40
SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE JUNE 3, 2019

SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

SUMTER DOWNTOWN MASTER PLAN

FINAL PLAN OPEN HOUSEJUNE 3, 2019

Page 2: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Agenda• Master Plan Process• Master Plan Highlights• Implementation Summary• Next Steps

Page 3: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

MASTER PLAN PROCESS

Page 4: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Scope

• Historically, Downtown Sumter has been the community’s center of commerce, education, law, healthcare, and government.

• A lot has happened in recent years: new county offices, a new hotel, and the Central Carolina Technical College Health Sciences Center.

• The City of Sumter wants to create a consensus-driven vision and “road map” to continue strengthening downtown’s role today and in the future.

Page 5: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Stud

y Ar

ea

Page 6: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Process

RESEARCH &

ANALYSISVISIONING

Existing Conditions

Previous Plan Review

Market Analysis

Stakeholder Interviews

Vision

Goals

Design Workshop

Create Recommendations

Create Action Plan

Final Open House

Presentation to City Council

(City of Sumter Planning

Department to do, if deemed

necessary)

DRAFT PLAN

FINAL PLAN

Page 7: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

MASTER PLAN HIGHLIGHTS

Page 8: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Vision

“This master plan builds on the historic character and

recent investment to create an inclusive, active, and

prosperous Downtown Sumter, making it the true heart of the

community.”

Page 9: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

GoalsDESIGN GOALS

Bring residents to Downtown Sumter

Make a more cohesive transportation network

Create usable and accessible park space

POLICY GOALSCreate an environment for a thriving commercial core

Bring the arts and community-serving agencies to Downtown

Ensure equitable opportunity and a community welcoming to all

Page 10: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Fram

ewor

k P

lan

Page 11: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Summary• Infill mixed-use development with a focus on adding residential units Downtown

• New office and retail space in renovated and new buildings

• Multi-purpose Downtown Civic Green

• Road diets on Bartlette, Calhoun, Harvin, Liberty, Sumter, Washington

• Intersection upgrades to increase pedestrian safety and make them ADA-compliant

Rec

omm

enda

tion

s

Page 12: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Con

cept

Pla

nA

B

C

D

E

F

W. Calhoun Street

Ma

in S

tre

et

Ha

rvin

Str

ee

t

Su

mte

r S

tre

et

Wa

shin

gto

n S

tre

et

Liberty Street

Bartlette Street

Prisma Health Tuomey Hospital

ParkingGarage

City Offices

CCTC

Sumter Opera House

Site-Specific Concept PlansMedical Offices

Downtown Civic Green

Neighborhood Transition

Student Living & CCTC Expansion

Offices & Missing Middle Housing

Adaptive Re-use for the Arts

LegendNew Buildings

Existing Buildings

Recent Projects

A

B

C

D

E

F

Page 13: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Land

Use

P

P

P

P

P

P

P

P

P

P P

P

P

P

James E. Clyburn Intermodal

Transportation Center

Hyatt Place

Prisma Health

Tuomey Hospital

Judicial Center

Library

CCTC

MA

IN S

TR

EE

T

HAMPTON AVENUE

LIBERTY STREET

CALHOUN STREET

WA

SH

ING

TO

N S

TR

EE

T

HA

RV

IN S

TR

EE

T

SU

MT

ER

ST

RE

ET

BARTLETTE STREET

OAKLAND AVENUE

Single-family houses

Townhouses

Multi-family units

Office

Commercial / retail

Mixed-use

Institutional

Park

New / Reconfigured Parking

Liner Buildings

P

Single-family units: 128Multi-family units: 163Townhouses: 135ADUs: 14

Offices: 93,400 SFRetail: 137,600 SF

Arts Center: 8,400 SFCCTC Exp.: 50,000 SFCounty Offices (relocated): 22,400 SFLibrary Exp.: 3,300 SF

Civic Green: 1.70 ACHistoric Courthouse Property: 1.20 AC

Total Residential: 440 units

Total Commercial: 231,000 SF

Total Institutional Space: 84,600 SF

Total Green Space: 2.90 AC

Land Use Summary

Page 14: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Prisma Health

Tuomey Hospital

Medical Office

Buildings

W. Calhoun Street

First

Presbyterian

Church

P

Mid-blockCrossing

Ma

in S

tre

et

Med

ical

Offi

ces

A

Wa

shin

gto

n S

tre

et

**NOTE: These concept plans are ideas for the future. They show potential, but do not guarantee that development will occur, or that the site design will be exactly as shown.

Page 15: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Dow

ntow

n C

ivic

Gre

en

Chamber of Commerce

Judicial Center

Historic Courthouse

Library

N.

Ha

rvin

Str

ee

t

W. Calhoun Street

N.

Ma

in S

tre

et

Canal Street

Liner Buildings

Potential County Office

Amphitheater

Splash Pad

Prisma Health

Tuomey Hospital

Office Building

Small Single-Family

Houses (22)

Townhouses (9)

Church of the

Holy Comforter

First

Presbyterian

Church

P

P

Townhouses

(7)

Lawn

B

Page 16: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Dow

ntow

n C

ivic

Gre

en

Shared Streets

Splash Pad

Page 17: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

S.C.1 Calhoun Street Facing East

S.H.2 Harvin Street Facing North

Stre

et S

ecti

ons

• Removes 2 travel lanes and reduces the width of each

• Adds on-street parking on north side

• Adds a planted median in the left-turn lane

• Increases buffers between sidewalks and travel lanes

• Removes 2 travel lanes and reduces the width of each

• Adds back-in angled parking east side

• Increases buffers between sidewalks and travel lanes

Page 18: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Nei

ghbo

rhoo

d Tr

ansi

tion

Parking

Garage

Hyatt

Place

Prisma Health

Tuomey

Hospital

N.

Wa

shin

gto

n S

tre

et

W. Hampton Avenue

W. Liberty Street

Dugan Street

S.

Su

mte

r S

tre

et

P

P

Townhouses (10)

Single-Family Houses - Multiple Sizes (26)

Single-Family Houses (14)

Single-Family Houses (10)

Multi-Family Units (24)

Commercial Buildings

PMixed-Use Buildings

Commercial Buildings

CSummary• Transition between existing residential

neighborhoods and Downtown

• Uses underutilized properties

• 132 new dwelling units

• 90,000 SF of neighborhood-level retail and services

• Washington Street is made more walkable with bike lanes, wider sidewalks, and on-street parking

• Liberty Street and Sumter Street are updated to improve safety for pedestrians and cyclists and to add on-street parking

**NOTE: These concept plans are ideas for the future. They show potential, but do not guarantee that development will occur, or that the site design will be exactly as shown.

Page 19: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Washington Street

Nei

ghbo

rhoo

d Tr

ansi

tion

Page 20: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Stre

et S

ecti

ons

S.W.1 Washington Street Facing North

• Removes 2 travel lanes and reduces the width of each

• Adds on-street parking on both sides

• Adds a planted median in the left-turn lane

S.S.1 Sumter Street Facing North

• Removes 2 travel lanes and reduces the width of each lane

• Adds on-street parking on east side

• Adds two buffered bike lanes

Page 21: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Stre

et S

ecti

ons

S.L.2 Liberty Street Facing East

• Removes 2 travel lanes and reduces lane width

• Adds on-street parking on both sides

• Widens sidewalks and landscape buffers

Page 22: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Stud

ent L

ivin

g &

CC

TC

Exp

ansi

on

James E. Clyburn

Intermodal

Transportation Center

City

Offices

Potential

Government

Expansion

P

Mixed-Use Buildings (40 units)

P

Townhouses (6; See Liner Buildings, Page #)

CCTC

Parking Deck w/ Liner Building

Multi-Family Units (56)

CCTC ExpansionS

. M

ain

Str

ee

t

S.

Ha

rvin

Str

ee

t

Caldwell Street

E. Bartlette Street

DSummary• Multi-family units and retail space in

mixed-use buildings on Harvin Street

• Townhouses as liner buildings on existing parking lots

• Potential housing for students

• Potential for CCTC expansion on current property

• Harvin Street is improved with on-street parking, wider sidewalks, and a buffered two-way bike lane south of Liberty Street

• E. Liberty Street is improved to connect to recent streetscape improvements

**NOTE: These concept plans are ideas for the future. They show potential, but do not guarantee that development will occur, or that the site design will be exactly as shown.

Page 23: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Stre

et S

ecti

ons

S.H.3 Harvin Street Facing North

• Removes 2 travel lanes and reduces the width of each

• Adds on-street parking

• Adds buffered two-way bike lane

• Increases sidewalk width

S.H.1 Harvin Street Facing North

• Removes 2 travel lanes and reduces the width of each

• Adds on-street parking on both sides

• Widens sidewalks and landscape buffers

Page 24: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

S.L.2 Liberty Street Facing East

• Removes 2 travel lanes

• Adds on-street parking on both sides

• Adds planted median in left-turn lane

• Widens sidewalks and landscape buffers

S.L.1 Liberty Street Facing East

• Removes 2 travel lanes and reduces lane width

• Adds on-street parking on both sides

• Widens sidewalks and landscape buffers

Stre

et S

ecti

ons

Page 25: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Offi

ces &

Mis

sing

Mid

dle

Hou

sing

Shiloh-

Randolph

Manor

Townhouses (24)

Offices

S.

Wa

shin

gto

n S

tre

et

ADUs (14)

Single-Family Houses (8)

Single-Family Houses (10)

Su

mte

r S

tre

et

Offices

E

**NOTE: These concept plans are ideas for the future. They show potential, but do not guarantee that development will occur, or that the site design will be exactly as shown.

Page 26: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Ada

ptiv

e R

e-us

e fo

r th

e Ar

ts

James E. Clyburn

Intermodal

Transportation

Center

P

Ma

in S

tre

et

Bartlette Street

Ha

rvin

Str

ee

t

Arts CenterS

um

ter

Str

ee

t

Sumter

Place

Single-Family Houses (9)

Townhouses (56)

Townhouses (9)

Single-Family Houses (28)

Multi-Family Units (10)

F

**NOTE: These concept plans are ideas for the future. They show potential, but do not guarantee that development will occur, or that the site design will be exactly as shown.

Page 27: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Ada

ptiv

e R

e-us

e fo

r th

e Ar

ts

Main Street

Page 28: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Stre

et S

ecti

ons

S.B.1 Bartlette Street Facing East

• Preserves curb-to-curb width

• Removes 2 travel lanes• Adds on-street parking on

east side• Adds buffered two-way

bike lane

Page 29: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Transportation• Trail connection to Shot Pouch Trail with bike lanes on connecting streets (Liberty, Sumter, Harvin)

• Bike lanes Downtown also create a “loop” in the study area

• Intersection improvements for most intersections to include re-striping crosswalks and making ADA upgrades

• Mid-block crossings with pedestrian hybrid beacons (HAWK signals) on Harvin, Hampton, LibertyO

ther

Rec

omm

enda

tion

s

Page 30: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

IMPLEMENTATION SUMMARY

Page 31: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

How Does this Get Done?• This plan could take more than 20 years to implement

• Some policies and programs may need to be updated to accommodate recommendations set forth in this plan (i.e. zoning changes, expanding the land banking program)

• We’ve highlighted 4 priority projects

• All projects are in a detailed action matrix (pick up a copy of this chapter of the report for more details).Im

plem

enta

tion

Sum

mar

y

Page 32: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

How Does this Get Done?• The City should consider taking over SCDOT-controlled streets to implement streetscape recommendations

• Immediate, short-term steps to test some of the recommendations (re-striping streets, tactical urbanism, colorful crosswalks)

• Social media campaigns to promote downtown events and programming

• Public-private partnerships for development recommendations

Impl

emen

tati

on S

umm

ary

Page 33: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Priority ProjectsIm

plem

enta

tion

Sum

mar

y

Some projects lend themselves to priority implementation because they:• Provide public open space

• Improve connectivity within and around Downtown

• Could be funded with public dollars

• May catalyze future private investment because of the amenities they provide

Page 34: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

1. Property Acquisition (D-1)Acquire the parcels at 201 and 211 W. Hampton Avenue for residential development

Prio

rity

Pro

ject

s

D.2

T.1T.2

W. Calhoun Street

Ma

in S

tre

et

Ha

rvin

Str

ee

t

Su

mte

r S

tre

et

Wa

shin

gto

n S

tre

et

Liberty Street

Bartlette Street

D.1

• Vacant and / or under-utilized land

• Residential units could serve hospital employees and future medical students

• Opportunity for public-private partnership

Page 35: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

2. Streetscape Improvements for Harvin Street (T-1)• Traffic volumes do not support a

four-lane street

• Adding on-street parking will increase parking supply by ~115 spaces

• This street is key to the connection between the Downtown Civic Green (as currently drawn) and Main StreetPr

iori

ty P

roje

cts

D.2

T.1T.2

W. Calhoun Street

Ma

in S

tre

et

Ha

rvin

Str

ee

t

Su

mte

r S

tre

et

Wa

shin

gto

n S

tre

et

Liberty Street

Bartlette Street

D.1

Page 36: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Prio

rity

Pro

ject

s3. Streetscape Improvements for Washington Street (T-2)• Bridges the connection between

the residential neighborhoods and Downtown

• Traffic volumes do not support a four-lane street

• Adding on-street parking will increase parking supply by ~150 spaces

• The City of Sumter is currently upgrading 3 intersections to comply with ADA requirements

D.2

T.1T.2

W. Calhoun Street

Ma

in S

tre

et

Ha

rvin

Str

ee

t

Su

mte

r S

tre

et

Wa

shin

gto

n S

tre

et

Liberty Street

Bartlette Street

D.1

Page 37: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Prio

rity

Pro

ject

s4. Downtown Civic Green (D-2)• Public feedback and analysis

uncovered a need for a large public park space Downtown

• Many of the County buildings on the site are under-utilized

• Location may change depending on Sumter County government’s needs

• Adding to the green space around the Historic Courthouse provides direct connection to Main Street

D.2

T.1T.2

W. Calhoun Street

Ma

in S

tre

et

Ha

rvin

Str

ee

t

Su

mte

r S

tre

et

Wa

shin

gto

n S

tre

et

Liberty Street

Bartlette Street

D.1

Page 38: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

NEXT STEPS

Page 39: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

Next StepsTOMORROW City Council Presentation - TSWJune 4, 2019 at 1:00 PM

Revise Master Plan Draft - TSWSubmit to City of Sumter by end of June

City Council Approval - City of Sumter Planning Department(if additional meeting required) Date and Time TBD

Page 40: SUMTER DOWNTOWN MASTER PLAN FINAL PLAN OPEN HOUSE · Opera House Site-Specific Concept Plans Medical Offices Downtown Civic Green ... • We’ve highlighted 4 priority projects •

THANK YOU! +