begisting 2/20-2 M M2 12,000 11 Batu Alam 15 x 15 cm M2 79,875 12 Semen warna Kg - 13 Plamir Tembok Kg 7,000 14 Cat Tembok Kg 15,000 15 Kertas Gosok Lbr 2,500 16 Papan Proyek Unit 200,000 17 Prasasti Unit 300,000
UPAH1 Pekerja HOK 25,000 2 Tukang HOK 35,000
KONSTRUKSI1 Kontruksi Reklame Unit 5,900,000
Kemiren, Oktober 2009Mengetahui
Fasilitator KETUA TPK
BAGUS PRATAMA NURDIANTO
HARGA SATUAN BAHAN-ALAT DAN UPAH KERJA
HASIL KESEPAKATAN HARGA SATUAN BAHAN
Propinsi : Jawa TimurKabupaten : BanyuwangiKecamatan : GlagahDesa : Kemiren
Uraian Satuan
Harga satuan hasil survei
Pemasok - 1Nama :Alamat :Telp :
B A H A N1 Batu Belah M3 85,000 2 Pasir Pasang M3 95,200 3 Kerikil Cor 2-3 M3 165,000 4 Bata Merah Bh 370 5 Semen PC 50 Kg Zak 52,500 6 Besi Beton dia. 6 mm Btg 27,500 7 Besi Beton dia. 10 mm Btg 65,000 8 Kawat Bendrat Kg 20,000 9 Paku Kg 14,000
10 Papan Begisting 2/20-2 M M2 12,000 11 Batu Alam 15 x 15 cm M2 79,875 12 Semen warna Kg - 13 Plamir Tembok Kg 7,000 14 Cat Tembok Kg 15,000 15 Kertas Gosok Lbr 2,500 16 Papan Proyek Unit 200,000 17 Prasasti Unit 300,000
UPAH1 Pekerja HOK 25,000 2 Tukang HOK 35,000
KONSTRUKSI1 Kontruksi Reklame Unit 5,900,000
Kemiren, Oktober 2009Mengetahui
Fasilitator Ketua TPK
BAGUS PRATAMA NURDIANTO
Harga Satuan
Kabupaten
HASIL KESEPAKATAN HARGA SATUAN BAHAN
Kegiatan :
Tanggal Pelaksanaan Survei :
Harga satuan hasil survei Rekomendasi terendah yang di pilih bulan ini
Pemasok - 2 Pemasok - 3 Harga Satuan Nama PemasokNama : Nama : Nama :Alamat : Alamat : Alamat :Telp : Telp : Telp :
Kemiren, Oktober 2009
Ketua TPK
NURDIANTO
HASIL KESEPAKATAN HARGA SATUAN BAHAN
Propinsi : Jawa TimurKabupaten : BanyuwangiKecamatan : GlagahDesa : Kemiren
Uraian Satuan
Harga satuan hasil survei
Pemasok - 1Nama :Alamat :Telp :
B A H A N1 Batu Belah M3 85,000 2 Pasir Pasang M3 95,200 3 Kerikil Cor 2-3 M3 165,000 4 Bata Merah Bh 370 5 Semen PC 50 Kg Zak 52,500 6 Besi Beton dia. 6 mm Btg 27,500 7 Besi Beton dia. 10 mm Btg 65,000 8 Kawat Bendrat Kg 20,000 9 Paku Kg 14,000
10 Papan Begisting 2/20-2 M M2 12,000 11 Batu Alam 15 x 15 cm M2 79,875 12 Semen warna Kg - 13 Plamir Tembok Kg 7,000 14 Cat Tembok Kg 15,000 15 Kertas Gosok Lbr 2,500 16 Papan Proyek Unit 200,000 17 Prasasti Unit 300,000
UPAH1 Pekerja HOK 25,000 2 Tukang HOK 35,000
KONSTRUKSI1 Kontruksi Reklame Unit 5,900,000
Kemiren, Oktober 2009Mengetahui
Fasilitator Ketua TPK
BAGUS PRATAMA NURDIANTO
Harga Satuan
Kabupaten
HASIL KESEPAKATAN HARGA SATUAN BAHAN
Kegiatan :
Tanggal Pelaksanaan Survei :
Harga satuan hasil survei Rekomendasi terendah yang di pilih bulan ini
Pemasok - 2 Pemasok - 3 Harga Satuan Nama PemasokNama : Nama : Nama :Alamat : Alamat : Alamat :Telp : Telp : Telp :
Kemiren, Oktober 2009
Ketua TPK
NURDIANTO
HASIL KESEPAKATAN HARGA SATUAN BAHAN
Propinsi : Jawa TimurKabupaten : BanyuwangiKecamatan : GlagahDesa : Kemiren
Uraian Satuan
Harga satuan hasil survei
Pemasok - 1Nama :Alamat :Telp :
B A H A N1 Batu Belah M3 85,000 2 Pasir Pasang M3 95,200 3 Kerikil Cor 2-3 M3 165,000 4 Bata Merah Bh 370 5 Semen PC 50 Kg Zak 52,500 6 Besi Beton dia. 6 mm Btg 27,500 7 Besi Beton dia. 10 mm Btg 65,000 8 Kawat Bendrat Kg 20,000 9 Paku Kg 14,000
10 Papan Begisting 2/20-2 M M2 12,000 11 Batu Alam 15 x 15 cm M2 79,875 12 Semen warna Kg - 13 Plamir Tembok Kg 7,000 14 Cat Tembok Kg 15,000 15 Kertas Gosok Lbr 2,500 16 Papan Proyek Unit 200,000 17 Prasasti Unit 300,000
UPAH1 Pekerja HOK 25,000 2 Tukang HOK 35,000
KONSTRUKSI1 Kontruksi Reklame Unit 5,900,000
Kemiren, Oktober 2009Mengetahui
Fasilitator Ketua TPK
BAGUS PRATAMA NURDIANTO
Harga Satuan
Kabupaten
HASIL KESEPAKATAN HARGA SATUAN BAHAN
Kegiatan :
Tanggal Pelaksanaan Survei :
Harga satuan hasil survei Rekomendasi terendah yang di pilih bulan ini
Pemasok - 2 Pemasok - 3 Harga Satuan Nama PemasokNama : Nama : Nama :Alamat : Alamat : Alamat :Telp : Telp : Telp :
Kemiren, Oktober 2009
Ketua TPK
NURDIANTO
PROGRAM NASIONAL PEMBERDAYAN MASYARAKAT - PARIWISATA TAHUN 2009KECAMATAN GLAGAH KABUPATEN BANYUWANGI
RINCIAN PENGGUNAAN DANA
DESA : KEMIREN DANA : Rp 37,986,700 JENIS KEGIATAN : PEMBANGUNAN GAPURA ( PINTU GERBANG )VOLUME : 1 UNIT TOTAL BIAYA : Rp 37,986,700
NO Uraian
RENCANA ANGGARAN BIAYA REALISASI PENGGUNAAN DANA SISA
Ket
Volume
Satuan s/d Tahap Lalu Tahap Ini Jumlah (Rp) Volume Jumlah (Rp)
Total
Dari Dana
1 2 3 4 5 6 7 8 = 5 x 7 9 10 11 = 9 + 10 12 13 = 10 x 12 14 = 11 x 12 15 = 5 - 11 16 = 8 - 14 17BAHAN
1 Batu Belah 34.4 0.0 34.4 M' 85,000 2,923,150 - 20.8 20.8 70,000 1,458,100 1,458,100 13.6 1,465,050 2 Pasir Pasang 25.9 0.0 25.9 Bh 95,200 2,466,632 - 16.8 16.8 80,000 1,344,000 1,344,000 9.1 1,122,632 3 Kerikil Cor 2-3 1.4 0.0 1.4 Bh 165,000 232,650 - 1.8 1.8 165,000 303,600 303,600 -0.4 (70,950)4 Bata Merah 10,486.0 0.0 10,486.0 Bh 370 3,879,820 - 6,000.0 6,000.0 370 2,220,000 2,220,000 4486.0 1,659,820 5 Semen PC 50 Kg 165.7 0.0 165.7 Bh 52,500 8,699,775 - 70.0 70.0 52,500 3,675,000 3,675,000 95.7 5,024,775 6 Besi Beton dia. 6 mm 18.8 0.0 18.8 Bh 27,500 515,625 - 32.0 32.0 18,000 576,000 576,000 -13.3 (60,375)7 Besi Beton dia. 10 mm 18.8 0.0 18.8 Bh 65,000 1,218,750 - 39.0 39.0 33,000 1,287,000 1,287,000 -20.3 (68,250)8 Kawat Bendrat 4.7 0.0 4.7 Bh 20,000 93,800 - 1.0 1.0 15,000 15,000 15,000 3.7 78,800 9 Paku 1.9 0.0 1.9 Bh 14,000 26,320 - 1.0 1.0 14,000 14,000 14,000 0.9 12,320
10 Papan Begisting 2/20-2 M 46.9 0.0 46.9 Bh 12,000 562,560 - 26.0 26.0 12,000 312,000 312,000 20.9 250,560 11 Batu Alam 15 x 15 cm 45.6 0.0 45.6 Bh 79,875 3,642,300 - 0.0 - 79,875 0 0 45.6 3,642,300 12 Semen warna 0.0 0.0 0.0 Bh - 0 - 0.0 - - 0 0 0.0 - 13 Plamir Tembok 7.6 0.0 7.6 Bh 7,000 53,060 - 0.0 - 7,000 0 0 7.6 53,060 14 Cat Tembok 27.2 0.0 27.2 Bh 15,000 408,300 - 0.0 - 15,000 0 0 27.2 408,300 15 Kertas Gosok 7.6 0.0 7.6 Bh 2,500 18,900 - 0.0 - 2,500 0 0 7.6 18,900 16 Papan Proyek 1.0 0.0 1.0 Bh 200,000 200,000 - 0.0 - 200,000 0 0 1.0 200,000 17 Prasasti 1.0 0.0 1.0 Bh 300,000 300,000 - 0.0 - 300,000 0 0 1.0 300,000
Sub Total 1 = 25,241,642 11,204,700 11,204,700 14,036,942 UPAH
1 Pekerja 282.0 80.0 202.0 HOK 25,000.0 5,049,250 72.0 72.0 22,500.0 1,620,000 1,620,000 130.0 3,429,250 2 Tukang 121.3 70.0 51.3 HOK 35,000.0 1,795,850 36.0 36.0 30,000.0 1,080,000 1,080,000 15.3 715,850
Sub Total 3 = 6,845,100 2,700,000 2,700,000 4,145,100 LAIN-LAIN
1 Konstruksi 10.0 10.0 590,000 5,900,000 0.0 536,000 0 0 5,900,000
Sub Total 4 5,900,000 0 0 5,900,000
Jumlah Total 37,986,742 13,904,700 13,904,700 24,082,042 JUMLAH DIBULATKAN 37,986,700 13,904,700 13,904,700 24,082,000
Kemiren, 05 Desember 2009Mengetahui Disetujui Dibuat OlehFasilitator KETUA TPK Kepala Desa KOORDINATOR KELOMPOK
BAGUS PRATAMA NURDIANTO A. A. Tahrim S. Ag AHMAD SUGITO
Harga Satuan (Rp)
Jumlah Total (Rp)
Jumlah Komulatif
Harga Satuan (Rp)
Jumlah Komulatif (Rp)
Dari Swaday
a
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN DANA
DESA : KEMIRENJENIS KEGIATAN : PELENGSENGANVOLUME : 1 UNIT
NO Uraian RENCANA ANGGARAN BIAYA
Volume Satuan
Total1 2 3 4 5 6 = 3 x 5
BAHAN
1 Batu Belah 128.0 M3 70,000 8,960,000
2 Pasir Pasang 88.0 M3 80,000 7,040,000
3 Kerikil Cor 2-3 4.0 M3 175,000 700,000
4 Semen PC 50 Kg 212.0 Zak 55,000 11,660,000
5 Besi Beton dia. 12 mm 76.0 Lonjor 52,000 3,952,000
6 Kawat Bendrat 10.0 Kilogram 20,000 200,000
7 Papan Begisting 2/20-3 M 20.0 Buah 30,000 600,000
8 Usuk 5/7-2M 5.0 Lonjor 19,000 95,000
Sub Total 1 = 33,207,000
ALAT - ALAT
1 Arco 1.0 Unit 280,000 280,000
2 Cangkul 3.0 Buah 50,000 150,000
3 Sekrop 2.0 M3 40,000 80,000
4 Timba 17.0 Buah 4,000 68,000
5 Benang 15.0 Buah 1,000 15,000
Sub Total 2 = 593,000
Jumlah Total 33,800,000
KETUA TPK
NURDIANTO
Harga Satuan (Rp)
Jumlah Total (Rp)
PROGRAM NASIONAL PEMBERDAYAN MASYARAKAT - PARIWISATA TAHUN 2009
KECAMATAN GLAGAH KABUPATEN BANYUWANGI
RINCIAN PENGGUNAAN DANA
DESA : KEMIREN
JENIS KEGIATAN : PEMBANGUNAN GAPURA ( PINTU GERBANG )
VOLUME : 1 UNIT
NO Uraian
RENCANA ANGGARAN BIAYA
Volume Satuan Harga Satuan (Rp) Jumlah Total (Rp)
Total
1 2 3 4 5 6 = 3 x 5
ALAT - ALAT
1 Arco 1.0 Unit 280,000 280,000
2 Cangkul 3.0 Bh 50,000 150,000
3 Sekrop 2.0 M3 40,000 80,000
4 Timba 17.0 Bh 4,000 68,000
5 Benang 15.0 Bh 1,000 15,000
Jumlah Total 593,000JUMLAH DIBULATKAN 33,800,000
KETUA TPK
NURDIANTO
SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU
KEC. BANYUWANGI – KAB. BANYUWANGI
PENERIMAAN
NO Uraian Jumlah Total (Rp) NO
1 2 3 1
1 Terima uang dari Bupati 36,000,000
1
2
3
4
5
Jumlah 36,000,000 Jumlah
SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU
KEC. BANYUWANGI – KAB. BANYUWANGI
PENERIMAAN
NO Uraian Jumlah Total (Rp) NO
1 2 3 1
1 Terima uang dari Bupati 75,000,000
1
2
3
4
5
6
Jumlah 75,000,000 Jumlah
SANGGAR SENI ” PELANGI BUDAYA ”LINGKUNGAN KRAJAN RT.005 RW.001 KELURAHAN KALIPURO
KEC. KALIPURO – KAB. BANYUWANGI
PENERIMAAN
NO Uraian Jumlah Total (Rp) NO
1 2 3 1
1 Terima uang dari Bupati 20,000,000
1
2
3
4
5
6
7
Jumlah 20,000,000 Jumlah
SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU
KEC. BANYUWANGI – KAB. BANYUWANGI
Uraian Jumlah Total (Rp)
2 3
Transportasi 2 bus AKAS @ Rp 5.000.000 10,000,000
Honor 84 orang @ Rp 200.000 16,800,000
Transport Latihan 84 orang @ Rp 10.000 X 5 Pertemuan 4,200,000
Mamirat latihan 84 orang @ Rp 5.000 X 5 Pertemuan 2,100,000
Pembuatan Mobil Hias 2,900,000
Jumlah 36,000,000
SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU
KEC. BANYUWANGI – KAB. BANYUWANGI
Uraian Jumlah Total (Rp)
2 3
Pembuatan Passport, Visa dan Tiket 64,000,000
Honor 3 orang @ Rp 2.000.000 6,000,000
Transportasi ke Bandara Bali PP 2,000,000
Pembuatan Jas Batik 3 Stel @ Rp 750.000 2,250,000
Mamirat Latihan 3 bungkus @ Rp 5.000 X 10 150000
Transport latihan 3 orang @ Rp 20.000 X 10 600,000
Jumlah 75,000,000
SANGGAR SENI ” PELANGI BUDAYA ”LINGKUNGAN KRAJAN RT.005 RW.001 KELURAHAN KALIPURO
KEC. KALIPURO – KAB. BANYUWANGI
Uraian Jumlah Total (Rp)
2 3
Honor 25 Orang @ Rp 300.000 7,500,000
Mamirat Latihan 25 bungkus @ Rp 10.000 X 5 1,250,000
Transport latihan 25 orang @ Rp 20.000 X 5 2,500,000
Transport Bus 5,000,000
Sewa Pakaian 25 Stel @ Rp 50.000 1250000
Mamirat Perjalanan 25 bungkus @ Rp. 10.000 X 2 500,000
Honor Perias 4 orang @ Rp 500.000 2,000,000
Jumlah 20,000,000
7500000
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN UNTUK BAHAN
DESA : KEMIRENPENGADAAN BAHAN : BATU BELAH
VOLUME
NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH
1 29 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
2 29 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
3 29 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
4 29 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
5 29 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
6 29 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
7 29 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
8 29 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
9 29 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
10 29 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
11 29 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
12 30 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
13 30 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
14 30 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
15 30 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
16 30 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
17 30 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
18 30 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
19 30 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
20 30 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
21 30 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
22 31 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
23 31 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
24 31 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
25 31 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000
26 31 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
27 31 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
28 31 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
29 31 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000
30 31 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
31 31 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
32 31 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000
Jumlah 128 Rp 8,960,000
KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS
Duren Abang
NURDIYANTO AHMAD SUGITO
: 128 M3
HARGA SATUAN
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN UNTUK BAHAN
DESA : KEMIRENPENGADAAN BAHAN : PASIR PASANG
VOLUME
NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH
1 29 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000
2 29 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000
3 29 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000
4 29 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000
5 29 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000
6 29 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000
7 29 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000
8 30 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000
9 30 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000
10 30 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000
11 30 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000
12 30 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000
13 30 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000
14 30 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000
15 30 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000
16 31 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000
17 31 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000
18 31 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000
19 31 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000
20 31 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000
21 31 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000
22 31 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000
Jumlah 88 Rp 7,040,000
KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS
Duren Abang
NURDIYANTO AHMAD SUGITO
: 88 M3
HARGA SATUAN
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN UNTUK BAHAN
DESA : KEMIRENPENGADAAN BAHAN : KRIKIL COR 2-3
VOLUME
NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH
1 29 Desember 2009 MAD 4 Rp 175,000 Rp 700,000
Jumlah 4 Rp 700,000
KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS
Duren Abang
NURDIYANTO AHMAD SUGITO
: 4 M3
HARGA SATUAN
M3
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN UNTUK BAHAN
DESA : KEMIRENPENGADAAN BAHAN : SEMEN PC 50 KgVOLUME : 212 Zak
NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH
1 29 Desember 2009 Toko Bangunan 212 Zak Rp 55,000 Rp 11,660,000 Pondok Tresno
Jumlah 212 Rp 11,660,000
KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS
Duren Abang
NURDIYANTO AHMAD SUGITO
HARGA SATUAN
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN UNTUK BAHAN
DESA : KEMIRENPENGADAAN BAHAN : Besi Beton Diameter 12 mmVOLUME : 76 Lonjor
NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH
1 29 Desember 2009 Toko Bangunan 76 Lonjor Rp 52,000 Rp 3,952,000 Pondok Tresno
Jumlah 76 Rp 3,952,000
KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS
Duren Abang
NURDIYANTO AHMAD SUGITO
HARGA SATUAN
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN UNTUK BAHAN
DESA : KEMIRENPENGADAAN BAHAN : Kawat BendratVOLUME : 10 Kg
NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH
1 29 Desember 2009 Toko Bangunan 10 Kg Rp 20,000 Rp 200,000 Pondok Tresno
Jumlah 10 Rp 200,000
KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS
Duren Abang
NURDIYANTO AHMAD SUGITO
HARGA SATUAN
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN UNTUK BAHAN
DESA : KEMIRENPENGADAAN BAHAN : Papan Begisting 2/20-3 MVOLUME : 20 Buah
NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH
1 29 Desember 2009 Toko Bangunan 20 Buah Rp 30,000 Rp 600,000 Pondok Tresno
Jumlah 20 Rp 600,000
KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS
Duren Abang
NURDIYANTO AHMAD SUGITO
HARGA SATUAN
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN UNTUK BAHAN
DESA : KEMIRENPENGADAAN BAHAN : Usuk 5/7-2 MVOLUME : 5 Lonjor
NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH
1 29 Desember 2009 Toko Bangunan 5 Lonjor Rp 19,000 Rp 95,000 Pondok Tresno
Jumlah 5 Rp 95,000
KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS
Duren Abang
NURDIYANTO AHMAD SUGITO
HARGA SATUAN
KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI
RINCIAN PENGGUNAAN UNTUK ALAT - ALAT
DESA : KEMIRENJENIS KEGIATAN : PENGADAAN ALAT - ALATVOLUME : -
NO TANGGAL ALAT - ALAT VOLUME SATUAN JUMLAH
1 29 Desember 2009 Arco 1 Unit 280,000 Rp 280,000
Cangkul 3 Buah 50,000 Rp 150,000
Sekrop 2 M3 40,000 Rp 80,000
Timba 17 Buah 4,000 Rp 68,000
Benang 15 Buah 1,000 Rp 15,000
Jumlah 38 Rp 593,000
KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS
Duren Abang
NURDIYANTO AHMAD SUGITO
HARGA SATUAN
Rp 840,000 Rp 840,000 Rp 960,000 Rp 1,120,000 Rp 1,120,000 Rp 1,800,000 Rp 640,000
Rp 1,760,000
SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU
KEC. BANYUWANGI – KAB. BANYUWANGI
PENERIMAAN
NO Uraian Jumlah Total (Rp) NO
1 2 3 1
1 Terima uang dari Bupati 36,000,000 12345
Jumlah 36,000,000 Jumlah
SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU
KEC. BANYUWANGI – KAB. BANYUWANGI
Uraian Jumlah Total (Rp)
2 3
Transportasi 2 b 10,000,000Honor 84 orang @ 16,800,000Transport Latihan 4,200,000Mamirat latihan 8 2,100,000Pembuatan Mobil 2900000
Jumlah 36,000,000